Chaitanya Elite
SRI CHAITANYARAM BUILDERS · Rangareddy · RERA P02400005127
CHAITANYA ELITE is a residential apartments project in Kondapur, Serilingampally Mandal, Ranga Reddy District. It is being developed by the registered promoter Sri Chaitanyaram Builders on a site of 376.07 sq. m, with one building recorded as existing 1 Stilt + 4 upper floors and proposed 1 upper floor. The RERA unit record lists 10 homes: 5 2BHK units and 5 3BHK units. Its TG-RERA registration number is P02400005127, and the proposed completion date stated to TG-RERA is 13 July 2025.
More from Sri Chaitanyaram Builders · 16 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | CHAITANYA ELITE RERA record |
| Project type | Residential apartments RERA record RERA filing |
| Phase / registered portion | The record identifies one registered project; a separate phase name is not disclosed. RERA record |
| TG-RERA registration | P02400005127 |
| Registration validity | 29/09/2022 to 13/07/2025; the certificate says extension is subject to Authority approval. The supplied record does not show an extension. Registration validity is distinct from the completion undertaking and from occupancy certification. |
| Registered promoter | Sri Chaitanyaram Builders Corporate record |
| RERA status | New Project in the supplied project record. RERA record |
| Registration status at report review | The supplied certificate’s validity ended on 13/07/2025; no extension or renewed certificate is supplied. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Kondapur RERA record |
| Revenue village | Kondapur RERA record |
| Mandal | Serilingampally RERA record |
| District | Ranga Reddy (also rendered “Rangareddy” in the building-permit extraction) RERA record |
| PIN | 500084 RERA record |
| Survey number | Survey No. 72 |
| Site description / subdivision | Southern Part of 209-B and 224-B; the building-permit record also lists the survey description as “SOUTHERN PART OF 209-B, 224-B.” |
| Registered site extent | 376.07 sq. m in the project land details and building-permit record. The development agreement describes 450.0 sq. yards or 376.25 sq. m for the southern part of Plot 209-B and Plot 224-B; the development agreement is recorded in the title documents. RERA filing |
| Net / total area | Building-permit record: plot area 376.07 sq. m, road-affected area 0.0 sq. m, nala-affected area 0.0 sq. m, and net plot area 376.07 sq. m. |
| Boundaries as filed | East: Plot Nos. 208 and 225; West: Plot Nos. 210 and 223; North: northern part of Plot 209-B; South: 30 feet wide road. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC); delegated to Serilingampally Zone. |
| Principal building approval | 2296/GHMC/SLP/2022-BP, approved 13 July 2022. File No. 004210/GHMC/2143/SLP2/2022-BP. Approvals record |
| Approved built-up area | 1,089.00 sq. m in the RERA project fields. RERA filing |
| Building count | One sanctioned building/unit is recorded in the project fields; the permit describes a proposed residential building. RERA filing |
| Sanctioned floor configuration | Building-permit extraction: Existing 1 Stilt + 4 upper floors and Proposed 1 upper floor. The recorded building height is 14.99 (unit not stated in the extracted field). |
| Parking | Permit records total parking area 217.85 (unit not stated in the extracted field) and identifies stilt parking. It requires approved cellar/stilt parking to be used exclusively for vehicle parking. A parking-space count is not supplied. |
| Units | 10 total units in the RERA unit record; the permit condition says sanctioned unit numbers must not be increased without prior GHMC approval. The permit extraction does not separately provide an approved unit count. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 5 units; 3BHK: 5 units. RERA unit table |
| RERA-filed saleable area | 2BHK: 111.48 sq. m; 3BHK: 148.64 sq. m. RERA unit table |
| Booked / available | Portal-derived unit counts show 0 booked and 5 available for each configuration (10 available in total). The record has no booking-count as-of date, so these figures are indicative. RERA unit table |
| Completion date declared to TG-RERA | Promoter Form B and registration certificate state 13 July 2025. |
| Original / revised completion dates | The supplied record gives the stated completion date above but does not separately identify a revised date or an approved extension. |
| Construction stage | No independently verified site-progress measurement is supplied. The RERA amenities record lists progress as 0% for the listed items; it does not provide a building-construction percentage. RERA amenities |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is supplied in the reviewed project documents. The building permit makes an occupancy certificate compulsory before occupation. Document index |
2. The project story
CHAITANYA ELITE is a single-building residential apartment project registered with TG-RERA for Survey No. 72 at Kondapur, Serilingampally Mandal, Ranga Reddy District. Its site description identifies the southern part of Plot 209-B and Plot 224-B. The GHMC building permit records a plot and net plot area of 376.07 sq. m and sanctions an existing stilt with four upper floors plus one proposed upper floor. RERA record
The RERA unit record lists ten apartments: five 2BHK and five 3BHK. The promoter’s Form B declaration and the registration certificate state a completion date of 13 July 2025. The supplied file does not establish current construction progress or provide an occupancy/completion certificate; the amenity progress entries are recorded at 0%. Accordingly, a construction stage or completed-and-occupiable status cannot be independently confirmed from this evidence. RERA unit table RERA amenities
3. Master plan, architecture & building design
The GHMC building permit describes a residential building on a 376.07 sq. m plot, with 376.07 sq. m net plot area and no recorded road- or nala-affected area. It records 1,089.00 sq. m as approved built-up area in the RERA project fields. These are distinct reported measures; the supplied documents do not provide a separate FSI-counted area, carpet-area total for the building, or gross built-up-area figure. RERA filing
The permit describes Existing 1 Stilt + 4 upper floors and Proposed 1 upper floor, with a recorded height of 14.99 (unit not stated in the extracted field). It also records total parking area as 217.85 (unit not stated in that field). The building-permit conditions call for a periphery strip of greenery, a tot-lot to be fenced and maintained as greenery before occupancy certification, a rainwater-harvesting structure, transformer space, and a garbage house. The permit’s amenities/utility extraction records three rainwater-harvesting pits and “Tot Lot NA”; the permit conditions and the extracted amenity entry are both reproduced here as filed, without inferring delivery.
The RERA filing includes a layout-plan document entry, but the supplied extraction does not provide readable layout or site-plan details. The floor-plan document is identified as doc 255144 and drawing measurements are available for the apartment configurations; the supplied evidence does not establish building footprint, flats per floor, lift or stair count, entry/exit arrangement, internal circulation, or measured open-space area. Document index
4. Homes, configurations & floor plans
The RERA unit record lists the configurations, unit counts and saleable areas below. Drawing-derived carpet figures were measured by software from floor-plan geometry; they are not RERA disclosures and are described in the supplied data as needing review. Saleable area and carpet area are different measures: the supplied drawing analysis says saleable area includes the home’s share of common areas, while the drawing-based carpet measurement excludes balcony area. RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 111.48 sq. m | 66.1–66.8 sq. m; median 66.7 sq. m (software-measured) | 40% (drawing-analysis figure) |
| 3BHK | 5 | 0 | 5 | 148.64 sq. m | 108.0–108.2 sq. m; median 108.2 sq. m (software-measured) | 27% (drawing-analysis figure) |
The measured first-floor 2BHK example shows two bedrooms, a hall, a combined dining/kitchen area, a toilet, a wash area and a 1.20 m-wide balcony. The measured first-floor 3BHK example shows three bedrooms, a hall, a kitchen and two toilets. The listed room dimensions are drawing-derived examples, not RERA-filed room-area disclosures.
5. Parking & vehicle circulation
The GHMC building-permit extraction records 217.85 as total parking area (unit not stated) and identifies a stilt level. Its conditions state that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The record does not provide sanctioned car or two-wheeler space counts, visitor or accessible-space provisions, a parking allocation by apartment, or vehicle-entry, ramp and driveway details. A drawn or sanctioned parking area does not, by itself, establish an exclusive parking right for a particular apartment.
6. Amenities, recreation & open spaces
The RERA amenities record contains 14 listed infrastructure or amenity items. Entries marked “YES” have no recorded completion percentage; the other listed items show 0%. The building permit separately requires certain site provisions. No independent site verification of completion is supplied. RERA amenities
| Description / size | Green Strip/TOT LOT/Park marked “YES”; permit conditions require a fenced tot-lot maintained as greenery before occupancy certificate. Permit extraction also states “Tot Lot NA.” No area or size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA entry shows 0%; no independent completion verification. |
| Description / size | No dimensions supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification. |
| Description / size | Marked “YES”; no source or capacity stated in the RERA amenity entry. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification. |
| Description / size | “Sewerage (Chamber, Lines, Septic Tank, STP).” No system selection, capacity or size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification. |
| Description / size | No dimensions supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification. |
| Description / size | No quantity or specification supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification. |
| Description / size | No method or capacity supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification. |
| Description / size | No method or capacity supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification. |
| Description / size | Marked “YES”; GHMC permit records three rainwater-harvesting pits and requires a rainwater-harvesting structure. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA entry shows 0%; no independent completion verification. |
| Description / size | No system details supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification. |
| Description / size | Listed in the RERA amenity record; no system details supplied there. Permit requires an Occupancy Fire NOC before issue of the occupancy certificate. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification or Fire NOC supplied. |
| Description / size | Marked “YES”; permit conditions require transformer space on site. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification. |
| Description / size | Aggregate area not supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification. |
| Description / size | Kids’ play areas/sand pits, indoor games and central green/park. These are third-party vendor-listed claims, not established as RERA-sanctioned or delivered facilities in the supplied evidence. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | No verified progress or completion evidence supplied. |
7. Utilities, building services & safety
Water and drainage: The RERA amenity record marks water supply and rainwater harvesting “YES,” but lists 0% progress for both and provides no water source, storage, treatment or capacity. Sewerage, storm-water drainage, sewage/sullage treatment and solid-waste management are listed without system specifications or capacities. The building permit requires a rainwater-harvesting structure and the extracted permit parameters state 3 rainwater-harvesting pits. RERA amenities
Electrical and vertical transportation: The RERA amenity record marks an electrical meter room/substation/receiving station “YES,” without capacity or completion evidence. The permit requires space for a transformer. Lift provision, number, capacity and backup-power specification are not established in the supplied RERA documents; lift and power backup appear only in the vendor listing. RERA amenities Promoter website
Fire and life safety: Fire protection and fire-safety requirements are listed in the RERA amenities record, but no system design or completion evidence is supplied. The building-permit conditions require an Occupancy Fire NOC from the Director (EV&DM) before issue of the occupancy certificate and make an occupancy certificate compulsory before occupation. No Fire NOC or occupancy certificate is supplied. RERA amenities
Waste, security and accessibility: The permit requires a garbage house within the premises; the RERA record lists solid-waste management/disposal but shows 0% progress. CCTV and security are vendor-listed only. No RERA-filed accessibility features, accessible circulation or specific security-system details are supplied. RERA amenities Promoter website
8. Location, access & connectivity
The registered location is Kondapur village, Serilingampally Mandal, Ranga Reddy District, Telangana, PIN 500084. The RERA record gives Survey No. 72 and the site description “Southern Part of 209-B, 224-B.” The GHMC building permit records an 18 mt. road width and identifies the southern boundary as a 30 feet wide road. RERA record RERA filing
The supplied location data places HITEC City 3.5 km from the cadastral parcel centroid. This is a location-data distance, not a stated travel time. Location record
9. Developer & development status
The registered promoter is Sri Chaitanyaram Builders, identified in the RERA party record as a partnership. Its supplied GSTIN is 36ADHFS3993A1ZY. The RERA record lists the promoter address as Plot No. 84, Venkataramana Colony, Kondapur, Serilingampally, Ranga Reddy District, PIN 500084. The registration certificate’s promoter-office field instead gives an incomplete address line and PIN 500049; the supplied information does not establish a complete registered-office address. No official promoter website or contact details are supplied. Corporate record Parties record RERA record
TG-RERA records 13 July 2025 as the promoter’s declared completion date. The supplied evidence does not include a construction-progress percentage, an approved registration extension, or an occupancy/completion certificate. The unit record reports five available 2BHK units and five available 3BHK units, with booking figures lacking an as-of date. RERA unit table Document index
10. Approvals, official records & documents
| Details and scope | CHAITANYA ELITE, registration P02400005127, issued 29/09/2022, valid through 13/07/2025 as stated on the certificate. |
|---|
| Details and scope | Approval 2296/GHMC/SLP/2022-BP, file 004210/GHMC/2143/SLP2/2022-BP, dated 13 July 2022; residential building at Kondapur, Survey No. 72, site described as southern part of 209-B and 224-B. |
|---|---|
| Source | Approvals record |
| Details and scope | Promoter-authorized signatory declares the project completion date as 13 July 2025 and makes the stated land, account, audit and approvals declarations. |
|---|
| Details and scope | Documents include the registered development agreement cum GPA 14223/2021 and title-report materials. The development agreement is described as granting development and attorney rights for the identified land. |
|---|---|
| Source | Document index |
| Details and scope | A layout-plan document entry is present, but its supplied extraction is not readable and no approved-layout details are available here. |
|---|---|
| Source | Document index |
| Details and scope | Document 255144 is the source for software-measured apartment-plan areas and room examples; no separate readable drawing sheet is reproduced in the supplied evidence. |
|---|
| Details and scope | No occupancy certificate, completion certificate or occupancy Fire NOC is supplied in the reviewed documents. The building permit states that an occupancy certificate is compulsory before occupation and requires an Occupancy Fire NOC before its issue. |
|---|---|
| Source | Document index |
1. Project at a glance
Project identity
Registered project name: CHAITANYA ELITE
Project type: Residential apartments
Phase / registered portion: The record identifies one registered project; a separate phase name is not disclosed.
TG-RERA registration: P02400005127
Registration validity: 29/09/2022 to 13/07/2025; the certificate says extension is subject to Authority approval. The supplied record does not show an extension. Registration validity is distinct from the completion undertaking and from occupancy certification.
Registered promoter: Sri Chaitanyaram Builders
RERA status: New Project in the supplied project record.
Registration status at report review: The supplied certificate’s validity ended on 13/07/2025; no extension or renewed certificate is supplied.
Land and geographic identity
Locality: Kondapur
Revenue village: Kondapur
Mandal: Serilingampally
District: Ranga Reddy (also rendered “Rangareddy” in the building-permit extraction)
PIN: 500084
Survey number: Survey No. 72
Site description / subdivision: Southern Part of 209-B and 224-B; the building-permit record also lists the survey description as “SOUTHERN PART OF 209-B, 224-B.”
Registered site extent: 376.07 sq. m in the project land details and building-permit record. The development agreement describes 450.0 sq. yards or 376.25 sq. m for the southern part of Plot 209-B and Plot 224-B; the development agreement is recorded in the title documents.
Net / total area: Building-permit record: plot area 376.07 sq. m, road-affected area 0.0 sq. m, nala-affected area 0.0 sq. m, and net plot area 376.07 sq. m.
Boundaries as filed: East: Plot Nos. 208 and 225; West: Plot Nos. 210 and 223; North: northern part of Plot 209-B; South: 30 feet wide road.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC); delegated to Serilingampally Zone.
Principal building approval: 2296/GHMC/SLP/2022-BP, approved 13 July 2022. File No. 004210/GHMC/2143/SLP2/2022-BP.
Approved built-up area: 1,089.00 sq. m in the RERA project fields.
Building count: One sanctioned building/unit is recorded in the project fields; the permit describes a proposed residential building.
Sanctioned floor configuration: Building-permit extraction: Existing 1 Stilt + 4 upper floors and Proposed 1 upper floor. The recorded building height is 14.99 (unit not stated in the extracted field).
Parking: Permit records total parking area 217.85 (unit not stated in the extracted field) and identifies stilt parking. It requires approved cellar/stilt parking to be used exclusively for vehicle parking. A parking-space count is not supplied.
Units: 10 total units in the RERA unit record; the permit condition says sanctioned unit numbers must not be increased without prior GHMC approval. The permit extraction does not separately provide an approved unit count.
Offering and status
RERA-filed configurations: 2BHK: 5 units; 3BHK: 5 units.
RERA-filed saleable area: 2BHK: 111.48 sq. m; 3BHK: 148.64 sq. m.
Booked / available: Portal-derived unit counts show 0 booked and 5 available for each configuration (10 available in total). The record has no booking-count as-of date, so these figures are indicative.
Completion date declared to TG-RERA: Promoter Form B and registration certificate state 13 July 2025.
Original / revised completion dates: The supplied record gives the stated completion date above but does not separately identify a revised date or an approved extension.
Construction stage: No independently verified site-progress measurement is supplied. The RERA amenities record lists progress as 0% for the listed items; it does not provide a building-construction percentage.
Occupancy / completion certificate: No occupancy certificate or completion certificate is supplied in the reviewed project documents. The building permit makes an occupancy certificate compulsory before occupation.
2. The project story
CHAITANYA ELITE is a single-building residential apartment project registered with TG-RERA for Survey No. 72 at Kondapur, Serilingampally Mandal, Ranga Reddy District. Its site description identifies the southern part of Plot 209-B and Plot 224-B. The GHMC building permit records a plot and net plot area of 376.07 sq. m and sanctions an existing stilt with four upper floors plus one proposed upper floor.
The RERA unit record lists ten apartments: five 2BHK and five 3BHK. The promoter’s Form B declaration and the registration certificate state a completion date of 13 July 2025. The supplied file does not establish current construction progress or provide an occupancy/completion certificate; the amenity progress entries are recorded at 0%. Accordingly, a construction stage or completed-and-occupiable status cannot be independently confirmed from this evidence.
3. Master plan, architecture & building design
The GHMC building permit describes a residential building on a 376.07 sq. m plot, with 376.07 sq. m net plot area and no recorded road- or nala-affected area. It records 1,089.00 sq. m as approved built-up area in the RERA project fields. These are distinct reported measures; the supplied documents do not provide a separate FSI-counted area, carpet-area total for the building, or gross built-up-area figure.
The permit describes Existing 1 Stilt + 4 upper floors and Proposed 1 upper floor, with a recorded height of 14.99 (unit not stated in the extracted field). It also records total parking area as 217.85 (unit not stated in that field). The building-permit conditions call for a periphery strip of greenery, a tot-lot to be fenced and maintained as greenery before occupancy certification, a rainwater-harvesting structure, transformer space, and a garbage house. The permit’s amenities/utility extraction records three rainwater-harvesting pits and “Tot Lot NA”; the permit conditions and the extracted amenity entry are both reproduced here as filed, without inferring delivery.
The RERA filing includes a layout-plan document entry, but the supplied extraction does not provide readable layout or site-plan details. The floor-plan document is identified as doc 255144 and drawing measurements are available for the apartment configurations; the supplied evidence does not establish building footprint, flats per floor, lift or stair count, entry/exit arrangement, internal circulation, or measured open-space area.
4. Homes, configurations & floor plans
The RERA unit record lists the configurations, unit counts and saleable areas below. Drawing-derived carpet figures were measured by software from floor-plan geometry; they are not RERA disclosures and are described in the supplied data as needing review. Saleable area and carpet area are different measures: the supplied drawing analysis says saleable area includes the home’s share of common areas, while the drawing-based carpet measurement excludes balcony area.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 111.48 sq. m | 66.1–66.8 sq. m; median 66.7 sq. m (software-measured) | 40% (drawing-analysis figure) |
| 3BHK | 5 | 0 | 5 | 148.64 sq. m | 108.0–108.2 sq. m; median 108.2 sq. m (software-measured) | 27% (drawing-analysis figure) |
The measured first-floor 2BHK example shows two bedrooms, a hall, a combined dining/kitchen area, a toilet, a wash area and a 1.20 m-wide balcony. The measured first-floor 3BHK example shows three bedrooms, a hall, a kitchen and two toilets. The listed room dimensions are drawing-derived examples, not RERA-filed room-area disclosures.
5. Parking & vehicle circulation
The GHMC building-permit extraction records 217.85 as total parking area (unit not stated) and identifies a stilt level. Its conditions state that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The record does not provide sanctioned car or two-wheeler space counts, visitor or accessible-space provisions, a parking allocation by apartment, or vehicle-entry, ramp and driveway details. A drawn or sanctioned parking area does not, by itself, establish an exclusive parking right for a particular apartment.
6. Amenities, recreation & open spaces
The RERA amenities record contains 14 listed infrastructure or amenity items. Entries marked “YES” have no recorded completion percentage; the other listed items show 0%. The building permit separately requires certain site provisions. No independent site verification of completion is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community/open space | Green Strip/TOT LOT/Park marked “YES”; permit conditions require a fenced tot-lot maintained as greenery before occupancy certificate. Permit extraction also states “Tot Lot NA.” No area or size supplied. | RERA entry shows 0%; no independent completion verification. | |
| Internal roads and footpaths | No dimensions supplied. | 0%; no independent completion verification. | |
| Water supply | Marked “YES”; no source or capacity stated in the RERA amenity entry. | 0%; no independent completion verification. | |
| Sewerage | “Sewerage (Chamber, Lines, Septic Tank, STP).” No system selection, capacity or size supplied. | 0%; no independent completion verification. | |
| Storm-water drains | No dimensions supplied. | 0%; no independent completion verification. | |
| Street lighting | No quantity or specification supplied. | 0%; no independent completion verification. | |
| Sewage and sullage treatment/disposal | No method or capacity supplied. | 0%; no independent completion verification. | |
| Solid-waste management/disposal | No method or capacity supplied. | 0%; no independent completion verification. | |
| Water conservation / rainwater harvesting | Marked “YES”; GHMC permit records three rainwater-harvesting pits and requires a rainwater-harvesting structure. | RERA entry shows 0%; no independent completion verification. | |
| Energy management | No system details supplied. | 0%; no independent completion verification. | |
| Fire protection and fire safety | Listed in the RERA amenity record; no system details supplied there. Permit requires an Occupancy Fire NOC before issue of the occupancy certificate. | 0%; no independent completion verification or Fire NOC supplied. | |
| Electrical meter room / substation / receiving station | Marked “YES”; permit conditions require transformer space on site. | 0%; no independent completion verification. | |
| Recreational open space | Aggregate area not supplied. | 0%; no independent completion verification. | |
| Promoter-listed facilities | Kids’ play areas/sand pits, indoor games and central green/park. These are third-party vendor-listed claims, not established as RERA-sanctioned or delivered facilities in the supplied evidence. | No verified progress or completion evidence supplied. |
7. Utilities, building services & safety
Water and drainage: The RERA amenity record marks water supply and rainwater harvesting “YES,” but lists 0% progress for both and provides no water source, storage, treatment or capacity. Sewerage, storm-water drainage, sewage/sullage treatment and solid-waste management are listed without system specifications or capacities. The building permit requires a rainwater-harvesting structure and the extracted permit parameters state 3 rainwater-harvesting pits.
Electrical and vertical transportation: The RERA amenity record marks an electrical meter room/substation/receiving station “YES,” without capacity or completion evidence. The permit requires space for a transformer. Lift provision, number, capacity and backup-power specification are not established in the supplied RERA documents; lift and power backup appear only in the vendor listing.
Fire and life safety: Fire protection and fire-safety requirements are listed in the RERA amenities record, but no system design or completion evidence is supplied. The building-permit conditions require an Occupancy Fire NOC from the Director (EV&DM) before issue of the occupancy certificate and make an occupancy certificate compulsory before occupation. No Fire NOC or occupancy certificate is supplied.
Waste, security and accessibility: The permit requires a garbage house within the premises; the RERA record lists solid-waste management/disposal but shows 0% progress. CCTV and security are vendor-listed only. No RERA-filed accessibility features, accessible circulation or specific security-system details are supplied.
8. Location, access & connectivity
The registered location is Kondapur village, Serilingampally Mandal, Ranga Reddy District, Telangana, PIN 500084. The RERA record gives Survey No. 72 and the site description “Southern Part of 209-B, 224-B.” The GHMC building permit records an 18 mt. road width and identifies the southern boundary as a 30 feet wide road.
The supplied location data places HITEC City 3.5 km from the cadastral parcel centroid. This is a location-data distance, not a stated travel time.
9. Developer & development status
The registered promoter is Sri Chaitanyaram Builders, identified in the RERA party record as a partnership. Its supplied GSTIN is 36ADHFS3993A1ZY. The RERA record lists the promoter address as Plot No. 84, Venkataramana Colony, Kondapur, Serilingampally, Ranga Reddy District, PIN 500084. The registration certificate’s promoter-office field instead gives an incomplete address line and PIN 500049; the supplied information does not establish a complete registered-office address. No official promoter website or contact details are supplied.
TG-RERA records 13 July 2025 as the promoter’s declared completion date. The supplied evidence does not include a construction-progress percentage, an approved registration extension, or an occupancy/completion certificate. The unit record reports five available 2BHK units and five available 3BHK units, with booking figures lacking an as-of date.
10. Approvals, official records & documents
| Details and scope | CHAITANYA ELITE, registration P02400005127, issued 29/09/2022, valid through 13/07/2025 as stated on the certificate. |
|---|
| Details and scope | Approval 2296/GHMC/SLP/2022-BP, file 004210/GHMC/2143/SLP2/2022-BP, dated 13 July 2022; residential building at Kondapur, Survey No. 72, site described as southern part of 209-B and 224-B. |
|---|
| Details and scope | Promoter-authorized signatory declares the project completion date as 13 July 2025 and makes the stated land, account, audit and approvals declarations. |
|---|
| Details and scope | Documents include the registered development agreement cum GPA 14223/2021 and title-report materials. The development agreement is described as granting development and attorney rights for the identified land. |
|---|
| Details and scope | A layout-plan document entry is present, but its supplied extraction is not readable and no approved-layout details are available here. |
|---|
| Details and scope | Document 255144 is the source for software-measured apartment-plan areas and room examples; no separate readable drawing sheet is reproduced in the supplied evidence. |
|---|
| Details and scope | No occupancy certificate, completion certificate or occupancy Fire NOC is supplied in the reviewed documents. The building permit states that an occupancy certificate is compulsory before occupation and requires an Occupancy Fire NOC before its issue. |
|---|
Frequently asked questions
Is CHAITANYA ELITE registered with Telangana RERA?
Yes. CHAITANYA ELITE is registered with the Telangana Real Estate Regulatory Authority as P02400005127; the registration status is New Project.
Who is the developer of CHAITANYA ELITE?
The promoter named in the RERA registration is SRI CHAITANYARAM BUILDERS.
Where is CHAITANYA ELITE located?
CHAITANYA ELITE is in Kondapur, Serilingampally, Rangareddy, Telangana (500084).
When will CHAITANYA ELITE be completed?
The promoter's proposed date of completion filed with RERA is 13/07/2025. This is the promoter's declaration, not a guarantee.