Ananda-Lilly

POSA · Rangareddy · RERA P02400003783

ANANDA-LILLY is a residential apartment project at plots 62&63, Sector-I, H Block, Neknampur, Gandipet Mandal, Ranga Reddy District. The registered promoter is Posa Venkata Sreenivasulu. The project has a land area of 334.45 sq. m., one building described as 1 stilt + 5 upper floors, and 10 proposed 2BHK units, each with a RERA-filed saleable area of 107.3 sq. m. Its TG-RERA registration number is P02400003783, and the proposed completion date recorded in the project fields is 30/11/2022.

01What we found

Period endedTG-RERA registration ran to 30 Nov 2022 - check its extension on TG-RERA
11documents on file - each fact links to its page
3court cases on this project's land (survey 81, 101, Narsingi)
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameANANDA-LILLY
Project type / phaseResidential apartment project; registered phase or portion is not separately identified in the supplied record. RERA record
TG-RERA registrationP02400003783; granted under section 5.
Registration validity20/12/2021 to 30/11/2022; the certificate records no extension. This is registration validity, not the completion undertaking or an occupancy certificate.
Registered promoterCertificate names Posa Venkata Sreenivasulu; the project record identifies the promoter as POSA. RERA record
RERA status in supplied recordRegistration certificate issued; its recorded validity ended 30/11/2022. Current registration status is not established by the supplied documents.

Land and geographic identity

ItemRecord
Locality / plotNeknampur, plots 62&63, Sector-I, H Block; the filed project address also gives NEKNAMPUR.
Revenue villageNeknampur / Narsingi: the approval and certificate use Neknampur; the project identity record lists Narsingi. RERA record
Mandal / district / PINGandipet; Ranga Reddy; 500089. RERA record
Project survey numbers81, 82, 101. No subdivision is specified in the project approval or RERA certificate.
Registered site extent334.45 sq. m.
Filed land areaTotal area and net area each recorded as 334.45 sq. m.; affected area recorded as 0. RERA filing
BoundariesNorth: 30 -0 WIDE ROAD; South: PLOT NO 69 AND 68; East: PLOT NO 64; West: PLOT NO 61. RERA filing

Development identity

ItemRecord
Technical approval authorityHyderabad Metropolitan Development Authority (HMDA); the technical approval directs the applicant to seek sanction/release from the Executive Authority, identified as Manikonda Municipality in the filed approval.
Principal approval026218/SKP/R1/U6/HMDA/24072019, approved 11/09/2019; RERA-filed approval record. Approvals record
Subsequent technical approval041615/SKP/R1/U6/HMDA/04012021, dated 03/08/2021; the filed document describes 1 stilt + 5 upper floors. Approvals record
Approved built-up areaThe later technical approval records Total Built up Area (In Sq.mts) 1097.4. Its component figures include Built up Area 914.5; the earlier technical approval records Total Built up Area (In Sq.mts) 914.5. These are figures recorded in the respective approvals.
Building / floorsOne building is recorded in the RERA fields; the later HMDA technical approval describes 1Stilt + 5 Upper floors. RERA filing
Parking provisionThe filed technical approval lists STILT FLOOR PARKING; a parking-space count or unit allocation is not established in the supplied records.
Unit countsRERA fields record 10 total building units and 10 proposed units as per agreement; the filed configuration records also total 10 units. RERA filing RERA unit table

Offering and status

ItemRecord
Unit type2BHK; the RERA filing spells the configuration in three variants: “DOUBLE BED ROOM,” “DOUBLE BEDROOM,” and “DOUBLE BEDRROM.” RERA unit table
RERA-filed saleable area107.3 sq. m. per unit. RERA unit table
Booked / availablePortal-derived count: 0 booked / 10 available, with no as-of date attached to the booking record; treat as indicative. RERA unit table
Completion datesRERA project fields state proposed completion 30/11/2022; the Form B declaration states completion by 20/11/2023. RERA record
Construction stageThe supplied records contain declared amenity/progress percentages but no independently verified site-construction assessment. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents. The HMDA technical approval states that an occupancy certificate is compulsory before occupation. Document index

2. The project story

ANANDA-LILLY is registered as a residential apartment project at plots 62&63, Sector-I, H Block, Neknampur, on survey numbers 81, 82 and 101. The filed land extent is 334.45 sq. m. The project record describes one residential building and 10 proposed 2BHK units. RERA filing RERA unit table

The RERA registration certificate ran from 20/12/2021 to 30/11/2022. The project record gives 30/11/2022 as the proposed completion date, while the Form B declaration gives 20/11/2023 as the promoter’s completion undertaking. These are recorded separately; neither establishes actual completion. The supplied pack does not establish construction completion or an issued occupancy certificate. RERA record

3. Master plan, architecture & building design

The principal HMDA technical approval is for a residential building on plots 62&63 in survey numbers 81, 82 and 101. The later technical approval, dated 03/08/2021, describes 1 stilt + 5 upper floors and records Total Built up Area (In Sq.mts) 1097.4; it also records Built up Area 914.5 and building height 14.9. The supplied extract does not identify those area figures as carpet area or saleable area.

The earlier technical approval describes a stilt plus four upper floors and records Residential Net BUA 731.61 and Total Proposed Net BUA Area 731.61. The supplied extracts therefore document more than one technical approval description; this overview reports the figures as recorded in each approval and does not infer which drawing set governs current construction.

The earlier plan lists a 1.0M WIDE GREEN STRIP and stilt-floor parking. The later approval lists a tot-lot, transformer, garbage house and rain-water-harvesting structures. Two floor-plan drawings are recorded, but both remain unmeasured scans; there is no supplied drawing-derived account of floor layouts, flats per floor, lift/stair arrangements, circulation or building footprint. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010107.3 sq. m.Not measured from the supplied drawingsNot supplied

The 10 RERA-filed units are recorded across three spelling variants of the same configuration: DOUBLE BED ROOM (2), DOUBLE BEDROOM (7), and DOUBLE BEDRROM (1). The booking counts are portal-derived and have no recorded as-of date. RERA unit table RERA unit table

The two floor-plan drawings are listed as scans pending measurement, so no software-measured carpet or room dimensions are available. The RERA-filed saleable area is not presented as carpet area; no RERA-filed carpet area or loading figure is supplied. Floor plans RERA unit table

5. Parking & vehicle circulation

The filed plan identifies STILT FLOOR PARKING, and the later HMDA technical approval requires the stilt/cellar area to be used exclusively for vehicle parking without partition walls. The supplied records do not establish a count of car or two-wheeler spaces, visitor or accessible parking, ramp or driveway arrangements, EV charging, or legally documented parking allocation to individual units.

6. Amenities, recreation & open spaces

The table below reflects RERA-filed amenity entries and approval-document provisions. The percentages are the values recorded in the supplied amenity data; they are not independent verification of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot lot / parkTot-lot to be fenced and maintained as greenery; no size supplied.RERA amenitiesRERA amenity entry: 50%; completion not independently verified.
Aggregate recreational open spaceArea not supplied.RERA amenitiesRERA amenity entry: 30%; completion not independently verified.
Community buildingsNo facility or size disclosed.RERA amenities0% recorded.
Internal roads & footpathsNo dimensions supplied.RERA amenities0% recorded.

No supplied project-specific RERA amenity record establishes a clubhouse, gym, pool or other indoor/sports facility as sanctioned or delivered.

7. Utilities, building services & safety

ServiceSupplied project record
WaterRERA amenity entries record water supply at 75%. The later HMDA technical approval specifies a separate underground static water-storage tank of 25, 000 Its. Capacity and a separate terrace tank of 25,000 Its. Capacity for residential buildings. RERA amenities
Sewerage and drainageThe amenity record lists sewerage (chamber, lines, septic tank, STP) at 70%, treatment and disposal of sewage and sullage water at 60%, and storm-water drains at 75%. The earlier plan lists a septic tank. RERA amenities
RainwaterRain-water harvesting is listed in the technical approvals; water conservation/rainwater harvesting is recorded at 80% in the RERA amenity data. RERA amenities
ElectricityThe approval requires provisions for a transformer; the amenity record lists electrical meter room, sub-station and receiving station at 80%. RERA amenities
WasteA garbage house is required by the technical approval. Solid-waste management and disposal is recorded at 70% in the amenity data. RERA amenities
Fire and safetyFire protection and fire-safety requirements are recorded at 80% in the amenity data. The approval also places responsibility for structural safety and compliance with the National Building Code on the applicant. These records do not independently establish completed systems or statutory clearances. RERA amenities
Lifts, backup, security and accessibilityNo project-specific approved or RERA-filed capacities or arrangements are established in the supplied documents. Document index

8. Location, access & connectivity

The registered location is Neknampur, Gandipet Mandal, Ranga Reddy District, Telangana, PIN 500089; the project record also identifies Narsingi as the revenue village. The approval identifies a 9.0 M WIDE NORTH ROAD and a 9.0 M WIDE MAINROAD in the plan extract. RERA record

Supplied location data gives these measured distances: Sankaraya Eye Hospital 0.6 km; unnamed park 0.1 km; unnamed school 1.4 km; ICICI Bank 1.6 km; Microchip Hyderabad 1.7 km; Holy Mary College 2.1 km; and Financial District (Nanakramguda) 2.2 km. No public-transport distance or travel-time evidence is supplied. Location record

9. Developer & development status

The TG-RERA certificate names the promoter as Posa Venkata Sreenivasulu and gives the promoter office as FLAT NO 201 1ST FLOOR PLOT NO 94,95,105,106, Village: Neknapur, Mandal: Gandipet, District: Ranga Reddy, Pin: 500089 State of Telangana. Legal entity type, corporate identifier, official contact details and official website are not established in the supplied record. Corporate record

The Form B declaration by P.V. Sreenivasulu states that the project would be completed by 20/11/2023. The supplied information does not establish actual construction completion, current site progress, or an issued occupancy certificate. Document index

10. Approvals, official records & documents

RecordWhat the supplied record establishes
TG-RERA registration certificate, P02400003783FORM C registration for ANANDA-LILLY, valid 20/12/2021–30/11/2022; no extension is recorded on the certificate.
HMDA technical approval, 026218/SKP/R1/U6/HMDA/24072019, dated 11/09/2019Technical approval for a residential building at plots 62&63, survey numbers 81, 82 and 101; the extract says plans were forwarded to the Municipality/Local Body for final sanction.
HMDA technical approval, 041615/SKP/R1/U6/HMDA/04012021, dated 03/08/2021Later technical approval describing 1 stilt + 5 upper floors and directing the applicant to approach Manikonda Municipality for sanction and release.
Encumbrance statementRERA-filed encumbrance statement 68355971, with a stated search period of 01-01-1983 to 14-11-2021.
Form B declarationPromoter declaration for ANANDA LILLY concerning title, encumbrances, project funds, approvals and completion undertaking.
Occupancy certificateNo occupancy or completion certificate is present in the supplied documents. Document index

Frequently asked questions

Is ANANDA-LILLY registered with Telangana RERA?

Yes. ANANDA-LILLY is registered with the Telangana Real Estate Regulatory Authority as P02400003783; the registration status is New Project.

Who is the developer of ANANDA-LILLY?

The promoter named in the RERA registration is POSA.

Where is ANANDA-LILLY located?

ANANDA-LILLY is in NEKNAMPUR, Narsingi, Gandipet, Rangareddy, Telangana (500089).