Sign in

Silver Stone

RATHI CONSTRUCTIONS · Hyderabad · RERA P02500011320

SILVER STONE is a residential apartment project in Himayath Nagar, Himayatha Nagar mandal, Hyderabad district, developed by registered promoter RATHI CONSTRUCTIONS. The registered site extent is 648.84 sq. m., and the project comprises one building with 1 Stilt + 5 Floors and 10 3BHK apartments. It is registered under TG-RERA number P02500011320, with a proposed completion date of 24/12/2028.

More from Rathi Constructions · 7 projects →

01What we found

RegisteredTG-RERA - valid till 24 Dec 2028
19documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Bagh Lingampally, Himayatha Nagar, Hyderabad · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameSILVER STONE
Project typeResidential apartment project RERA record
Registered phase/portionPhase designation not disclosed; registration is for the project named above
TG-RERA registration numberP02500011320
Registration validity24/12/2025 to 24/12/2028; certificate says three years. This is registration validity, not evidence of completion or occupancy.
Registered promoterRATHI CONSTRUCTIONS, represented by Mr./Ms. Murli Narayan Rathi and others
RERA statusRegistered under section 5; certificate issued 16/10/2026

Land and geographic identity

FieldRecord
LocalityHimayath Nagar; the registration certificate also identifies Bagh Lingampally as locality RERA record
Revenue villageBagh Lingampally, as recorded in project identity and RERA filing; building-permit extraction describes the location as Himayath Nagar RERA record
Mandal / district / PINHimayatha Nagar / Hyderabad / 500029 RERA record
Plot / house identifiers3-6-230/A, 3-6-230
Survey number / subdivisionNot disclosed in the supplied project record Land records
Registered site extent648.84 sq. m.; total and net area are each recorded as 648.84 sq. m. RERA record Land records
Road-affected / NALA-affected areaEach recorded as 0 sq. m. in the building-permit extraction
BoundariesNorth: 30 Feet Wide Road; South: Portion of H No 3-6-230; East: Dead Lane 16 Feet Wide; West: H No 3-6-229 Land records
Extent described in development agreement776.03 SqYd Land records

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approval2350/GHMC/SWBP/SEC2/2025, approved 24/12/2025 Approvals record
Related file number009225/GHMC/04270/SWBP/SEC2/2025 Approvals record
Approved built-up area1,927.37 sq. m. in the project record RERA filing; the permit extraction separately lists Residential 1,606.15, without a supplied explanation of the area basis
Building / block countOne building / one block recorded RERA unit table
Sanctioned configuration1 Stilt + 5 Floors; building height recorded as 14.95 m
Parking provisionPermit extraction records total parking area of 304.64 sq. m.; cellar and stilts approved for parking are subject to the permit condition that they be used exclusively for vehicle parking. A sanctioned bay count is not provided in the supplied extraction.
Unit count10 dwelling units in the GHMC permit and 10 units in the RERA unit schedule RERA unit table

Offering and status

FieldRecord
Unit type3BHK apartments RERA unit table
RERA-filed saleable area195.09 sq. m. per unit RERA unit table
Booked / available0 booked / 10 available in the portal-derived unit record; it has no as-of date, so counts are indicative RERA unit table
Construction stageCurrent physical construction progress is not established by the supplied evidence; the permit is not a progress certificate
Completion deadline24/12/2028, stated in the Form B undertaking and building-permit extraction
Occupancy / completion certificateNot shown as issued; the supplied permit extraction records completion certification as false. The permit requires a completion notice and occupancy certificate before occupation.

2. The project story

SILVER STONE is a single-building residential apartment project registered with TG-RERA under P02500011320, at the recorded plot/house identifiers 3-6-230/A, 3-6-230 in Himayath Nagar, Hyderabad. Its project record identifies Bagh Lingampally as the revenue village and gives a site extent of 648.84 sq. m. RERA record Land records

The GHMC permit authorizes a residential building with 1 Stilt + 5 Floors and 10 dwelling units. The RERA unit schedule lists ten 3BHK apartments. The project is registered through 24/12/2028 and has a stated completion deadline of 24/12/2028; neither date establishes construction progress. The supplied evidence does not establish that construction is complete or that an occupancy certificate has been issued. RERA unit table

The RERA portal-derived inventory indicates all ten units available and none booked, but the record gives no “as of” date. A floor-plan drawing was not successfully measured in the supplied drawing record, so no drawing-based carpet area or room layout can be confirmed here. RERA unit table Floor plans

3. Master plan, architecture & building design

The project record gives a total and net site area of 648.84 sq. m. The GHMC building-permit extraction describes one residential building, with 1 Stilt + 5 Floors, a recorded building height of 14.95 m, and a residential area entry of 1,606.15. Separately, the project filing records an approved built-up area of 1,927.37 sq. m. The supplied evidence does not define these area figures on a common basis; they are reported as recorded, not treated as interchangeable. Land records RERA filing

The building permit also records setbacks of Front 3.0 m, Rear 3.51 m, Side I 3.51 m and Side II 3.5 m. It records an 18 mt. road width. The provided materials do not establish a detailed floor-by-floor plan, footprint, number of apartments per floor, lifts, stairways, entrances, circulation layout, or residential/common-area distribution. The floor-plan record reports one drawing and one failed measurement; there are no software-measured plan dimensions to report. Floor plans

The permit records total parking area of 304.64 sq. m., 8 rainwater-harvesting pits, 25 trees and a tot lot area of 0 sq. m. It does not supply a site plan or landscape/open-space dimensions in the materials reviewed here.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010195.09 sq. m. per unitNot available: drawing measurement failedNot supplied

The RERA filing lists units 101, 102, 201, 202, 301, 302, 401, 402, 501 and 502, each as a 3BHK with saleable area of 195.09 sq. m. The 0-booked/10-available status is portal-derived and carries no as-of date. No carpet-area measurement, room dimensions, balcony or utility areas, or floor-plan arrangement could be confirmed from the supplied drawing record: its single drawing is marked failed, with zero measured drawings. RERA-filed saleable area is distinct from carpet area; the supplied evidence does not provide a verified carpet-area figure or loading calculation. RERA unit details RERA unit table RERA unit table Floor plans

5. Parking & vehicle circulation

The GHMC permit extraction records 304.64 sq. m. as total parking area and states that cellar and stilt areas approved for parking must be used exclusively for parking vehicles, without partition walls or rolling shutters. The building is described as 1 Stilt + 5 Floors; the supplied extraction does not give a confirmed parking-space count, identify separate resident/visitor/accessibility spaces, or describe parking allocation to particular units. The permit refers to a 18 mt. road width, but the supplied record does not describe a project driveway, ramp arrangement, pedestrian separation, or EV charging provision.

The RERA unit schedule marks units 201 and 202 as mortgaged; that unit-level record does not establish a buyer’s parking allocation. No evidence supplied here confirms a parking bay as an exclusive unit entitlement. RERA unit table

6. Amenities, recreation & open spaces

The RERA amenity record lists 14 infrastructure/facility categories. Its listed progress percentages are 0; these are record entries, not independent site verification.

Green strip / tot lot / park
Description / sizePermit extraction records tot lot area as 0 sq. m.; it also requires a strip of greenery at the site perimeter
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record shows 0%; no independent completion evidence
Aggregate recreational open space
Description / sizeListed as available in the RERA amenity record; no area stated RERA amenities
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; not independently verified
Community buildings
Description / sizeListed in the RERA amenity record; no size or facility detail stated RERA amenities
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; no independent completion evidence
Internal roads and footpaths
Description / sizeListed in the RERA amenity record; no dimensions stated RERA amenities
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; no independent completion evidence
Street lighting
Description / sizeListed in the RERA amenity record; no quantity or specification stated RERA amenities
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; no independent completion evidence
Trees / avenue plantation
Description / sizePermit extraction records 25 trees and requires avenue plantation inside the perimeter
Declared progress / verified statusRequired/recorded in permit; planting completion not independently verified

No clubhouse, indoor recreation or sports facility is identified in the supplied records. The amenity list also includes water supply, sewerage, storm-water drains, sewage/sullage treatment, solid-waste management, rainwater harvesting, energy management, fire protection and electrical infrastructure; these are addressed under utilities and safety below. RERA amenities

7. Utilities, building services & safety

ServiceEvidence and status
WaterThe RERA amenity record lists water supply as “YES” and 0% progress. The permit requires a rainwater-harvesting structure and records 8 rainwater-harvesting pits; completion is not independently verified. No water source, storage capacity or treatment capacity is provided. RERA amenities
Sewerage and drainageThe RERA amenity record lists sewerage, storm-water drains and treatment/disposal of sewage and sullage water as “YES,” each with 0% progress. No STP capacity, reuse system or drainage design is supplied. RERA amenities
ElectricalElectrical meter room/sub-station/receiving station and energy management are listed as “YES” in the RERA amenity record, with 0% progress. The permit requires space for a transformer; no transformer capacity or backup-power details are provided. RERA amenities
Lifts and circulationLift count, lift capacity, service lifts, stair configuration and accessibility provisions are not disclosed in the supplied records. Document index Floor plans
Fire and life safetyFire protection/fire safety requirements are listed as “YES” in the RERA amenity record, with 0% progress. The permit requires a working fire extinguisher on each floor and states that an occupancy Fire NOC is to be obtained from the Director (EV&DM) before issue of the Occupancy Certificate. The supplied materials do not establish that the Fire NOC or systems are complete. RERA amenities
Waste and securitySolid-waste management/disposal is listed as “YES” with 0% progress. The permit requires a garbage house, twin bins for each tenement and CCTV installation; completion of these measures is not independently verified. RERA amenities
Construction and worker safetyThe permit requires dust-mitigation measures, compliance with the stated construction-waste disposal condition, and construction-worker safety. The supplied evidence does not independently verify implementation.

8. Location, access & connectivity

The registered project record identifies Bagh Lingampally, Himayatha Nagar mandal, Hyderabad district, PIN 500029; the permit and promoter locality record identify the site as Himayath Nagar. The recorded site identifiers are 3-6-230/A, 3-6-230. RERA record

The recorded site boundaries include a 30 Feet Wide Road to the north and a Dead Lane 16 Feet Wide to the east; the building-permit extraction also records an 18 mt. road width. The location record lists HITEC City — 12.6 km. No travel time, route, public-transport details or additional landmark distances are supplied. Land records Location record

9. Developer & development status

The registered promoter is RATHI CONSTRUCTIONS. The RERA project record identifies the organization type as a Partnership and gives GSTIN 36AANFR8002L1ZU. The registered office is recorded as “Village: Bagh Lingampally, Mandal: Himayatha Nagar, District: Hyderabad, Pin: 500029.” The authorized signatory is recorded as Murli Narayan Rathi. No separate official promoter contact details are supplied in the reviewed data. Corporate record Parties record

The promoter’s Form B declaration undertakes completion by 24/12/2028 and states that 70% of amounts realized from allottees will be deposited in a separate scheduled-bank account for land and construction costs. The project record identifies HDFC Bank, Himayath Nagar, and a masked designated-account number ending 5845; account operation or use is not independently verified here. Parties record

The GHMC permit provides for construction commencement before 22/06/2026 and completion before 24/12/2028. The supplied materials do not provide independently verified construction progress, a completed phase or tower, or an issued occupancy certificate.

10. Approvals, official records & documents

TG-RERA registration certificate (Form C)
Identifier / dateP02500011320; registration valid 24/12/2025–24/12/2028; certificate issued 16/10/2026
What the supplied record establishesRegistration of SILVER STONE under section 5, subject to certificate conditions including the 70% separate-account requirement.
GHMC Building Permit Order
Identifier / date2350/GHMC/SWBP/SEC2/2025; 24/12/2025
What the supplied record establishesPermit extraction records one residential building, 1 Stilt + 5 Floors and 10 dwelling units at the stated site; it lists permit conditions including completion notice and an occupancy certificate before occupation.
Related GHMC file number
Identifier / date009225/GHMC/04270/SWBP/SEC2/2025; 24/12/2025
What the supplied record establishesFile number recorded in the building-permit extraction.
Form B promoter declaration
Identifier / date07. 11 3 (as extracted)
What the supplied record establishesPromoter declaration of completion by 24/12/2028 and project-account, audit and approval commitments.
Encumbrance details filed with RERA
Identifier / dateStatement No. 223123079; searched period 01-02-1996 to 12-05-2026
What the supplied record establishesFiled encumbrance-statement record.
Legal title report
Identifier / dateDated 16-05-26, as described in the RERA document record
What the supplied record establishesAdvocate’s title opinion based on reviewed copies of title documents and GHMC building permit.
Building-plan/layout upload
Identifier / dateRERA document item 708876
What the supplied record establishesListed as a layout-plan/approval document, but extraction is unavailable.
Completion / occupancy certificate
Identifier / dateNot supplied as an issued certificate
What the supplied record establishesThe permit extraction records completion certification as false and requires completion notice and an occupancy certificate before occupation.

The HMDA land-use sheet available in the shared record is image-only and does not establish a survey-level zoning determination. The supplied public-portal note also says the HMDA DPMS layout lookup was not reachable; this is a record-access limitation, not a determination that approval was refused. HMDA

Frequently asked questions

Is SILVER STONE registered with Telangana RERA?

Yes. SILVER STONE is registered with the Telangana Real Estate Regulatory Authority as P02500011320; the registration status is New Project.

Who is the developer of SILVER STONE?

The promoter named in the RERA registration is RATHI CONSTRUCTIONS.

Where is SILVER STONE located?

SILVER STONE is in Himayath Nagar, Bagh Lingampally, Himayatha Nagar, Hyderabad, Telangana (500029).

When will SILVER STONE be completed?

The promoter's proposed date of completion filed with RERA is 24/12/2028. This is the promoter's declaration, not a guarantee.

More projects in Bagh Lingampally