Sign in

Gita Serene Block-B

MAKUTA DEVELOPERS AND INFRASTRUCTURES PRIVATE LIMITED · Medchal-Malkajgiri · RERA P02200004704

GITA SERENE BLOCK-B is a residential apartment project in JONNABAMDA, Alwal mandal, Medchal-Malkajgiri district. The registered promoter is MAKUTA DEVELOPERS AND INFRASTRUCTURES PRIVATE LIMITED. The project has a registered site extent of 501.68 sq. m. and one residential building with 1 Stilt + 5 upper floors, comprising 10 3BHK apartments with RERA saleable areas of 145.83–149.26 sq. m. Its TG-RERA registration number is P02200004704, and its proposed completion date is 17/05/2025.

More from Makuta Developers And Infrastructures Pvt Ltd · 2 projects →

01What we found

Period endedTG-RERA registration ran to 17 May 2025 - check its extension on TG-RERA
15documents on file - each fact links to its page
4court cases on this project's land (survey 21, 577, Janna Banda)
8items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameGITA SERENE BLOCK-B RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionBlock-B is named in the registration. The registration certificate identifies Plot No. 37; the evidence does not separately describe a broader phase boundary.
TG-RERA registrationP02200004704
Registration validity19/07/2022 to 17/05/2025; the certificate records a stated period of “2 years” and no extension. Registration validity is distinct from the completion deadline and the occupancy certificate.
Registered promoterMAKUTA DEVELOPERS AND INFRASTRUCTURES PRIVATE LIMITED, company RERA filing Corporate record
RERA status in supplied recordThe certificate records the project’s registration and original validity; no extension is recorded in the supplied evidence.

Land and geographic identity

ItemProject record
LocalityJONNABAMDA / Jonna Banda; Plot No. 37 RERA record RERA filing
Revenue villageRERA filing: Janna Banda. The supplied permit and OC identify ALWAL / Alwal Village. RERA record RERA filing
Mandal / districtRERA filing: Alwal, Medchal-Malkajgiri. Permit and OC state MALKAJGIRI, MEDCHAL. RERA record RERA filing
PIN500010 RERA record
Survey numbersSy. No. 21 and Sy. No. 577; no subdivisions are stated in the project identity or the cited permit/OC. RERA record RERA filing
Registered site extent501.68 sq. m. total and net area in the RERA filing RERA filing
Permit area figures501.68 sq. m. plot area; 499.19 sq. m. net plot area in the building permit
Boundaries in RERA filingNorth: 30FT WIDE ROAD; East: 40FT WIDE ROAD; South: neighbours’ house on Plot No. 35; West: neighbours’ house on Plot Nos. 44 and 45 RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approval2485/GHMC/KPL/2022-BP, approved 17 May, 2022 Approvals record
Approved built-up / floor area1,181.40 sq. m. in the RERA filing and sanctioned-plan figures RERA filing
Building count and configurationOne residential building; 1 Stilt + 5 upper floors in the building permit RERA filing
Height14.99 m as stated in the sanctioned-plan figures
Parking provision in approval recordTotal parking area 236.3 sq. m.; stilt parking is shown in the permit figures. A parking-space count is not supplied.
Approved versus RERA-declared unitsGHMC permit conditions refer to the sanctioned number of units but the supplied permit extraction does not state that count. The RERA record lists 10 units. RERA unit table

Offering and status

ItemProject record
Unit type3BHK apartments RERA unit table
RERA saleable area145.83–149.26 sq. m. RERA unit table
RERA booking record10 booked; 0 available in the portal-derived record; no as-of date is supplied, so counts are indicative. RERA unit table
Construction stageAn architect’s completion certificate is dated 30-06-2024; GHMC’s OC record states the building is fit for occupation. These are document records, not an independent site inspection.
Original completion deadline17/05/2025, as declared in the Form B affidavit and registration record
Occupancy certificateGHMC OC 2076/GHMC/KPL/2024-OC relates to the residential building identified at Plot No. 37, Sy. Nos. 21 and 577.

2. The project story

GITA SERENE BLOCK-B is registered as a residential apartment project at Plot No. 37 in the JONNABAMDA/Jonna Banda locality, on Sy. Nos. 21 and 577. The RERA filing identifies the revenue village as Janna Banda, while the supplied GHMC permit and OC use Alwal/Alwal Village. RERA record RERA filing

The project record describes one residential building, with 10 RERA-listed 3BHK units. The RERA booking snapshot shows all 10 booked and none available, but has no as-of date. RERA unit table The promoter’s Form B affidavit undertook completion by 17/05/2025. A project architect’s certificate dated 30-06-2024 records completion, and GHMC issued an occupancy certificate for the building in July 2024. These documents indicate a completion and occupancy-certification record; no independent site inspection or current physical-progress report is supplied.

3. Master plan, architecture & building design

The GHMC building permit records a single residential building, 1 Stilt + 5 upper floors, with a height of 14.99 m. It states a plot area of 501.68 sq. m., net plot area of 499.19 sq. m., and sanctioned floor area of 1,181.40 sq. m. The RERA filing records the same approved built-up area. RERA filing

The permit also records 236.3 sq. m. as total parking area and calls for one rainwater-harvesting pit, a transformer space, a garbage house, and a fenced tot-lot maintained as greenery. The supplied material does not establish a building-footprint measurement, flats per floor, lift or stair details, internal circulation plan, or a quantified open-space area. The approved layout-plan document listed in the RERA file is not extracted into usable drawing details. Document index

4. Homes, configurations & floor plans

The RERA filing records 10 3BHK units across two filed labels (“3BHK” and “3 BK”); the normalized unit record groups them as one configuration. RERA unit table Saleable area is the RERA-filed area. Carpet-area figures below are software measurements from the approved floor-plan drawing, not RERA disclosures, and require review against the drawing. RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10100145.83–149.26 sq. m.86.5–92.1 sq. m. measured range; median 89.3 sq. m.39%

The drawings include living/dining, kitchen, three bedrooms, toilets, a utility and a balcony. One measured first-floor flat drawing lists a living/dining area of 42.82 sq. m., kitchen 8.26 sq. m., and a balcony 4.53 sq. m.; the utility and balcony are excluded from that drawing-based carpet measurement. RERA unit details These are software-measured drawing dimensions, not RERA-filed room-area disclosures. The supplied record says saleable area includes the home’s share of common areas; it should not be read as carpet area. Floor plans

5. Parking & vehicle circulation

The GHMC permit records 236.3 sq. m. of total parking area and includes stilt parking in the sanctioned figures. It also requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The OC extraction records 236.3 sq. m. parking area in both sanctioned-plan and site-plan fields.

No count of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by apartment, ramp or driveway arrangement, pedestrian separation, or EV charging provision is supplied. A drawn or sanctioned parking area does not by itself establish an exclusive parking allocation to a particular apartment.

6. Amenities, recreation & open spaces

The GHMC permit specifies a fenced tot-lot maintained as greenery, one rainwater-harvesting pit, transformer space and a garbage house. The OC extraction records rainwater harvesting and a tot-lot area of 0 m² in both sanctioned and site-plan fields. The RERA amenities snapshot reports selected infrastructure as 80% and several other items as 0%; no snapshot date is supplied. These are portal-reported progress figures, not independent verification. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green stripPermit requires a fenced tot-lot maintained as greenery; OC extraction records 0 m².GHMC permit and OCPermit condition; OC figure recorded. No independent verification.
Water supplyRERA amenities record: available “YES”.RERA amenities RERA amenities80% reported; snapshot date not supplied.
SewerageRERA amenities record: available “YES”; listed as chambers, lines, septic tank and STP.RERA amenities RERA amenities80% reported; snapshot date not supplied.
Rainwater harvestingPermit requires one rainwater-harvesting pit; OC lists RWH.GHMC permit and OCRequired in permit and listed in OC; no independent operational verification.
Internal roads and footpathsNo facility details supplied beyond the site-boundary roads.RERA amenities RERA amenities0% reported; snapshot date not supplied.
Storm-water drainsNo further description supplied.RERA amenities RERA amenities0% reported; snapshot date not supplied.
Street lightingNo further description supplied.RERA amenities RERA amenities0% reported; snapshot date not supplied.
Community buildingsNo facility details supplied.RERA amenities RERA amenities0% reported; snapshot date not supplied.
Sewage/sullage treatment and disposalNo treatment or disposal details supplied in the amenities record.RERA amenities RERA amenities0% reported; snapshot date not supplied.
Solid-waste managementPermit requires a garbage house; further waste-management details are not supplied.GHMC permit and RERA amenities RERA amenitiesPermit condition; RERA amenities record 0%.
Energy managementNo details supplied.RERA amenities RERA amenities0% reported; snapshot date not supplied.
Fire protection and fire safetyNo system details supplied in the RERA amenities record.RERA amenities RERA amenities0% reported; snapshot date not supplied.
Electrical meter room / sub-station / receiving stationPermit requires transformer space; further facilities are not described.GHMC permit and RERA amenities RERA amenitiesPermit condition; RERA amenities record 0%.
Aggregate recreational open spaceNo area supplied.RERA amenities RERA amenities0% reported; snapshot date not supplied.

No clubhouse, indoor recreation or sports facilities are established in the supplied project-specific records.

7. Utilities, building services & safety

The building permit requires a rainwater-harvesting structure, transformer space, a garbage house and a fenced tot-lot. It also requires an occupancy fire NOC from the Director (EV&DM) before issue of the occupancy certificate, and states that an occupancy certificate is compulsory before occupation. The OC record lists rainwater harvesting and parking area, but the supplied documents do not specify water source or storage capacity, treatment capacity, STP details, storm-water arrangements, electrical backup, lift count or capacity, CCTV, access control, accessibility features, or installed fire-system details. RERA amenities

These records identify permit conditions and RERA-reported amenity progress; they do not independently establish current operation or condition of building services.

8. Location, access & connectivity

The project is identified in the RERA filing at JONNABAMDA, village Janna Banda, Alwal mandal, Medchal-Malkajgiri district, PIN 500010. The supplied building permit and OC refer to Jonna Banda / Alwal. RERA record RERA filing

The RERA filing describes the north and east boundaries as 30FT WIDE ROAD and 40FT WIDE ROAD, respectively; its permit extraction separately records a road width of 18 mt. RERA filing A location dataset gives the nearest sampled Outer Ring Road interchange at approximately 6.9 km. Location record No project-specific public-transport or landmark distances are supplied in the structured location record.

9. Developer & development status

The registered legal promoter is MAKUTA DEVELOPERS AND INFRASTRUCTURES PRIVATE LIMITED, a company, with GSTIN 36AAGCA7740Q1Z3. The RERA filing gives the promoter address as BSNL BUILDING, MINDSPACE, GREEN LANDS ENCLAVE, JONNABAMDA, Alwal, Medchal-Malkajgiri, 500010; KOMPALLY JANARDHAN is listed as authorized signatory. Corporate record Parties record

The promoter’s Form B affidavit, signed by KOMPALLY JANARDHAN, declared completion by 17/05/2025 and undertook project-account and audit obligations. An architect’s certificate dated 30-06-2024 records completion in all aspects, and GHMC’s OC record identifies the building at Plot No. 37. The evidence supplied here contains no current site inspection or independent assessment of the promoter’s present construction or maintenance activity.

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02200004704; issued 19/07/2022; valid through 17/05/2025
Scope and sourceGITA SERENE BLOCK-B; certificate states no extension.
GHMC building permit
Identifier / date2485/GHMC/KPL/2022-BP; 17 May, 2022
Scope and sourceResidential building permit; 1 Stilt + 5 upper floors.
GHMC permit proceedings / file number
Identifier / date005919/GHMC/3172/KPL2/2021-BP
Scope and sourceIdentified in the permit and OC records.
Architect’s completion certificate
Identifier / dateDated 30-06-2024
Scope and sourceRecords completion in all aspects and identifies the OC number.
GHMC Occupancy Certificate
Identifier / date2076/GHMC/KPL/2024-OC; issued 10 July, 2024 in the architect’s certificate; OC document dated 09 July, 2024
Scope and sourceIdentifies Plot No. 37 on Sy. Nos. 21 and 577.
OC application / proceedings
Identifier / dateApplication 006010/GHMC/2895/KPL2/2024-OC; proceedings 2076/GHMC/KPL/2024-OC
Scope and sourceGHMC record.
RERA Form B declaration
Identifier / dateVerified at Hyderabad 30-05-2022
Scope and sourcePromoter declaration, including completion undertaking and project-account commitments.
Legal title report
Identifier / dateDocument 241466
Scope and sourceAdvocate’s title opinion relating to Plot Nos. 36 and 37 and the project land.
Encumbrance statement
Identifier / dateDocument 239385
Scope and sourceRERA-filed encumbrance statement; it records the searched period as 01-01-1983 to 29-05-2022.
Approved layout-plan document
Identifier / dateDocument 239386
Scope and sourceListed in the RERA file; no usable layout detail is extracted in the supplied evidence.
RERA agreement-for-sale form
Identifier / dateDocument 241469
Scope and sourcePartially filled form with allottee, project, land and unit particulars blank.

Other registrations of Gita Serene

Frequently asked questions

Is GITA SERENE BLOCK-B registered with Telangana RERA?

Yes. GITA SERENE BLOCK-B is registered with the Telangana Real Estate Regulatory Authority as P02200004704; the registration status is New Project.

Who is the developer of GITA SERENE BLOCK-B?

The promoter named in the RERA registration is MAKUTA DEVELOPERS AND INFRASTRUCTURES PRIVATE LIMITED.

Where is GITA SERENE BLOCK-B located?

GITA SERENE BLOCK-B is in JONNABAMDA, Janna Banda, Alwal, Medchal-Malkajgiri, Telangana (500010).

When will GITA SERENE BLOCK-B be completed?

The promoter's proposed date of completion filed with RERA is 17/05/2025. This is the promoter's declaration, not a guarantee.

More projects in Janna Banda