Sign in

JBs NATURE VALLEY PHASE-II

SRI VENKATESWARA PROJECTS · Nalgonda · RERA P01800002831

JBs NATURE VALLEY PHASE-II is a plotted development in NAGOLE, Chityal mandal, Nalgonda district. It is being developed by the registered promoter Sri Venkateshwara Projects. The registered land area is 338762.35 sq. m., and the DTCP final-layout record states 794 plots across Ac. 83.71 cts; tower or floor configurations and plot-size bands are not stated. Its TG-RERA registration is P01800002831, and its proposed completion date is 02/11/2026.

01What we found

Period endedTG-RERA registration ran to 2 Nov 2026 - check its extension on TG-RERA
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameJBs NATURE VALLEY PHASE-II RERA record
Project typePlotted development RERA record RERA filing
Phase / registered portionPhase-II, registered under P01800002831. The registered portion is identified by the survey numbers listed below; a separate phase boundary plan is not included in the supplied material. RERA record
TG-RERA registration and validityP01800002831; issued 30/04/2021; valid from 30/04/2021 to 02/11/2026, stated as five years. Registration validity is distinct from project completion and occupancy status.
Registered promoterSri Venkateshwara Projects (also rendered in project records as SRI VENKATESWARA PROJECTS). RERA record Corporate record
RERA statusRegistration certificate records a grant under section 5; no extension is recorded in the supplied certificate.

Land and geographic identity

ItemProject record
LocalityNAGOLE in the RERA filing; the filed approval documents identify Gundrampally / Gundram Palle. RERA record RERA filing
Revenue villageGundram Palle in the project header and registration certificate; approval documents use Gundrampally. RERA record
MandalChityal in the project identity and approval records. The registration certificate instead states Abdullapurmet; the registered site location should be confirmed against the title and sanctioned records. RERA record RERA filing
District / PINNalgonda / 508114 in project and registration records. RERA record
Project survey numbers196, 200, 201, 202/P, 221/P, 222, 223/P, 224/P, 225/P, 299/P, 300, 301. The filing does not identify the subdivisions held within the base surveys; cadastral subdivision-level scope is therefore not established by these survey labels alone. RERA record
Registered site extent338762.35 sq. m. in the RERA land details. RERA filing
Net / total areaTotal area 338762.35 sq. m.; net area 338762.35 sq. m.; reported affected area 00 sq. m. RERA filing
BoundariesEast: ROAD WIDTH; West: ROAD WIDTH; North: ROAD WIDTH; South: ROAD WIDTH. RERA filing

Development identity

ItemProject record
Sanctioning authorityDirector of Town and Country Planning (DTCP); the layout approval records delegation to Gundrampally Gram Panchayat.
Principal layout approvalT.L.P. No. 251/2020/H; final layout release dated 29-06-2022. The earlier draft technical layout approval is dated 9-11-2020. Approvals record
Approved layout area in DTCP final-layout recordAc. 83.71 cts.
Approved built-up areaRERA project information states 338762.35 sq. m. as approved built-up area. For this plotted project, that filing figure should not be read as a count or size of houses; individual dwelling permissions are separately addressed in the layout conditions. RERA filing
Plots and layout allocationFinal-layout record states 794 plots. It allocates 10% / Ac. 8.371 cts; 40515.64 Syds to open space (park), 29.42% / Ac. 24.63 cts; 119209.20 Syds to roads and 60.58% / Ac. 50.709 cts; 245431.56 Syds to plotted area. It also identifies school, nursery-school and convenient-shopping areas.
Buildings / floor configurationNot disclosed in the supplied project record. The project is registered as a plotted layout, not as a specified multi-storey building scheme. RERA record
Mortgage areaRERA land details report 31363 sq. m. as mortgage area. The draft layout record describes Ac. 7.75 cts; 37510.00 Syds in favour of the Gram Panchayat; the final-layout extraction does not repeat that mortgage allocation. RERA filing

Offering and status

ItemProject record
OfferingPlots; the supplied RERA material does not provide plot-size bands, plot-by-plot inventory or unit configuration counts. RERA record
Booked / availableNot disclosed in the supplied project records. Document index
Construction / development stageThe project documents include an architect’s completion certificate and a DTCP final-layout release dated 29-06-2022. No independent site inspection record is supplied.
Completion deadlineProject filing states proposed completion 02/11/2026. This is separate from TG-RERA registration validity, which ends 02/11/2026. RERA record RERA filing
Occupancy / completion certificateArchitect’s certificate identifies DTCP certificate 10421/1040/2020/H, dated 29-06-2022, and states the registered project is complete. The supplied extraction does not specify a tower or individual-plot scope; the certificate is presented for the registered plotted project.

2. The project story

JBs NATURE VALLEY PHASE-II is registered as a plotted development in the Gundram Palle/Gundrampally area of Nalgonda district. Its RERA-identified land covers surveys 196, 200, 201, 202/P, 221/P, 222, 223/P, 224/P, 225/P, 299/P, 300 and 301. The DTCP final-layout record describes a layout of Ac. 83.71 cts and 794 plots, with land allocated to plots, roads, parks and specified community uses. RERA record

The supplied record contains an architect’s certificate stating that the project is complete and identifies a DTCP certificate dated 29-06-2022. This is a filed certification, not an independent inspection of present on-site condition. No plot-level inventory, sales status or current construction-progress evidence is supplied.

3. Master plan, architecture & building design

The development is documented as a plotted layout rather than a building-by-building or tower scheme. The DTCP final-layout record identifies 794 plots across an approved layout area of Ac. 83.71 cts. Its stated land-use allocation includes 10% open space (park), 29.42% roads and 60.58% plotted area. It separately lists Ac. 1.26 cts; 6098.40 Syds for a primary school, Ac. 0.35 cts; 1694.0 Syds for a nursery school and Ac. 0.596 cts; 2884.64 Syds for convenient shopping (plots 205 to 212). These are the filed layout allocations, not evidence that each facility has been constructed or is operating.

The draft layout record identifies a Gram Panchayat mortgage area of Ac. 7.75 cts; 37510.00 Syds, described as plots 327 to 467, 470 to 489, 492 to 501 and 514 to 522. The RERA filing separately reports a mortgage area of 31363 sq. m. RERA filing

The approved layout conditions describe residential dwelling use, with individual building permissions to be considered under applicable building rules. They also refer to roads, open spaces, water supply, sewerage, drainage, street lighting and rainwater harvesting. No dwelling designs, building footprints, height or floor schedules, internal plot-size schedule, or apartment-style carpet/saleable-area information is supplied.

4. Homes, configurations & floor plans

This is a plotted project; the supplied material does not include RERA plot-size bands, plot-level configuration counts, booked or available plot counts, or a plot-wise sales inventory. Accordingly, a configuration table with unit counts and areas cannot be completed from the supplied record. RERA record Document index

Two drawing sheets are recorded, but both are scans pending measurement; no measured floor-plan or carpet-area result is available. The project’s plotted offering should not be assigned apartment carpet-area or loading figures. Floor plans

5. Parking & vehicle circulation

The supplied project documents do not establish a sanctioned parking count, visitor or accessible parking provision, parking arrangement for individual plots, or legally documented parking allocation. The layout approval records roads and road-area allocation but does not provide a detailed circulation or parking schedule in the supplied extraction.

6. Amenities, recreation & open spaces

The RERA amenity record lists the following facilities. Its progress fields show 0 where supplied; these entries do not establish that a facility is complete or independently verified. The final-layout document also specifies land allocations for parks, schools and convenient shopping. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Open space (park)10%; Ac. 8.371 cts; 40515.64 SydsDTCP final layoutApproved allocation; no completion verification supplied
Primary schoolAc. 1.26 cts; 6098.40 SydsDTCP final layoutAllocated land; no completion verification supplied
Nursery schoolAc. 0.35 cts; 1694.0 SydsDTCP final layoutAllocated land; no completion verification supplied
Convenient shopping (205 to 212)Ac. 0.596 cts; 2884.64 SydsDTCP final layoutAllocated land; no completion verification supplied
Green strip / tot lot / parkSize not stated in the RERA amenity entryTG-RERA amenities RERA amenitiesMarked “YES”; progress shown as 0; no independent completion verification
Community buildingsSize and facility details not statedTG-RERA amenities RERA amenitiesListed; no progress or completion verification supplied

7. Utilities, building services & safety

The DTCP final-layout conditions describe the layout as provided with water supply, sewerage and drainage-disposal systems, street lighting, rainwater-harvesting structure and other civic amenities; they also refer to local-body maintenance. These are approval-document statements, not independent confirmation of current operation or capacity.

Water
Evidence in supplied recordWater supply is listed in the RERA amenities and DTCP layout conditions. No source, storage, treatment process or capacity is stated. RERA amenities
Status limitationFiled / approval-document description; operating status not independently verified
Sewerage and drainage
Evidence in supplied recordRERA amenities list sewerage (chambers, lines, septic tank, STP); the DTCP conditions refer to sewerage and drainage-disposal systems. No capacity or commissioning evidence is supplied. RERA amenities
Status limitationFacilities are described in the records; current operation not independently verified
Stormwater / rainwater
Evidence in supplied recordRERA amenities list storm-water drains and water conservation/rainwater harvesting; DTCP conditions refer to rainwater-harvesting structures. No design capacity or completion evidence is supplied. RERA amenities
Status limitationListed / approval condition; independent verification unavailable
Electrical
Evidence in supplied recordRERA amenities list an electrical meter room, sub-station and receiving station, and street lighting. No supply capacity or backup specification is supplied. RERA amenities
Status limitationListed; operational status not independently verified
Fire and life safety
Evidence in supplied recordRERA amenities mark fire protection and fire-safety requirements “YES.” No system details, capacity or separate clearance document is supplied. RERA amenities
Status limitationFiling entry only; statutory compliance is not established by this entry
Waste management
Evidence in supplied recordSolid-waste management and disposal appears in the RERA amenity list; no process or operating evidence is supplied. RERA amenities
Status limitationListed; completion and operation not independently verified
Energy management
Evidence in supplied recordListed as “YES” in RERA amenities; no system details are supplied. RERA amenities
Status limitationFiling entry only

8. Location, access & connectivity

The project records place the site in revenue village Gundram Palle/Gundrampally, Chityal mandal, Nalgonda district, PIN 508114. The RERA header also records locality NAGOLE. The RERA-filed layout approval identifies Gundrampally G.P. and the project survey numbers. RERA record RERA filing

The supplied location data gives an approximate distance of 40.8 km to the nearest sampled Outer Ring Road interchange. No other independently measured road, public-transport or landmark distances are supplied. Location record The project’s cadastral parcel-centroid coordinates are 17.25949, 79.00833 (rounded as displayed in the supplied location record). Location record

9. Developer & development status

The registered legal promoter is Sri Venkateshwara Projects, identified in the project filing as a partnership. The GSTIN supplied is 32ADZFS6777LZZZ. The project filing lists B Manohar Reddy as authorized signatory. Corporate record Parties record RERA filing

The registration certificate gives the promoter office as Village: PEDDAAMBERPET, Mandal: Abdullapurmet, District: Ranga Reddy, Pin: 500079. The project record separately lists a promoter address at Pedda aamberpet, Gundram Palle, NAGOLE, Chityal, Nalgonda, 508114. Parties record These are the addresses stated in the supplied records; a separate official website or contact number is not provided.

The registered project completion date is 02/11/2026. The architect’s filed completion certificate states that the project is complete and identifies the DTCP certificate dated 29-06-2022. No current independent site verification or plot-by-plot completion record is supplied. RERA filing

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C registration certificate for JBs NATURE VALLEY PHASE-II, P01800002831, issued 30/04/2021 and valid through 02/11/2026.
Draft layout approvalDTCP Draft Technical Layout Pattern, Draft-TLP No. 251/2020/H, dated 9-11-2020; records 794 plots and draft conditions.
Final layout releaseDTCP final technical layout approval, T.L.P. No. 251/2020/H, dated 29-06-2022; records Ac. 83.71 cts, 794 plots, land-use allocations and conditions.
Occupancy / completion recordArchitect’s Form-1A identifies DTCP certificate 10421/1040/2020/H, dated 29-06-2022, and states the project is complete.
Title / promoter declarationFiled Form B affidavit by SRI VENKATESWARA PROJECTS; the supplied extraction records the promoter’s title and encumbrance assertions.
Drawing reviewTwo drawing sheets are recorded; both are scans pending measurement, with no software-measured floor-plan results. Floor plans

Frequently asked questions

Is JBs NATURE VALLEY PHASE-II registered with Telangana RERA?

Yes. JBs NATURE VALLEY PHASE-II is registered with the Telangana Real Estate Regulatory Authority as P01800002831; the registration status is New Project.

Who is the developer of JBs NATURE VALLEY PHASE-II?

The promoter named in the RERA registration is SRI VENKATESWARA PROJECTS.

Where is JBs NATURE VALLEY PHASE-II located?

JBs NATURE VALLEY PHASE-II is in NAGOLE, Gundram Palle, Chityal, Nalgonda, Telangana (508114).

When will JBs NATURE VALLEY PHASE-II be completed?

The promoter's proposed date of completion filed with RERA is 02/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Gundram Palle