4 BLOCKS is a residential apartment project in JEEDIMETLA, Qutballapur mandal, Medchal-Malkajgiri district, developed by Beams And Columns Builders Private Limited. The project covers a site area of 13019.84 m² and has four residential blocks, each with eight upper floors above stilt; Block A also has two cellar levels. The TG-RERA unit record lists 182 2BHK and 127 3BHK homes. Its TG-RERA registration number is P02200001921, and the proposed completion date is 17th January, 2026.

More from Beams And Columns Builders Pvt Ltd · 2 projects →

01What we found

Period endedTG-RERA registration ran to 17 Jan 2026 - check its extension on TG-RERA
38documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.inPhoto from nobroker.in
▦ View all 2 photos
Jeedimetla, Qutballapur, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project name4 BLOCKS RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase is not identified in the supplied record. The registration is for the project named 4 BLOCKS; phase-specific scope is not separately stated. RERA record
TG-RERA registrationP02200001921; valid from 06/07/2020 through 17/01/2026. The certificate states five years’ validity and says extension is subject to Authority approval; no extension is recorded in the supplied certificate.
RERA record statusRegistration certificate issued under section 5. The evidence pack labels the project “New Project”; the supplied certificate does not establish current construction or occupancy status. RERA record
Registered promoterBeams And Columns Builders Private Limited
RERA-recorded site identityJeedimetla-Village, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500015 RERA record

Land and geographic identity

ItemProject record
Locality / revenue villageLocality: JEEDIMETLA; revenue village: Jeedimetla-Village (also stated as Jeedimetla in the permit) RERA record Land records
Mandal / district / PINQutballapur / Medchal-Malkajgiri / 500015 RERA record
Project survey numbers114, 115 and 116; no project-held subdivisions are specified in the filing identity. RERA record Land records
Site area in permit13019.84 m²
Net area in permit / RERA filing11974.62 m² RERA record
Road-affected area1045.22 m²; the permit states this portion is to be surrendered to GHMC free of cost.
Boundaries in RERA filingEast: ROAD WIDTH 18; West: SURVEY NO 117; North: SURVEY NO 64; South: OPEN LAND RERA record

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building permitApproval no. 1/C25/00555/2020, dated 17 January, 2020; file no. 1/C25/23352/2018
Approved built-up area39740.31 m² as recorded in the RERA filing RERA record
Sanctioned buildings and floor configurationsFour residential blocks: A-1 (Block A), 2 Cellar + Stilt + 8 upper floors; B-1 (Block B), 1 Stilt + 8 upper floors; D-1 (Block D), 1 Stilt + 8 upper floors; C-1 (Block C), 1 Stilt + 8 upper floors. The permit also sanctions Building E-1 (Club House), 1 Stilt + 5 upper floors.
Building heightsResidential buildings: 23.95 m; clubhouse building: 15 m
Parking levels / approved countsThe permit identifies cellar and stilt floors as parking areas, but the supplied extract does not give a parking-space count.
Unit countsRERA unit table: 314 total rows, including 309 homes (182 2BHK and 127 3BHK) and five clubhouse/common-area entries; the permit says sanctioned unit numbers must not be increased without prior GHMC approval. RERA unit table

Offering and status

ItemProject record
Home configurations2BHK and 3BHK RERA unit table
RERA-filed saleable area2BHK: 114.2 m²; 3BHK: 147.66 m² RERA unit table
Booked / availablePortal figures read as 0 booked and 182 available 2BHKs, and 0 booked and 127 available 3BHKs. The portal extract gives no as-of date; treat these counts as indicative, not a current inventory confirmation. RERA unit table
Construction stageThe RERA filing records water supply at 30% and lists other infrastructure and facilities with 0% progress. These are filed progress figures, not independent site verification. No construction-stage inspection is supplied. RERA amenities
Completion deadlineGHMC permit completion date: 17 January, 2026. The promoter’s Form B also undertakes completion by 17th January, 2026.
Occupancy / completion certificateThe supplied permit extraction records no completion certification; no project OC or completion certificate is included in the supplied documents. This is not a tower-by-tower OC confirmation.

2. The project story

4 BLOCKS is recorded with TG-RERA as a residential apartment project on survey numbers 114, 115 and 116 in Jeedimetla-Village, Qutballapur mandal. The GHMC permit provides for four residential buildings—Blocks A, B, C and D—and a separate clubhouse building, E-1. The residential blocks are sanctioned at stilt and eight upper floors, with Block A also having two cellar levels. RERA record Land records

The RERA unit record lists 182 2BHK and 127 3BHK homes. The clubhouse appears separately in the unit table as five common-area entries, not as homes for sale. See the completion deadline and filed progress figures above. RERA unit table RERA amenities

3. Master plan, architecture & building design

The GHMC permit records a site area of 13019.84 m², net area of 11974.62 m², and 1045.22 m² affected by road widening and to be surrendered to GHMC. The RERA filing records approved built-up area of 39740.31 m². These are distinct filed figures; the supplied material does not provide a verified FSI calculation or a separate carpet-area total for the project. RERA record

The approved building arrangement comprises four residential blocks and one clubhouse building. Residential blocks A, B, C and D are each sanctioned at 23.95 m in height and have eight upper floors above stilt; Block A additionally has two cellar levels. The clubhouse building is sanctioned at 15 m, with five upper floors above stilt. The supplied extract does not detail flat counts per floor, lifts, stairs, entrances, internal circulation, landscaping layout, or the distribution of residential units between blocks.

The permit records a 1205.26 m² tot-lot, 22 rainwater-harvesting pits and 650 trees. It also requires a perimeter greenery strip and specifies transformer space, a garbage house and an ETP. These are permit-recorded provisions or conditions, not evidence that they have been installed or completed.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1820182114.2 m²48.2–93.7 m²; median 71.7 m²37%
3BHK1270127147.66 m²88.7–114.3 m²; median 100.8 m²32%

RERA unit counts, booked/available figures and saleable areas come from the TG-RERA filing; the portal extract has no inventory as-of date. Carpet-area ranges and medians are software measurements from the approved floor-plan drawing, not RERA-filed disclosures, and the drawing measurements are flagged for review. RERA unit table RERA unit details Floor plans

The measured 2BHK drawing sample includes bedrooms, living/dining, kitchen, toilets and utility spaces. The measured 3BHK sample includes bedrooms, guest room, living/dining, dining, kitchen, toilets, puja room and utility. Utility areas are identified separately in the drawing measurements. RERA saleable area is not the same measure as carpet area: the supplied drawing-analysis note says saleable area also counts the home’s share of common areas. These drawing measurements should be checked against the plan before relying on them. RERA unit details Floor plans

5. Parking & vehicle circulation

The GHMC permit states that the cellar and stilt floors approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. Block A has two cellar levels as well as stilt; Blocks B, C and D have stilt levels. The supplied permit extract does not state the number of parking spaces, identify visitor or accessible bays, or describe ramps, vehicle entry/exit arrangements, pedestrian separation, EV charging, or unit-specific parking allocations.

The RERA filing records a mortgage area of 3731.88 m²; it does not establish individual parking rights or allocations. A parking bay shown or provided in the project should not be treated as proof of exclusive ownership without the relevant unit documentation. RERA record

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green open space1205.26 m² tot-lot; permit also requires fencing and maintenance as greenery before OCGHMC permitSanctioned condition; completion not verified
Rainwater harvesting22 rainwater-harvesting pitsGHMC permitPermit-recorded provision; completion not verified
Trees650 treesGHMC permitPermit-recorded figure; planting not independently verified
Community buildings / clubhouseSeparate Building E-1, 1 Stilt + 5 upper floors, 15 m highGHMC permit; RERA unit tableSanctioned building; progress not independently verified RERA unit table
Green stripPeriphery strip of greenery to be maintainedGHMC permitPermit condition; completion not verified

The TG-RERA amenity/infrastructure table lists internal roads and footpaths, water supply, sewerage/STP, storm-water drains, green strip/tot-lot/park, street lighting, community buildings, sewage and sullage treatment, solid-waste management, rainwater harvesting, energy management, fire protection and electrical meter room/substation/receiving station. Each is marked “YES” in the filing, but the table records 0% progress for these items except water supply at 30%. These are filed declarations/progress entries, not independent verification of delivery. RERA amenities

7. Utilities, building services & safety

Water
Evidence in the project recordTG-RERA infrastructure table lists water supply at 30%. The permit extract does not identify a water source or storage/treatment capacity. RERA amenities
Status / limitationFiled progress figure; no independent verification supplied.
Sewerage and drainage
Evidence in the project recordThe RERA table lists sewerage, storm-water drains and treatment/disposal of sewage and sullage water. The permit requires an ETP. RERA amenities
Status / limitationEach listed infrastructure item shows 0% in the RERA table; installation and capacity are not established.
Rainwater harvesting
Evidence in the project recordPermit records 22 rainwater-harvesting pits.
Status / limitationRequired/provided for in the permit; completion not verified.
Electrical
Evidence in the project recordThe RERA table lists electrical meter room, substation and receiving station; the permit requires transformer space. RERA amenities
Status / limitationListed in the filing/permit; capacity and completion are not supplied.
Lifts and vertical transport
Evidence in the project recordNo lift number, capacity or service-lift information is supplied in the project approval extract or RERA infrastructure table. RERA amenities
Status / limitationNot established by the supplied project records.
Fire and life safety
Evidence in the project recordThe permit requires a Fire NOC from the Director (EV&DM) before OC, compliance with Fire Services NOC conditions, automatic sprinklers in the cellar and other fire systems under the cited building-code conditions.
Status / limitationPermit conditions; no Fire NOC or installation/compliance evidence is supplied here.
Waste management
Evidence in the project recordPermit requires a garbage house; the RERA table lists solid-waste management and disposal. RERA amenities
Status / limitationRequired/listed; completion and operating arrangements are not verified.
Access, security and accessibility
Evidence in the project recordNo project-specific evidence supplied for CCTV, controlled access, ramps or accessible circulation. RERA amenities
Status / limitationNot established by the supplied records.

8. Location, access & connectivity

The registered location is Jeedimetla-Village, Qutballapur mandal, Medchal-Malkajgiri district, Telangana, PIN 500015. The RERA filing describes the project boundaries as east: ROAD WIDTH 18, west: SURVEY NO 117, north: SURVEY NO 64, and south: OPEN LAND. The GHMC permit records an 18 mt. road width. RERA record Land records

The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 9.4 km from the cadastral parcel centroid. No approach-road route, public-transport stops, nearby landmarks or verified travel times are included in the supplied project location record. Location record

9. Developer & development status

The registered promoter is BEAMS AND COLUMNS BUILDERS PRIVATE LIMITED, a private limited company, GSTIN 36AAHCB9265C1ZM. The RERA record lists PODDATURI MADHUSUDHAN as authorized signatory and PODDATURI NAVEEN KUMAR as director. The supplied promoter address is SRI TIRUMALA ENCLAVE, KHARKHANA, JEEDIMETLA, JEEDIMETLA, Qutballapur, Medchal-Malkajgiri, 500015. No official company website or contact details are supplied. Corporate record Parties record

In Form B, P. Madhusudhan, identified as Managing Director, declared that the project would be completed by 17th January, 2026 and made commitments concerning approvals and project-account handling. The GHMC permit separately records a completion deadline of 17 January, 2026. See the construction and occupancy information above.

10. Approvals, official records & documents

RecordEvidence summary
TG-RERA registrationForm C registration for 4 BLOCKS, P02200001921, issued 06/07/2020 and valid through 17/01/2026; certificate records a separate-account condition.
GHMC building permitBuilding Permit Order under approval no. 1/C25/00555/2020, dated 17 January, 2020; file no. 1/C25/23352/2018. The permit extract covers residential Blocks A–D and Building E-1 (Club House).
Approved drawing filed with RERADrawing document 104646, page 1 bears a stamp read from the drawing text layer dated 20-01-2020; the drawing stamp is noted as needing review.
Commencement / completion / occupancyThe permit document is described as a building permit order. Its conditions require commencement notice, completion notice and an occupancy certificate before occupation. No OC or completion certificate is supplied in the evidence pack.
Promoter Form BAffidavit-cum-declaration by P. Madhusudhan, dated 26* day of January 2019, including a completion undertaking and project-related declarations.
RERA unit and progress recordsTG-RERA unit table records 182 2BHK and 127 3BHK homes; the infrastructure table records progress entries, including water supply at 30%. Counts have no stated as-of date, and progress is not independently verified. RERA unit table RERA amenities

The available record does not include a project OC, a completion certificate, or an independent site-progress assessment. The approved building-permit conditions and complete technical approval details are available for review in the permit document; this overview summarizes rather than reproduces those conditions.

Other registrations of 4 Blocks

Frequently asked questions

Is 4 BLOCKS registered with Telangana RERA?

Yes. 4 BLOCKS is registered with the Telangana Real Estate Regulatory Authority as P02200001921; the registration status is New Project.

Who is the developer of 4 BLOCKS?

The promoter named in the RERA registration is BEAMS AND COLUMNS BUILDERS PRIVATE LIMITED.

Where is 4 BLOCKS located?

4 BLOCKS is in JEEDIMETLA, Jeedimetla-Village, Qutballapur, Medchal-Malkajgiri, Telangana (500015).

When will 4 BLOCKS be completed?

The promoter's proposed date of completion filed with RERA is 17/01/2026. This is the promoter's declaration, not a guarantee.