Lakshmi Enclave
PINNACLE LANDMARK · Medchal-Malkajgiri · RERA P02200010381
Lakshmi Enclave is a residential apartment project in Osmania University Teacher’s Colony, Kapra, Kapra mandal, Medchal-Malkajgiri district. The registered promoter is PINNACLE LANDMARK. The project is on 338.98 sq. m. and comprises Building - 1, with 1 Stilt + 5 Floors and 10 “DOUBLE BED ROOM” units, each with a RERA-filed saleable area of 115.2 sq. m. It is registered with TG-RERA under P02200010381, and the promoter’s Form B declares completion by 06/11/2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | Lakshmi Enclave RERA record |
| Project type | Residential apartment project; TG-RERA records it as a new project RERA record RERA filing |
| Phase / registered portion | No separate phase name is disclosed. TG-RERA identifies the registered land as Survey Nos. 602 Part and 605 Part |
| TG-RERA registration | P02200010381 RERA record |
| Registration validity | 6 November 2025 to 6 November 2028, unless extended by the Authority RERA record |
| Registered promoter | PINNACLE LANDMARK; partnership RERA filing Corporate record |
| RERA status | New Project; a TG-RERA registration certificate is on file RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Osmania University Teacher’s Colony, Kapra |
| Revenue village | Kapra (the approval document also identifies the locality as Osmania University Teachers Colony) RERA filing |
| Mandal / district / PIN | Kapra / Medchal-Malkajgiri / 500062 RERA record |
| Project survey numbers and subdivisions | Survey No. 602 Part and Survey No. 605 Part; the building-permit record states “602 PART” and “605 PART” RERA record |
| Registered site extent | 338.98 sq. m. RERA filing |
| Approved plot-area figures | Gross plot area 338.98 sq. m.; net plot area 338.98 sq. m. |
| Boundaries in the RERA filing | East: 12 M Wide Road; West: Plot No 101 and Plot No 101A; North: Plot No 88; South: Temple Land RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building-permit number / date | 1708/GHMC/SWBP/LBN2/2025, approved 06/11/2025 Approvals record |
| Related file number | 001292/GHMC/00837/SWBP/LBN2/2025 Approvals record |
| Approved building count and configuration | Building - 1; 1 Stilt + 5 Floors |
| Approved height | 17.99 m; height excluding stilt 14.99 m |
| Approved area figures | Residential upper floors: 848.25 sq. m.; proposed BUA excluding parking: 858.87 sq. m.; proposed BUA including parking: 1014.14 sq. m.; parking area: 155.27 sq. m. These are distinct figures as stated in the approval records |
| Units | 10 dwelling units in the GHMC permit and 10 units in the TG-RERA filing RERA unit table |
| Parking | The approval record lists 4 car-parking spaces and 155.27 sq. m. total parking area |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | “DOUBLE BED ROOM”; 10 units RERA unit table RERA unit table |
| RERA-filed saleable area | 115.2 sq. m. per unit RERA unit table RERA unit table |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; no as-of date is supplied, so the counts are indicative RERA unit table |
| Construction stage | No independently verified site-progress record is supplied. The RERA filing identifies the project as new; the approval requires a commencement notice before construction starts RERA record |
| Promoter completion undertaking | Form B declares completion by 06/11/2028 |
| GHMC permit completion date | Construction to be completed before 06/11/2028 |
| Registration validity vs completion | Registration is valid to 06/11/2028 unless extended; this is separate from the completion undertaking and does not itself establish completion |
| Occupancy / completion certificate | The supplied approval extraction states that completion has not been certified. No occupancy or completion certificate is supplied |
The project story
- Lakshmi Enclave is registered as a residential apartment project on 338.98 sq. m. in Kapra, Medchal-Malkajgiri district. The project land is identified in the filing and building permit as parts of Survey Nos. 602 and 605, in Osmania University Teacher’s Colony, Kapra.
- The sanctioned scheme is a single building, Building - 1, comprising stilt parking and five floors, with 10 dwelling units. The RERA filing describes the homes as “DOUBLE BED ROOM” units and records all 10 as available when the portal data was read; the portal record has no as-of date RERA unit table. No construction-progress inspection or independently verified completion evidence is included. The promoter’s Form B declares completion by 06/11/2028, and the permit also sets a completion date before that day; neither is evidence that the work has been completed.
- The GHMC permit states that an occupancy certificate is required before occupation and that a completion notice is to be submitted after construction. No occupancy certificate is supplied for this building.
Master plan, architecture & building design
- The GHMC building-permit record describes one residential building on a gross and net plot area of 338.98 sq. m. It records proposed coverage of 169.65 sq. m. (50%), vacant plot area of 167.74 sq. m., proposed BUA excluding parking of 858.87 sq. m., proposed BUA including parking of 1014.14 sq. m., and parking area of 155.27 sq. m.. The permit extraction separately records 848.25 sq. m. of residential upper-floor area; these figures are reproduced under their stated labels rather than treated as interchangeable.
- The approved floor arrangement is 1 Stilt + 5 Floors, with a stated building height of 17.99 m and height excluding stilt of 14.99 m. The floor-area schedule lists a stilt floor and first through fifth floors, each at 169.65 sq. m., and terrace BUA of 23.38 sq. m. The fifth floor is identified as “TDR” in the schedule.
- The supplied drawing-derived record includes a typical floor plan and measured 2BHK layouts. It does not provide a reliable full description of building circulation, lift or stair counts, entrance/exit arrangements, landscaping layout or common-area distribution. The permit lists a lift, staircase, tot-lot and open-tank water storage (OHT) among its stated facilities or utilities, but does not supply their capacities. A layout plan for a plotted subdivision is not evidenced; the approval record is a building permit for an apartment project.
Homes, configurations & floor plans
The TG-RERA filing records 10 “DOUBLE BED ROOM” units, each with saleable area of 115.2 sq. m. The portal data read shows 0 booked and 10 available, without an as-of date RERA unit table RERA unit table.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK / “DOUBLE BED ROOM” | 10 | 0 | 10 | 115.2 sq. m. | 48.0–54.5 sq. m.; median 51.2 sq. m. | 56% |
Carpet areas and loading in the table are software measurements from the approved floor-plan drawing geometry, not RERA-filed disclosures; six flat designs were measured and all six are marked as needing review. The measurements should therefore be checked against the drawing Floor plans RERA unit details.
The measured example plan shows two bedrooms, living/dining, kitchen, two toilets, a balcony and a utility area. The example bedroom dimensions are 4.0 m × 3.0 m and 3.0 m × 3.0 m; the kitchen is 2.5 m × 2.57 m. The balcony and utility are each shown as 2.53 m × 1.46 m and are excluded from the supplied carpet measurement RERA unit details. Saleable area and drawing-measured carpet area are different measures; the supplied drawing record notes that saleable area also counts a home’s share of common areas Floor plans.
Parking & vehicle circulation
The GHMC permit lists 4 car-parking spaces and total parking area of 155.27 sq. m. The sanctioned configuration includes a stilt floor, and the approval conditions state that the stilt and any cellar approved for parking must be used exclusively for vehicle parking; the supplied permit schedule specifically identifies stilt parking. The permit’s conditions also refer to EV-charging infrastructure in parking places.
No project-specific count of two-wheeler, visitor or accessible spaces, parking-allocation schedule, ramp details, driveway layout or EV-charger quantity is supplied. The available records do not establish exclusive ownership or allocation of a particular parking bay to any unit.
Amenities, recreation & open spaces
The amenity record contains RERA progress entries for site infrastructure. The listed percentages are declared progress figures in that record, not independent verification of completion RERA amenities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Tot-lot is also listed in the GHMC permit; no area is stated | RERA amenities | RERA progress record: 0%; permit requires the tot-lot to be fenced and maintained as greenery before OC. Completion not independently verified |
| Recreational open space | Aggregate area not supplied | RERA amenities | RERA progress record: 0% |
| Community buildings | No facility details supplied | RERA amenities | RERA progress record: 0% |
| Internal roads and footpaths | No dimensions or specification supplied | RERA amenities | RERA progress record: 0% |
| Water supply | No source or storage capacity supplied | RERA amenities | RERA progress record: 10%; not independently verified |
| Sewerage | RERA item is “Sewerage (Chamber, Lines, Septic Tank, STP)”; no system capacity or treatment details supplied | RERA amenities | RERA progress record: 10%; not independently verified |
| Storm-water drains | No system details supplied | RERA amenities | RERA progress record: 0% |
| Sewage and sullage treatment/disposal | No treatment or reuse details supplied | RERA amenities | RERA progress record: 0% |
| Solid-waste management and disposal | GHMC permit also requires a garbage house within the premises | RERA amenities | RERA progress record: 0%; delivery not independently verified |
| Rainwater harvesting | Permit lists one rainwater-harvesting pit and requires a percolation pit | RERA amenities | RERA progress record: 10%; not independently verified |
| Street lighting | No fixture details supplied | RERA amenities | RERA progress record: 10%; not independently verified |
| Energy management | No system or capacity details supplied | RERA amenities | RERA progress record: 10%; not independently verified |
| Fire protection and fire safety | Permit conditions refer to fire-fighting installations and an occupancy Fire NOC | RERA amenities | RERA progress record: 10%; no completion verification or Fire NOC supplied |
| Electrical meter room / substation / receiving station | Permit requires space for a transformer; equipment capacity is not supplied | RERA amenities | RERA progress record: 10%; not independently verified |
The GHMC permit also lists 10 trees and a proposed coverage area of 169.65 sq. m.; the record does not establish that the trees or open-space facilities have been delivered. No sanctioned clubhouse, indoor sports facility or other recreational building is evidenced in the supplied project records.
Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, rainwater harvesting, energy management, fire safety and electrical meter-room/substation/receiving-station items as present at 10% declared progress. It does not provide capacity, design, commissioning or independent completion evidence RERA amenities.
The GHMC permit lists one rainwater-harvesting pit, an OHT, a transformer space, a garbage house, a lift and a staircase. It also includes conditions concerning fire-fighting installations, means of escape, qualified technical supervision for services and an occupancy Fire NOC before an occupancy certificate. These are permit requirements or listed provisions, not confirmation that the systems are installed, approved at completion or operational.
The approval record includes a condition referring to dual piping, but no project-specific system design, water source, treatment capacity, sewage-treatment plant details, backup-power capacity, lift capacity, CCTV, security-access arrangements or accessibility features are supplied. The permit conditions also refer to EV-charging infrastructure at parking places; no charger count or installation status is stated.
Location, access & connectivity
The registered project location is Kapra, in Kapra mandal, Medchal-Malkajgiri district, PIN 500062; the approval documents place it in Osmania University Teacher’s Colony, Kapra RERA record. The filing records a 12 M Wide Road on the eastern boundary RERA filing. The GHMC permit identifies the existing road width as 12.0 m in its sanctioned parameters.
The supplied location record lists Financial District (Nanakramguda) at 1.2 km as an anchor Location record. No project-specific public-transport routes, measured distances to other landmarks, or verified travel times are supplied.
Developer & development status
The TG-RERA registered promoter is PINNACLE LANDMARK, recorded as a partnership, with GSTIN 36ABDFP5030D1ZN Corporate record RERA filing. The RERA filing lists Narendra Kumar Karnatapu as authorized signatory and Lakshmi Karnatapu as partner Parties record. The promoter address in the filing is Flat No-5, Plot No-180, Sri Nilayam, Raja Rajeswari Nagar, Kapra, Medchal-Malkajgiri, 500062 RERA filing.
The promoter’s Form B affidavit, signed by Karnatapu Narendra Kumar on 28 November 2025, declares completion by 06/11/2028. The permit also sets a completion date before 06/11/2028. The records supplied do not establish actual construction progress, and no occupancy or completion certificate is provided.
Approvals, official records & documents
| Identifier / date | P02200010381; valid 06/11/2025–06/11/2028 unless extended |
|---|---|
| What the supplied record establishes | Registration of Lakshmi Enclave and the registered land identity, including Survey Nos. 602 Part and 605 Part |
| Identifier / date | 1708/GHMC/SWBP/LBN2/2025; 06/11/2025 |
|---|---|
| What the supplied record establishes | Building permit for Building - 1, 1 Stilt + 5 Floors, 10 dwelling units |
| Identifier / date | 001292/GHMC/00837/SWBP/LBN2/2025 |
|---|---|
| What the supplied record establishes | File reference associated with the building permit |
| Identifier / date | Doc. 625721 |
|---|---|
| What the supplied record establishes | The supplied extraction records a building-permit order and conditions, including submission of a commencement notice before construction. It does not establish that the notice was filed |
| Identifier / date | Doc. 625706 |
|---|---|
| What the supplied record establishes | Building-permit plan extraction with site, area, floor and parking parameters |
| Identifier / date | 28 November 2025 |
|---|---|
| What the supplied record establishes | Promoter declaration of title basis, encumbrance status and completion undertaking |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The supplied approval extraction records completion as uncertified; no OC or completion certificate is in the evidence pack |
| Identifier / date | Property Watch Register Sr. No. 5120/2025; Mortgage Deed No. 5046/2025 dated 01/11/2025; TDR DRC No. 02801/TDR/2023; Contractor’s all Risk Policy No. 431190/44/2026/48 |
|---|---|
| What the supplied record establishes | Identifiers appearing in the GHMC permit record |
Project at a glance
Project identity
Registered project name: Lakshmi Enclave
Project type: Residential apartment project; TG-RERA records it as a new project
Phase / registered portion: No separate phase name is disclosed. TG-RERA identifies the registered land as Survey Nos. 602 Part and 605 Part
TG-RERA registration: P02200010381
Registration validity: 6 November 2025 to 6 November 2028, unless extended by the Authority
Registered promoter: PINNACLE LANDMARK; partnership
RERA status: New Project; a TG-RERA registration certificate is on file
Land and geographic identity
Locality: Osmania University Teacher’s Colony, Kapra
Revenue village: Kapra (the approval document also identifies the locality as Osmania University Teachers Colony)
Mandal / district / PIN: Kapra / Medchal-Malkajgiri / 500062
Project survey numbers and subdivisions: Survey No. 602 Part and Survey No. 605 Part; the building-permit record states “602 PART” and “605 PART”
Registered site extent: 338.98 sq. m.
Approved plot-area figures: Gross plot area 338.98 sq. m.; net plot area 338.98 sq. m.
Boundaries in the RERA filing: East: 12 M Wide Road; West: Plot No 101 and Plot No 101A; North: Plot No 88; South: Temple Land
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit number / date: 1708/GHMC/SWBP/LBN2/2025, approved 06/11/2025
Related file number: 001292/GHMC/00837/SWBP/LBN2/2025
Approved building count and configuration: Building - 1; 1 Stilt + 5 Floors
Approved height: 17.99 m; height excluding stilt 14.99 m
Approved area figures: Residential upper floors: 848.25 sq. m.; proposed BUA excluding parking: 858.87 sq. m.; proposed BUA including parking: 1014.14 sq. m.; parking area: 155.27 sq. m. These are distinct figures as stated in the approval records
Units: 10 dwelling units in the GHMC permit and 10 units in the TG-RERA filing
Parking: The approval record lists 4 car-parking spaces and 155.27 sq. m. total parking area
Offering and status
RERA-filed configuration: “DOUBLE BED ROOM”; 10 units
RERA-filed saleable area: 115.2 sq. m. per unit
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; no as-of date is supplied, so the counts are indicative
Construction stage: No independently verified site-progress record is supplied. The RERA filing identifies the project as new; the approval requires a commencement notice before construction starts
Promoter completion undertaking: Form B declares completion by 06/11/2028
GHMC permit completion date: Construction to be completed before 06/11/2028
Registration validity vs completion: Registration is valid to 06/11/2028 unless extended; this is separate from the completion undertaking and does not itself establish completion
Occupancy / completion certificate: The supplied approval extraction states that completion has not been certified. No occupancy or completion certificate is supplied
The project story
- Lakshmi Enclave is registered as a residential apartment project on 338.98 sq. m. in Kapra, Medchal-Malkajgiri district. The project land is identified in the filing and building permit as parts of Survey Nos. 602 and 605, in Osmania University Teacher’s Colony, Kapra.
- The sanctioned scheme is a single building, Building - 1, comprising stilt parking and five floors, with 10 dwelling units. The RERA filing describes the homes as “DOUBLE BED ROOM” units and records all 10 as available when the portal data was read; the portal record has no as-of date. No construction-progress inspection or independently verified completion evidence is included. The promoter’s Form B declares completion by 06/11/2028, and the permit also sets a completion date before that day; neither is evidence that the work has been completed.
- The GHMC permit states that an occupancy certificate is required before occupation and that a completion notice is to be submitted after construction. No occupancy certificate is supplied for this building.
Master plan, architecture & building design
- The GHMC building-permit record describes one residential building on a gross and net plot area of 338.98 sq. m. It records proposed coverage of 169.65 sq. m. (50%), vacant plot area of 167.74 sq. m., proposed BUA excluding parking of 858.87 sq. m., proposed BUA including parking of 1014.14 sq. m., and parking area of 155.27 sq. m.. The permit extraction separately records 848.25 sq. m. of residential upper-floor area; these figures are reproduced under their stated labels rather than treated as interchangeable.
- The approved floor arrangement is 1 Stilt + 5 Floors, with a stated building height of 17.99 m and height excluding stilt of 14.99 m. The floor-area schedule lists a stilt floor and first through fifth floors, each at 169.65 sq. m., and terrace BUA of 23.38 sq. m. The fifth floor is identified as “TDR” in the schedule.
- The supplied drawing-derived record includes a typical floor plan and measured 2BHK layouts. It does not provide a reliable full description of building circulation, lift or stair counts, entrance/exit arrangements, landscaping layout or common-area distribution. The permit lists a lift, staircase, tot-lot and open-tank water storage (OHT) among its stated facilities or utilities, but does not supply their capacities. A layout plan for a plotted subdivision is not evidenced; the approval record is a building permit for an apartment project.
Homes, configurations & floor plans
The TG-RERA filing records 10 “DOUBLE BED ROOM” units, each with saleable area of 115.2 sq. m. The portal data read shows 0 booked and 10 available, without an as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK / “DOUBLE BED ROOM” | 10 | 0 | 10 | 115.2 sq. m. | 48.0–54.5 sq. m.; median 51.2 sq. m. | 56% |
Carpet areas and loading in the table are software measurements from the approved floor-plan drawing geometry, not RERA-filed disclosures; six flat designs were measured and all six are marked as needing review. The measurements should therefore be checked against the drawing.
The measured example plan shows two bedrooms, living/dining, kitchen, two toilets, a balcony and a utility area. The example bedroom dimensions are 4.0 m × 3.0 m and 3.0 m × 3.0 m; the kitchen is 2.5 m × 2.57 m. The balcony and utility are each shown as 2.53 m × 1.46 m and are excluded from the supplied carpet measurement. Saleable area and drawing-measured carpet area are different measures; the supplied drawing record notes that saleable area also counts a home’s share of common areas.
Parking & vehicle circulation
The GHMC permit lists 4 car-parking spaces and total parking area of 155.27 sq. m. The sanctioned configuration includes a stilt floor, and the approval conditions state that the stilt and any cellar approved for parking must be used exclusively for vehicle parking; the supplied permit schedule specifically identifies stilt parking. The permit’s conditions also refer to EV-charging infrastructure in parking places.
No project-specific count of two-wheeler, visitor or accessible spaces, parking-allocation schedule, ramp details, driveway layout or EV-charger quantity is supplied. The available records do not establish exclusive ownership or allocation of a particular parking bay to any unit.
Amenities, recreation & open spaces
The amenity record contains RERA progress entries for site infrastructure. The listed percentages are declared progress figures in that record, not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Tot-lot is also listed in the GHMC permit; no area is stated | RERA progress record: 0%; permit requires the tot-lot to be fenced and maintained as greenery before OC. Completion not independently verified | |
| Recreational open space | Aggregate area not supplied | RERA progress record: 0% | |
| Community buildings | No facility details supplied | RERA progress record: 0% | |
| Internal roads and footpaths | No dimensions or specification supplied | RERA progress record: 0% | |
| Water supply | No source or storage capacity supplied | RERA progress record: 10%; not independently verified | |
| Sewerage | RERA item is “Sewerage (Chamber, Lines, Septic Tank, STP)”; no system capacity or treatment details supplied | RERA progress record: 10%; not independently verified | |
| Storm-water drains | No system details supplied | RERA progress record: 0% | |
| Sewage and sullage treatment/disposal | No treatment or reuse details supplied | RERA progress record: 0% | |
| Solid-waste management and disposal | GHMC permit also requires a garbage house within the premises | RERA progress record: 0%; delivery not independently verified | |
| Rainwater harvesting | Permit lists one rainwater-harvesting pit and requires a percolation pit | RERA progress record: 10%; not independently verified | |
| Street lighting | No fixture details supplied | RERA progress record: 10%; not independently verified | |
| Energy management | No system or capacity details supplied | RERA progress record: 10%; not independently verified | |
| Fire protection and fire safety | Permit conditions refer to fire-fighting installations and an occupancy Fire NOC | RERA progress record: 10%; no completion verification or Fire NOC supplied | |
| Electrical meter room / substation / receiving station | Permit requires space for a transformer; equipment capacity is not supplied | RERA progress record: 10%; not independently verified |
The GHMC permit also lists 10 trees and a proposed coverage area of 169.65 sq. m.; the record does not establish that the trees or open-space facilities have been delivered. No sanctioned clubhouse, indoor sports facility or other recreational building is evidenced in the supplied project records.
Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, rainwater harvesting, energy management, fire safety and electrical meter-room/substation/receiving-station items as present at 10% declared progress. It does not provide capacity, design, commissioning or independent completion evidence.
The GHMC permit lists one rainwater-harvesting pit, an OHT, a transformer space, a garbage house, a lift and a staircase. It also includes conditions concerning fire-fighting installations, means of escape, qualified technical supervision for services and an occupancy Fire NOC before an occupancy certificate. These are permit requirements or listed provisions, not confirmation that the systems are installed, approved at completion or operational.
The approval record includes a condition referring to dual piping, but no project-specific system design, water source, treatment capacity, sewage-treatment plant details, backup-power capacity, lift capacity, CCTV, security-access arrangements or accessibility features are supplied. The permit conditions also refer to EV-charging infrastructure at parking places; no charger count or installation status is stated.
Location, access & connectivity
The registered project location is Kapra, in Kapra mandal, Medchal-Malkajgiri district, PIN 500062; the approval documents place it in Osmania University Teacher’s Colony, Kapra. The filing records a 12 M Wide Road on the eastern boundary. The GHMC permit identifies the existing road width as 12.0 m in its sanctioned parameters.
The supplied location record lists Financial District (Nanakramguda) at 1.2 km as an anchor. No project-specific public-transport routes, measured distances to other landmarks, or verified travel times are supplied.
Developer & development status
The TG-RERA registered promoter is PINNACLE LANDMARK, recorded as a partnership, with GSTIN 36ABDFP5030D1ZN. The RERA filing lists Narendra Kumar Karnatapu as authorized signatory and Lakshmi Karnatapu as partner. The promoter address in the filing is Flat No-5, Plot No-180, Sri Nilayam, Raja Rajeswari Nagar, Kapra, Medchal-Malkajgiri, 500062.
The promoter’s Form B affidavit, signed by Karnatapu Narendra Kumar on 28 November 2025, declares completion by 06/11/2028. The permit also sets a completion date before 06/11/2028. The records supplied do not establish actual construction progress, and no occupancy or completion certificate is provided.
Approvals, official records & documents
| Identifier / date | P02200010381; valid 06/11/2025–06/11/2028 unless extended |
|---|---|
| What the supplied record establishes | Registration of Lakshmi Enclave and the registered land identity, including Survey Nos. 602 Part and 605 Part |
| Identifier / date | 1708/GHMC/SWBP/LBN2/2025; 06/11/2025 |
|---|---|
| What the supplied record establishes | Building permit for Building - 1, 1 Stilt + 5 Floors, 10 dwelling units |
| Identifier / date | 001292/GHMC/00837/SWBP/LBN2/2025 |
|---|---|
| What the supplied record establishes | File reference associated with the building permit |
| Identifier / date | Doc. 625721 |
|---|---|
| What the supplied record establishes | The supplied extraction records a building-permit order and conditions, including submission of a commencement notice before construction. It does not establish that the notice was filed |
| Identifier / date | Doc. 625706 |
|---|---|
| What the supplied record establishes | Building-permit plan extraction with site, area, floor and parking parameters |
| Identifier / date | 28 November 2025 |
|---|---|
| What the supplied record establishes | Promoter declaration of title basis, encumbrance status and completion undertaking |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The supplied approval extraction records completion as uncertified; no OC or completion certificate is in the evidence pack |
| Identifier / date | Property Watch Register Sr. No. 5120/2025; Mortgage Deed No. 5046/2025 dated 01/11/2025; TDR DRC No. 02801/TDR/2023; Contractor’s all Risk Policy No. 431190/44/2026/48 |
|---|---|
| What the supplied record establishes | Identifiers appearing in the GHMC permit record |
Frequently asked questions
Is Lakshmi Enclave registered with Telangana RERA?
Yes. Lakshmi Enclave is registered with the Telangana Real Estate Regulatory Authority as P02200010381; the registration status is New Project.
Who is the developer of Lakshmi Enclave?
The promoter named in the RERA registration is PINNACLE LANDMARK.
Where is Lakshmi Enclave located?
Lakshmi Enclave is in Kapra, Medchal-Malkajgiri, Telangana (500062).
When will Lakshmi Enclave be completed?
The promoter's proposed date of completion filed with RERA is 06/03/2029. This is the promoter's declaration, not a guarantee.