Sign in

Sri Shakthi Nilayam

M/S.PAVITHRA CONSTRUCTIONS · Rangareddy · RERA P02400006235

Sri Shakthi Nilayam is a residential apartment project in Kondapur, Serilingampally mandal, Ranga Reddy district, developed by registered promoter M/S.Pavithra Constructions. The project is on a land area of 668.9 sq. m and comprises one building with 1 Stilt + 5 upper floors and 15 apartments: 10 2BHK and 5 3BHK units. Its TG-RERA registration is P02400006235, and its proposed completion date is 18/04/2025.

01What we found

Period endedTG-RERA registration ran to 18 Apr 2025 - check its extension on TG-RERA
11documents on file - each fact links to its page
17court cases on this project's land (survey 202, Kondapur)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in

1. Project at a glance

Project identity

FieldRecord
Registered project nameSri Shakthi Nilayam RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNot identified as a separate phase; the registration certificate identifies the project, and the building permit describes Building Name – A (Residential).
TG-RERA registrationP02400006235, granted 12 June 2023; certificate validity runs to 18 April 2025. The supplied record does not identify an extension.
Registered promoterM/S.Pavithra Constructions
Registration statusThe certificate records registration under section 5. Its stated validity end date is past; current registration status is not established by the supplied certificate.

Land and geographic identity

FieldRecord
LocalityKondapur; the completion certificate also identifies Sree Ram Nagar Colony, Kondapur. RERA record
Revenue villageKondapur RERA record
Mandal / district / PINSerilingampally / Ranga Reddy / 500084 RERA record
Project survey number(s)Survey No. 202; no subdivision is stated in the registration certificate.
RERA-filed site areaTotal/net area: 668.9 sq. m. RERA filing
GHMC permit areaPlot area: 668.9 sq. m; road-affected area: 0.0 sq. m; net plot area recorded in the permit: 664.45 sq. m.
Boundaries in RERA filingEast: 30 ft wide road; west: Plot No. 1021 and 1016; north: 30 ft wide road; south: 30 ft wide road. RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approvalRevised Building Permit 1028/GHMC/SLP/2022-BP, approved 18 April 2022.
Building described in permitBuilding Name – A (Residential); 1 Stilt + 5 upper floors.
Approved built-up area1,730.20 sq. m recorded under the permit’s residential sanctioned parameters.
Building countOne building is recorded in the RERA filing. RERA filing
ParkingPermit records Total Parking Area 362.7; the supplied extract does not state a number of parking spaces or specify a parking level count.
Unit countGHMC permit conditions refer to the sanctioned number of units but the supplied extract does not state that number. The RERA filing records 15 units. RERA unit table

Offering and status

FieldRecord
RERA-filed configurations2BHK: 10 units; 3BHK: 5 units. RERA unit table
RERA-filed saleable area2BHK: 75.31 sq. m; 3BHK: 127.77 sq. m. RERA unit table
Booked / availablePortal-derived counts show 0 booked and 15 available (10 2BHK and 5 3BHK); the portal record has no as-of date, so counts are indicative. RERA unit table
Completion deadlineThe RERA registration certificate and Form-B declaration state 18/04/2025 as the completion date.
Occupancy certificateArchitect’s completion certificate identifies GHMC OC 3307/GHMC/SLP/2023-OC, issued 7 September 2023. The certificate describes overall completion of the registered project; the supplied extract does not separately specify tower or phase scope.
Construction stageThe architect’s certificate dated 12 February 2024 states that construction was complete in all aspects. This is a filed certificate, not an independent site inspection.

2. The project story

Sri Shakthi Nilayam is a residential apartment project in Kondapur village, Serilingampally mandal, Ranga Reddy district, on Survey No. 202. The RERA filing describes one building and 15 apartments, comprising 10 two-bedroom and 5 three-bedroom units. RERA record RERA filing RERA unit table

GHMC’s revised permit describes a residential building with one stilt level and five upper floors. The project’s architect later certified overall completion and cited an occupancy certificate issued by GHMC on 7 September 2023. These are filed project records; they do not establish a current independent inspection of the property.

The RERA registration certificate separately records its validity through 18 April 2025, while the Form-B declaration states that date as the completion undertaking. The supplied documents do not establish whether the registration was subsequently extended.

3. Master plan, architecture & building design

The RERA record and GHMC permit describe one residential building, Building Name – A, on a site listed as 668.9 sq. m. The permit records a net plot area of 664.45 sq. m and approved residential built-up area of 1,730.20 sq. m. RERA filing

The sanctioned configuration is 1 Stilt + 5 upper floors. The permit extract does not provide floor-by-floor apartment arrangements, a building footprint, tower height, lifts, stair counts, internal circulation drawings or a detailed land-use schedule.

GHMC’s permit lists a total parking area of 362.7 and identifies one tot-lot, a transformer space, a garbage house and a rainwater-harvesting pit. It also requires the sanctioned plan to be followed and states that the stilt and cellar approved for parking must be used exclusively for parking. The supplied permit extract does not give a cellar level configuration or parking-space count.

The layout-plan document in the RERA file is listed but not extracted; no layout drawing is available in the supplied material for further description. Document index

4. Homes, configurations & floor plans

RERA-filed unit counts and saleable areas are shown below. The separate carpet-area figures are software measurements from floor-plan drawing geometry, not RERA disclosures; the drawing measurements are identified as requiring review. RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001075.31 sq. m55.6–58.5 sq. m; median 57.0 sq. m (software-measured)24% (supplied drawing comparison)
3BHK505127.77 sq. m114.8–117.0 sq. m; median 115.9 sq. m (software-measured)Not supplied

The filing identifies the 2BHK units as “DOUBLE BEDROOM” / “DOUBLEBEDROOM” and the 3BHK units as “TRIPLE BEDROOM” / “TRIPLEBEDROOM.” The portal’s booked and available figures have no stated as-of date. RERA unit table

The measured drawings show, among other spaces, living/dining areas, kitchens, bedrooms, toilets and balconies; the measured 3BHK drawing also labels a guest room and wash area. These are drawing-based measurements and labels, not a substitute for checking the approved drawing itself. The supplied area note distinguishes the measured carpet area from RERA saleable area: the latter includes the home’s share of common areas, while the drawing-based carpet measure excludes balcony area. Floor plans

5. Parking & vehicle circulation

GHMC’s permit records Total Parking Area 362.7 and requires the stilt and cellar areas approved for parking to be used exclusively for vehicle parking. The permit extract does not specify the number of car or two-wheeler spaces, the number of parking levels, visitor or accessible parking, ramp arrangement, EV charging, or unit-wise parking allocation. The available records therefore establish a sanctioned parking area, but do not establish how many spaces are provided or whether any specific space is allocated to a particular apartment.

6. Amenities, recreation & open spaces

The RERA-filed amenity schedule records the following items. A “YES” denotes availability as recorded in the filing; the supplied progress percentages are not independent verification of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot-lot / parkSize not suppliedRERA amenity schedule; GHMC permit also requires a fenced tot-lot and maintained greenery RERA amenitiesRERA schedule: 0%; GHMC permit condition, not completion verification
Water supplyDetails and capacity not suppliedRERA amenity schedule RERA amenitiesMarked YES; 50% progress recorded
Water conservation / rainwater harvestingSize or capacity not suppliedRERA amenity schedule; permit lists one rainwater-harvesting pit RERA amenitiesMarked YES; schedule records 0%
Sewerage (chambers, lines, septic tank, STP)System details and capacity not suppliedRERA amenity schedule RERA amenitiesMarked YES; schedule records 0%
Internal roads and footpathsDetails not suppliedRERA amenity schedule RERA amenities0% recorded
Storm-water drainsDetails not suppliedRERA amenity schedule RERA amenities0% recorded
Street lightingDetails not suppliedRERA amenity schedule RERA amenities0% recorded
Community buildingsNo facility details suppliedRERA amenity schedule RERA amenities0% recorded
Sewage and sullage treatment/disposalDetails not suppliedRERA amenity schedule RERA amenities0% recorded
Solid-waste management and disposalDetails not suppliedRERA amenity schedule RERA amenities0% recorded
Energy managementDetails not suppliedRERA amenity schedule RERA amenities0% recorded
Fire protection and fire safetyDetails not suppliedRERA amenity schedule RERA amenities0% recorded
Electrical meter room / sub-station / receiving stationDetails not supplied; permit also identifies transformer spaceRERA amenity schedule RERA amenitiesMarked YES; schedule records 0%
Recreational open spaceAggregate area not suppliedRERA amenity schedule RERA amenities0% recorded

A separate third-party listing advertises additional facilities, including a pool, gym and clubhouse; these are not established as RERA-filed or sanctioned facilities in the supplied project records and are not treated here as confirmed project provision. Promoter website

7. Utilities, building services & safety

The RERA amenity schedule marks water supply, sewerage and rainwater harvesting as available, but records progress of 50% for water supply and 0% for the listed sewerage and rainwater-harvesting items. The schedule does not provide water source, storage, treatment, STP capacity, reuse arrangements or system commissioning evidence. RERA amenities

GHMC’s permit identifies a transformer space, garbage house and rainwater-harvesting structure, and requires water and electricity public amenities to be provided only on production of an occupancy certificate. It also states that public utility connections are subject to that certificate. These permit conditions do not, on their own, confirm the installation or operating status of the systems.

The permit requires sanitation, plumbing, fire-safety systems, lifts and electrical installations to be executed under qualified technical supervision. It also assigns responsibility for structural and means-of-escape safety and requires an Occupancy Fire NOC before issue of an occupancy certificate. The supplied extracts do not specify the installed fire systems, lift count or capacity, backup power, security/CCTV, waste-segregation arrangements, or accessibility features.

8. Location, access & connectivity

The registered location is Kondapur village, Serilingampally mandal, Ranga Reddy district, Telangana, PIN 500084; the RERA certificate gives the promoter’s project office location as Kondapur, Serilingampally, Ranga Reddy. The RERA filing describes 30 ft wide roads on the east, north and south boundaries. RERA record RERA filing

A supplied parcel-centroid record locates the site at 17.457113437412538, 78.34902055669444; this is a cadastral centroid, not a surveyed entrance location. The supplied connectivity record lists HITEC City at 3.4 km. Cadastral map Location record

The supplied project records do not provide verified public-transport routes, approach-road directions or measured distances to other landmarks. Location record

9. Developer & development status

The registered promoter is M/S.Pavithra Constructions. The RERA filing identifies the organisation as a partnership and lists GSTIN 36ABBFP5884B1Z7. The supplied records identify its address as 482-B, Street No. 12/A, Sreeram Nagar Colony, Kondapur, Serilingampally, Ranga Reddy, 500084. Corporate record Parties record

The RERA documents identify Jasti Siva Kumari as the land owner and name an area-share arrangement. Her Form-B declaration states a completion undertaking of 18/04/2025. Parties record The architect’s certificate dated 12 February 2024 states that the project was complete in all aspects and cites the GHMC occupancy certificate issued on 7 September 2023; this is a filed professional certificate, not independent site verification.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400006235; issued 12 June 2023; validity to 18 April 2025
What the supplied record establishesForm ‘C’ registration certificate under section 5; names Sri Shakthi Nilayam, M/S.Pavithra Constructions and Survey No. 202.
GHMC revised building permit
Identifier / date1028/GHMC/SLP/2022-BP; approved 18 April 2022
What the supplied record establishesResidential Building A, 1 Stilt + 5 upper floors; permit includes sanctioned parameters and conditions.
GHMC file number
Identifier / date002231/GHMC/1130/SLP2/2022-BP
What the supplied record establishesFile number shown in the permit record.
GHMC occupancy certificate cited by architect
Identifier / date3307/GHMC/SLP/2023-OC; issued 7 September 2023
What the supplied record establishesIdentified in the architect’s Form–1A completion certificate.
Architect’s completion certificate
Identifier / dateDated 12 February 2024
What the supplied record establishesStates overall completion of the registered project.
Form-B declaration
Identifier / dateProject completion undertaking: 18/04/2025
What the supplied record establishesDeclaration by Jasti Sivakumari, identified in the record as land owner.
Layout plan record
Identifier / dateRERA-filed document ID 266714
What the supplied record establishesListed as a layout-plan document, but the supplied record does not provide an extracted layout plan for review. Document index

The approval index above identifies the principal project records supplied for this overview; the detailed permit conditions and other land and approval matters are addressed in their respective due-diligence sections.

Frequently asked questions

Is Sri Shakthi Nilayam registered with Telangana RERA?

Yes. Sri Shakthi Nilayam is registered with the Telangana Real Estate Regulatory Authority as P02400006235; the registration status is New Project.

Who is the developer of Sri Shakthi Nilayam?

The promoter named in the RERA registration is M/S.PAVITHRA CONSTRUCTIONS.

Where is Sri Shakthi Nilayam located?

Sri Shakthi Nilayam is in Kondapur, Serilingampally, Rangareddy, Telangana (500084).

When will Sri Shakthi Nilayam be completed?

The promoter's proposed date of completion filed with RERA is 18/04/2025. This is the promoter's declaration, not a guarantee.

More projects in Kondapur