Tjr Meadows
HARIKESHAVA INFRA DEVELOPERS LLP · Yadadri Bhuvanagiri · RERA P02000002782
TJR MEADOWS is a plotted layout / plotted development at Peddakandukur, Yadagirigutta Mandal, Yadadri Bhuvanagiri District, developed by the registered promoter HARIKESHAVA INFRA DEVELOPERS LLP. The RERA-filed site area is 48,663.44 sq m, and the layout records describe 171 residential plots for detached single-family dwellings; building count, floor configuration and plot-size range are not disclosed in the supplied records. It is registered with TG-RERA under **P02000002782**, with a proposed completion date of **19/01/2022**.
More from Harikeshava Infra Developers LLP · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | TJR MEADOWS |
| Project type | Plotted layout / plotted development RERA record |
| Phase or registered portion | Phase is not identified in the TG-RERA registration certificate; the registration is for TJR MEADOWS. |
| TG-RERA registration | P02000002782, granted under section 5; issued 30/04/2021. |
| Registration validity | 30/04/2021 to 19/01/2022; the certificate states validity could be extended by the Authority. |
| Registered promoter | HARIKESHAVA INFRA DEVELOPERS LLP |
| RERA status recorded in the supplied materials | Registration certificate is supplied. No extension order is included. The filed architect’s certificate and final-layout record later document completion-related approvals; see sections 2 and 10. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Peddakandukur (also rendered “Pedda Kandukur” in approval documents) RERA record |
| Mandal | Yadagirigutta RERA record |
| District | Yadadri Bhuvanagiri RERA record |
| PIN | 508286 RERA record |
| Project survey numbers / subdivisions | 251/A, 251/AA/1 and 268/RUU/1/2 |
| RERA-filed site area | 48,663.44 sq m total and net area; affected area recorded as 0 sq m. RERA filing |
| Layout area in approval record | Ac. 12.025 Cents; 58201.00 Sq.yards |
| Boundaries in RERA filing | East: “NEIGHBOURS LAND”; West: “NEIGHNOURS LAND”; North: “ROAD”; South: “NEIGHBOURSLAND”. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Principal layout approval | Draft - TLP.No.07/2020/H, dated 09-01-2020, Director of Town and Country Planning; the draft record says approval was delegated to Pedakandukur Grampanchayat. |
| Later layout record | TLP.No. 07/2020/H, final inspection report dated 09-10-2023, Director of Town and Country Planning. |
| Approved built-up area | RERA filing records 29,036.19 sq m; the supplied extracts do not identify a building schedule or explain the scope of this figure. RERA filing |
| Plots | 171 plots in the draft layout and final-layout records. |
| Building count / floor configuration | Not disclosed in the supplied records. This is a plotted layout; individual dwelling permissions are to be considered separately under the final-layout conditions. |
| Parking | No project-wide parking count, parking level or parking allocation is established in the supplied materials. |
| RERA-declared homes/plots count and inventory status | No booked, available or current inventory counts are supplied. |
Offering and status
| Item | Project record |
|---|---|
| Product | Residential plots; layout records specify detached single-family dwelling use. |
| RERA-filed plot-size range | Not available in the supplied RERA data. |
| Construction / development status | An architect’s certificate dated 20/10/2023 states overall project completion; a final-layout record is dated 09-10-2023. These are document assertions, not an independent site inspection for this report. |
| Original RERA completion date | 19/01/2022 RERA record |
| Revised completion date | No revised date or RERA extension order supplied. |
| Occupancy / completion record | Architect’s certificate records Occupancy Certificate No. 07/2020/H, dated 09/10/2023, and says the project is completed in all aspects. The supplied extract does not establish a separate OC scope by tower or phase. |
2. The project story
TJR MEADOWS is a residential plotted layout registered with TG-RERA as P02000002782. The project record places it at Peddakandukur, Yadagirigutta Mandal, Yadadri Bhuvanagiri District, across survey subdivisions 251/A, 251/AA/1 and 268/RUU/1/2. The layout documents describe 171 plots and a site organized with roads and open space, rather than apartment blocks.
The RERA-filed completion undertaking gives 19/01/2022 as the proposed completion date. A later architect’s certificate dated 20/10/2023 records overall completion and an Occupancy Certificate dated 09/10/2023; the final-layout record is also dated 09-10-2023. These later documents describe completion-related status, but this report has not independently inspected the site. RERA record
The draft layout approval identifies a 171-plot layout and reserves open space and roads. The later final-layout record says roads and open spaces were taken over by registered deed. The supplied information does not provide a current plot-by-plot sales or availability schedule.
3. Master plan, architecture & building design
The project is a plotted layout, not a multi-storey building scheme in the supplied records. The draft layout document describes a total layout area of Ac. 12.025 Cents; 58201.00 Sq.yards, with 171 plots. It lists 10% open space—Ac. 1.20 Cents; 5808.00 Sq.yards—30.35% roads—Ac. 3.65 Cents; 17666.00 Sq.yards—and 59.66% plotted area—Ac. 7.175 Cents; 34727.00 Sq.yards.
The final-layout record also gives 171 plots and the same total layout area, with 10.00% open space, 32.99% roads and 59.66% plotted area. The records do not include a legible layout drawing here from which plot-by-plot dimensions, road widths, plot orientation or the arrangement of individual plots can be described.
The draft approval identifies plots 57 to 83—Ac 1.08 Cents, or 5227.20 Sq. Yards—as the mortgage area in favour of Peddakandukuru Gram Panchayat. The final-layout record says that, after handover of open spaces, a relinquishment of mortgage deed concerning the mortgaged plots was executed.
The final-layout conditions specify residential dwelling use and detached, single-family occupancy for each building site; they also state that individual building permissions are considered separately. Building footprints, dwelling designs, building heights, floor areas for individual homes and plot-size bands are not established by the supplied approved-drawing extracts.
4. Homes, configurations & floor plans
This is a plotted offering, so apartment configuration, carpet area and floor-plan comparisons are not applicable. No RERA-filed plot-size schedule, unit-wise inventory, booked count or available count is provided in the supplied data.
The final-layout conditions describe each site as intended for a detached dwelling for one family and prohibit use for shops, godowns, industry or other non-dwelling buildings, subject to the stated layout conditions. Individual building permissions remain separate.
The vendor data contains plot-size claims, but these are not RERA-filed measurements and are not used here as the project’s official plot-size schedule. The two supplied floor-plan drawings are scans pending measurement, so no software-measured carpet areas are available. Promoter website Floor plans
5. Parking & vehicle circulation
No project-wide parking count, visitor or accessible parking provision, parking level, EV charging provision or plot-specific parking allocation is established by the supplied records.
The draft approval requires roads to be opened for access to neighbouring sites and says no compound wall or fencing is to be constructed around the site. The final-layout record says internal roads should remain open to provide access to neighbouring lands. These are layout conditions; they do not establish current road completion or a particular vehicle-circulation design.
The draft record identifies the mortgaged plots as 57 to 83 and states they are not for sale while under mortgage. The final-layout record later refers to execution of a relinquishment of mortgage deed after open-space handover; no plot-wise sale or allocation schedule is supplied.
6. Amenities, recreation & open spaces
The RERA filing records facilities with availability percentages. A “YES” and 100% entry is a filed status, not an independent verification of present operation. The final-layout record separately describes civic services and maintenance conditions. RERA amenities
| Description / size | No dimensions supplied |
|---|---|
| Evidence source | RERA amenity filing |
| Declared progress / verified status | “YES”, 100%; not independently inspected. RERA amenities |
| Description / size | Open space in layout: Ac. 1.20 Cents; 5808.00 Sq.yards, stated as 10% in the draft approval |
|---|---|
| Evidence source | Draft approval and RERA amenity filing |
| Declared progress / verified status | RERA amenity filing: “YES”, 100%; final-layout record says open spaces were taken over by registered deed. No independent inspection. RERA amenities |
| Description / size | Draft conditions refer to plantation and greenery in roads and open spaces |
|---|---|
| Evidence source | Draft approval and final-layout record |
| Declared progress / verified status | Conditions describe required provision/maintenance; no independent status established. |
| Description / size | Rainwater-harvesting pits/structures; no number or capacity supplied |
|---|---|
| Evidence source | Draft approval, final-layout record and RERA amenity filing |
| Declared progress / verified status | RERA amenity filing: “YES”, 100%; final-layout conditions refer to rainwater-harvesting structures. Not independently verified. RERA amenities |
| Description / size | No approved dimensions or capacities supplied |
|---|---|
| Evidence source | Vendor claims only |
| Declared progress / verified status | Not established as sanctioned or delivered facilities in the supplied project records. Promoter website |
| Description / size | No size or use disclosed |
|---|---|
| Evidence source | RERA amenity filing |
| Declared progress / verified status | RERA filing records 0%; no completed facility established. RERA amenities |
7. Utilities, building services & safety
The draft approval lists avenue plantation, rainwater-harvesting pits, street lighting and electricity facilities, a sewerage-disposal system and protected water supply. The final-layout record describes water supply, sewerage and drainage-disposal systems, street lighting, rainwater harvesting and other civic amenities. These are approval-record descriptions; they do not independently verify current operation or capacity.
| Evidence in the project record | “Protected water supply system” in draft approval; water supply listed in final-layout record and RERA amenities |
|---|---|
| Status / limit | No source, storage, treatment process or capacity disclosed. RERA amenities |
| Evidence in the project record | Sewerage-disposal system in draft approval; sewerage and drainage-disposal systems in final-layout record; RERA filing lists sewerage and storm-water drains as “YES”, 100% |
|---|---|
| Status / limit | No STP capacity, reuse details or drainage design supplied. The RERA filing’s separate sewage/sullage treatment-and-disposal item is recorded at 0%. RERA amenities |
| Evidence in the project record | Rainwater-harvesting pits/structures listed in approval records; RERA filing records “YES”, 100% for water conservation/rainwater harvesting |
|---|---|
| Status / limit | No number, capacity or independent operating verification supplied. RERA amenities |
| Evidence in the project record | Street lighting and electricity facilities listed in draft approval; electrical meter room, sub-station and receiving station listed as “YES”, 100% in RERA filing |
|---|---|
| Status / limit | No supply capacity, backup or EV provision disclosed. The street-lighting RERA amenity entry is recorded at 0%. RERA amenities |
| Evidence in the project record | No project-specific fire system or clearance established in the supplied materials |
|---|---|
| Status / limit | RERA amenity filing records fire protection and fire-safety requirements at 0%; no claim of compliance is made. RERA amenities |
| Evidence in the project record | No project-specific waste-segregation or disposal details supplied |
|---|---|
| Status / limit | RERA amenity filing records solid-waste management and disposal at 0%. RERA amenities |
| Evidence in the project record | Not applicable to the plotted layout evidence supplied; no common building details disclosed |
|---|---|
| Status / limit | No project-level lift, stair or accessible-circulation provision established. |
8. Location, access & connectivity
The registered project location is Peddakandukur, Yadagirigutta Mandal, Yadadri Bhuvanagiri District, PIN 508286. The project’s survey identity is 251/A, 251/AA/1 and 268/RUU/1/2. The supplied location record gives the cadastral parcel centroid as 17.62073146313293, 78.98938934623318. RERA record Location record
The approval records identify a road along the northern boundary in the RERA land filing and require layout roads to remain open for access to neighbouring lands. The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 37.9 km. No measured distances or verified travel times to other local landmarks or transport points are supplied. RERA filing Location record
9. Developer & development status
The registered promoter is HARIKESHAVA INFRA DEVELOPERS LLP, an LLP. The supplied corporate identifier is GSTIN 36AALFH9355C1Z7. The RERA registration certificate lists the promoter office as Village: Boduppal, Mandal: Medipally, District: Medchal-Malkajgiri, Pin: 500092; the project site is at Peddakandukur. Corporate record
The project documents identify the LLP as developer/applicant and describe M. Venugopal Reddy and Muralidhar Reddy as its representatives or designated partners in the layout records. The RERA registration certificate records the validity period as 30/04/2021 to 19/01/2022; no extension order is supplied. The later architect’s certificate and final-layout record document completion-related status in October 2023.
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA registration certificate — P02000002782 | Form C registration for TJR MEADOWS, issued 30/04/2021, valid through 19/01/2022; the certificate includes standard registration conditions, including the separate-account condition. |
| Draft layout approval — Draft - TLP.No.07/2020/H | Director of Town and Country Planning draft Technical Layout Pattern record dated 09-01-2020 for 171 plots over the stated survey numbers and layout area, with conditions and reserved open-space, road and mortgage areas. |
| Final layout record — TLP.No. 07/2020/H | Director of Town and Country Planning final inspection report dated 09-10-2023 for the 171-plot layout; it records handover of roads/open spaces by registered deed and lists continuing layout conditions. |
| Local-authority annexure — Roc. No. 15757/270/2020/H | Grama Panchayath Peddakandukur record dated 01-09-2020; the supplied OCR does not expose legible land, applicant or approval particulars beyond the recorded authority, locality, number and date. |
| Occupancy/completion record — 07/2020/H | Architect’s certificate dated 20/10/2023 records an Occupancy Certificate dated 09/10/2023 and certifies overall completion of TJR MEADOWS. |
| Demarcation certificate | District Survey Land Records certificate concerning Sy. Nos. 251 and 268 at Peddakandukur, issued for DT&CP layout approval; its extract states no government land is encroached. |
| Form B declaration | Promoter affidavit/declaration concerning title basis, project-fund account and other promoter undertakings; the supplied extract leaves the completion period blank and presents an encumbrance disclosure referring to statement 53719287 and DAGPA.NO.12225/2019. |
| HMDA layout-status lookup | The supplied project record says the public approved-layout lookup was unavailable; it does not establish approval or refusal through that portal. HMDA |
The registration record also identifies the project’s separate-account condition. The supplied materials do not include a current plot inventory schedule or an independent site-verification report.
1. Project at a glance
Project identity
Registered name: TJR MEADOWS
Project type: Plotted layout / plotted development
Phase or registered portion: Phase is not identified in the TG-RERA registration certificate; the registration is for TJR MEADOWS.
TG-RERA registration: P02000002782, granted under section 5; issued 30/04/2021.
Registration validity: 30/04/2021 to 19/01/2022; the certificate states validity could be extended by the Authority.
Registered promoter: HARIKESHAVA INFRA DEVELOPERS LLP
RERA status recorded in the supplied materials: Registration certificate is supplied. No extension order is included. The filed architect’s certificate and final-layout record later document completion-related approvals; see sections 2 and 10.
Land and geographic identity
Locality / revenue village: Peddakandukur (also rendered “Pedda Kandukur” in approval documents)
Mandal: Yadagirigutta
District: Yadadri Bhuvanagiri
PIN: 508286
Project survey numbers / subdivisions: 251/A, 251/AA/1 and 268/RUU/1/2
RERA-filed site area: 48,663.44 sq m total and net area; affected area recorded as 0 sq m.
Layout area in approval record: Ac. 12.025 Cents; 58201.00 Sq.yards
Boundaries in RERA filing: East: “NEIGHBOURS LAND”; West: “NEIGHNOURS LAND”; North: “ROAD”; South: “NEIGHBOURSLAND”.
Development identity
Principal layout approval: Draft - TLP.No.07/2020/H, dated 09-01-2020, Director of Town and Country Planning; the draft record says approval was delegated to Pedakandukur Grampanchayat.
Later layout record: TLP.No. 07/2020/H, final inspection report dated 09-10-2023, Director of Town and Country Planning.
Approved built-up area: RERA filing records 29,036.19 sq m; the supplied extracts do not identify a building schedule or explain the scope of this figure.
Plots: 171 plots in the draft layout and final-layout records.
Building count / floor configuration: Not disclosed in the supplied records. This is a plotted layout; individual dwelling permissions are to be considered separately under the final-layout conditions.
Parking: No project-wide parking count, parking level or parking allocation is established in the supplied materials.
RERA-declared homes/plots count and inventory status: No booked, available or current inventory counts are supplied.
Offering and status
Product: Residential plots; layout records specify detached single-family dwelling use.
RERA-filed plot-size range: Not available in the supplied RERA data.
Construction / development status: An architect’s certificate dated 20/10/2023 states overall project completion; a final-layout record is dated 09-10-2023. These are document assertions, not an independent site inspection for this report.
Original RERA completion date: 19/01/2022
Revised completion date: No revised date or RERA extension order supplied.
Occupancy / completion record: Architect’s certificate records Occupancy Certificate No. 07/2020/H, dated 09/10/2023, and says the project is completed in all aspects. The supplied extract does not establish a separate OC scope by tower or phase.
2. The project story
TJR MEADOWS is a residential plotted layout registered with TG-RERA as P02000002782. The project record places it at Peddakandukur, Yadagirigutta Mandal, Yadadri Bhuvanagiri District, across survey subdivisions 251/A, 251/AA/1 and 268/RUU/1/2. The layout documents describe 171 plots and a site organized with roads and open space, rather than apartment blocks.
The RERA-filed completion undertaking gives 19/01/2022 as the proposed completion date. A later architect’s certificate dated 20/10/2023 records overall completion and an Occupancy Certificate dated 09/10/2023; the final-layout record is also dated 09-10-2023. These later documents describe completion-related status, but this report has not independently inspected the site.
The draft layout approval identifies a 171-plot layout and reserves open space and roads. The later final-layout record says roads and open spaces were taken over by registered deed. The supplied information does not provide a current plot-by-plot sales or availability schedule.
3. Master plan, architecture & building design
The project is a plotted layout, not a multi-storey building scheme in the supplied records. The draft layout document describes a total layout area of Ac. 12.025 Cents; 58201.00 Sq.yards, with 171 plots. It lists 10% open space—Ac. 1.20 Cents; 5808.00 Sq.yards—30.35% roads—Ac. 3.65 Cents; 17666.00 Sq.yards—and 59.66% plotted area—Ac. 7.175 Cents; 34727.00 Sq.yards.
The final-layout record also gives 171 plots and the same total layout area, with 10.00% open space, 32.99% roads and 59.66% plotted area. The records do not include a legible layout drawing here from which plot-by-plot dimensions, road widths, plot orientation or the arrangement of individual plots can be described.
The draft approval identifies plots 57 to 83—Ac 1.08 Cents, or 5227.20 Sq. Yards—as the mortgage area in favour of Peddakandukuru Gram Panchayat. The final-layout record says that, after handover of open spaces, a relinquishment of mortgage deed concerning the mortgaged plots was executed.
The final-layout conditions specify residential dwelling use and detached, single-family occupancy for each building site; they also state that individual building permissions are considered separately. Building footprints, dwelling designs, building heights, floor areas for individual homes and plot-size bands are not established by the supplied approved-drawing extracts.
4. Homes, configurations & floor plans
This is a plotted offering, so apartment configuration, carpet area and floor-plan comparisons are not applicable. No RERA-filed plot-size schedule, unit-wise inventory, booked count or available count is provided in the supplied data.
The final-layout conditions describe each site as intended for a detached dwelling for one family and prohibit use for shops, godowns, industry or other non-dwelling buildings, subject to the stated layout conditions. Individual building permissions remain separate.
The vendor data contains plot-size claims, but these are not RERA-filed measurements and are not used here as the project’s official plot-size schedule. The two supplied floor-plan drawings are scans pending measurement, so no software-measured carpet areas are available.
5. Parking & vehicle circulation
No project-wide parking count, visitor or accessible parking provision, parking level, EV charging provision or plot-specific parking allocation is established by the supplied records.
The draft approval requires roads to be opened for access to neighbouring sites and says no compound wall or fencing is to be constructed around the site. The final-layout record says internal roads should remain open to provide access to neighbouring lands. These are layout conditions; they do not establish current road completion or a particular vehicle-circulation design.
The draft record identifies the mortgaged plots as 57 to 83 and states they are not for sale while under mortgage. The final-layout record later refers to execution of a relinquishment of mortgage deed after open-space handover; no plot-wise sale or allocation schedule is supplied.
6. Amenities, recreation & open spaces
The RERA filing records facilities with availability percentages. A “YES” and 100% entry is a filed status, not an independent verification of present operation. The final-layout record separately describes civic services and maintenance conditions.
| Description / size | No dimensions supplied |
|---|---|
| Evidence source | RERA amenity filing |
| Declared progress / verified status | “YES”, 100%; not independently inspected. |
| Description / size | Open space in layout: Ac. 1.20 Cents; 5808.00 Sq.yards, stated as 10% in the draft approval |
|---|---|
| Evidence source | Draft approval and RERA amenity filing |
| Declared progress / verified status | RERA amenity filing: “YES”, 100%; final-layout record says open spaces were taken over by registered deed. No independent inspection. |
| Description / size | Draft conditions refer to plantation and greenery in roads and open spaces |
|---|---|
| Evidence source | Draft approval and final-layout record |
| Declared progress / verified status | Conditions describe required provision/maintenance; no independent status established. |
| Description / size | Rainwater-harvesting pits/structures; no number or capacity supplied |
|---|---|
| Evidence source | Draft approval, final-layout record and RERA amenity filing |
| Declared progress / verified status | RERA amenity filing: “YES”, 100%; final-layout conditions refer to rainwater-harvesting structures. Not independently verified. |
| Description / size | No approved dimensions or capacities supplied |
|---|---|
| Evidence source | Vendor claims only |
| Declared progress / verified status | Not established as sanctioned or delivered facilities in the supplied project records. |
| Description / size | No size or use disclosed |
|---|---|
| Evidence source | RERA amenity filing |
| Declared progress / verified status | RERA filing records 0%; no completed facility established. |
7. Utilities, building services & safety
The draft approval lists avenue plantation, rainwater-harvesting pits, street lighting and electricity facilities, a sewerage-disposal system and protected water supply. The final-layout record describes water supply, sewerage and drainage-disposal systems, street lighting, rainwater harvesting and other civic amenities. These are approval-record descriptions; they do not independently verify current operation or capacity.
| Evidence in the project record | “Protected water supply system” in draft approval; water supply listed in final-layout record and RERA amenities |
|---|---|
| Status / limit | No source, storage, treatment process or capacity disclosed. |
| Evidence in the project record | Sewerage-disposal system in draft approval; sewerage and drainage-disposal systems in final-layout record; RERA filing lists sewerage and storm-water drains as “YES”, 100% |
|---|---|
| Status / limit | No STP capacity, reuse details or drainage design supplied. The RERA filing’s separate sewage/sullage treatment-and-disposal item is recorded at 0%. |
| Evidence in the project record | Rainwater-harvesting pits/structures listed in approval records; RERA filing records “YES”, 100% for water conservation/rainwater harvesting |
|---|---|
| Status / limit | No number, capacity or independent operating verification supplied. |
| Evidence in the project record | Street lighting and electricity facilities listed in draft approval; electrical meter room, sub-station and receiving station listed as “YES”, 100% in RERA filing |
|---|---|
| Status / limit | No supply capacity, backup or EV provision disclosed. The street-lighting RERA amenity entry is recorded at 0%. |
| Evidence in the project record | No project-specific fire system or clearance established in the supplied materials |
|---|---|
| Status / limit | RERA amenity filing records fire protection and fire-safety requirements at 0%; no claim of compliance is made. |
| Evidence in the project record | No project-specific waste-segregation or disposal details supplied |
|---|---|
| Status / limit | RERA amenity filing records solid-waste management and disposal at 0%. |
| Evidence in the project record | Not applicable to the plotted layout evidence supplied; no common building details disclosed |
|---|---|
| Status / limit | No project-level lift, stair or accessible-circulation provision established. |
8. Location, access & connectivity
The registered project location is Peddakandukur, Yadagirigutta Mandal, Yadadri Bhuvanagiri District, PIN 508286. The project’s survey identity is 251/A, 251/AA/1 and 268/RUU/1/2. The supplied location record gives the cadastral parcel centroid as 17.62073146313293, 78.98938934623318.
The approval records identify a road along the northern boundary in the RERA land filing and require layout roads to remain open for access to neighbouring lands. The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 37.9 km. No measured distances or verified travel times to other local landmarks or transport points are supplied.
9. Developer & development status
The registered promoter is HARIKESHAVA INFRA DEVELOPERS LLP, an LLP. The supplied corporate identifier is GSTIN 36AALFH9355C1Z7. The RERA registration certificate lists the promoter office as Village: Boduppal, Mandal: Medipally, District: Medchal-Malkajgiri, Pin: 500092; the project site is at Peddakandukur.
The project documents identify the LLP as developer/applicant and describe M. Venugopal Reddy and Muralidhar Reddy as its representatives or designated partners in the layout records. The RERA registration certificate records the validity period as 30/04/2021 to 19/01/2022; no extension order is supplied. The later architect’s certificate and final-layout record document completion-related status in October 2023.
10. Approvals, official records & documents
TG-RERA registration certificate — P02000002782: Form C registration for TJR MEADOWS, issued 30/04/2021, valid through 19/01/2022; the certificate includes standard registration conditions, including the separate-account condition.
Draft layout approval — Draft - TLP.No.07/2020/H: Director of Town and Country Planning draft Technical Layout Pattern record dated 09-01-2020 for 171 plots over the stated survey numbers and layout area, with conditions and reserved open-space, road and mortgage areas.
Final layout record — TLP.No. 07/2020/H: Director of Town and Country Planning final inspection report dated 09-10-2023 for the 171-plot layout; it records handover of roads/open spaces by registered deed and lists continuing layout conditions.
Local-authority annexure — Roc. No. 15757/270/2020/H: Grama Panchayath Peddakandukur record dated 01-09-2020; the supplied OCR does not expose legible land, applicant or approval particulars beyond the recorded authority, locality, number and date.
Occupancy/completion record — 07/2020/H: Architect’s certificate dated 20/10/2023 records an Occupancy Certificate dated 09/10/2023 and certifies overall completion of TJR MEADOWS.
Demarcation certificate: District Survey Land Records certificate concerning Sy. Nos. 251 and 268 at Peddakandukur, issued for DT&CP layout approval; its extract states no government land is encroached.
Form B declaration: Promoter affidavit/declaration concerning title basis, project-fund account and other promoter undertakings; the supplied extract leaves the completion period blank and presents an encumbrance disclosure referring to statement 53719287 and DAGPA.NO.12225/2019.
HMDA layout-status lookup: The supplied project record says the public approved-layout lookup was unavailable; it does not establish approval or refusal through that portal.
The registration record also identifies the project’s separate-account condition. The supplied materials do not include a current plot inventory schedule or an independent site-verification report.
Frequently asked questions
Is TJR MEADOWS registered with Telangana RERA?
Yes. TJR MEADOWS is registered with the Telangana Real Estate Regulatory Authority as P02000002782; the registration status is New Project.
Who is the developer of TJR MEADOWS?
The promoter named in the RERA registration is HARIKESHAVA INFRA DEVELOPERS LLP.
Where is TJR MEADOWS located?
TJR MEADOWS is in PEDDAKANDUKUR, Yadagirigutta, Yadadri Bhuvanagiri, Telangana (508286).
When will TJR MEADOWS be completed?
The promoter's proposed date of completion filed with RERA is 19/01/2022. This is the promoter's declaration, not a guarantee.