ORGANO DEEPALLE is a residential apartment project in Deepalle, Nawabpet mandal, Mahabubnagar district, developed by the registered promoter ORGANO COSMOSGREEN PRIVATE LIMITED. The registered site extent is 52,482.27 sq. m, and the project comprises ten residential blocks recorded as Ground Floor + 1 Floor, with 73 total building units and 73 proposed units as per agreement. The RERA-filed configurations include 70 2BHK units and 1 1BHK unit. Its TG-RERA registration number is P01400010035, valid 18/08/2025–17/08/2028; the promoter’s Form-B completion undertaking is 17-08-2028.
More from Organo Cosmosgreen Pvt Ltd · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | ORGANO DEEPALLE RERA record |
| Project type | Residential apartment project; the filed building permit describes a G+1 apartment/group-housing scheme with agriculture farming RERA record |
| Phase / registered portion | Phase is not separately identified in the supplied registration record. TG-RERA treats each phase as a standalone project where development is phased |
| TG-RERA registration | P01400010035 RERA record |
| Registration validity | 18/08/2025–17/08/2028; registration validity is separate from the completion undertaking and the building-permit completion date |
| Registered promoter | ORGANO COSMOSGREEN PRIVATE LIMITED, company RERA record Corporate record |
| RERA status | Registered; the supplied Form C certificate records the above registration and validity |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Deepalle (also rendered Depalle in the registration certificate); locality is Deepalle RERA record |
| Mandal | Nawabpet RERA record |
| District | Mahabubnagar RERA record |
| PIN | 509340 RERA record |
| Project survey numbers | 47, 61, 66, 67, 68; the supplied project records do not state project-specific subdivisions for these survey numbers RERA record Land records |
| Registered site extent | 52,482.27 sq. m RERA filing |
| Approved total / net plot area | 52,482.27 sq. m; building permit records road-affected area 0 sq. m and NALA-affected area 0 sq. m |
| Boundaries recorded in project information | East: vacant land; West: 12MTS road; North: vacant land; South: vacant land RERA filing |
Development identity
| Field | Record |
|---|---|
| Building-permit authority / principal approval | Building Permit Order 0350/HMDA/SWBP/2025, approved 18/08/2025; the extracted order identifies Deepalle Gram Panchayat as issuing authority and the approval record identifies HMDA Approvals record |
| Related file number | 003406/HMDA/00982/SWBP/SKP1/2025 Approvals record |
| Approved built-up area | The plan extraction reports proposed BUA 10,558.46 sq. m excluding parking and 12,979.37 sq. m including parking. Other plan excerpts give block-level gross and net BUA; these are not carpet or saleable areas |
| Buildings | The permit extraction lists residential BLOCK 1 through BLOCK-10, plus ground-floor SECURITY and EMR&EMO; buildings |
| Sanctioned floors / height | Residential blocks are recorded as Ground Floor + 1 Floor; proposed height 7.8 m. Security and EMR&EMO; are ground-floor structures, with extracted heights 3.52 m and 3.15 m, respectively |
| Parking provision in plan | Parking area 2,420.91 sq. m; visitor parking area 216.40 sq. m; onsite parking 2,637.30 (unit not stated in the extracted field) |
| Approved / RERA-declared unit counts | Plan extraction lists unit counts by blocks, including BLOCK 1: 6, BLOCK-2: 6, BLOCK-3: 8, BLOCK-4: 9, BLOCK-5 through BLOCK-10: 7 each. TG-RERA project information records 73 total building units and 73 proposed units as per agreement RERA filing |
| Commencement / completion status in records | Permit states construction to commence before 14/02/2026 and complete before 18/08/2028. No completion certificate or occupancy certificate is supplied; the permit requires an occupancy certificate before occupation |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configurations | 2BHK: 70 units; 1BHK: 1 unit; one additional row is filed verbatim as EMR and its configuration is not interpreted here RERA unit table RERA unit details |
| RERA-filed saleable area | 148.71 sq. m for both filed 1BHK and 2BHK entries; the EMR row is 294.24 sq. m RERA unit table RERA unit details |
| Booking / availability | Portal-derived counts show 0 booked and 70 available 2BHKs, 0 booked and 1 available 1BHK, and 0 booked and 1 available EMR row. Counts are indicative: the supplied portal record has no as-of date RERA unit table RERA unit details |
| Construction stage | The supplied records establish a building permit but do not provide independently verified site progress or a completed-building certificate RERA amenities |
| Completion dates | Permit completion-before date: 18/08/2028; promoter’s Form-B completion undertaking: 17-08-2028 |
| Occupancy certificate | Not supplied. The permit states an occupancy certificate is compulsory before occupation and before registration of mortgaged built-up area |
2. The project story
ORGANO DEEPALLE is registered as a residential apartment project in Deepalle village, Nawabpet mandal, Mahabubnagar district. The registered land schedule names survey numbers 47, 61, 66, 67 and 68 and records a site area of 52,482.27 sq. m. The building-permit material describes a G+1 group-housing development with agriculture farming and ten residential blocks, together with separate ground-floor security and EMR&EMO; structures. RERA record RERA filing
The RERA unit table includes 70 2BHK entries and one 1BHK entry. It also contains an EMR row that the supplied data does not classify as a home configuration, so it is not presented as a saleable apartment type here. The portal-derived booking counts show none booked at the last read, but the record gives no as-of date. RERA unit details RERA unit table
The project is permitted for construction, but the evidence supplied does not establish actual construction progress, completion, or an occupancy-certified portion. The permit records a completion-before date of 18/08/2028; the promoter’s Form-B affidavit undertakes completion by 17-08-2028.
3. Master plan, architecture & building design
The building-permit extraction records a total and net plot area of 52,482.27 sq. m, with proposed coverage area of 9,723.79 sq. m and vacant plot area of 40,182.43 sq. m. It records proposed built-up area of 10,558.46 sq. m excluding parking and 12,979.37 sq. m including parking. The permit excerpts separately label block-level gross and net BUA; these figures should not be treated as saleable or carpet area.
The building-permit records show ten G+1 residential blocks. Extracted heights for residential blocks are 7.8 m. The permit lists separate ground-floor SECURITY and EMR&EMO; buildings. The plan extraction includes roads of 12.0 m and a 6m Wide Drive Way; it also identifies 12m Wide Main Road. The supplied material does not establish a verified site arrangement drawing, block-to-block placement, landscape-area allocation, or completed internal circulation.
The filed plan lists residential group housing and, within its conditions and utility schedule, tot-lot, rainwater harvesting structure, transformer space, garbage house, STP/WTP and other service labels. These are plan-recorded or conditionally required items, not evidence that installation or completion has been independently verified.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK | 1 | 0 | 1 | 148.71 sq. m | 59.6–63.4 sq. m; median 61.4 sq. m (software-measured from drawings) | 59% (supplied measurement record) |
| 2BHK | 70 | 0 | 70 | 148.71 sq. m | Not supplied | Not supplied |
| EMR (configuration not interpreted) | 1 row | 0 | 1 | 294.24 sq. m | Not supplied | Not supplied |
RERA saleable areas and unit counts are from the project filing; booking and availability counts are indicative because the supplied portal record has no as-of date. The additional EMR entry is quoted as filed and is not asserted to be a residential configuration. RERA unit details RERA unit table
The 1BHK drawing measurements are software-measured from supplied approved-plan drawings, not RERA-filed carpet-area disclosures, and are marked as needing review. The drawing record identifies a bedroom, dining and kitchen, lobby, toilet/WC, open-to-air balcony and utility/balcony spaces; the supplied example gives lobby dimensions of 1.5 × 3.22 m, WC dimensions of 1.5 × 1.2 m, and balcony dimensions of 2.0 × 3.6 m and 2.08 × 1.25 m. Balcony and utility areas are excluded from the measured carpet area. Verify measurements against the drawing and the executed agreement. RERA unit details Floor plans
Carpet area measured from a drawing is not the same as RERA-filed saleable area: the supplied measurement notes say saleable area includes the home’s share of common areas. No measured carpet area is supplied for the 2BHK entry. RERA unit details Floor plans
5. Parking & vehicle circulation
The plan extraction records 2,420.91 sq. m of parking area and 216.40 sq. m of visitor parking area, against a stated required visitor parking area of 214.46 (10.00%). It separately records onsite parking as 2,637.30, without a unit in the extracted field. These are plan-recorded areas/figures, not a count of individual bays.
The supplied records do not give the number of car or two-wheeler spaces, accessible spaces, parking levels, ramp configuration, EV charging-point count, or unit-specific parking allocation. The plan conditions state parking areas are to be used exclusively for vehicle parking and refer to electric-vehicle charging infrastructure; they do not establish completed charging facilities or an exclusive parking right for a particular apartment.
6. Amenities, recreation & open spaces
| Description / size | Listed as a plan amenity; no area or capacity supplied |
|---|---|
| Declared progress / verified status | Plan/condition record; completion not independently verified |
| Description / size | Percolation pit; permit extraction states 1 rainwater-harvesting pit |
|---|---|
| Declared progress / verified status | Permit record; completion not independently verified |
| Description / size | 2,615 trees listed in the permit extraction; plan conditions also refer to tree planting and maintaining greenery |
|---|---|
| Declared progress / verified status | Permit/condition record; planting progress not independently verified |
| Description / size | Ground floor; extracted height 3.52 m |
|---|---|
| Declared progress / verified status | Included in building-permit record; completion not established |
| Description / size | Ground floor; extracted net BUA 294.24 sq. m and height 3.15 m |
|---|---|
| Declared progress / verified status | Included in plan extraction; completion not established |
| Description / size | No project-specific RERA-filed facility, size or capacity is established in the supplied evidence |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Not established as sanctioned or delivered by the supplied records |
The TG-RERA amenity table marks water supply, sewerage/STP, storm-water drains, rainwater harvesting and an electrical meter room/sub-station as available “YES,” while the progress percentages shown for listed items are 0. These are filed amenity-table entries, not independent verification of operational completion. RERA amenities
7. Utilities, building services & safety
The RERA amenity table records water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, rainwater harvesting and an electrical meter room/sub-station as “YES”; its listed progress percentages are 0. The supplied plan extraction also names WTP, STP, sewage treatment, wastewater reuse, transformer space and garbage house. No capacities, sources, operating status or independent commissioning evidence are supplied. RERA amenities
The building-permit conditions require a rainwater-harvesting percolation pit, transformer space and a garbage house. The plan materials refer to electric-vehicle charging infrastructure and dual piping, and the approval conditions address fire-safety systems, escape safety and fire NOC before occupancy certification. These are permit provisions/conditions, not proof that the facilities have been installed or that clearances have been obtained.
The supplied evidence does not specify lift or service-lift numbers/capacities, backup-power capacity, water-storage capacity, STP/WTP capacity, fire-equipment specifications, CCTV/access-control provision, or accessible apartment/common-area features. No occupancy certificate is supplied; the permit states that an occupancy certificate is required before occupation. RERA amenities
8. Location, access & connectivity
The registered project location is Deepalle/Depalle village, Nawabpet mandal, Mahabubnagar district, PIN 509340. The building-permit material describes a 12.0 m road and a 6m Wide Drive Way; the project-information record describes a 12MTS road on the western boundary. RERA record RERA filing
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 45.7 km; this is a sampled distance, not a travel-time estimate. The project evidence does not provide measured distances to public transport, schools, airports, hospitals or other landmarks. Location record
9. Developer & development status
The registered promoter is ORGANO COSMOSGREEN PRIVATE LIMITED, a company, with GSTIN 36AAECO2730L1ZD. The supplied promoter address is B, Khairatabad, Depalle/Deepalle, Nawabpet, Mahabubnagar, 509340; a project website is listed at https://www.organo.co.in/depalle. Corporate record Parties record
The project Form-B declaration is signed by B. Nagesh Kumar and dated 19.08.2025. It declares legal title to the project land, states that the land is free from encumbrances, and undertakes completion by 17-08-2028. These are promoter declarations in the filed affidavit, not independent title or construction verification.
The building permit records completion before 18/08/2028, while the RERA registration certificate is valid through 17/08/2028. No completion or occupancy certificate is included in the supplied documents.
10. Approvals, official records & documents
| Identifier / date | P01400010035; valid 18/08/2025–17/08/2028 |
|---|---|
| What the supplied evidence establishes | Registration of ORGANO DEEPALLE under ORGANO COSMOSGREEN PRIVATE LIMITED |
| Identifier / date | 0350/HMDA/SWBP/2025; 18/08/2025 |
|---|---|
| What the supplied evidence establishes | Building-permit record for the G+1 group-housing development on survey numbers 47, 61, 66, 67 and 68 |
| Identifier / date | 003406/HMDA/00982/SWBP/SKP1/2025 |
|---|---|
| What the supplied evidence establishes | Appears in the permit/layout-plan extracts |
| Identifier / date | Mortgage Deed 10580/2025, dated 14/08/2025 |
|---|---|
| What the supplied evidence establishes | Permit extraction records built-up area mortgaged in favour of the Metropolitan Commissioner, HMDA; permit states mortgaged built-up area may be registered only after an occupancy certificate |
| Identifier / date | 19.08.2025 |
|---|---|
| What the supplied evidence establishes | Promoter’s title, encumbrance and completion declarations for the project |
| Identifier / date | Documents 590824, 590825, 590826 |
|---|---|
| What the supplied evidence establishes | Extracted plan information includes block floors, areas, units, roads, parking and stated utilities/conditions |
| Identifier / date | Document 590793 |
|---|---|
| What the supplied evidence establishes | Permit conditions include commencement notice, completion notice and occupancy-certificate requirements; the extracted record states completion is not certified |
| Identifier / date | Not supplied |
|---|---|
| What the supplied evidence establishes | The supplied records do not establish an issued OC or completion certificate |
The approved-layout lookup is reported as unavailable through the public HMDA DPMS channel in the supplied HMDA record; that access limitation does not itself establish that approval was refused. HMDA
1. Project at a glance
Project identity
Registered project name: ORGANO DEEPALLE
Project type: Residential apartment project; the filed building permit describes a G+1 apartment/group-housing scheme with agriculture farming
Phase / registered portion: Phase is not separately identified in the supplied registration record. TG-RERA treats each phase as a standalone project where development is phased
TG-RERA registration: P01400010035
Registration validity: 18/08/2025–17/08/2028; registration validity is separate from the completion undertaking and the building-permit completion date
Registered promoter: ORGANO COSMOSGREEN PRIVATE LIMITED, company
RERA status: Registered; the supplied Form C certificate records the above registration and validity
Land and geographic identity
Locality / revenue village: Deepalle (also rendered Depalle in the registration certificate); locality is Deepalle
Mandal: Nawabpet
District: Mahabubnagar
PIN: 509340
Project survey numbers: 47, 61, 66, 67, 68; the supplied project records do not state project-specific subdivisions for these survey numbers
Registered site extent: 52,482.27 sq. m
Approved total / net plot area: 52,482.27 sq. m; building permit records road-affected area 0 sq. m and NALA-affected area 0 sq. m
Boundaries recorded in project information: East: vacant land; West: 12MTS road; North: vacant land; South: vacant land
Development identity
Building-permit authority / principal approval: Building Permit Order 0350/HMDA/SWBP/2025, approved 18/08/2025; the extracted order identifies Deepalle Gram Panchayat as issuing authority and the approval record identifies HMDA
Related file number: 003406/HMDA/00982/SWBP/SKP1/2025
Approved built-up area: The plan extraction reports proposed BUA 10,558.46 sq. m excluding parking and 12,979.37 sq. m including parking. Other plan excerpts give block-level gross and net BUA; these are not carpet or saleable areas
Buildings: The permit extraction lists residential BLOCK 1 through BLOCK-10, plus ground-floor SECURITY and EMR&EMO; buildings
Sanctioned floors / height: Residential blocks are recorded as Ground Floor + 1 Floor; proposed height 7.8 m. Security and EMR&EMO; are ground-floor structures, with extracted heights 3.52 m and 3.15 m, respectively
Parking provision in plan: Parking area 2,420.91 sq. m; visitor parking area 216.40 sq. m; onsite parking 2,637.30 (unit not stated in the extracted field)
Approved / RERA-declared unit counts: Plan extraction lists unit counts by blocks, including BLOCK 1: 6, BLOCK-2: 6, BLOCK-3: 8, BLOCK-4: 9, BLOCK-5 through BLOCK-10: 7 each. TG-RERA project information records 73 total building units and 73 proposed units as per agreement
Commencement / completion status in records: Permit states construction to commence before 14/02/2026 and complete before 18/08/2028. No completion certificate or occupancy certificate is supplied; the permit requires an occupancy certificate before occupation
Offering and status
RERA-filed configurations: 2BHK: 70 units; 1BHK: 1 unit; one additional row is filed verbatim as EMR and its configuration is not interpreted here
RERA-filed saleable area: 148.71 sq. m for both filed 1BHK and 2BHK entries; the EMR row is 294.24 sq. m
Booking / availability: Portal-derived counts show 0 booked and 70 available 2BHKs, 0 booked and 1 available 1BHK, and 0 booked and 1 available EMR row. Counts are indicative: the supplied portal record has no as-of date
Construction stage: The supplied records establish a building permit but do not provide independently verified site progress or a completed-building certificate
Completion dates: Permit completion-before date: 18/08/2028; promoter’s Form-B completion undertaking: 17-08-2028
Occupancy certificate: Not supplied. The permit states an occupancy certificate is compulsory before occupation and before registration of mortgaged built-up area
2. The project story
ORGANO DEEPALLE is registered as a residential apartment project in Deepalle village, Nawabpet mandal, Mahabubnagar district. The registered land schedule names survey numbers 47, 61, 66, 67 and 68 and records a site area of 52,482.27 sq. m. The building-permit material describes a G+1 group-housing development with agriculture farming and ten residential blocks, together with separate ground-floor security and EMR&EMO; structures.
The RERA unit table includes 70 2BHK entries and one 1BHK entry. It also contains an EMR row that the supplied data does not classify as a home configuration, so it is not presented as a saleable apartment type here. The portal-derived booking counts show none booked at the last read, but the record gives no as-of date.
The project is permitted for construction, but the evidence supplied does not establish actual construction progress, completion, or an occupancy-certified portion. The permit records a completion-before date of 18/08/2028; the promoter’s Form-B affidavit undertakes completion by 17-08-2028.
3. Master plan, architecture & building design
The building-permit extraction records a total and net plot area of 52,482.27 sq. m, with proposed coverage area of 9,723.79 sq. m and vacant plot area of 40,182.43 sq. m. It records proposed built-up area of 10,558.46 sq. m excluding parking and 12,979.37 sq. m including parking. The permit excerpts separately label block-level gross and net BUA; these figures should not be treated as saleable or carpet area.
The building-permit records show ten G+1 residential blocks. Extracted heights for residential blocks are 7.8 m. The permit lists separate ground-floor SECURITY and EMR&EMO; buildings. The plan extraction includes roads of 12.0 m and a 6m Wide Drive Way; it also identifies 12m Wide Main Road. The supplied material does not establish a verified site arrangement drawing, block-to-block placement, landscape-area allocation, or completed internal circulation.
The filed plan lists residential group housing and, within its conditions and utility schedule, tot-lot, rainwater harvesting structure, transformer space, garbage house, STP/WTP and other service labels. These are plan-recorded or conditionally required items, not evidence that installation or completion has been independently verified.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK | 1 | 0 | 1 | 148.71 sq. m | 59.6–63.4 sq. m; median 61.4 sq. m (software-measured from drawings) | 59% (supplied measurement record) |
| 2BHK | 70 | 0 | 70 | 148.71 sq. m | Not supplied | Not supplied |
| EMR (configuration not interpreted) | 1 row | 0 | 1 | 294.24 sq. m | Not supplied | Not supplied |
RERA saleable areas and unit counts are from the project filing; booking and availability counts are indicative because the supplied portal record has no as-of date. The additional EMR entry is quoted as filed and is not asserted to be a residential configuration.
The 1BHK drawing measurements are software-measured from supplied approved-plan drawings, not RERA-filed carpet-area disclosures, and are marked as needing review. The drawing record identifies a bedroom, dining and kitchen, lobby, toilet/WC, open-to-air balcony and utility/balcony spaces; the supplied example gives lobby dimensions of 1.5 × 3.22 m, WC dimensions of 1.5 × 1.2 m, and balcony dimensions of 2.0 × 3.6 m and 2.08 × 1.25 m. Balcony and utility areas are excluded from the measured carpet area. Verify measurements against the drawing and the executed agreement.
Carpet area measured from a drawing is not the same as RERA-filed saleable area: the supplied measurement notes say saleable area includes the home’s share of common areas. No measured carpet area is supplied for the 2BHK entry.
5. Parking & vehicle circulation
The plan extraction records 2,420.91 sq. m of parking area and 216.40 sq. m of visitor parking area, against a stated required visitor parking area of 214.46 (10.00%). It separately records onsite parking as 2,637.30, without a unit in the extracted field. These are plan-recorded areas/figures, not a count of individual bays.
The supplied records do not give the number of car or two-wheeler spaces, accessible spaces, parking levels, ramp configuration, EV charging-point count, or unit-specific parking allocation. The plan conditions state parking areas are to be used exclusively for vehicle parking and refer to electric-vehicle charging infrastructure; they do not establish completed charging facilities or an exclusive parking right for a particular apartment.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / recreational open space | Listed as a plan amenity; no area or capacity supplied | Plan/condition record; completion not independently verified | |
| Rainwater harvesting | Percolation pit; permit extraction states 1 rainwater-harvesting pit | Permit record; completion not independently verified | |
| Trees / planting | 2,615 trees listed in the permit extraction; plan conditions also refer to tree planting and maintaining greenery | Permit/condition record; planting progress not independently verified | |
| Security building | Ground floor; extracted height 3.52 m | Included in building-permit record; completion not established | |
| EMR&EMO; building | Ground floor; extracted net BUA 294.24 sq. m and height 3.15 m | Included in plan extraction; completion not established | |
| Indoor / clubhouse, sports and recreation facilities | No project-specific RERA-filed facility, size or capacity is established in the supplied evidence | Not established as sanctioned or delivered by the supplied records |
The TG-RERA amenity table marks water supply, sewerage/STP, storm-water drains, rainwater harvesting and an electrical meter room/sub-station as available “YES,” while the progress percentages shown for listed items are 0. These are filed amenity-table entries, not independent verification of operational completion.
7. Utilities, building services & safety
The RERA amenity table records water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, rainwater harvesting and an electrical meter room/sub-station as “YES”; its listed progress percentages are 0. The supplied plan extraction also names WTP, STP, sewage treatment, wastewater reuse, transformer space and garbage house. No capacities, sources, operating status or independent commissioning evidence are supplied.
The building-permit conditions require a rainwater-harvesting percolation pit, transformer space and a garbage house. The plan materials refer to electric-vehicle charging infrastructure and dual piping, and the approval conditions address fire-safety systems, escape safety and fire NOC before occupancy certification. These are permit provisions/conditions, not proof that the facilities have been installed or that clearances have been obtained.
The supplied evidence does not specify lift or service-lift numbers/capacities, backup-power capacity, water-storage capacity, STP/WTP capacity, fire-equipment specifications, CCTV/access-control provision, or accessible apartment/common-area features. No occupancy certificate is supplied; the permit states that an occupancy certificate is required before occupation.
8. Location, access & connectivity
The registered project location is Deepalle/Depalle village, Nawabpet mandal, Mahabubnagar district, PIN 509340. The building-permit material describes a 12.0 m road and a 6m Wide Drive Way; the project-information record describes a 12MTS road on the western boundary.
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 45.7 km; this is a sampled distance, not a travel-time estimate. The project evidence does not provide measured distances to public transport, schools, airports, hospitals or other landmarks.
9. Developer & development status
The registered promoter is ORGANO COSMOSGREEN PRIVATE LIMITED, a company, with GSTIN 36AAECO2730L1ZD. The supplied promoter address is B, Khairatabad, Depalle/Deepalle, Nawabpet, Mahabubnagar, 509340; a project website is listed at https://www.organo.co.in/depalle.
The project Form-B declaration is signed by B. Nagesh Kumar and dated 19.08.2025. It declares legal title to the project land, states that the land is free from encumbrances, and undertakes completion by 17-08-2028. These are promoter declarations in the filed affidavit, not independent title or construction verification.
The building permit records completion before 18/08/2028, while the RERA registration certificate is valid through 17/08/2028. No completion or occupancy certificate is included in the supplied documents.
10. Approvals, official records & documents
| Identifier / date | P01400010035; valid 18/08/2025–17/08/2028 |
|---|---|
| What the supplied evidence establishes | Registration of ORGANO DEEPALLE under ORGANO COSMOSGREEN PRIVATE LIMITED |
| Identifier / date | 0350/HMDA/SWBP/2025; 18/08/2025 |
|---|---|
| What the supplied evidence establishes | Building-permit record for the G+1 group-housing development on survey numbers 47, 61, 66, 67 and 68 |
| Identifier / date | 003406/HMDA/00982/SWBP/SKP1/2025 |
|---|---|
| What the supplied evidence establishes | Appears in the permit/layout-plan extracts |
| Identifier / date | Mortgage Deed 10580/2025, dated 14/08/2025 |
|---|---|
| What the supplied evidence establishes | Permit extraction records built-up area mortgaged in favour of the Metropolitan Commissioner, HMDA; permit states mortgaged built-up area may be registered only after an occupancy certificate |
| Identifier / date | 19.08.2025 |
|---|---|
| What the supplied evidence establishes | Promoter’s title, encumbrance and completion declarations for the project |
| Identifier / date | Documents 590824, 590825, 590826 |
|---|---|
| What the supplied evidence establishes | Extracted plan information includes block floors, areas, units, roads, parking and stated utilities/conditions |
| Identifier / date | Document 590793 |
|---|---|
| What the supplied evidence establishes | Permit conditions include commencement notice, completion notice and occupancy-certificate requirements; the extracted record states completion is not certified |
| Identifier / date | Not supplied |
|---|---|
| What the supplied evidence establishes | The supplied records do not establish an issued OC or completion certificate |
The approved-layout lookup is reported as unavailable through the public HMDA DPMS channel in the supplied HMDA record; that access limitation does not itself establish that approval was refused.
Frequently asked questions
Is ORGANO DEEPALLE registered with Telangana RERA?
Yes. ORGANO DEEPALLE is registered with the Telangana Real Estate Regulatory Authority as P01400010035; the registration status is New Project.
Who is the developer of ORGANO DEEPALLE?
The promoter named in the RERA registration is ORGANO COSMOSGREEN PRIVATE LIMITED.
Where is ORGANO DEEPALLE located?
ORGANO DEEPALLE is in DEEPALLE, Depalle, Nawabpet, Mahabubnagar, Telangana (509340).
When will ORGANO DEEPALLE be completed?
The promoter's proposed date of completion filed with RERA is 17/12/2028. This is the promoter's declaration, not a guarantee.