Vasavi Vijay Vihar
VASAVI REALTY AND DEVELOPERS LLP · Mahabubnagar · RERA P01400010779
VASAVI VIJAY VIHAR is a plotted development in Udithyal, Balanagar Mandal, Mahabubnagar District. The registered promoter is VASAVI REALTY AND DEVELOPERS LLP. The RERA-filed site area is 171868.24 sq. m; the offering is open plots, with drawing-based extraction identifying 462 plots ranging from 150.5 sq. m to 916.53 sq. m, and no towers or floors disclosed. It is registered with TG-RERA as P01400010779, and the project header gives a proposed completion date of 12/04/2029.
More from Vasavi Realty And Developers LLP · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | VASAVI VIJAY VIHAR RERA record |
| Project type | Plotted development / open-plot layout RERA record |
| Phase / registered portion | No phase name is separately disclosed; the registration is for the project as recorded under the RERA number below. RERA record |
| TG-RERA registration number | P01400010779 RERA record |
| Registration validity | 12/12/2025 to 12/12/2028, unless extended by TG-RERA. This is the registration-validity period, not the stated project completion date. RERA record |
| Registered promoter | VASAVI REALTY AND DEVELOPERS LLP RERA record Corporate record |
| RERA status | New Project; registration certificate is in the file. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Revenue village | Udithyal (also printed as “UDITHYAL VILLAGE” in the filed layout-plan record). RERA record |
| Locality | Udithyal / Balanagar Mandal RERA record RERA filing |
| Mandal / district / PIN | Balanagar / Mahabubnagar / 509202 RERA record |
| Survey numbers and subdivisions, as registered | 496; 510 PART; 530 PART; 535 PART; 497 PART; 498 PART; 504 PART; 505 PART; 506 PART; 507 PART; 508 PART; 509 PART RERA record |
| RERA-filed site area | 171868.24 sq. m total area; 167699.22 sq. m net area; 4169.02 sq. m recorded as affected in road widening/FTL of tanks/Nala widening. RERA filing |
| Boundaries | East: 33FT WIDE EXISTING ROAD; West: OTHERS LAND; North: OTHERS LAND; South: MAIN ROAD 18M EXISTING AND 30M PROPOSED ROAD WIDTH. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval on file | 1218/HMDA/SWDL/2025, dated 12/12/2025; document describes a draft layout letter / technical approval. Approvals record |
| Revised layout record also on file | 2612/HMDA/SWDL/2026, dated 17/10/2026, described as a revised draft layout letter. Approvals record |
| Approved built-up area recorded in RERA fields | 86803.85 sq. m RERA filing |
| Buildings / floors | Not applicable to the recorded offering as a plotted layout; no building count or floor configuration is disclosed. The filed HMDA draft-layout conditions state that buildings are not to be constructed on plots before final layout release. |
| Parking | The draft-layout area statement lists Common Parking Area: 0.0; no project-wide parking-space count or plot-specific parking allocation is disclosed. |
Offering and status
| Field | Project record |
|---|---|
| Offering | Open plots; RERA-filed materials identify the project as a plotted development. RERA record |
| Plot count and sizes | Drawing-based software extraction identifies 462 plots, with sizes from 150.5 sq. m to 916.53 sq. m; these are drawing-measured values, not RERA-filed inventory figures. Layout record |
| Booked / available counts | Not disclosed in the supplied project record. |
| Construction / development stage | No independently verified site-progress report is supplied. The RERA amenity record reports internal roads and footpaths at 30% and lists the other facilities at 0%; this is a filed progress declaration, not an independent site inspection. RERA amenities |
| Completion timing | Form-B declaration states completion by 12 December 2028. The project header separately gives proposed completion as 12/04/2029. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. For this plotted layout, the file contains draft-layout approval records and conditions for later final layout release. Document index |
2. The project story
VASAVI VIJAY VIHAR is registered as a plotted development in Udithyal village, Balanagar Mandal, Mahabubnagar District. The RERA-filed survey schedule covers 496, 510 PART, 530 PART, 535 PART, 497 PART, 498 PART, 504 PART, 505 PART, 506 PART, 507 PART, 508 PART and 509 PART. The offering is open plots, rather than apartments or completed houses. RERA record
The file contains HMDA draft-layout records, including the 12 December 2025 technical approval and a revised draft-layout record dated 17 October 2026. These records set out plot, road, open-space, utility and social-infrastructure land uses and require development work and handover of specified areas before final layout release. The supplied material does not establish that final layout release has occurred or independently verify current on-site completion. HMDA
3. Master plan, architecture & building design
This is a plotted layout, so the relevant design evidence concerns plot arrangement, internal roads and allocated land uses, rather than towers, building footprints or apartment floor plans. The RERA fields record 171868.24 sq. m total site area, 4169.02 sq. m affected area and 167699.22 sq. m net area. The 2026 revised HMDA draft-layout record gives a net layout area of 183495.28 sq. m. RERA filing
The revised draft-layout area statement allocates 99207.96 sq. m (54.07%) to plots, 57721.50 sq. m (31.46%) to roads, 17037.33 sq. m (9.28%) to open space, 2958.15 sq. m (1.61%) to buffer area, 4775.75 sq. m (2.60%) to social infrastructure and 1793.28 sq. m (0.98%) to utilities. Its common-parking and amenities entries are 0.0 sq. m. These are figures in the revised draft-layout record.
Software extraction from the layout drawing identifies 462 plots and plot sizes from 150.5 sq. m (180.0 sq. yd) to 916.53 sq. m (1096.2 sq. yd). The median extracted plot size is 167.23 sq. m (200.0 sq. yd). The drawing extraction is not a RERA-filed plot schedule; verify plot particulars against the sanctioned drawing and final layout documents. Layout record
4. Homes, configurations & floor plans
This is a plotted project; no apartment configuration or apartment carpet-area schedule is supplied. The RERA-filed plot inventory counts and booking status are not disclosed. The following plot count and size information is extracted by software from the layout drawing and should be checked against the drawing schedule. RERA record Layout record
| Plot-size band (sq. yd) | Equivalent band shown (sq. m) | Drawing-extracted plots |
|---|---|---|
| 150–200 | 125–167 | 111 |
| 200–250 | 167–209 | 250 |
| 250–300 | 209–251 | 11 |
| 300–400 | 251–334 | 53 |
| 400–500 | 334–418 | 7 |
| 500–1000 | 418–836 | 28 |
| 1000+ | 836+ | 2 |
The drawing extraction identifies 462 plots with sizes, ranging from 150.5 sq. m to 916.53 sq. m; the most common extracted size is 167.23 sq. m (200.0 sq. yd), appearing for 140 plots. These are software-measured layout-drawing values, not RERA-filed saleable or carpet areas. No apartment floor-plan measurements are supplied. Layout record Floor plans
5. Parking & vehicle circulation
The HMDA draft-layout area statement records 0.0 sq. m as common parking area. The supplied materials do not establish a count of parking spaces, plot-specific parking allocation, visitor or accessible parking, or a separate parking facility.
The draft-layout drawing includes internal road widths and identifies road areas as part of the layout. The 2025 draft record also refers to roads being opened for neighbouring-site access and not enclosing the site with a compound wall or fencing. No supplied evidence specifies vehicle entry/exit arrangements, ramps, pedestrian separation or EV charging.
6. Amenities, recreation & open spaces
The amenities register lists facilities as available for the project but reports progress separately; apart from internal roads and footpaths, it records 0% progress. These figures are RERA-filed declarations, not independent verification of completion. RERA amenities
| Description / size | Included in the layout road network; no separate size in the amenity register. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-filed progress: 30%; not independently verified. |
| Description / size | Open-space and park-development provisions; revised draft-layout open space: 17037.33 sq. m (9.28%). |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-filed progress: 0%; not independently verified. |
| Description / size | Listed as a project facility; no size or capacity supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-filed progress: 0%; not independently verified. |
| Description / size | Included in the filed amenity list; area is stated in the draft-layout record as open space above. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-filed progress: 0%; not independently verified. |
7. Utilities, building services & safety
The revised HMDA draft-layout record allocates 1793.28 sq. m (0.98%) to utilities. The filed layout and amenity materials list water supply, internal water-supply pipelines, protected water supply, sumps and an overhead tank; storm-water drains and underground storm-water drainage; sewerage lines and a common septic tank/STP; rainwater-harvesting pits; solid-waste disposal and a bio-compost unit; electrical supply lines, a transformer and street lighting. The documents do not supply capacities or independently verified completion status for these systems. RERA amenities
Fire protection and fire-safety requirements appear in the amenity list, but no specific fire-system design, clearance, capacity or completed installation is established by the supplied evidence. The project is plotted; no apartment lifts, accessible-building circulation, security/CCTV system or backup-power capacity is disclosed. RERA amenities Document index
8. Location, access & connectivity
The registered location is Udithyal village, Balanagar Mandal, Mahabubnagar District, Telangana, PIN 509202. The project boundary description records an existing 33FT WIDE EXISTING ROAD on the east and an 18M existing and 30M proposed road width on the south. HMDA draft-layout materials also identify internal layout roads. RERA record RERA filing
The supplied location data gives the nearest sampled Outer Ring Road interchange as approximately 43.0 km and SubCentre Udithyala as 1.9 km. These are supplied distance estimates; no travel times or public-transport details are provided. Location record
9. Developer & development status
The registered promoter is VASAVI REALTY AND DEVELOPERS LLP, an LLP, with GSTIN 36AATFV8296Q1ZM. The project registration certificate identifies the same legal promoter. Corporate record
The promoter’s Form-B filing is a declaration by authorised signatory CHANDA ABHISHEK and states a completion undertaking of 12 December 2028. The project header separately records proposed completion as 12/04/2029. Registration validity runs from 12/12/2025 to 12/12/2028; none of these dates, by itself, establishes construction completion or an occupancy/completion certificate. RERA record
The file identifies the registered office address as 1ST FLOOR, 8-2-120/86/9/A/1, 12 AND 2/13, NORTH END ANILATHMAJA HOUSING SOCIETY, ROAD NO 2, Balanagar Mandal, Mahabubnagar, Telangana, 509202. The promoter’s site is listed as thevasavigroup.com. RERA filing Parties record
10. Approvals, official records & documents
| Record | What the supplied file establishes |
|---|---|
| TG-RERA registration | Form-C certificate for VASAVI VIJAY VIHAR, registration P01400010779, valid 12/12/2025–12/12/2028. |
| HMDA draft layout | 1218/HMDA/SWDL/2025, dated 12/12/2025; technical approval / draft layout letter for a plotted layout. |
| Revised HMDA draft layout | 2612/HMDA/SWDL/2026, dated 17/10/2026; revised draft-layout record with an area statement and conditions for final layout release. |
| Related HMDA records | Application 006227/HMDA/01878/SWDL/SKP1/2025; road-affected-area gift deed 13777/2025 is cited in the draft-layout record. The revised record identifies application 017427/HMDA/04432/SWDL/SKP1/2026-ADD. |
| HMDA mortgage records | The draft-layout files identify mortgages in favour of the Metropolitan Commissioner, HMDA, including deeds 14835/2025 and 14836/2025; the revised layout record also identifies deeds 12159/2026 and 12160/2026. |
| Completion / occupancy records | No final layout release, completion certificate or occupancy certificate is supplied. The approval records describe draft-layout permissions and require development work and handover of specified areas before final layout release. Document index |
| Other filed project documents | Form-B declaration (633920); blank allotment-letter form (633921); Rule 38 agreement-for-sale template (633925); LLP incorporation certificate (633928). Document index |
1. Project at a glance
Project identity
Registered name: VASAVI VIJAY VIHAR
Project type: Plotted development / open-plot layout
Phase / registered portion: No phase name is separately disclosed; the registration is for the project as recorded under the RERA number below.
TG-RERA registration number: P01400010779
Registration validity: 12/12/2025 to 12/12/2028, unless extended by TG-RERA. This is the registration-validity period, not the stated project completion date.
Registered promoter: VASAVI REALTY AND DEVELOPERS LLP
RERA status: New Project; registration certificate is in the file.
Land and geographic identity
Revenue village: Udithyal (also printed as “UDITHYAL VILLAGE” in the filed layout-plan record).
Locality: Udithyal / Balanagar Mandal
Mandal / district / PIN: Balanagar / Mahabubnagar / 509202
Survey numbers and subdivisions, as registered: 496; 510 PART; 530 PART; 535 PART; 497 PART; 498 PART; 504 PART; 505 PART; 506 PART; 507 PART; 508 PART; 509 PART
RERA-filed site area: 171868.24 sq. m total area; 167699.22 sq. m net area; 4169.02 sq. m recorded as affected in road widening/FTL of tanks/Nala widening.
Boundaries: East: 33FT WIDE EXISTING ROAD; West: OTHERS LAND; North: OTHERS LAND; South: MAIN ROAD 18M EXISTING AND 30M PROPOSED ROAD WIDTH.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval on file: 1218/HMDA/SWDL/2025, dated 12/12/2025; document describes a draft layout letter / technical approval.
Revised layout record also on file: 2612/HMDA/SWDL/2026, dated 17/10/2026, described as a revised draft layout letter.
Approved built-up area recorded in RERA fields: 86803.85 sq. m
Buildings / floors: Not applicable to the recorded offering as a plotted layout; no building count or floor configuration is disclosed. The filed HMDA draft-layout conditions state that buildings are not to be constructed on plots before final layout release.
Parking: The draft-layout area statement lists Common Parking Area: 0.0; no project-wide parking-space count or plot-specific parking allocation is disclosed.
Offering and status
Offering: Open plots; RERA-filed materials identify the project as a plotted development.
Plot count and sizes: Drawing-based software extraction identifies 462 plots, with sizes from 150.5 sq. m to 916.53 sq. m; these are drawing-measured values, not RERA-filed inventory figures.
Booked / available counts: Not disclosed in the supplied project record.
Construction / development stage: No independently verified site-progress report is supplied. The RERA amenity record reports internal roads and footpaths at 30% and lists the other facilities at 0%; this is a filed progress declaration, not an independent site inspection.
Completion timing: Form-B declaration states completion by 12 December 2028. The project header separately gives proposed completion as 12/04/2029.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. For this plotted layout, the file contains draft-layout approval records and conditions for later final layout release.
2. The project story
VASAVI VIJAY VIHAR is registered as a plotted development in Udithyal village, Balanagar Mandal, Mahabubnagar District. The RERA-filed survey schedule covers 496, 510 PART, 530 PART, 535 PART, 497 PART, 498 PART, 504 PART, 505 PART, 506 PART, 507 PART, 508 PART and 509 PART. The offering is open plots, rather than apartments or completed houses.
The file contains HMDA draft-layout records, including the 12 December 2025 technical approval and a revised draft-layout record dated 17 October 2026. These records set out plot, road, open-space, utility and social-infrastructure land uses and require development work and handover of specified areas before final layout release. The supplied material does not establish that final layout release has occurred or independently verify current on-site completion.
3. Master plan, architecture & building design
This is a plotted layout, so the relevant design evidence concerns plot arrangement, internal roads and allocated land uses, rather than towers, building footprints or apartment floor plans. The RERA fields record 171868.24 sq. m total site area, 4169.02 sq. m affected area and 167699.22 sq. m net area. The 2026 revised HMDA draft-layout record gives a net layout area of 183495.28 sq. m.
The revised draft-layout area statement allocates 99207.96 sq. m (54.07%) to plots, 57721.50 sq. m (31.46%) to roads, 17037.33 sq. m (9.28%) to open space, 2958.15 sq. m (1.61%) to buffer area, 4775.75 sq. m (2.60%) to social infrastructure and 1793.28 sq. m (0.98%) to utilities. Its common-parking and amenities entries are 0.0 sq. m. These are figures in the revised draft-layout record.
Software extraction from the layout drawing identifies 462 plots and plot sizes from 150.5 sq. m (180.0 sq. yd) to 916.53 sq. m (1096.2 sq. yd). The median extracted plot size is 167.23 sq. m (200.0 sq. yd). The drawing extraction is not a RERA-filed plot schedule; verify plot particulars against the sanctioned drawing and final layout documents.
4. Homes, configurations & floor plans
This is a plotted project; no apartment configuration or apartment carpet-area schedule is supplied. The RERA-filed plot inventory counts and booking status are not disclosed. The following plot count and size information is extracted by software from the layout drawing and should be checked against the drawing schedule.
| Plot-size band (sq. yd) | Equivalent band shown (sq. m) | Drawing-extracted plots |
|---|---|---|
| 150–200 | 125–167 | 111 |
| 200–250 | 167–209 | 250 |
| 250–300 | 209–251 | 11 |
| 300–400 | 251–334 | 53 |
| 400–500 | 334–418 | 7 |
| 500–1000 | 418–836 | 28 |
| 1000+ | 836+ | 2 |
The drawing extraction identifies 462 plots with sizes, ranging from 150.5 sq. m to 916.53 sq. m; the most common extracted size is 167.23 sq. m (200.0 sq. yd), appearing for 140 plots. These are software-measured layout-drawing values, not RERA-filed saleable or carpet areas. No apartment floor-plan measurements are supplied.
5. Parking & vehicle circulation
The HMDA draft-layout area statement records 0.0 sq. m as common parking area. The supplied materials do not establish a count of parking spaces, plot-specific parking allocation, visitor or accessible parking, or a separate parking facility.
The draft-layout drawing includes internal road widths and identifies road areas as part of the layout. The 2025 draft record also refers to roads being opened for neighbouring-site access and not enclosing the site with a compound wall or fencing. No supplied evidence specifies vehicle entry/exit arrangements, ramps, pedestrian separation or EV charging.
6. Amenities, recreation & open spaces
The amenities register lists facilities as available for the project but reports progress separately; apart from internal roads and footpaths, it records 0% progress. These figures are RERA-filed declarations, not independent verification of completion.
| Description / size | Included in the layout road network; no separate size in the amenity register. |
|---|---|
| Declared progress / verified status | RERA-filed progress: 30%; not independently verified. |
| Description / size | Open-space and park-development provisions; revised draft-layout open space: 17037.33 sq. m (9.28%). |
|---|---|
| Declared progress / verified status | RERA-filed progress: 0%; not independently verified. |
| Description / size | Listed as a project facility; no size or capacity supplied. |
|---|---|
| Declared progress / verified status | RERA-filed progress: 0%; not independently verified. |
| Description / size | Included in the filed amenity list; area is stated in the draft-layout record as open space above. |
|---|---|
| Declared progress / verified status | RERA-filed progress: 0%; not independently verified. |
7. Utilities, building services & safety
The revised HMDA draft-layout record allocates 1793.28 sq. m (0.98%) to utilities. The filed layout and amenity materials list water supply, internal water-supply pipelines, protected water supply, sumps and an overhead tank; storm-water drains and underground storm-water drainage; sewerage lines and a common septic tank/STP; rainwater-harvesting pits; solid-waste disposal and a bio-compost unit; electrical supply lines, a transformer and street lighting. The documents do not supply capacities or independently verified completion status for these systems.
Fire protection and fire-safety requirements appear in the amenity list, but no specific fire-system design, clearance, capacity or completed installation is established by the supplied evidence. The project is plotted; no apartment lifts, accessible-building circulation, security/CCTV system or backup-power capacity is disclosed.
8. Location, access & connectivity
The registered location is Udithyal village, Balanagar Mandal, Mahabubnagar District, Telangana, PIN 509202. The project boundary description records an existing 33FT WIDE EXISTING ROAD on the east and an 18M existing and 30M proposed road width on the south. HMDA draft-layout materials also identify internal layout roads.
The supplied location data gives the nearest sampled Outer Ring Road interchange as approximately 43.0 km and SubCentre Udithyala as 1.9 km. These are supplied distance estimates; no travel times or public-transport details are provided.
9. Developer & development status
The registered promoter is VASAVI REALTY AND DEVELOPERS LLP, an LLP, with GSTIN 36AATFV8296Q1ZM. The project registration certificate identifies the same legal promoter.
The promoter’s Form-B filing is a declaration by authorised signatory CHANDA ABHISHEK and states a completion undertaking of 12 December 2028. The project header separately records proposed completion as 12/04/2029. Registration validity runs from 12/12/2025 to 12/12/2028; none of these dates, by itself, establishes construction completion or an occupancy/completion certificate.
The file identifies the registered office address as 1ST FLOOR, 8-2-120/86/9/A/1, 12 AND 2/13, NORTH END ANILATHMAJA HOUSING SOCIETY, ROAD NO 2, Balanagar Mandal, Mahabubnagar, Telangana, 509202. The promoter’s site is listed as thevasavigroup.com.
10. Approvals, official records & documents
TG-RERA registration: Form-C certificate for VASAVI VIJAY VIHAR, registration P01400010779, valid 12/12/2025–12/12/2028.
HMDA draft layout: 1218/HMDA/SWDL/2025, dated 12/12/2025; technical approval / draft layout letter for a plotted layout.
Revised HMDA draft layout: 2612/HMDA/SWDL/2026, dated 17/10/2026; revised draft-layout record with an area statement and conditions for final layout release.
Related HMDA records: Application 006227/HMDA/01878/SWDL/SKP1/2025; road-affected-area gift deed 13777/2025 is cited in the draft-layout record. The revised record identifies application 017427/HMDA/04432/SWDL/SKP1/2026-ADD.
HMDA mortgage records: The draft-layout files identify mortgages in favour of the Metropolitan Commissioner, HMDA, including deeds 14835/2025 and 14836/2025; the revised layout record also identifies deeds 12159/2026 and 12160/2026.
Completion / occupancy records: No final layout release, completion certificate or occupancy certificate is supplied. The approval records describe draft-layout permissions and require development work and handover of specified areas before final layout release.
Other filed project documents: Form-B declaration (633920); blank allotment-letter form (633921); Rule 38 agreement-for-sale template (633925); LLP incorporation certificate (633928).
Frequently asked questions
Is VASAVI VIJAY VIHAR registered with Telangana RERA?
Yes. VASAVI VIJAY VIHAR is registered with the Telangana Real Estate Regulatory Authority as P01400010779; the registration status is New Project.
Who is the developer of VASAVI VIJAY VIHAR?
The promoter named in the RERA registration is VASAVI REALTY AND DEVELOPERS LLP.
Where is VASAVI VIJAY VIHAR located?
VASAVI VIJAY VIHAR is in Balanagar Mandal, Udithyal, Balanagar, Mahabubnagar, Telangana (509202).
When will VASAVI VIJAY VIHAR be completed?
The promoter's proposed date of completion filed with RERA is 12/04/2029. This is the promoter's declaration, not a guarantee.
More projects in Udithyal