Sign in

Akshara Mansion

CHAVVA · Medchal-Malkajgiri · RERA P02200001402

AKSHARA MANSION is a residential apartment project in JEEDIMETLA, Qutballapur mandal, Medchal-Malkajgiri district. The registered promoter is Chavva Satish Kumar. The project is on 703 sq. m of land and comprises one building, Building A, with 1 Stilt + 5 upper floors and 15 apartments: 10 2BHK and 5 3BHK. Its TG-RERA registration number is P02200001402, and its proposed completion date is 01/05/2022.

01What we found

Period endedTG-RERA registration ran to 1 May 2022 - check its extension on TG-RERA
19documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from gharpe.comPhoto from nobroker.in
▦ View all 2 photos
Jeedimetla, Qutballapur, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameAKSHARA MANSION
Project type / phaseResidential apartment project; phase or separately named registered portion not disclosed
TG-RERA registrationP02200001402; certificate issued 18/11/2019, valid through 01/05/2022 unless extended by the Authority. The supplied certificate records no extension. Registration validity is distinct from the completion deadline and occupancy-certificate status. RERA record
Registered promoterChavva Satish Kumar on the registration certificate; legal entity type is not disclosed. Corporate record
RERA status in the supplied recordNew Project; registered. The certificate’s stated validity ended 01/05/2022; current registration status is not established by the supplied certificate. RERA record

Land and geographic identity

FieldProject record
Locality / streetJEEDIMETLA; Gayathri Nagar
Revenue villageJeedimetla-Village; the filed drawing also describes the location as Jeedimetla-15.
Mandal / district / PINQutballapur / Medchal-Malkajgiri / 500055
Project survey number(s)Sy. No. 124/2
Plots57, 58 and 59
Registered site extentRegistration and project land fields record 703 sq. m. RERA record RERA filing Land records
Area shown on filed drawings703.45 sq.mt. in the layout-plan drawing; the GHMC building-permission extraction records site area as 703-45 and net area as 703.4s.
Boundaries recorded in project fieldsEast: PLOT NO 60 61 621; West: 40 FEET ROAD; North: PLOT NO 57 PART AND NEIGHBOURS LAND; South: 40 FEET ROAD. RERA filing
Net / affected area in project fieldsNet area 703.00 sq. m; area affected in road widening/FTL of Tanks/Nala Widening 0 sq. m. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal filed approval referenceThe project fields list plan approval 2/C25/07098/2019. Filed GHMC plan documents also show approval reference 2/C25/07908/2019 and application 2/C25/07004/2019. RERA record RERA filing
Approval date shown in project fields18/05/2019. The filed drawing extraction gives 21-05-2019 for the layout-plan sheet; the building-permission extraction’s date is OCR-garbled. RERA filing
Building / approved configurationOne residential building, Building A; 1 Stilt + 5 upper floors. RERA filing
Height / built-up area shown in filed planBuilding height 14.99 MT; total height 19.99 mt. and total built-up area 2053.19 sq.mt. are stated in the filed layout-plan extraction. The same extraction separately lists Residential Net BUA 1693.10 and Proposed Net Built up Area 1717.98 sq.mt.; these are distinct drawing labels, not interchangeable area measures.
Unit count15 units shown as sanctioned in the filed plan and 15 total units in the project record: 10 2BHK and 5 3BHK. RERA unit table
ParkingThe filed approval requires the cellar and stilts approved for parking to be used exclusively for vehicle parking. The supplied extracts do not establish a parking-space count or unit allocations.

Offering and status

FieldProject record
Configurations2BHK: 10 units; 3BHK: 5 units. RERA unit table
RERA saleable areas2BHK: 105.5 sq. m; 3BHK: 127.0 sq. m. RERA unit table
Booked / availablePortal-read record lists 0 booked and 10 available 2BHKs, and 0 booked and 5 available 3BHKs. Counts are indicative: the portal record supplied here has no as-of date. RERA unit table
Promoter-declared completion deadline01/05/2022 in the Form B declaration; the project fields also list proposed completion 01/05/2022. RERA record
Occupancy / completion certificateThe supplied building-permission extraction records completion certified as false. No occupancy or completion certificate is supplied; its issue status is therefore not established by these materials.
Construction stageNo independently verified current construction-stage evidence is supplied. RERA quarterly progress entries show 0% for the listed amenity and infrastructure items in the supplied amenities data; this is not independent site verification. RERA amenities

2. The project story

  • AKSHARA MANSION is recorded with TG-RERA as a residential apartment development on plots 57, 58 and 59 in Sy. No. 124/2, Jeedimetla-Village, Qutballapur mandal, Medchal-Malkajgiri district. The filed GHMC plan describes one building, Building A, with a stilt and five upper floors and 15 apartments. RERA record Land records
  • The project offers 10 two-bedroom and 5 three-bedroom apartments in the RERA unit record. The promoter’s Form B declares a completion date of 01/05/2022. The supplied building-permission extraction does not record completion certification, and no occupancy certificate is included in the supplied documents. The current physical construction stage cannot be independently confirmed from this evidence. RERA unit table

3. Master plan, architecture & building design

  • The filed layout-plan material describes a single residential apartment building on a site shown as 703.45 sq.mt. It lists proposed coverage area 360.09 (51.19%), vacant plot area 343.36, Residential Net BUA 1693.10, and total built-up area 2053.19 sq.mt. It also separately lists proposed and total net built-up area as 1717.98 sq.mt. These are separate labels in the drawing record; the evidence does not define them as equivalent measures.
  • The building is shown as 1 Stilt + 5 upper floors, with a stated building height of 14.99 MT and total height 19.99 mt. The supplied drawing extraction does not establish the number of apartments per floor, lift or stair arrangement, entry/exit layout, internal circulation, or an approved landscape/open-space schedule.
  • The drawing lists a 175.09 sq.mt. mortgage area and a further 0.009 extra installment mortgage area. The filed plan also names a tot-lot, greenery and tree-planting requirements; it records “Tot-lot (m2) 0” in the building-permission extraction, so no tot-lot size is established by the supplied evidence.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010105.5 sq. m73.2–81.4 sq. m; median 77.3 sq. m27%
3BHK505127.0 sq. m97.2 sq. m23%

Unit counts, bookings, availability and saleable areas are from the TG-RERA unit record; booking counts have no as-of date in the supplied data. Carpet areas and loading are software measurements from the filed floor-plan drawing, not RERA-filed carpet-area disclosures, and the measured plans are noted as needing review. RERA unit table RERA unit details Floor plans

The 2BHK drawing sample shows a living area, dining/kitchen, two bedrooms, two toilets and two utility areas. The 3BHK sample shows a living/dining area, kitchen, three bedrooms, three toilets, a sitout and two utility areas. Utility areas are excluded from the supplied software-measured carpet-area figures. Saleable area and carpet area are different measures; the supplied drawing-measurement notes say saleable area also includes the home’s share of common areas. RERA unit details Floor plans

5. Parking & vehicle circulation

  • The GHMC-filed plan conditions say the cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The available extracts do not specify the number of parking spaces, visitor or accessible parking, a parking allocation for individual apartments, or whether a cellar is included in the final constructed configuration.
  • No parking-space count, ramp/driveway layout, pedestrian separation, mechanical parking or EV charging provision is established by the supplied project evidence. A drawing condition requiring parking use does not establish an exclusive parking entitlement for any particular unit.

6. Amenities, recreation & open spaces

Tot-lot / green strip
Description / sizeTot-lot is listed; the building-permission extraction records Tot-lot (m2) 0. A 1.00 MT greenery entry also appears in the filed layout-plan extraction.
Declared progress / verified statusPlan condition / filed item; no completion is independently verified.
Tree planting / perimeter greenery
Description / size35 Trees appears in the building-permission extraction; the plan requires planting and maintenance of greenery.
Declared progress / verified statusRequired or listed in filed approval material; delivery is not verified.
Rainwater harvesting
Description / sizeRain Water Harvesting Structure (percolation pit) is listed in the filed plan conditions.
Declared progress / verified statusRequired or proposed; completion is not verified.
Community buildings
Description / sizeListed in the RERA amenities record.
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0%; no delivered facility is verified.
Gym, swimming pool, jogging track, CCTV and children’s play area
Description / sizeListed in a third-party vendor description, not established in the supplied TG-RERA amenity or sanctioned-plan evidence.
Evidence sourcePromoter website
Declared progress / verified statusVendor-described only; not verified as sanctioned or delivered.

The RERA amenities record marks listed infrastructure items at 0% progress. The supplied evidence does not establish an independently verified completed amenity. RERA amenities

7. Utilities, building services & safety

Water
What the supplied record saysWater supply is marked “YES” in the RERA amenities record. The filed plan specifies an underground static water storage tank of 25,000 lits. and a separate terrace tank of 25,000 lits for residential buildings.
Evidence / statusRERA amenities
Sewerage / wastewater
What the supplied record saysSewerage is marked “YES” in the RERA amenities record. The building-permission conditions require an ETP; the RERA amenity list also includes treatment and disposal of sewage and sullage water. No capacity or verified operating status is supplied.
Evidence / statusRERA amenities
Storm water / rainwater
What the supplied record saysStorm water drains are listed in the RERA amenities record; a rainwater-harvesting percolation pit is required in the filed plan. No completion is verified.
Evidence / statusRERA amenities
Electrical
What the supplied record saysThe plan lists space for a transformer and an electrical meter room/sub-station/receiving station. It does not establish installed capacity or power-backup provision.
Evidence / statusRERA amenities
Lifts
What the supplied record saysLift Machine Room is listed on the filed layout-plan material. Lift count, capacity and service-lift provision are not established.
Fire and life safety
What the supplied record saysFire protection and fire-safety requirements appear in the RERA amenities record, and the GHMC-filed conditions assign safety requirements to the owner, builder/developer, architect and site engineer. The supplied material does not establish a fire clearance or completed fire systems.
Evidence / statusRERA amenities
Waste
What the supplied record saysA garbage house is required by the building-permission conditions. The RERA record lists solid-waste management and disposal. No operating or completion status is established.
Evidence / statusRERA amenities
Accessibility
What the supplied record saysThe filed plan includes a condition concerning facilities for physically handicapped persons in public and semi-public buildings above 300 sq. m. The supplied evidence does not establish an accessible route or facilities in this residential building.

8. Location, access & connectivity

The registered location is JEEDIMETLA, Gayathri Nagar, Jeedimetla-Village, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500055. The project fields record 40 FEET ROAD to the west and south. Filed plan material refers to a 12.00 MT main road; the building-permission extraction separately records an abutting road width of 18 m. RERA record RERA filing RERA filing

The supplied location dataset lists these distances: Konark Hospitals 0.4 km; Sherwood Public School 0.5 km; HDFC Bank 1.1 km; Meenakshi Estates Park 1.2 km; an unnamed mall 1.4 km; an unnamed college 1.7 km; Transguard Electrical Systems 2.2 km; Suchitra Centre 2.9 km; and Balanagar Metro 6.9 km. These are dataset distances; no route or travel-time method is provided. Location record

9. Developer & development status

The registration certificate names Chavva Satish Kumar as promoter; the Form B declaration names CHAWA SATHIS KUMAR and states that the project would be completed by 01/05/2022. The project record identifies the promoter as “CHAVVA” and does not disclose a legal entity type, corporate registration number, registered office or official contact details. Corporate record RERA record

The project record contains one building and 15 units. The supplied materials do not provide independently verified construction progress or an issued occupancy certificate. The building-permission extraction records completion certified as false; current site status is not established here. RERA unit table

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for AKSHARA MANSION, registration P02200001402, issued 18/11/2019, valid through 01/05/2022 unless extended. The certificate supplied records no extension.
GHMC building permissionFiled building-permission material for Building A, plots 57, 58 and 59, Sy. No. 124/2; extraction includes approval references and conditions.
GHMC layout-plan detailsFiled layout-plan drawing for a 15-unit residential apartment building on plots 57, 58 and 59, Sy. No. 124/2.
Promoter Form BForm B affidavit-cum-declaration by CHAWA SATHIS KUMAR, including a completion undertaking of 01/05/2022 and statements concerning title, encumbrances, separate-account funding, approvals and audits.
Occupancy / completion certificateNo occupancy or completion certificate is supplied; the building-permission extraction records completion certified as false.

The evidence index above identifies the registration and plan documents available in this record; it does not establish that all subsequent approvals or completion-stage documents have been issued.

Frequently asked questions

Is AKSHARA MANSION registered with Telangana RERA?

Yes. AKSHARA MANSION is registered with the Telangana Real Estate Regulatory Authority as P02200001402; the registration status is New Project.

Who is the developer of AKSHARA MANSION?

The promoter named in the RERA registration is CHAVVA.

Where is AKSHARA MANSION located?

AKSHARA MANSION is in JEEDIMETLA, Jeedimetla-Village, Qutballapur, Medchal-Malkajgiri, Telangana (500055).

When will AKSHARA MANSION be completed?

The promoter's proposed date of completion filed with RERA is 01/05/2022. This is the promoter's declaration, not a guarantee.

More projects in Jeedimetla