Greenfield City
VYKUNTAPU SRINIVASA RAO · Khammam · RERA P00800005377
GREENFIELD CITY is a plotted development in Ammapalem Revenue Village, Konijerla Mandal, Khammam District, developed by registered promoter VYKUNTAPU SRINIVASA RAO. The project covers a RERA-filed site extent of 21074.16 sq. m and has a tentative layout approval for 70 plots, with plot sizes of 149.08–254.73 sq. m. It is registered under TG-RERA number P00800005377, with a proposed completion date of 20/09/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | GREENFIELD CITY RERA record |
| Project type | Plotted development / tentative plotted layout RERA record |
| Phase or registered portion | No separate phase name is stated; TG-RERA registration covers land identified as Sy. Nos. 236/PART and 239/PART |
| TG-RERA registration number | P00800005377 |
| Registration validity | Certificate states valid from 25/11/2022 to 20/09/2025; no extension is recorded in the supplied certificate |
| Registered promoter | VYKUNTAPU SRINIVASA RAO RERA record |
| RERA status | The supplied certificate records registration; it does not establish the project’s current registration status after the stated expiry date |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | KONIJERLA RERA record |
| Revenue village | Ammapalem Revenue Village RERA record |
| Mandal / district / PIN | Konijerla Mandal / Khammam / 507305 RERA record |
| Project survey numbers | 236/PART and 239/PART |
| RERA-filed total site extent | 21074.16 sq. m RERA filing |
| Net site extent | 21074.16 sq. m RERA filing |
| Layout approval extent | Ac. 5.207 cents; 25204.492 Sq.Yds |
| Boundaries as filed | East: ROAD WIDTH; West, North and South: OTHERS LAND RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority shown in the tentative-layout document | SUDA, with the approval delegated to Ammapalem Grampanchayat |
| Principal layout approval | 200109/LP/GP/202452/0001/2022, dated 20-09-2022 Approvals record |
| Tentative Layout Plan number printed in approval | 200109/LP/GP/202452/0001/2 |
| Approved development type and count | Tentative layout for 70 plots |
| Approved built-up area | 12858.03 sq. m, as stated in RERA project information RERA filing |
| Building/tower count and floors | Not disclosed in the supplied project record; the approval is for a plotted layout, not a building configuration |
| Parking provision | No parking-space count or parking arrangement is established in the supplied material |
| RERA-declared plot inventory count | The approval document records 70 plots; a separate RERA inventory or booked/available count is not supplied |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Plots RERA record |
| Plot-size range | Software-read from the approved layout drawing: 149.08–254.73 sq. m (about 178.3–304.7 sq. yd); drawing-derived figures should be checked against the drawing Layout record |
| Booked / available counts | Not disclosed in the supplied RERA record Document index |
| Construction stage | No independently verified site-progress evidence is supplied. The tentative approval requires development works and a later final-layout step |
| Completion dates | RERA registration certificate and Form B state 20/09/2025 as the stated end/completion date |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The project is a plotted layout; the approval document refers to a final layout plan and a work-completion certificate |
2. The project story
GREENFIELD CITY is a proposed residential plotted layout in Ammapalem Revenue Village, Konijerla Mandal, Khammam District. Its tentative layout approval identifies land in Sy. Nos. 236/PART and 239/PART and records 70 plots, internal roads, open space, utilities and social-infrastructure land. The approval describes the plan as tentative and calls for infrastructure and amenity works, a work-completion certificate from a Licensed Technical Person, and approval of a final layout plan. It does not establish that those works have been completed.
The layout approval requires the applicant to provide roads, drains, sewerage disposal, protected water supply, street lighting, rainwater-harvesting pits and greenery, among other works. It also states that plots reserved for mortgage to the Grampanchayat are not to be developed or treated as released until development works are completed and the final layout is obtained. The supplied records do not report verified construction progress or identify any phase or tower-level delivery.
3. Master plan, architecture & building design
The principal supplied drawing-related record is the tentative layout approval, which describes a 70-plot layout. The layout drawing’s software-read schedule also reports 70 plots, with plot sizes ranging from 149.08 sq. m to 254.73 sq. m; the software-derived reading should be verified against the drawing. Layout record
The approval document’s area statement allocates land as follows:
| Layout use | Area as recorded in approval | Share as printed or calculated in the approval |
|---|---|---|
| Plotted area | Ac. 3.177 cents; 15378.084 Sq.Yds | 61.0132680142678249349079126% |
| Roads area | Ac. 1.372 cents; 6641.041 Sq.Yds | 26.3486411448425286336379585% |
| Open space (Park) | Ac. 0.474 cents; 2292.23 Sq.Yds | 9.0945283736017716626039967% |
| Social infrastructure | Ac. 0.131 cents; 636.248 Sq.Yds | 2.5243439899136328716109289% |
| Utilities | Ac. 0.053 cents; 256.877 Sq.Yds | 1.0191710255153390506496397% |
| Mortgage area | Ac. 0.618 cents; 2992.835 Sq.Yds | 11.8742108162716220326573183% of plotted area |
The approval identifies 11 mortgaged plots—4, 5, 6, 7, 8, 19, 20, 21, 22, 36 and 37—in favour of the Grampanchayat. It describes this mortgage as security for completion of infrastructure and amenities, with release linked to final-layout approval.
The supplied record does not establish building footprints, apartment or villa plans, building heights, floor levels, internal plot-by-plot road geometry, or a separate phase arrangement. The 12858.03 sq. m figure is filed as approved built-up area; it is not identified in the supplied evidence as carpet area, saleable area or FSI-counted area. RERA filing
4. Homes, configurations & floor plans
This is a plotted project rather than an apartment configuration. The approval document records 70 plots. Software-read plot sizes and bands from the layout drawing are below; these are drawing-derived readings, not a RERA-filed saleable-area schedule. No plot-wise booking or availability schedule is supplied. Layout record
| Plot-size band (sq. yd) | Plot count |
|---|---|
| 150–200 | 19 |
| 200–250 | 43 |
| 250–300 | 5 |
| 300–400 | 3 |
| Total | 70 |
The software-read individual plot-size range is 149.08–254.73 sq. m (178.3–304.7 sq. yd). The supplied floor-plan record contains two layout sheets, neither of which is identified as containing apartment floor plans; no carpet-area measurements are available. Layout record Floor plans
5. Parking & vehicle circulation
The supplied records do not establish designated resident or visitor parking counts, accessible bays, parking allocation to individual plots, or a separate parking facility. The tentative layout approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site. It does not provide enough information to describe road widths, driveways, pedestrian separation, entrances or exits. Document index
6. Amenities, recreation & open spaces
The tentative approval identifies open space, social infrastructure, utilities and roads as layout land uses. It also lists infrastructure and amenity works required of the applicant. The supplied records do not establish that any listed item has been completed or independently inspected. RERA amenities
| Facility / land use | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | Ac. 0.474 cents; 2292.23 Sq.Yds | Tentative layout approval | Required in the approved layout; completion not verified |
| Social infrastructure | Ac. 0.131 cents; 636.248 Sq.Yds | Tentative layout approval | Land allocation recorded; facility details and completion not supplied |
| Roads | Ac. 1.372 cents; 6641.041 Sq.Yds | Tentative layout approval | Road land allocation recorded; road works not verified |
| Utility land | Ac. 0.053 cents; 256.877 Sq.Yds | Tentative layout approval | Land allocation recorded; delivery of utility facilities not verified |
| Water reservoir / protected water supply | Reservoir is listed among utility items; protected water supply is a required work | Tentative layout approval | Required/proposed; completion and capacity not supplied |
| Septic tank / sewerage treatment | Listed among utility items | Tentative layout approval | Required/proposed; system type, capacity and completion not established |
| Solid waste management | Listed among utility items | Tentative layout approval | Required/proposed; capacity and completion not established |
| Street lighting and electricity | Required development works | Tentative layout approval | Required/proposed; completion not verified |
| Drains, nala channelization and rainwater-harvesting pits | Required development works | Tentative layout approval | Required/proposed; completion not verified |
| Greenery and fencing of open spaces | Required development works | Tentative layout approval | Required/proposed; completion not verified |
The RERA amenities checklist also marks internal roads and footpaths, water supply, sewerage, storm-water drains, park/green strip, street lighting, rainwater harvesting and an electrical meter room/sub-station/receiving station as available (“YES”); the checklist shows 0 progress for its listed entries and does not establish completed delivery. RERA amenities
7. Utilities, building services & safety
The tentative-layout approval requires a protected water-supply system, an overhead tank or sump, septic tank “as case may be,” sewerage disposal, drains, nala channelization, rainwater-harvesting pits, street lighting and electricity facilities. It also lists a water reservoir, septic tank / Sewerage Treatment Plant, electric transformer and solid-waste-management area among utility items. These are approval requirements or listed provisions, not evidence of installation or operational status; capacities and technical specifications are not supplied.
The supplied material does not establish an installed STP, treated-water reuse, electrical backup, EV charging, fire-protection systems, CCTV, access-control arrangements or accessibility provisions. The RERA checklist includes fire protection and safety requirements but shows no progress figure beyond 0; the checklist alone does not establish statutory clearance or completed fire-safety works. RERA amenities
8. Location, access & connectivity
The project’s official filed location is Ammapalem Revenue Village, Konijerla Mandal, Khammam District, Telangana, PIN 507305, with the site identified in Sy. Nos. 236/PART and 239/PART. The supplied cadastral coordinate is the parcel centroid at 17.221858908761366, 80.24988469604241. RERA record Cadastral map
The tentative approval records the eastern boundary as ROAD WIDTH and requires roads to remain open for access to neighbouring sites. The only supplied measured connectivity item is the nearest sampled Outer Ring Road interchange, approximately 168.6 km away. No local public-transport details, approach-road names or travel times are supplied. RERA filing Location record
9. Developer & development status
The registered promoter is VYKUNTAPU SRINIVASA RAO. The RERA filing identifies the organization type as “Others” and describes it as “OTHERS”; a more specific legal-entity type and corporate identifier are not established in the supplied records. The filed promoter address is VISON PRIDE APARTMENT, INDIRA NAGAR COLONY, AMMAPALEM, KONIJERLA, Konijerla Mandal, Khammam, 507305. RERA record RERA filing RERA filing
The layout approval names seven applicants, including VYKUNTAPU SRINIVASA RAO, and identifies him as an applicant alongside six other named individuals. The approval places responsibility for layout development works on the applicants/layout owner or developer. The Form B filing is the promoter’s declaration of a 20/09/2025 completion period; it is a promoter declaration, not evidence of completion.
No construction-progress percentage, site inspection, final-layout approval, work-completion certificate or occupancy/completion certificate is supplied. The approval requires a work-completion certificate from a Licensed Technical Person before approval of the final layout plan.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for GREENFIELD CITY, registration P00800005377, issued 25/11/2022, with stated validity through 20/09/2025 |
| Principal layout approval | SUDA tentative-layout approval 200109/LP/GP/202452/0001/2022, dated 20-09-2022, for 70 plots in Sy. Nos. 236/PART and 239/PART; approval is delegated to Ammapalem Grampanchayat |
| Tentative Layout Plan number | 200109/LP/GP/202452/0001/2 |
| Promoter declaration | Form B by Vykuntapu Srinivasa Rao, including a declared completion period of 20/09/2025 and statements concerning title, encumbrances and project funds |
| Layout drawing / plot schedule | Two layout sheets are referenced; plot count and plot-size readings are software-measured from the drawing Layout record |
| Final-layout / completion records | No final-layout approval or work-completion certificate is supplied; the tentative approval calls for these further steps |
| Occupancy / completion certificate | None supplied in the reviewed records Document index |
1. Project at a glance
Project identity
Registered project name: GREENFIELD CITY
Project type: Plotted development / tentative plotted layout
Phase or registered portion: No separate phase name is stated; TG-RERA registration covers land identified as Sy. Nos. 236/PART and 239/PART
TG-RERA registration number: P00800005377
Registration validity: Certificate states valid from 25/11/2022 to 20/09/2025; no extension is recorded in the supplied certificate
Registered promoter: VYKUNTAPU SRINIVASA RAO
RERA status: The supplied certificate records registration; it does not establish the project’s current registration status after the stated expiry date
Land and geographic identity
Locality: KONIJERLA
Revenue village: Ammapalem Revenue Village
Mandal / district / PIN: Konijerla Mandal / Khammam / 507305
Project survey numbers: 236/PART and 239/PART
RERA-filed total site extent: 21074.16 sq. m
Net site extent: 21074.16 sq. m
Layout approval extent: Ac. 5.207 cents; 25204.492 Sq.Yds
Boundaries as filed: East: ROAD WIDTH; West, North and South: OTHERS LAND
Development identity
Sanctioning authority shown in the tentative-layout document: SUDA, with the approval delegated to Ammapalem Grampanchayat
Principal layout approval: 200109/LP/GP/202452/0001/2022, dated 20-09-2022
Tentative Layout Plan number printed in approval: 200109/LP/GP/202452/0001/2
Approved development type and count: Tentative layout for 70 plots
Approved built-up area: 12858.03 sq. m, as stated in RERA project information
Building/tower count and floors: Not disclosed in the supplied project record; the approval is for a plotted layout, not a building configuration
Parking provision: No parking-space count or parking arrangement is established in the supplied material
RERA-declared plot inventory count: The approval document records 70 plots; a separate RERA inventory or booked/available count is not supplied
Offering and status
Unit type: Plots
Plot-size range: Software-read from the approved layout drawing: 149.08–254.73 sq. m (about 178.3–304.7 sq. yd); drawing-derived figures should be checked against the drawing
Booked / available counts: Not disclosed in the supplied RERA record
Construction stage: No independently verified site-progress evidence is supplied. The tentative approval requires development works and a later final-layout step
Completion dates: RERA registration certificate and Form B state 20/09/2025 as the stated end/completion date
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The project is a plotted layout; the approval document refers to a final layout plan and a work-completion certificate
2. The project story
GREENFIELD CITY is a proposed residential plotted layout in Ammapalem Revenue Village, Konijerla Mandal, Khammam District. Its tentative layout approval identifies land in Sy. Nos. 236/PART and 239/PART and records 70 plots, internal roads, open space, utilities and social-infrastructure land. The approval describes the plan as tentative and calls for infrastructure and amenity works, a work-completion certificate from a Licensed Technical Person, and approval of a final layout plan. It does not establish that those works have been completed.
The layout approval requires the applicant to provide roads, drains, sewerage disposal, protected water supply, street lighting, rainwater-harvesting pits and greenery, among other works. It also states that plots reserved for mortgage to the Grampanchayat are not to be developed or treated as released until development works are completed and the final layout is obtained. The supplied records do not report verified construction progress or identify any phase or tower-level delivery.
3. Master plan, architecture & building design
The principal supplied drawing-related record is the tentative layout approval, which describes a 70-plot layout. The layout drawing’s software-read schedule also reports 70 plots, with plot sizes ranging from 149.08 sq. m to 254.73 sq. m; the software-derived reading should be verified against the drawing.
The approval document’s area statement allocates land as follows:
| Layout use | Area as recorded in approval | Share as printed or calculated in the approval |
|---|---|---|
| Plotted area | Ac. 3.177 cents; 15378.084 Sq.Yds | 61.0132680142678249349079126% |
| Roads area | Ac. 1.372 cents; 6641.041 Sq.Yds | 26.3486411448425286336379585% |
| Open space (Park) | Ac. 0.474 cents; 2292.23 Sq.Yds | 9.0945283736017716626039967% |
| Social infrastructure | Ac. 0.131 cents; 636.248 Sq.Yds | 2.5243439899136328716109289% |
| Utilities | Ac. 0.053 cents; 256.877 Sq.Yds | 1.0191710255153390506496397% |
| Mortgage area | Ac. 0.618 cents; 2992.835 Sq.Yds | 11.8742108162716220326573183% of plotted area |
The approval identifies 11 mortgaged plots—4, 5, 6, 7, 8, 19, 20, 21, 22, 36 and 37—in favour of the Grampanchayat. It describes this mortgage as security for completion of infrastructure and amenities, with release linked to final-layout approval.
The supplied record does not establish building footprints, apartment or villa plans, building heights, floor levels, internal plot-by-plot road geometry, or a separate phase arrangement. The 12858.03 sq. m figure is filed as approved built-up area; it is not identified in the supplied evidence as carpet area, saleable area or FSI-counted area.
4. Homes, configurations & floor plans
This is a plotted project rather than an apartment configuration. The approval document records 70 plots. Software-read plot sizes and bands from the layout drawing are below; these are drawing-derived readings, not a RERA-filed saleable-area schedule. No plot-wise booking or availability schedule is supplied.
150–200: 19
200–250: 43
250–300: 5
300–400: 3
Total: 70
The software-read individual plot-size range is 149.08–254.73 sq. m (178.3–304.7 sq. yd). The supplied floor-plan record contains two layout sheets, neither of which is identified as containing apartment floor plans; no carpet-area measurements are available.
5. Parking & vehicle circulation
The supplied records do not establish designated resident or visitor parking counts, accessible bays, parking allocation to individual plots, or a separate parking facility. The tentative layout approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site. It does not provide enough information to describe road widths, driveways, pedestrian separation, entrances or exits.
6. Amenities, recreation & open spaces
The tentative approval identifies open space, social infrastructure, utilities and roads as layout land uses. It also lists infrastructure and amenity works required of the applicant. The supplied records do not establish that any listed item has been completed or independently inspected.
| Facility / land use | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | Ac. 0.474 cents; 2292.23 Sq.Yds | Tentative layout approval | Required in the approved layout; completion not verified |
| Social infrastructure | Ac. 0.131 cents; 636.248 Sq.Yds | Tentative layout approval | Land allocation recorded; facility details and completion not supplied |
| Roads | Ac. 1.372 cents; 6641.041 Sq.Yds | Tentative layout approval | Road land allocation recorded; road works not verified |
| Utility land | Ac. 0.053 cents; 256.877 Sq.Yds | Tentative layout approval | Land allocation recorded; delivery of utility facilities not verified |
| Water reservoir / protected water supply | Reservoir is listed among utility items; protected water supply is a required work | Tentative layout approval | Required/proposed; completion and capacity not supplied |
| Septic tank / sewerage treatment | Listed among utility items | Tentative layout approval | Required/proposed; system type, capacity and completion not established |
| Solid waste management | Listed among utility items | Tentative layout approval | Required/proposed; capacity and completion not established |
| Street lighting and electricity | Required development works | Tentative layout approval | Required/proposed; completion not verified |
| Drains, nala channelization and rainwater-harvesting pits | Required development works | Tentative layout approval | Required/proposed; completion not verified |
| Greenery and fencing of open spaces | Required development works | Tentative layout approval | Required/proposed; completion not verified |
The RERA amenities checklist also marks internal roads and footpaths, water supply, sewerage, storm-water drains, park/green strip, street lighting, rainwater harvesting and an electrical meter room/sub-station/receiving station as available (“YES”); the checklist shows 0 progress for its listed entries and does not establish completed delivery.
7. Utilities, building services & safety
The tentative-layout approval requires a protected water-supply system, an overhead tank or sump, septic tank “as case may be,” sewerage disposal, drains, nala channelization, rainwater-harvesting pits, street lighting and electricity facilities. It also lists a water reservoir, septic tank / Sewerage Treatment Plant, electric transformer and solid-waste-management area among utility items. These are approval requirements or listed provisions, not evidence of installation or operational status; capacities and technical specifications are not supplied.
The supplied material does not establish an installed STP, treated-water reuse, electrical backup, EV charging, fire-protection systems, CCTV, access-control arrangements or accessibility provisions. The RERA checklist includes fire protection and safety requirements but shows no progress figure beyond 0; the checklist alone does not establish statutory clearance or completed fire-safety works.
8. Location, access & connectivity
The project’s official filed location is Ammapalem Revenue Village, Konijerla Mandal, Khammam District, Telangana, PIN 507305, with the site identified in Sy. Nos. 236/PART and 239/PART. The supplied cadastral coordinate is the parcel centroid at 17.221858908761366, 80.24988469604241.
The tentative approval records the eastern boundary as ROAD WIDTH and requires roads to remain open for access to neighbouring sites. The only supplied measured connectivity item is the nearest sampled Outer Ring Road interchange, approximately 168.6 km away. No local public-transport details, approach-road names or travel times are supplied.
9. Developer & development status
The registered promoter is VYKUNTAPU SRINIVASA RAO. The RERA filing identifies the organization type as “Others” and describes it as “OTHERS”; a more specific legal-entity type and corporate identifier are not established in the supplied records. The filed promoter address is VISON PRIDE APARTMENT, INDIRA NAGAR COLONY, AMMAPALEM, KONIJERLA, Konijerla Mandal, Khammam, 507305.
The layout approval names seven applicants, including VYKUNTAPU SRINIVASA RAO, and identifies him as an applicant alongside six other named individuals. The approval places responsibility for layout development works on the applicants/layout owner or developer. The Form B filing is the promoter’s declaration of a 20/09/2025 completion period; it is a promoter declaration, not evidence of completion.
No construction-progress percentage, site inspection, final-layout approval, work-completion certificate or occupancy/completion certificate is supplied. The approval requires a work-completion certificate from a Licensed Technical Person before approval of the final layout plan.
10. Approvals, official records & documents
TG-RERA registration: Form C for GREENFIELD CITY, registration P00800005377, issued 25/11/2022, with stated validity through 20/09/2025
Principal layout approval: SUDA tentative-layout approval 200109/LP/GP/202452/0001/2022, dated 20-09-2022, for 70 plots in Sy. Nos. 236/PART and 239/PART; approval is delegated to Ammapalem Grampanchayat
Tentative Layout Plan number: 200109/LP/GP/202452/0001/2
Promoter declaration: Form B by Vykuntapu Srinivasa Rao, including a declared completion period of 20/09/2025 and statements concerning title, encumbrances and project funds
Layout drawing / plot schedule: Two layout sheets are referenced; plot count and plot-size readings are software-measured from the drawing
Final-layout / completion records: No final-layout approval or work-completion certificate is supplied; the tentative approval calls for these further steps
Occupancy / completion certificate: None supplied in the reviewed records
Frequently asked questions
Is GREENFIELD CITY registered with Telangana RERA?
Yes. GREENFIELD CITY is registered with the Telangana Real Estate Regulatory Authority as P00800005377; the registration status is New Project.
Who is the developer of GREENFIELD CITY?
The promoter named in the RERA registration is VYKUNTAPU SRINIVASA RAO.
Where is GREENFIELD CITY located?
GREENFIELD CITY is in KONIJERLA, Ammapalem, Konijerla Mandal, Khammam, Telangana (507305).
When will GREENFIELD CITY be completed?
The promoter's proposed date of completion filed with RERA is 20/09/2025. This is the promoter's declaration, not a guarantee.