Sree Hemadurga Paradise
SHARVANI VENTURES & AVENUES PRIVATE LIMITED · Rangareddy · RERA P02400002908
SREE HEMADURGA PARADISE is a residential apartment project in Chanda Nagar, Serilingampally Mandal, Ranga Reddy District, developed by SHARVANI VENTURES & AVENUES PRIVATE LIMITED. It is on a site of 32729.16 sq. m. and comprises six residential towers—1A, 1B, 2, 3, 4 and 5—with 2 CELLARS + STILT+ 12 UPPER FLOORS, plus a separate amenities block with 2 CELLARS+GROUND + 5 UPPER FLOORS. The TG-RERA filing records 1127 units, with 2BHK and 3BHK configurations. Its TG-RERA registration is P02400002908, issued 14/05/2021, and its proposed completion date is 02/01/2027.
More from Sharvani Ventures & Avenues Pvt Ltd · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SREE HEMADURGA PARADISE RERA record |
| Project type | Residential apartment project RERA record Approvals record |
| Phase / registered portion | The supplied registration identifies the project as a whole; no separate phase name or phase boundary is disclosed. The RERA filing records six buildings/blocks. RERA record RERA filing |
| TG-RERA registration | P02400002908, issued 14/05/2021; Form C states a five-year term ending 02/09/2026, unless extended by the Authority. |
| Registered promoter | SHARVANI VENTURES & AVENUES PRIVATE LIMITED RERA record Corporate record |
| RERA status | “On-Going Project” in the supplied project record. The registration-validity date above is separate from the promoter’s proposed completion date; no extension is recorded in the supplied certificate. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Chanda Nagar / Chandanagar RERA record |
| Revenue village | Chanda Nagar (also rendered “Chandanagar” in the filed documents) RERA record Land records |
| Mandal / district | Serilingampally / Ranga Reddy RERA record Land records |
| PIN | 500050 RERA record |
| Project survey numbers | 279 and 280; the supplied RERA and sanctioned-plan records do not specify project subdivisions. Land records |
| Registered/sanctioned site extent | 32729.16 sq. m.; the sanctioned plan records both plot area and net plot area as 32729.16 sq. m. RERA filing |
| Boundaries in RERA filing | North: Neighbours land; South: 60 feet road; East: Neighbours land; West: Neighbours land. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building-permit approval | 1/C21/09391/2020, dated 02 September, 2020 in the GHMC building permit order; revised plan sheets also bear this approval number. Approvals record |
| Approved built-up area | The revised plan lists BUILT UP AREA 136370.70 and separately lists 183667.27 as a total built-up-area figure. The supplied extraction does not explain the basis of the latter figure. |
| Residential / commercial net BUA | 126488.32 residential net BUA and 4519.23 commercial net BUA, as listed in the revised plan. |
| Buildings | Six residential towers—1A, 1B, 2, 3, 4 and 5—plus a separate amenities block. |
| Sanctioned floor configuration | Revised plan: residential towers with 2 CELLARS + STILT+ 12 UPPER FLOORS; amenities block with 2 CELLARS+GROUND + 5 UPPER FLOORS. |
| Parking provision in revised plan | PROPOSED NUMBER OF PARKINGS 1184. |
| Unit counts | RERA filing: 1127 total units across six buildings. A separate sanctioned-plan sheet records a “num_units” figure of 192 for a building sheet; the supplied material does not establish that as the project-wide total. RERA unit table |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configurations | 2BHK and 3BHK apartments RERA unit table |
| RERA-filed saleable areas | 2BHK: 98.11–108.9 sq. m.; 3BHK: 167.26 sq. m. RERA unit table |
| Booked / available | 2BHK: 143 booked / 650 available; 3BHK: 107 booked / 227 available. Counts are from the TG-RERA portal record; it gives no “as of” date, so treat them as indicative. RERA unit table |
| Construction stage | TG-RERA amenity/infrastructure fields report varying progress by item; these are portal-reported percentages, not independent site verification. No overall construction-completion percentage is supplied. RERA amenities |
| Proposed completion | 02/01/2027 in the project header; the RERA Form-B declaration dated 05 April 2021 undertakes completion by 02/09/2026. RERA record |
| Revised proposed completion | 02/01/2027 in the project record RERA record |
| Occupancy / completion certificate | No project occupancy certificate or completion certificate is included in the supplied records. The GHMC plan requires an occupancy certificate before occupation. Document index |
The project story
SREE HEMADURGA PARADISE is registered as a residential apartment development in Chanda Nagar, on Survey Nos. 279 and 280 of Chanda Nagar village, Serilingampally Mandal, Ranga Reddy District. The RERA filing describes six buildings and 1,127 units; the GHMC revised plan identifies six residential towers and a separate amenities block. The sanctioned arrangement shown in that plan is two cellars, a stilt level and 12 upper floors for each residential tower, with two cellars, a ground floor and five upper floors for the amenities block. RERA record RERA filing RERA unit table
The RERA unit schedule records 793 two-bedroom homes and 334 three-bedroom homes. See the construction-stage and certificate records above. RERA unit table RERA amenities Document index
Master plan, architecture & building design
The revised GHMC plan describes a multi-tower residential scheme, with commercial net BUA also listed in its area schedule. It records a site and net plot area of 32729.16 sq. m., proposed coverage of 13288.06 sq. m. (40.6%), vacant plot area of 19441.10 sq. m., residential net BUA of 126488.32 sq. m., commercial net BUA of 4519.23 sq. m. and built-up area of 136370.70 sq. m. It also lists 183667.27 as a separate total built-up-area figure; the supplied extraction does not define how this figure relates to the other area entries. These are plan-recorded figures, not carpet or saleable areas.
The plan identifies Towers 1A, 1B, 2, 3, 4 and 5, each described as having two cellar levels, a stilt and 12 upper floors, with TDR utilisation noted for the 11th and 12th upper floors. The amenities block is shown with two cellars, a ground floor and five upper floors. The GHMC order also lists an amenities building; the detailed revised plan is the source for the above floor schedule.
The drawings show internal driveways and parking ramps, tot-lots, a clubhouse, STP, transformer/electrical areas, rainwater-harvesting structures, a garbage house and fire-related rooms or installations. The supplied material does not provide a sufficiently complete tower-by-tower plan schedule to describe typical floor layouts, flats per floor, lift counts, stair counts or circulation details.
Homes, configurations & floor plans
The following are the TG-RERA configuration and inventory figures. Saleable area is the filed measure; it is not a carpet-area measurement. The supplied floor-plan review reports no measured 2BHK or 3BHK designs, so no drawing-based carpet area can be stated. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 793 | 143 | 650 | 98.11–108.9 sq. m. | Not supplied | Not supplied |
| 3BHK | 334 | 107 | 227 | 167.26 sq. m. | Not supplied | Not supplied |
The portal record does not carry an as-of date for booked and available counts; treat them as indicative. Carpet area, balcony/utility areas and a unit’s share of common areas are not separately quantified in the supplied unit or drawing records, so no loading figure can be calculated from this evidence. RERA unit table Floor plans
Parking & vehicle circulation
The revised GHMC plan records 1184 proposed parking spaces. The building-permit order states that approved cellar and stilt areas for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The revised drawings show parking ramps and internal driveways; one plan extraction identifies ramps of 5.40 M. WIDE and 5.48 M. WIDE.
The supplied records do not establish a current parking count by type or level, a resident/visitor/accessible-space breakdown, EV charging provision, or an individual apartment’s parking allocation. A plan’s parking provision does not, by itself, establish exclusive parking rights for a buyer.
Amenities, recreation & open spaces
The GHMC plan and RERA portal list the following amenities and community infrastructure. Portal progress is reported below as supplied; the record does not independently verify completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / community buildings | Clubhouse shown on revised plan; “Community Buildings” in portal list | RERA amenities | Portal: 50%; not independently verified |
| Tot-lots / play areas | Tot-lots shown in plan; GHMC order lists tot-lot 4613.05 m2 | Portal: “Green Strip/TOT LOT/Park” 0%; not independently verified | |
| Internal roads and footpaths | Listed as project infrastructure; plans show internal driveways | RERA amenities | Portal: 10%; not independently verified |
| Sewerage / sewage treatment | STP / sewage-treatment infrastructure shown in plan | Portal: 15% for “Sewerage”; 0% for treatment/disposal category; not independently verified | |
| Solid-waste management | Garbage house shown in plan; portal lists solid-waste management and disposal | RERA amenities | Portal: 90%; not independently verified |
| Water conservation | Rainwater-harvesting structure (percolation pit) shown in plan | Portal: 0%; not independently verified | |
| Electrical infrastructure | Transformer space shown in plan; portal lists electrical meter room/sub-station/receiving station | RERA amenities | Portal: 65%; not independently verified |
| Fire infrastructure | Fire command/control room and fire-fighting installation appear in plan extracts | Portal: 0% for fire protection and safety category; not independently verified |
No clubhouse size or a complete facilities schedule with quantities and capacities is supplied. The broader marketing amenity list is not treated here as confirmation that each item is sanctioned or delivered.
Utilities, building services & safety
The sanctioned drawing extracts identify water supply/water lines and sumps, storm-water and water-sump elements, a rainwater-harvesting percolation structure, and an STP/sewage-treatment arrangement. The GHMC order also requires an ETP as per standard specification. These are plan/order requirements or drawings, not evidence that the systems are complete or operational; capacities, treatment volumes and reuse quantities are not supplied.
Electrical provisions shown include transformer space, an electrical room and DG sets in the plan extracts; the supplied records do not state generator capacity or backup duration. The drawings identify lifts, a fire lift and a service lift in a tower plan, but do not supply a project-wide lift count, number per tower or capacity.
The plans identify a fire command/control room, fire-fighting installations and a fire escape staircase. The revised plan states that an Occupancy Fire NOC is to be obtained before issue of the occupancy certificate and refers to Fire Department and AAI NOC conditions. No final fire NOC, occupancy certificate or independent confirmation of completed fire systems is supplied.
The plans also show a garbage house and garbage-bin/waste-management elements. The supplied evidence does not establish CCTV, access-control configuration, accessibility ramps or accessible-unit/circulation provision for this residential project.
Location, access & connectivity
The registered location is Chanda Nagar, Serilingampally Mandal, Ranga Reddy District, PIN 500050. The RERA filing gives the south boundary as a 60 feet road; the GHMC plan records an abutting road width of 18 metres and internal driveways. RERA record RERA filing
The supplied location dataset gives these mapped distances: nearest metro, Miyapur Metro, 4.9 km; Chandanagar railway station, 1.7 km; Bandhan Bank, 0.7 km; Vijaya Nursing Home, 0.7 km; Narayana Jr. College, 0.8 km; Startbot, 1.2 km; Nagarjuna Grammar High School, 1.1 km; Balaji Dresses, 0.9 km; and mini public park, 1.0 km. These are dataset distances; no travel times or public-transport service details are supplied. Location record
Developer & development status
The registered promoter is SHARVANI VENTURES & AVENUES PRIVATE LIMITED, a company, with GSTIN 36AAUCS9242H1ZP. The project record gives the promoter address as VAKULA MANSION, GACHIBOWLI CROSS ROADS, PJR LAYOUT ROAD NO 1, CHANDA NAGAR, Serilingampally, Ranga Reddy, 500050. The supplied official project site is https://www.sharvani.co/projects/sree-hemadurga-paradise. Corporate record Parties record RERA record
The Form-B affidavit dated 05 April 2021 is a promoter declaration, signed by Bandi Ramesh on behalf of the company. It records an undertaking to complete by 02/09/2026 and statements concerning title, encumbrances, separate-account funding, audit and approvals. These are declarations in the filed form, not independent verification of the underlying matters.
The project header gives a proposed and revised completion date of 02/01/2027. The TG-RERA certificate states registration through 02/09/2026 unless extended by the Authority; it is a separate date from the proposed completion date. See the construction-stage and certificate records above. RERA record
Approvals, official records & documents
| Identifier / date | P02400002908; issued 14/05/2021; valid through 02/09/2026 unless extended |
|---|---|
| Scope or note | Registers SREE HEMADURGA PARADISE; certificate records Survey Nos. 279 and 280. |
| Identifier / date | Approval 1/C21/09391/2020; dated 02 September, 2020 |
|---|---|
| Scope or note | Building permit for a multi-building residential project with an amenities building on Survey Nos. 279 and 280. |
| Identifier / date | Approval 1/C21/09391/2020; plan sheets dated 03-09-2020 / approved date recorded as 13-Sep-2020 in plan extraction |
|---|---|
| Scope or note | Revised plans describe Towers 1A, 1B, 2, 3, 4 and 5 and the amenities block. |
| Identifier / date | Dated 05 April 2021 |
|---|---|
| Scope or note | Promoter declaration filed for the project, including completion undertaking and project-fund obligations. |
| Identifier / date | Not supplied |
|---|---|
| Scope or note | The GHMC plan states an occupancy certificate is compulsory before occupation. |
| Identifier / date | Not available in the supplied public-record review |
|---|---|
| Scope or note | No HMDA layout determination is established here. HMDA |
Project at a glance
Project identity
Registered project name: SREE HEMADURGA PARADISE
Project type: Residential apartment project
Phase / registered portion: The supplied registration identifies the project as a whole; no separate phase name or phase boundary is disclosed. The RERA filing records six buildings/blocks.
TG-RERA registration: P02400002908, issued 14/05/2021; Form C states a five-year term ending 02/09/2026, unless extended by the Authority.
Registered promoter: SHARVANI VENTURES & AVENUES PRIVATE LIMITED
RERA status: “On-Going Project” in the supplied project record. The registration-validity date above is separate from the promoter’s proposed completion date; no extension is recorded in the supplied certificate.
Land and geographic identity
Locality: Chanda Nagar / Chandanagar
Revenue village: Chanda Nagar (also rendered “Chandanagar” in the filed documents)
Mandal / district: Serilingampally / Ranga Reddy
PIN: 500050
Project survey numbers: 279 and 280; the supplied RERA and sanctioned-plan records do not specify project subdivisions.
Registered/sanctioned site extent: 32729.16 sq. m.; the sanctioned plan records both plot area and net plot area as 32729.16 sq. m.
Boundaries in RERA filing: North: Neighbours land; South: 60 feet road; East: Neighbours land; West: Neighbours land.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit approval: 1/C21/09391/2020, dated 02 September, 2020 in the GHMC building permit order; revised plan sheets also bear this approval number.
Approved built-up area: The revised plan lists BUILT UP AREA 136370.70 and separately lists 183667.27 as a total built-up-area figure. The supplied extraction does not explain the basis of the latter figure.
Residential / commercial net BUA: 126488.32 residential net BUA and 4519.23 commercial net BUA, as listed in the revised plan.
Buildings: Six residential towers—1A, 1B, 2, 3, 4 and 5—plus a separate amenities block.
Sanctioned floor configuration: Revised plan: residential towers with 2 CELLARS + STILT+ 12 UPPER FLOORS; amenities block with 2 CELLARS+GROUND + 5 UPPER FLOORS.
Parking provision in revised plan: PROPOSED NUMBER OF PARKINGS 1184.
Unit counts: RERA filing: 1127 total units across six buildings. A separate sanctioned-plan sheet records a “num_units” figure of 192 for a building sheet; the supplied material does not establish that as the project-wide total.
Offering and status
RERA-filed configurations: 2BHK and 3BHK apartments
RERA-filed saleable areas: 2BHK: 98.11–108.9 sq. m.; 3BHK: 167.26 sq. m.
Booked / available: 2BHK: 143 booked / 650 available; 3BHK: 107 booked / 227 available. Counts are from the TG-RERA portal record; it gives no “as of” date, so treat them as indicative.
Construction stage: TG-RERA amenity/infrastructure fields report varying progress by item; these are portal-reported percentages, not independent site verification. No overall construction-completion percentage is supplied.
Proposed completion: 02/01/2027 in the project header; the RERA Form-B declaration dated 05 April 2021 undertakes completion by 02/09/2026.
Revised proposed completion: 02/01/2027 in the project record
Occupancy / completion certificate: No project occupancy certificate or completion certificate is included in the supplied records. The GHMC plan requires an occupancy certificate before occupation.
The project story
SREE HEMADURGA PARADISE is registered as a residential apartment development in Chanda Nagar, on Survey Nos. 279 and 280 of Chanda Nagar village, Serilingampally Mandal, Ranga Reddy District. The RERA filing describes six buildings and 1,127 units; the GHMC revised plan identifies six residential towers and a separate amenities block. The sanctioned arrangement shown in that plan is two cellars, a stilt level and 12 upper floors for each residential tower, with two cellars, a ground floor and five upper floors for the amenities block.
The RERA unit schedule records 793 two-bedroom homes and 334 three-bedroom homes. See the construction-stage and certificate records above.
Master plan, architecture & building design
The revised GHMC plan describes a multi-tower residential scheme, with commercial net BUA also listed in its area schedule. It records a site and net plot area of 32729.16 sq. m., proposed coverage of 13288.06 sq. m. (40.6%), vacant plot area of 19441.10 sq. m., residential net BUA of 126488.32 sq. m., commercial net BUA of 4519.23 sq. m. and built-up area of 136370.70 sq. m. It also lists 183667.27 as a separate total built-up-area figure; the supplied extraction does not define how this figure relates to the other area entries. These are plan-recorded figures, not carpet or saleable areas.
The plan identifies Towers 1A, 1B, 2, 3, 4 and 5, each described as having two cellar levels, a stilt and 12 upper floors, with TDR utilisation noted for the 11th and 12th upper floors. The amenities block is shown with two cellars, a ground floor and five upper floors. The GHMC order also lists an amenities building; the detailed revised plan is the source for the above floor schedule.
The drawings show internal driveways and parking ramps, tot-lots, a clubhouse, STP, transformer/electrical areas, rainwater-harvesting structures, a garbage house and fire-related rooms or installations. The supplied material does not provide a sufficiently complete tower-by-tower plan schedule to describe typical floor layouts, flats per floor, lift counts, stair counts or circulation details.
Homes, configurations & floor plans
The following are the TG-RERA configuration and inventory figures. Saleable area is the filed measure; it is not a carpet-area measurement. The supplied floor-plan review reports no measured 2BHK or 3BHK designs, so no drawing-based carpet area can be stated.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 793 | 143 | 650 | 98.11–108.9 sq. m. | Not supplied | Not supplied |
| 3BHK | 334 | 107 | 227 | 167.26 sq. m. | Not supplied | Not supplied |
The portal record does not carry an as-of date for booked and available counts; treat them as indicative. Carpet area, balcony/utility areas and a unit’s share of common areas are not separately quantified in the supplied unit or drawing records, so no loading figure can be calculated from this evidence.
Parking & vehicle circulation
The revised GHMC plan records 1184 proposed parking spaces. The building-permit order states that approved cellar and stilt areas for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The revised drawings show parking ramps and internal driveways; one plan extraction identifies ramps of 5.40 M. WIDE and 5.48 M. WIDE.
The supplied records do not establish a current parking count by type or level, a resident/visitor/accessible-space breakdown, EV charging provision, or an individual apartment’s parking allocation. A plan’s parking provision does not, by itself, establish exclusive parking rights for a buyer.
Amenities, recreation & open spaces
The GHMC plan and RERA portal list the following amenities and community infrastructure. Portal progress is reported below as supplied; the record does not independently verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / community buildings | Clubhouse shown on revised plan; “Community Buildings” in portal list | Portal: 50%; not independently verified | |
| Tot-lots / play areas | Tot-lots shown in plan; GHMC order lists tot-lot 4613.05 m2 | Portal: “Green Strip/TOT LOT/Park” 0%; not independently verified | |
| Internal roads and footpaths | Listed as project infrastructure; plans show internal driveways | Portal: 10%; not independently verified | |
| Sewerage / sewage treatment | STP / sewage-treatment infrastructure shown in plan | Portal: 15% for “Sewerage”; 0% for treatment/disposal category; not independently verified | |
| Solid-waste management | Garbage house shown in plan; portal lists solid-waste management and disposal | Portal: 90%; not independently verified | |
| Water conservation | Rainwater-harvesting structure (percolation pit) shown in plan | Portal: 0%; not independently verified | |
| Electrical infrastructure | Transformer space shown in plan; portal lists electrical meter room/sub-station/receiving station | Portal: 65%; not independently verified | |
| Fire infrastructure | Fire command/control room and fire-fighting installation appear in plan extracts | Portal: 0% for fire protection and safety category; not independently verified |
No clubhouse size or a complete facilities schedule with quantities and capacities is supplied. The broader marketing amenity list is not treated here as confirmation that each item is sanctioned or delivered.
Utilities, building services & safety
The sanctioned drawing extracts identify water supply/water lines and sumps, storm-water and water-sump elements, a rainwater-harvesting percolation structure, and an STP/sewage-treatment arrangement. The GHMC order also requires an ETP as per standard specification. These are plan/order requirements or drawings, not evidence that the systems are complete or operational; capacities, treatment volumes and reuse quantities are not supplied.
Electrical provisions shown include transformer space, an electrical room and DG sets in the plan extracts; the supplied records do not state generator capacity or backup duration. The drawings identify lifts, a fire lift and a service lift in a tower plan, but do not supply a project-wide lift count, number per tower or capacity.
The plans identify a fire command/control room, fire-fighting installations and a fire escape staircase. The revised plan states that an Occupancy Fire NOC is to be obtained before issue of the occupancy certificate and refers to Fire Department and AAI NOC conditions. No final fire NOC, occupancy certificate or independent confirmation of completed fire systems is supplied.
The plans also show a garbage house and garbage-bin/waste-management elements. The supplied evidence does not establish CCTV, access-control configuration, accessibility ramps or accessible-unit/circulation provision for this residential project.
Location, access & connectivity
The registered location is Chanda Nagar, Serilingampally Mandal, Ranga Reddy District, PIN 500050. The RERA filing gives the south boundary as a 60 feet road; the GHMC plan records an abutting road width of 18 metres and internal driveways.
The supplied location dataset gives these mapped distances: nearest metro, Miyapur Metro, 4.9 km; Chandanagar railway station, 1.7 km; Bandhan Bank, 0.7 km; Vijaya Nursing Home, 0.7 km; Narayana Jr. College, 0.8 km; Startbot, 1.2 km; Nagarjuna Grammar High School, 1.1 km; Balaji Dresses, 0.9 km; and mini public park, 1.0 km. These are dataset distances; no travel times or public-transport service details are supplied.
Developer & development status
The registered promoter is SHARVANI VENTURES & AVENUES PRIVATE LIMITED, a company, with GSTIN 36AAUCS9242H1ZP. The project record gives the promoter address as VAKULA MANSION, GACHIBOWLI CROSS ROADS, PJR LAYOUT ROAD NO 1, CHANDA NAGAR, Serilingampally, Ranga Reddy, 500050. The supplied official project site is https://www.sharvani.co/projects/sree-hemadurga-paradise.
The Form-B affidavit dated 05 April 2021 is a promoter declaration, signed by Bandi Ramesh on behalf of the company. It records an undertaking to complete by 02/09/2026 and statements concerning title, encumbrances, separate-account funding, audit and approvals. These are declarations in the filed form, not independent verification of the underlying matters.
The project header gives a proposed and revised completion date of 02/01/2027. The TG-RERA certificate states registration through 02/09/2026 unless extended by the Authority; it is a separate date from the proposed completion date. See the construction-stage and certificate records above.
Approvals, official records & documents
| Identifier / date | P02400002908; issued 14/05/2021; valid through 02/09/2026 unless extended |
|---|---|
| Scope or note | Registers SREE HEMADURGA PARADISE; certificate records Survey Nos. 279 and 280. |
| Identifier / date | Approval 1/C21/09391/2020; dated 02 September, 2020 |
|---|---|
| Scope or note | Building permit for a multi-building residential project with an amenities building on Survey Nos. 279 and 280. |
| Identifier / date | Approval 1/C21/09391/2020; plan sheets dated 03-09-2020 / approved date recorded as 13-Sep-2020 in plan extraction |
|---|---|
| Scope or note | Revised plans describe Towers 1A, 1B, 2, 3, 4 and 5 and the amenities block. |
| Identifier / date | Dated 05 April 2021 |
|---|---|
| Scope or note | Promoter declaration filed for the project, including completion undertaking and project-fund obligations. |
| Identifier / date | Not supplied |
|---|---|
| Scope or note | The GHMC plan states an occupancy certificate is compulsory before occupation. |
| Identifier / date | Not available in the supplied public-record review |
|---|---|
| Scope or note | No HMDA layout determination is established here. |
Other registrations of Sree Hemadurga Paradise
Frequently asked questions
Is SREE HEMADURGA PARADISE registered with Telangana RERA?
Yes. SREE HEMADURGA PARADISE is registered with the Telangana Real Estate Regulatory Authority as P02400002908; the registration status is On-Going Project.
Who is the developer of SREE HEMADURGA PARADISE?
The promoter named in the RERA registration is SHARVANI VENTURES & AVENUES PRIVATE LIMITED.
Where is SREE HEMADURGA PARADISE located?
SREE HEMADURGA PARADISE is in CHANDA NAGAR, Serilingampally, Rangareddy, Telangana (500050).
When will SREE HEMADURGA PARADISE be completed?
The promoter's proposed date of completion filed with RERA is 02/01/2027. This is the promoter's declaration, not a guarantee.