Velkore Infra Pinnacle
VELKORE INFRA LLP · Rangareddy · RERA P02400002080
VELKORE INFRA PINNACLE is a Mixed Development (Residential & Commercial) in Kondapur, Serilingampally Mandal, Ranga Reddy District. The registered promoter is VELKORE INFRA LLP. The project covers 2,758.8 m² and has one building with 2 Cellar + Ground + 5 upper floors and 57 homes: 24 two-bedroom and 33 three-bedroom units. Its TG-RERA registration number is P02400002080, and the proposed completion date is 29/01/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | VELKORE INFRA PINNACLE RERA record |
| Project type | Mixed Development (Residential & Commercial); the building-permit order describes a proposed residential building RERA record RERA filing |
| Phase / registered portion | No phase name is stated in the supplied record. One building is identified in the permit as “Building - PROPOSED-1 (RESIDENTIAL BUILDING).” |
| TG-RERA registration | P02400002080; Form C registration certificate issued 24/08/2020, valid through 29/01/2026, unless extended by the Authority. No extension is recorded in the supplied certificate. RERA record |
| Registered promoter | VELKORE INFRA LLP RERA record Corporate record |
| TG-RERA status in supplied record | New Project; registration information captured 10 September 2026. The registration certificate states its validity dates; current live status is not established by the supplied record. RERA record Approvals record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Kondapur RERA record RERA filing |
| Revenue village | Kondapur RERA record RERA filing |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500084 RERA record |
| Project survey numbers and subdivisions | 178/C3, 179/A1, 178 & 179 RERA record RERA filing |
| Site extent | 2,758.8 m² total site area; RERA filing also records 409.02 m² affected by road widening/FTL/nala widening and 2,349.78 m² net area. The building-permit parameters separately state 6 m² nala-affected area and 2,344.31 m² net area. RERA filing |
| Boundaries (RERA filing) | North: 60FT WIDE ROAD; West: 40FT WIDE ROAD; East: NEIGHBOURS 5 STORIED BUILDING ON PART OF SY NO 179; South: PART OF SURVEY NO 178 179. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building-permit approval | 1/C20/01150/2020, approved 29 January 2020; permit file 1/C20/13516/2019. Approvals record |
| Approved built-up area | RERA filing records 11,404.75 m² as approved built-up area. The permit extraction separately lists component areas, including upper floors 6,538.85 m² and parking floors 2,760.18 m². RERA filing |
| Building count | One building is reported in the RERA filing; the permit identifies one proposed residential building. RERA filing |
| Sanctioned floor configuration | 2 Cellar + Ground + 5 upper floors; permit-stated height 17.34 m. |
| Parking levels / provision | The permit lists parking-floor area 2,760.18 m² and cellar area 0.00 m² in its parameters. A sanctioned parking-space count and the allocation of spaces to units are not supplied. |
| Units | 57 total units in the RERA filing: 24 two-bedroom and 33 three-bedroom units. The permit extraction does not give an approved unit count for comparison. RERA unit table RERA unit details |
Offering and status
| Field | Project record |
|---|---|
| Configurations | 2BHK and 3BHK; the RERA filing labels them “DOUBLE BED ROOM” and “TRIPLE BED ROOM.” RERA unit table RERA unit details |
| RERA-filed saleable areas | 2BHK: 108.71 m²; 3BHK: 161.04 m². RERA unit table RERA unit details |
| Booked / available | The portal-derived figures show 0 booked and 24 available 2BHK units; 0 booked and 33 available 3BHK units. The record provides no as-of date for these counts, so they are indicative, not a current inventory confirmation. RERA unit table RERA unit details |
| Construction stage | The supplied RERA amenity progress data reports 0% for most listed infrastructure items and 5% for sewerage. These are reported progress entries, not an independent site inspection; no overall construction percentage is supplied. RERA amenities |
| Completion dates | The RERA record gives proposed completion 29/01/2026. The GHMC permit also states completion before 29 January 2026. The Form B declaration separately undertakes completion within 24 months plus a nine-month grace period from execution of the development agreement-cum-GPA. RERA record |
| Occupancy / completion certificate | The permit extraction states that completion has not been certified and that an Occupancy Certificate is compulsory before occupation. No OC is included in the supplied project documents. |
2. The project story
VELKORE INFRA PINNACLE is a single-building development at Kondapur, Serilingampally Mandal, Ranga Reddy District. The registered project is classified as mixed residential and commercial development, while the supplied GHMC permit identifies a proposed residential building with 2 Cellar + Ground + 5 upper floors. The permit’s area schedule includes both residential and commercial area, but the supplied material does not establish how those uses are arranged within the building. RERA record RERA filing
The RERA filing lists 57 homes—24 2BHK and 33 3BHK—and the portal-derived booking figures show all 57 as available, with the date of that inventory snapshot unspecified. The GHMC permit and RERA filing describe a proposed project; the available records do not establish independently verified construction progress or completed, occupancy-certified portions. RERA infrastructure progress entries are largely 0%, with sewerage at 5%. RERA unit table RERA unit details RERA amenities
3. Master plan, architecture & building design
The RERA filing records a total site area of 2,758.8 m², a stated road-widening/FTL/nala-affected area of 409.02 m², and net area of 2,349.78 m². GHMC’s permit parameters separately record a 6 m² nala-affected area and net area of 2,344.31 m². These are the areas as recorded in their respective supplied documents; this Overview does not reconcile them. RERA filing
The GHMC permit identifies one proposed building, 2 Cellar + Ground + 5 upper floors, with a stated height of 17.34 m. Its extracted parameters list residential area 1,031.77 m², commercial area 214.10 m², upper-floors area 6,538.85 m², parking-floors area 2,760.18 m², and cellar area 0.00 m². The RERA filing separately states approved built-up area 11,404.75 m². These labels are retained as recorded; they are not interchangeable measures. RERA filing
The approved drawing is identified as document 127838, but the supplied extraction does not provide a complete architectural schedule for the building. Detailed information on flats per floor, building footprint, lifts, stairs, entries/exits, circulation, internal road arrangement, residential-commercial distribution, and phase organization is therefore not established here. Document index
4. Homes, configurations & floor plans
The RERA filing lists 24 “DOUBLE BED ROOM” units and 33 “TRIPLE BED ROOM” units. Its saleable areas are reported as 108.71 m² and 161.04 m², respectively. Booked and available figures below are portal-derived and have no stated snapshot date. RERA unit details RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 24 | 0 | 24 | 108.71 m² | Software-measured: 59.4–66.0 m²; median 63.4 m² | 42% |
| 3BHK | 33 | 0 | 33 | 161.04 m² | Software-measured: 80.5–92.9 m²; median 82.5 m² | 49% |
Carpet-area figures are software measurements from approved floor-plan drawing geometry, not RERA-filed figures; the measurement records state that review is needed. The filed saleable area is a separate figure and the drawing-measurement source notes that saleable area also counts the home’s share of common areas. Balcony areas are excluded from the supplied measured carpet figures. Verify any measured area against the drawing and the agreement for the specific unit. Floor plans RERA unit details
The supplied example 2BHK plan identifies living, dining, kitchen, bedrooms, toilets, wash space and balconies. The example 3BHK plan identifies a living/dining area, kitchen, bedrooms, toilets, wash space and balconies, including one labelled 1.52 m wide. These are drawing-based descriptions, not unit-specific contractual promises. RERA unit details
5. Parking & vehicle circulation
GHMC’s permit extraction lists 2,760.18 m² of parking-floor area and describes the building as having two cellar levels, although its parameter schedule separately records cellar area as 0.00 m². A sanctioned count of parking spaces, visitor or accessible spaces, two-wheeler provision, ramp details, EV charging, and unit-wise parking allocation are not established by the supplied evidence. A parking-floor area alone does not establish an exclusive parking right for a buyer.
The RERA filing records a mortgage area of 841.52 m²; the permit parameters also describe “Floor handed over GROUND & FIRST” and area 841.52 m². The supplied record does not explain the parking allocation or establish that any particular parking space is assigned to a unit. RERA filing
6. Amenities, recreation & open spaces
The RERA amenities schedule marks the following infrastructure or facility categories as “YES,” with progress percentages shown below. These are portal-reported progress entries, not independent confirmation of completion. The building permit separately specifies a tot-lot and tree planting. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Permit lists tot-lot 117.97 m² and 135 Trees. | RERA amenities | RERA schedule: 0%; completion not independently verified. |
| Community buildings | No size or capacity supplied. | RERA amenities | RERA schedule: 0%; completion not independently verified. |
| Internal roads and footpaths | No dimensions supplied. | RERA amenities | RERA schedule: 0%; completion not independently verified. |
| Street lighting | No fixture or coverage details supplied. | RERA amenities | RERA schedule: 0%; completion not independently verified. |
| Community / indoor facilities | No specific sanctioned room, clubhouse, gym, or hall details supplied in the project documents reviewed here. | RERA amenities | RERA schedule lists community buildings at 0%; completion not independently verified. |
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire protection, and electrical meter/substation/receiving-station provision as “YES.” It reports 5% progress for sewerage and 0% for the other listed items. These are RERA-recorded entries; they do not establish present operational status or independent completion. RERA amenities
The GHMC permit specifies a rainwater-harvesting structure (percolation pit), 10 RWHPs, space for a transformer, and an in-premises garbage house. It also requires an automatic sprinkler system in the cellar and other fire-safety systems, and states that a Fire NOC is to be obtained before the Occupancy Certificate. The permit makes an Occupancy Certificate compulsory before occupation. The supplied records do not give water-source or storage capacities, STP capacity, reuse quantities, backup-power capacity, lift count or capacity, CCTV/security design, or accessibility details.
8. Location, access & connectivity
The registered site is in Kondapur village, Kondapur locality, Serilingampally Mandal, Ranga Reddy District, Telangana 500084. The RERA filing gives the site boundaries as a 60FT WIDE ROAD to the north and a 40FT WIDE ROAD to the west, with neighbouring land and adjoining survey land on the other sides. RERA record RERA filing
The supplied location dataset lists the following distances from its cadastral-parcel-centroid reference. These are measured distance entries; no travel times are supplied. Location record
| Reference point | Distance |
|---|---|
| (unnamed park) | 0.9 km |
| HDFC Bank | 1.2 km |
| Lakshmi hospital | 1.2 km |
| Chandanagar railway station | 1.2 km |
| Kallam Anji Reddy School | 1.1 km |
| Sharada Vidyaniketan | 1.3 km |
| Infinity Mall | 1.7 km |
| Startbot | 1.8 km |
| Kondapur Bus Depot | 2.9 km |
| Miyapur Metro | 3.7 km |
9. Developer & development status
The registered promoter is VELKORE INFRA LLP, an LLP. Its RERA-recorded office address is 8-3-318/11/16/2A, Engineers Colony, Kondapur, Kondapur, Serilingampally, Ranga Reddy, 500084. The supplied corporate data identifies partners Vijayalakshmi Ventrapragada and Venkateswara Rao Ventrapragada, and authorized signatory Sharat Ventrapragada. No corporate registration number or official promoter website/contact details are supplied. Corporate record Parties record RERA record
The permit identifies V. Venkateswara Rao as applicant and VELKORE INFRA LLP as developer. The Form B affidavit dated 2 July 2020, made by Sharat Ventrapragada as Managing Partner, declares legal title, states the land is free from encumbrances, and undertakes project completion within 24 months plus a nine-month grace period from execution of the Development Agreement-Cum-General Power of Attorney. These are promoter declarations in the filed document.
The RERA-recorded proposed completion date is 29/01/2026. The supplied permit states the building is not completion-certified and requires an OC before occupation; no occupancy or completion certificate is included in the available material. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for VELKORE INFRA PINNACLE, registration P02400002080, issued 24/08/2020; validity stated through 29/01/2026, unless extended. |
| GHMC building permit | Building Permit Order 1/C20/01150/2020, file 1/C20/13516/2019, approved 29 January 2020; permits the proposed building subject to its printed conditions. |
| Approved drawing | RERA filing includes drawing document 127838, identified as a layout-plan document; the supplied extraction does not provide a complete drawing-based building schedule. Document index |
| Promoter declaration | Form B affidavit dated 2 July 2020, concerning title, encumbrances, funding, audits, approvals and completion undertaking. |
| Occupancy / completion certificate | The permit states an OC is compulsory before occupation. No OC or completion certificate is supplied; the permit extraction marks completion as not certified. |
The permit’s printed conditions include commencement and completion notices, adherence to the sanctioned plan, surrender of the road-affected portion without compensation, fire-safety requirements, and restrictions on registration of mortgaged built-up area before an OC. This table is an evidence index, not a full review of those conditions.
1. Project at a glance
Project identity
Registered project name: VELKORE INFRA PINNACLE
Project type: Mixed Development (Residential & Commercial); the building-permit order describes a proposed residential building
Phase / registered portion: No phase name is stated in the supplied record. One building is identified in the permit as “Building - PROPOSED-1 (RESIDENTIAL BUILDING).”
TG-RERA registration: P02400002080; Form C registration certificate issued 24/08/2020, valid through 29/01/2026, unless extended by the Authority. No extension is recorded in the supplied certificate.
Registered promoter: VELKORE INFRA LLP
TG-RERA status in supplied record: New Project; registration information captured 10 September 2026. The registration certificate states its validity dates; current live status is not established by the supplied record.
Land and geographic identity
Locality: Kondapur
Revenue village: Kondapur
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500084
Project survey numbers and subdivisions: 178/C3, 179/A1, 178 & 179
Site extent: 2,758.8 m² total site area; RERA filing also records 409.02 m² affected by road widening/FTL/nala widening and 2,349.78 m² net area. The building-permit parameters separately state 6 m² nala-affected area and 2,344.31 m² net area.
Boundaries (RERA filing): North: 60FT WIDE ROAD; West: 40FT WIDE ROAD; East: NEIGHBOURS 5 STORIED BUILDING ON PART OF SY NO 179; South: PART OF SURVEY NO 178 179.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit approval: 1/C20/01150/2020, approved 29 January 2020; permit file 1/C20/13516/2019.
Approved built-up area: RERA filing records 11,404.75 m² as approved built-up area. The permit extraction separately lists component areas, including upper floors 6,538.85 m² and parking floors 2,760.18 m².
Building count: One building is reported in the RERA filing; the permit identifies one proposed residential building.
Sanctioned floor configuration: 2 Cellar + Ground + 5 upper floors; permit-stated height 17.34 m.
Parking levels / provision: The permit lists parking-floor area 2,760.18 m² and cellar area 0.00 m² in its parameters. A sanctioned parking-space count and the allocation of spaces to units are not supplied.
Units: 57 total units in the RERA filing: 24 two-bedroom and 33 three-bedroom units. The permit extraction does not give an approved unit count for comparison.
Offering and status
Configurations: 2BHK and 3BHK; the RERA filing labels them “DOUBLE BED ROOM” and “TRIPLE BED ROOM.”
RERA-filed saleable areas: 2BHK: 108.71 m²; 3BHK: 161.04 m².
Booked / available: The portal-derived figures show 0 booked and 24 available 2BHK units; 0 booked and 33 available 3BHK units. The record provides no as-of date for these counts, so they are indicative, not a current inventory confirmation.
Construction stage: The supplied RERA amenity progress data reports 0% for most listed infrastructure items and 5% for sewerage. These are reported progress entries, not an independent site inspection; no overall construction percentage is supplied.
Completion dates: The RERA record gives proposed completion 29/01/2026. The GHMC permit also states completion before 29 January 2026. The Form B declaration separately undertakes completion within 24 months plus a nine-month grace period from execution of the development agreement-cum-GPA.
Occupancy / completion certificate: The permit extraction states that completion has not been certified and that an Occupancy Certificate is compulsory before occupation. No OC is included in the supplied project documents.
2. The project story
VELKORE INFRA PINNACLE is a single-building development at Kondapur, Serilingampally Mandal, Ranga Reddy District. The registered project is classified as mixed residential and commercial development, while the supplied GHMC permit identifies a proposed residential building with 2 Cellar + Ground + 5 upper floors. The permit’s area schedule includes both residential and commercial area, but the supplied material does not establish how those uses are arranged within the building.
The RERA filing lists 57 homes—24 2BHK and 33 3BHK—and the portal-derived booking figures show all 57 as available, with the date of that inventory snapshot unspecified. The GHMC permit and RERA filing describe a proposed project; the available records do not establish independently verified construction progress or completed, occupancy-certified portions. RERA infrastructure progress entries are largely 0%, with sewerage at 5%.
3. Master plan, architecture & building design
The RERA filing records a total site area of 2,758.8 m², a stated road-widening/FTL/nala-affected area of 409.02 m², and net area of 2,349.78 m². GHMC’s permit parameters separately record a 6 m² nala-affected area and net area of 2,344.31 m². These are the areas as recorded in their respective supplied documents; this Overview does not reconcile them.
The GHMC permit identifies one proposed building, 2 Cellar + Ground + 5 upper floors, with a stated height of 17.34 m. Its extracted parameters list residential area 1,031.77 m², commercial area 214.10 m², upper-floors area 6,538.85 m², parking-floors area 2,760.18 m², and cellar area 0.00 m². The RERA filing separately states approved built-up area 11,404.75 m². These labels are retained as recorded; they are not interchangeable measures.
The approved drawing is identified as document 127838, but the supplied extraction does not provide a complete architectural schedule for the building. Detailed information on flats per floor, building footprint, lifts, stairs, entries/exits, circulation, internal road arrangement, residential-commercial distribution, and phase organization is therefore not established here.
4. Homes, configurations & floor plans
The RERA filing lists 24 “DOUBLE BED ROOM” units and 33 “TRIPLE BED ROOM” units. Its saleable areas are reported as 108.71 m² and 161.04 m², respectively. Booked and available figures below are portal-derived and have no stated snapshot date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 24 | 0 | 24 | 108.71 m² | Software-measured: 59.4–66.0 m²; median 63.4 m² | 42% |
| 3BHK | 33 | 0 | 33 | 161.04 m² | Software-measured: 80.5–92.9 m²; median 82.5 m² | 49% |
Carpet-area figures are software measurements from approved floor-plan drawing geometry, not RERA-filed figures; the measurement records state that review is needed. The filed saleable area is a separate figure and the drawing-measurement source notes that saleable area also counts the home’s share of common areas. Balcony areas are excluded from the supplied measured carpet figures. Verify any measured area against the drawing and the agreement for the specific unit.
The supplied example 2BHK plan identifies living, dining, kitchen, bedrooms, toilets, wash space and balconies. The example 3BHK plan identifies a living/dining area, kitchen, bedrooms, toilets, wash space and balconies, including one labelled 1.52 m wide. These are drawing-based descriptions, not unit-specific contractual promises.
5. Parking & vehicle circulation
GHMC’s permit extraction lists 2,760.18 m² of parking-floor area and describes the building as having two cellar levels, although its parameter schedule separately records cellar area as 0.00 m². A sanctioned count of parking spaces, visitor or accessible spaces, two-wheeler provision, ramp details, EV charging, and unit-wise parking allocation are not established by the supplied evidence. A parking-floor area alone does not establish an exclusive parking right for a buyer.
The RERA filing records a mortgage area of 841.52 m²; the permit parameters also describe “Floor handed over GROUND & FIRST” and area 841.52 m². The supplied record does not explain the parking allocation or establish that any particular parking space is assigned to a unit.
6. Amenities, recreation & open spaces
The RERA amenities schedule marks the following infrastructure or facility categories as “YES,” with progress percentages shown below. These are portal-reported progress entries, not independent confirmation of completion. The building permit separately specifies a tot-lot and tree planting.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Permit lists tot-lot 117.97 m² and 135 Trees. | RERA schedule: 0%; completion not independently verified. | |
| Community buildings | No size or capacity supplied. | RERA schedule: 0%; completion not independently verified. | |
| Internal roads and footpaths | No dimensions supplied. | RERA schedule: 0%; completion not independently verified. | |
| Street lighting | No fixture or coverage details supplied. | RERA schedule: 0%; completion not independently verified. | |
| Community / indoor facilities | No specific sanctioned room, clubhouse, gym, or hall details supplied in the project documents reviewed here. | RERA schedule lists community buildings at 0%; completion not independently verified. |
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire protection, and electrical meter/substation/receiving-station provision as “YES.” It reports 5% progress for sewerage and 0% for the other listed items. These are RERA-recorded entries; they do not establish present operational status or independent completion.
The GHMC permit specifies a rainwater-harvesting structure (percolation pit), 10 RWHPs, space for a transformer, and an in-premises garbage house. It also requires an automatic sprinkler system in the cellar and other fire-safety systems, and states that a Fire NOC is to be obtained before the Occupancy Certificate. The permit makes an Occupancy Certificate compulsory before occupation. The supplied records do not give water-source or storage capacities, STP capacity, reuse quantities, backup-power capacity, lift count or capacity, CCTV/security design, or accessibility details.
8. Location, access & connectivity
The registered site is in Kondapur village, Kondapur locality, Serilingampally Mandal, Ranga Reddy District, Telangana 500084. The RERA filing gives the site boundaries as a 60FT WIDE ROAD to the north and a 40FT WIDE ROAD to the west, with neighbouring land and adjoining survey land on the other sides.
The supplied location dataset lists the following distances from its cadastral-parcel-centroid reference. These are measured distance entries; no travel times are supplied.
(unnamed park): 0.9 km
HDFC Bank: 1.2 km
Lakshmi hospital: 1.2 km
Chandanagar railway station: 1.2 km
Kallam Anji Reddy School: 1.1 km
Sharada Vidyaniketan: 1.3 km
Infinity Mall: 1.7 km
Startbot: 1.8 km
Kondapur Bus Depot: 2.9 km
Miyapur Metro: 3.7 km
9. Developer & development status
The registered promoter is VELKORE INFRA LLP, an LLP. Its RERA-recorded office address is 8-3-318/11/16/2A, Engineers Colony, Kondapur, Kondapur, Serilingampally, Ranga Reddy, 500084. The supplied corporate data identifies partners Vijayalakshmi Ventrapragada and Venkateswara Rao Ventrapragada, and authorized signatory Sharat Ventrapragada. No corporate registration number or official promoter website/contact details are supplied.
The permit identifies V. Venkateswara Rao as applicant and VELKORE INFRA LLP as developer. The Form B affidavit dated 2 July 2020, made by Sharat Ventrapragada as Managing Partner, declares legal title, states the land is free from encumbrances, and undertakes project completion within 24 months plus a nine-month grace period from execution of the Development Agreement-Cum-General Power of Attorney. These are promoter declarations in the filed document.
The RERA-recorded proposed completion date is 29/01/2026. The supplied permit states the building is not completion-certified and requires an OC before occupation; no occupancy or completion certificate is included in the available material.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for VELKORE INFRA PINNACLE, registration P02400002080, issued 24/08/2020; validity stated through 29/01/2026, unless extended.
GHMC building permit: Building Permit Order 1/C20/01150/2020, file 1/C20/13516/2019, approved 29 January 2020; permits the proposed building subject to its printed conditions.
Approved drawing: RERA filing includes drawing document 127838, identified as a layout-plan document; the supplied extraction does not provide a complete drawing-based building schedule.
Promoter declaration: Form B affidavit dated 2 July 2020, concerning title, encumbrances, funding, audits, approvals and completion undertaking.
Occupancy / completion certificate: The permit states an OC is compulsory before occupation. No OC or completion certificate is supplied; the permit extraction marks completion as not certified.
The permit’s printed conditions include commencement and completion notices, adherence to the sanctioned plan, surrender of the road-affected portion without compensation, fire-safety requirements, and restrictions on registration of mortgaged built-up area before an OC. This table is an evidence index, not a full review of those conditions.
Frequently asked questions
Is VELKORE INFRA PINNACLE registered with Telangana RERA?
Yes. VELKORE INFRA PINNACLE is registered with the Telangana Real Estate Regulatory Authority as P02400002080; the registration status is New Project.
Who is the developer of VELKORE INFRA PINNACLE?
The promoter named in the RERA registration is VELKORE INFRA LLP.
Where is VELKORE INFRA PINNACLE located?
VELKORE INFRA PINNACLE is in KONDAPUR, Serilingampally, Rangareddy, Telangana (500084).
When will VELKORE INFRA PINNACLE be completed?
The promoter's proposed date of completion filed with RERA is 29/01/2026. This is the promoter's declaration, not a guarantee.
More projects in Kondapur