YADADRI HEIGHTS is a residential apartment project in Chitanpally, Farooqnagar mandal, Ranga Reddy district, developed by the registered promoter SREE MALLESWARA INFRA PROJECTS. It covers 2,498.71 sq. m and comprises one building with 1 Stilt + 5 upper floors. The project has 70 2BHK apartments, each with a RERA-filed saleable area of 100.77 sq. m. Its TG-RERA registration number is P02400005684, and the proposed completion date is 23.10.2025.

01What we found

Period endedTG-RERA registration ran to 23 Oct 2025 - check its extension on TG-RERA
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from squareyards.com
Chatanpally, Farooqnagar, Ranga Reddy · geocoded — approximate.

Project at a glance

Project identity

FieldProject record
Registered project nameYADADRI HEIGHTS RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNew Project; phase-wise scope is not separately identified in the supplied records RERA record RERA filing
TG-RERA registrationP02400005684
Registration validity9 January 2023 to 23 October 2025; the certificate says registration may be extended by the Authority under the Act and Rules. No extension is recorded in the supplied evidence
Registered promoterSREE MALLESWARA INFRA PROJECTS RERA record Corporate record
RERA status in supplied recordThe certificate shows the stated validity dates above. Current registration status is not independently established by the supplied records

Land and geographic identity

FieldProject record
LocalityChitanpally (as recorded in the project identity); the approval and title documents use spelling variants including Chattanpally RERA record Land records
Revenue villageChatanpally in the RERA project record; Chattanpally / Chattanpally Village in filed documents RERA record
MandalFarooqnagar RERA record
DistrictRanga Reddy RERA record
PIN509216 RERA record
Project survey numbers637/AA1 and 651 RERA record Land records
Registered site extent2,498.71 sq. m (also stated as 2,498.71 Sq. Mt.) RERA filing
Net / total land areaNet area 2,498.71 sq. m; total area 2,498.71 sq. m RERA filing
Boundaries as filedEast: 30 feet wide road and plots of Vaishu developers; West: plots of Sujith Reddy and Sangameshwar; North: 30 feet wide road and plots of Vaishu developers; South: others’ land RERA filing

Development identity

FieldProject record
Sanctioning authority / recordHMDA technical approval; building permit order issued by Shadnagar Municipality / Municipal Corporation Approvals record
Principal approval number007434/BP/HMDA/1496/SMD/2022, dated 22 October 2022 Approvals record
Building permit proceedings001632/BP/HMDA/SMD/2022, dated 22 October 2022 Approvals record
Approved built-up area6,285.40 sq. m is recorded as the proposed built-up area in the RERA record. The building-permit extraction also records total built-up area of 7,764.28 sq. m; the supplied material does not label these figures as the same area measure RERA filing
Building count and configurationOne building; 1 Stilt + 5 upper floors RERA filing
Height14.9, as recorded in the building-permit extraction; the unit is not stated in that extracted field
Parking levels / approved useStilt and any cellar approved in the plan are to be used exclusively for vehicle parking, without partition walls or rolling shutters. No parking-space count is established in the supplied record
Unit counts70 units in the RERA unit record; the approved-plan extraction does not provide a separate approved unit count RERA unit table

Offering and status

FieldProject record
RERA-filed configuration2BHK; 70 units RERA unit table
RERA-filed saleable area100.77 sq. m per 2BHK RERA unit table
Booked / available11 booked; 59 available, as last read from the TG-RERA portal. The record does not give an as-of date, so these counts are indicative RERA unit table
Construction stageThe supplied RERA amenity record reports water supply and electrical meter room/sub-station/receiving station at 28%; most other listed infrastructure items are recorded at 0%. This is reported progress, not independent site verification RERA amenities
Completion undertaking / proposed completionPromoter’s Form B declares completion by 23.10.2025; the project header also records 23/10/2025 RERA record
Completion / occupancy certificateNo completion or occupancy certificate is included in the supplied documents; the building-permit record states that an occupancy certificate is compulsory before occupation Document index
Registration expiry versus completion dateThe certificate validity ends on 23 October 2025, and the Form B completion undertaking is also 23.10.2025. These are separate record fields; neither establishes that an occupancy certificate was issued

The project story

YADADRI HEIGHTS is a single-building residential apartment project registered with TG-RERA for land in survey numbers 637/AA1 and 651, in Chatanpally revenue village, Farooqnagar mandal, Ranga Reddy district. The project record gives a site extent of 2,498.71 sq. m and identifies one building with a stilt level and five upper floors. RERA record Land records

The RERA unit record lists 70 two-bedroom apartments, with 11 booked and 59 available in the last portal reading; no as-of date accompanies that inventory snapshot. The promoter’s Form B gives 23.10.2025 as its completion undertaking. The supplied records do not include a completion or occupancy certificate or independently verified site progress. RERA unit table Document index

Master plan, architecture & building design

The sanctioned-plan extraction lists a transformer, garbage house, septic tank, STP and rainwater-harvesting structures. The permit conditions also call for a generator and separate underground and terrace water tanks, each stated as 25,000 litres. Detailed drawing-based information on floor-by-floor apartment arrangements, lifts, stairs, entrances, common areas and landscaping is not available in the supplied extracts.

Homes, configurations & floor plans

TG-RERA lists 70 2BHK apartments, each with a filed saleable area of 100.77 sq. m. The portal reading records 11 booked and 59 available, but does not state its as-of date. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK701159100.77 sq. mSoftware-measured median 66.2 sq. m; range 61.0–68.5 sq. m34% (software-derived from drawing records)

The carpet figures are software measurements from the approved floor-plan drawing record, not RERA-filed carpet-area disclosures; the source notes that the drawing measurements need review. The supplied drawing sample measured 36 2BHK flat designs. One measured fifth-floor plan labels living, dining/kitchen, bedrooms, toilets, a wash area and a 1.00 m wide balcony. The balcony is identified separately from the measured carpet area. Floor plans RERA unit details

Carpet area, balcony area and saleable area are distinct measures: the drawing-based carpet measurement excludes the balcony, while the RERA-filed saleable area is a separate figure. The evidence does not provide a RERA-filed carpet area or a unit-specific common-area allocation. RERA unit table Floor plans

Parking & vehicle circulation

The supplied record does not establish a sanctioned parking-space count, resident or visitor allocation, accessible spaces, two-wheeler provision, ramp arrangement, EV charging, or legally documented exclusive parking allocations. A parking area shown or described in the approval does not by itself establish a buyer’s exclusive right to a particular space. Document index

Amenities, recreation & open spaces

The RERA amenity record provides progress entries for the following items. Its percentages are reported record values, not independent verification of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplySource and capacity not stated in this RERA progress entryRERA amenity record RERA amenitiesAvailable: YES; 28%; not independently verified
Green strip / TOT LOT / parkSize and individual facility details not statedRERA amenity record RERA amenitiesAvailable: YES; 0%; not independently verified
Water conservation / rainwater harvestingSize or capacity not statedRERA amenity record; sanctioned-plan extraction lists rainwater-harvesting structures RERA amenitiesAvailable: YES; 0%; not independently verified
Community buildingsNo description or size statedRERA amenity record RERA amenities0%; not independently verified

The supplied evidence does not establish a clubhouse or a defined indoor or sports facility. The building-permit extraction lists infrastructure and site services; those are addressed in the utilities section. RERA amenities

Utilities, building services & safety

Water and drainage: The RERA amenity record marks water supply as available and reports 28% progress, without identifying the source or supply capacity there. The building-permit extraction lists separate underground and terrace water storage tanks, each with a stated capacity of 25,000 litres, and lists an STP, septic tank and rainwater-harvesting structures. The approval conditions also refer to rainwater recycling. These are approval-recorded provisions; the supplied evidence does not establish their completion or operation. RERA amenities

Electrical, waste and security: The RERA record reports the electrical meter room, sub-station and receiving station at 28%. The building-permit extraction lists a transformer, garbage house and generator. The HMDA approval conditions call for CCTV cameras. The supplied material does not state generator capacity, CCTV coverage or operating status. RERA amenities

Fire safety and access: HMDA’s approval conditions place responsibility for structural and fire-safety requirements on the owner, builder/developer, architect and structural engineer, and call for fire-fighting installations under the cited building requirements. No fire-system design details, clearance or completed-installation evidence is supplied. The permit requires the approach road indicated in the plan to be developed and maintained as a black-topped road before release of the occupancy certificate.

The supplied evidence does not give lift or service-lift details, accessibility provisions, waste-segregation arrangements, or verified completion status for the listed services. Document index RERA amenities

Location, access & connectivity

The registered location is Chatanpally village, Farooqnagar mandal, Ranga Reddy district, PIN 509216; the project identity record also uses the locality spelling Chitanpally. The site boundaries recorded in the RERA filing identify 30 feet wide roads to the north and east. RERA record Land records

A supplied location record gives an approximate sampled distance of 29.5 km to the nearest sampled Outer Ring Road interchange. This is a recorded distance estimate; no travel time or public-transport information is supplied. Location record

Developer & development status

The registered promoter is SREE MALLESWARA INFRA PROJECTS, recorded as a partnership. The project record lists GSTIN 36ACPFS2390Q2Z5. It identifies Sreedhar Thayi as an authorized signatory and Jayanthi Nalini Thayi as a partner. The supplied records do not establish a registered-office address beyond the promoter contact/address details in the filing, and do not provide an official project website or project contact number. Corporate record Parties record

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400005684; issued 9 January 2023; validity stated through 23 October 2025
What the supplied evidence establishesForm C registration certificate for YADADRI HEIGHTS; records the stated validity period and registration conditions. No extension is recorded in the supplied certificate
HMDA technical building approval
Identifier / date007434/BP/HMDA/1496/SMD/2022; 22 October 2022
What the supplied evidence establishesTechnical approval for a residential building recorded as 1 Stilt + 5 upper floors on survey numbers 637/AA1 and 651
Building permit order
Identifier / date001632/BP/HMDA/SMD/2022; 22 October 2022
What the supplied evidence establishesShadnagar Municipality / Municipal Corporation building permit record for the same project site and building configuration
Mortgage recorded in approval documents
Identifier / dateDocument No. 13665/2022; 12 October 2022
What the supplied evidence establishesApproval extracts record a mortgage of 631.31 sq. m of proposed built-up area, described as in the fourth and fifth floors, in favour of HMDA
Promoter’s Form B declaration
Identifier / dateDated 29 November 2022
What the supplied evidence establishesPromoter declaration includes the 23.10.2025 completion undertaking and other RERA declarations
Completion / occupancy certificate
Identifier / dateNot present in supplied documents
What the supplied evidence establishesThe approval record states an occupancy certificate is compulsory before occupation; the supplied evidence does not establish issuance

Frequently asked questions

Is YADADRI HEIGHTS registered with Telangana RERA?

Yes. YADADRI HEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P02400005684; the registration status is New Project.

Who is the developer of YADADRI HEIGHTS?

The promoter named in the RERA registration is SREE MALLESWARA INFRA PROJECTS.

Where is YADADRI HEIGHTS located?

YADADRI HEIGHTS is in Chitanpally, Chatanpally, Farooqnagar, Rangareddy, Telangana (509216).

When will YADADRI HEIGHTS be completed?

The promoter's proposed date of completion filed with RERA is 23/10/2025. This is the promoter's declaration, not a guarantee.