V-INFRAS VRINDAVAN is a plotted development at Chatanpally, Farooqnagar Mandal, Ranga Reddy District, developed by the registered promoter Muslammolla Yadagiri & Others. The layout has a net area of 21,776.8 sq.m and shows 77 residential plots, with drawing-read sizes ranging from 141.1 sq.m to 314.04 sq.m. It is registered under TG-RERA registration P02400010853, with a Form B completion undertaking of 22-Jan-2029.

01What we found

RegisteredTG-RERA - valid till 22 Jan 2029
22documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameV-INFRAS VRINDAVAN
Project typePlotted development; open-plot layout
Phase / registered portionNew project; the registered portion is not separately named. The filing identifies the proposed layout on Sy. No. 711/Part.
TG-RERA registrationP02400010853
Registration validity22 January 2026–22 January 2029
RERA statusRegistered; registration certificate states validity for three years, subject to its conditions.
Registered promoterMuslammolla Yadagiri & Others
RERA completion undertaking22 January 2029, as stated in Form B

RERA record RERA filing Approvals record

Land and geographic identity

FieldRecord
Locality / revenue villageChatanpally; the layout approval also spells the village “CHATTANPALLY.”
MandalFarooqnagar
DistrictRanga Reddy
PIN509216
Project survey numberSy. No. 711/Part (also written as 711/PART in the approval records). No further project subdivision is stated in the registered identity.
Total site area shown on layout drawing21,874.7 sq.m
Road-widening area shown on layout drawing97.9 sq.m
Net layout area21,776.8 sq.m
Boundaries in RERA land detailsEast: Neighbours Land; West: Neighbours Land; North: Neighbours Land; South: “Naighbours Land” (as filed).

RERA record RERA filing Layout record

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the draft layout letter states it was delegated to Shadnagar Municipality.
Principal layout approval number / date1520/HMDA/SWDL/2026; 22/01/2026
Approval stage described in filed documentsDraft layout / technical approval; the filed letter says final layout plans are subject to development works and specified handovers.
Approved built-up areaNot applicable / not disclosed for this plotted-layout record; the RERA form reports “Approved Built up Area (In Sqmts)” as 12802.11.
Building, floor and parking configurationNo buildings, floor configuration, parking levels or building-unit count are stated in the supplied project record.
Layout plot count77 plots, as read from the layout drawing and stated in the approval-plan extraction.
Common parking area0.00 sq.m in the layout area statement.

Approvals record RERA filing Layout record

Offering and status

FieldRecord
OfferingResidential plots
Plot counts and sizes77 plots shown on the layout drawing. Software-read sizes range from 141.1 sq.m (168.8 sq.yd) to 314.04 sq.m (375.6 sq.yd); median 150.5 sq.m (180.0 sq.yd). Drawing-derived figures should be checked against the drawing.
Booked / available countsNot disclosed in the supplied evidence.
Construction / development stageNo independently verified site-progress information is supplied. The HMDA-filed layout records required development works and states that final layout release is conditional.
Completion dateForm B undertaking: 22-Jan-2029. Registration certificate validity ends 22/01/2029; these are separate record items.
Occupancy / completion certificateNo occupancy or completion certificate is supplied. For this plotted layout, the supplied approval record instead describes a draft layout and conditions for final layout release.

Layout record

2. The project story

V-INFRAS VRINDAVAN is registered as a residential plotted development at Chatanpally, Farooqnagar Mandal, Ranga Reddy District, on Sy. No. 711/Part. The filed layout drawing shows a 77-plot arrangement within a net layout area of 21,776.8 sq.m, with land also allocated to roads, open space, social infrastructure and utilities. RERA record RERA filing Layout record

The project’s RERA registration is valid from 22 January 2026 to 22 January 2029, and Form B records the promoter’s undertaking to complete by 22-Jan-2029. These dates do not establish construction progress or completion. The supplied HMDA record is described as draft layout / technical approval and makes final layout release dependent on development works and handover conditions. No site inspection evidence or occupancy/completion certificate is supplied.

3. Master plan, architecture & building design

The filed layout drawing gives a total layout area of 21,874.7 sq.m, a road-widening area of 97.9 sq.m and a net layout area of 21,776.8 sq.m. Its area statement allocates the net layout area as follows:

Layout useAreaShare shown
Plotted area12,802.11 sq.m58.79%
Roads6,610.54 sq.m30.36%
Open space1,640.53 sq.m7.53%
Social infrastructure545.83 sq.m2.51%
Utilities177.77 sq.m0.82%
Buffer area0.00 sq.m0%
Common parking area0.00 sq.m0%
Facilities area0.00 sq.m0%
Amenities area0.00 sq.m0%
Green belt area0.00 sq.m0%

The drawing’s plot schedule indicates 77 plots. Software-read plot sizes range from 141.1 sq.m to 314.04 sq.m, with a median of 150.5 sq.m; the size schedule is drawing-derived, not a separate RERA disclosure, and the extraction notes it should be verified against the drawing. Layout record

No apartment or building plan, building count, floor arrangement, building height, or built-up-area breakdown is supplied for this plotted development. The RERA form lists 12,802.11 sq.m as “Approved Built up Area”; the layout drawing separately labels 12,802.11 sq.m as “Plotted Area.” These are the filed labels, not a basis to infer a building programme. RERA filing

4. Homes, configurations & floor plans

This is a plotted layout, not an apartment configuration. The layout drawing shows 77 plots; the RERA-filed record supplied here does not give plot-by-plot RERA saleable area, booking status or availability. Layout record RERA filing

Plot informationRecord
Number of plots77, read from the plot schedule on the layout drawing
Smallest / median / largest drawing-read plot size141.1 / 150.5 / 314.04 sq.m
Corresponding smallest / median / largest168.8 / 180.0 / 375.6 sq.yd
Booked / availableNot disclosed
Measured carpet area / loadingNot applicable to plots; no such figures supplied

Layout record

The drawing-based size extraction is software-measured and should be verified against the source drawing. A vendor listing describes plots from 1673 sq. ft. to 2570 sq. ft.; this is a third-party marketing record, not the RERA-filed plot schedule. Layout record Promoter website

5. Parking & vehicle circulation

The layout area statement records 0.00 sq.m of common parking area. It does not provide a sanctioned parking-space count, visitor or accessible parking provision, individual plot parking allocation, vehicle-entry arrangement, or a parking-allotment instrument. A common parking count or individual parking entitlement therefore cannot be established from the supplied record.

The drawing and approval extracts refer to internal roads, including stated road widths of 9.14m and 30.0m in the layout-plan extraction, and 18 mts in the draft-layout-letter extraction. These records do not establish a separate parking allocation.

6. Amenities, recreation & open spaces

The layout drawing allocates 1,640.53 sq.m (7.53%) to open space, 545.83 sq.m (2.51%) to social infrastructure and 177.77 sq.m (0.82%) to utilities. The approval record requires specified areas, including roads, open space, social infrastructure and utilities, to be handed over to the local body by registered gift deed before release of the final layout plans. The area allocation is evidence of the layout plan, not confirmation that facilities have been completed or handed over.

Facility / areaDescription / sizeEvidence sourceDeclared progress / verified status
Open space / park1,640.53 sq.m; 7.53% of net layout areaLayout area statement; approval extraction also lists park developmentShown in layout; completion and handover not independently verified.
Social infrastructure545.83 sq.m; 2.51%Layout area statementAllocated in the layout; delivered status not supplied.
Utilities land177.77 sq.m; 0.82%Layout area statementAllocated in the layout; delivered status not supplied.
Cycle trackNo area or length statedLayout-plan extractionListed as a layout feature; progress not supplied.
Rainwater-harvesting structure / pitsNo capacity statedLayout conditions and approval extractionRequired / listed; completion not verified.
Garbage house / bio-compost unitNo size or capacity statedLayout conditions / approval extractionGarbage house is a stated condition; completion not verified.
Kids’ play areas / sand pits; large green areaNo sizes statedThird-party vendor listingMarketing claims only; not established as sanctioned or delivered by the supplied project record.

Promoter website

7. Utilities, building services & safety

The filed layout and draft-layout documents list proposed or required infrastructure including water supply, common septic tank / STP, overhead tank, electrical supply lines, transformer / transformer yard, street lighting, storm-water drains, rainwater-harvesting pits, garbage house and internal roads. The RERA amenity record marks water supply, sewerage, storm-water drains, street lighting, sewage treatment/disposal, solid-waste management, rainwater harvesting and electrical meter/substation/receiving station as available; the supplied data gives no quantities, capacities or independently verified completion evidence. RERA amenities

The filed approval material states that HMWS&SB and T.S. Transco are not to provide permanent connections until an occupancy certificate is produced. The project record supplied here does not establish installed utility connections, service capacities, or completed safety works. Fire-safety requirements appear in the layout-plan conditions, but no project-specific fire clearance or completion evidence is supplied.

8. Location, access & connectivity

The registered project location is Chatanpally, Farooqnagar Mandal, Ranga Reddy District, Telangana, PIN 509216; the project parcel is identified as Sy. No. 711/Part. The supplied location record gives coordinates 17.0791536, 78.2039881 and identifies the mapped place as Farooqnagar, Ranga Reddy, Telangana. RERA record RERA filing Location record

The supplied independently sampled connectivity point is the nearest sampled Outer Ring Road interchange, approximately 29.3 km away. A third-party listing separately refers to NH 44 and local schools, shops, a hospital and railway station; those listing descriptions are not independently established in the supplied project record. Location record Promoter website

9. Developer & development status

The TG-RERA registration identifies Muslammolla Yadagiri & Others as the registered promoter. The RERA filing describes the organization type as “Others” and “Joint Individuals”; a company or other formal legal-entity type is not established in the supplied record. Form B is signed by Muslammolla Yadagiri as an authorized signatory and declares a completion undertaking of 22-Jan-2029. RERA record RERA filing

The layout approval material also names SIA Elite Builders and Developers Pvt Ltd and individuals as applicants / stated owners. The supplied evidence does not establish that company as the registered TG-RERA promoter. No registered-office details for the promoter, official project contacts, or independently verified progress report is supplied. Corporate record

10. Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registrationForm C certificate for V-INFRAS VRINDAVAN, registration P02400010853; valid 22/01/2026–22/01/2029.
HMDA layout file / principal approvalDraft layout / technical approval under Layout Permit No. 1520/HMDA/SWDL/2026, dated 22/01/2026, for Sy. No. 711/PART, Chattanpally. The record describes conditions before final layout release.
HMDA application / file number008707/HMDA/02565/SWDL/SKP1/2025. The fee-intimation document states that it is not approval of the proposal or permission for development.
Layout drawingDraft residential open plotted layout drawing; 77 plots and area allocation shown.
Form B declarationPromoter declaration dated 18-April-2026, including title, encumbrance, fund-account and completion statements. These are promoter declarations.
Final layout release / occupancy or completion certificateNo final layout release document or occupancy/completion certificate is supplied. The supplied layout approval material refers to conditions and later final release.

The supplied project records describe a plotted layout; no building-specific commencement certificate or occupancy certificate is provided. The available HMDA public layout-lookup channel is reported unavailable in the evidence pack; that portal limitation does not establish whether any additional record exists. Document index HMDA

Frequently asked questions

Is V-INFRAS VRINDAVAN registered with Telangana RERA?

Yes. V-INFRAS VRINDAVAN is registered with the Telangana Real Estate Regulatory Authority as P02400010853; the registration status is New Project.

Who is the developer of V-INFRAS VRINDAVAN?

The promoter named in the RERA registration is Muslammolla Yadagiri & Others.

Where is V-INFRAS VRINDAVAN located?

V-INFRAS VRINDAVAN is in Chatanpally, Farooqnagar, Rangareddy, Telangana (509216).

When will V-INFRAS VRINDAVAN be completed?

The promoter's proposed date of completion filed with RERA is 22/05/2029. This is the promoter's declaration, not a guarantee.