S.S.SNIGDHA

S S INFRA · Hanamkonda · RERA P00300002029

S.S.SNIGDHA is a residential apartment project in Waddepally Revenue Village, Hanamkonda Mandal, Warangal Urban district, developed by registered promoter S S Infra. The project occupies 867.42 sq.m. and comprises one Stilt + 5 residential apartment building with 15 homes: 5 2BHK units of 125.42 sq.m. saleable area each and 10 3BHK units of 149.81 sq.m. saleable area each. Its TG-RERA registration number is P00300002029, and its proposed completion date is 19/11/2024.

01What we found

Period endedTG-RERA registration ran to 19 Nov 2024 - check its extension on TG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameS.S.SNIGDHA RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNot separately identified; registration is for this project.
TG-RERA registrationP00300002029; granted under section 5, valid from 24/08/2020 to 19/11/2024. The supplied certificate states no extension. Registration validity is distinct from the completion deadline and from occupancy certification. RERA record
Registered promoterS S Infra (also written M/s SS INFRA in its filing). The entity type is recorded as Partnership in the project information. RERA record RERA filing
RERA statusTG-RERA filing labels the project “On-Going Project.” That label does not establish current construction progress or an occupancy certificate. RERA filing

Land and geographic identity

ItemProject record
LocalityHanamkonda / Waddepally; the RERA address also records WADDEPELI REVENUE. RERA record RERA filing
Revenue villageWaddepally Revenue Village. RERA record
Mandal / district / PINHanamkonda / Warangal Urban / 506001. RERA record
Project survey numbers and subdivisions671/A, 671/B, 669/A and 669/C. RERA record Land records
Site extent867.42 sq.m. in the RERA land details and building permit. Land records
Net / total areaRERA records total area 867.42 sq.m., road-widening/FTL/nala-affected area 0 sq.m., and net area 867.42 sq.m. Land records RERA filing
BoundariesEast: vacant land; West: 10 M road; North: 10 MT road; South: vacant land. Land records

Development identity

ItemProject record
Sanctioning authorityGreater Warangal Municipal Corporation (building permit authority). The RERA filing also lists DTCP as its authority name. Approvals record
Principal approvalBuilding Permit Order 3006/14067/W51/2018, approved 19 November, 2018. Approvals record
Layout / subdivision numberKUDAL004257/2015-17, as recorded in the permit.
Approved built-up areaRERA records 1,860.50 sq.m. as approved built-up area. The permit extraction separately lists Residential 6 1,834.60 and Stilt 1 416.56; the supplied extract does not label those figures as the same area measure. RERA filing
Building count and floorsOne building/unit is recorded in the RERA land details. The permit describes a residential apartment building, Stilt + 5, with stated height 14.53 m. RERA filing
Parking levelsStilt is identified in the sanctioned configuration; a parking-space count and allocation schedule are not established in the supplied record. RERA amenities
Unit countsApproved plan: 1 building; RERA filing: 15 homes—10 3BHK and 5 2BHK. RERA filing RERA unit table

Offering and status

ItemProject record
RERA-filed configurations2BHK: 5 units, saleable area 125.42 sq.m. each; 3BHK: 10 units, saleable area 149.81 sq.m. each. RERA unit table
Booked / availableRERA portal data read for the project records 0 booked and 5 available 2BHK units, and 0 booked and 10 available 3BHK units. The portal record supplies no as-of date, so counts are indicative rather than a current availability confirmation. RERA unit table
Construction stageProject record gives 80% completeness, but the supplied data does not establish the measurement date, method or independent site verification. RERA record
Completion datesOriginal and revised proposed completion: 19/11/2024. The promoter’s Form B also undertakes completion by that date. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project records. The permit states an occupancy certificate is required before occupation. The scope is this registered building; no phase-wise certificate information is supplied. Document index

2. The project story

S.S.SNIGDHA is registered as a residential apartment project in Waddepally Revenue Village, Hanamkonda Mandal, Warangal Urban district. The RERA-identified land comprises survey subdivisions 671/A, 671/B, 669/A and 669/C, with a recorded site extent of 867.42 sq.m. The permit identifies a single residential apartment building on the site. RERA record Land records

The building permit describes a Stilt + 5 building; the RERA filing lists 15 homes, comprising five 2BHK and ten 3BHK units. The RERA record reports 80% completeness, but that figure is not accompanied here by a dated progress certificate or independent site inspection. The registered completion date is 19/11/2024; no occupancy/completion certificate is included in the supplied evidence. Thus, the available record identifies the project’s proposed building and units but does not establish that the building is complete or approved for occupation. RERA unit table RERA record Document index

3. Master plan, architecture & building design

The building permit identifies one residential apartment building with Stilt + 5 floors and a stated height of 14.53 m. RERA records the approved built-up area as 1,860.50 sq.m.; the permit extraction also lists “Residential 6 1,834.60” and “Stilt 1 416.56,” without enough detail in the supplied extract to reconcile the measurement labels. These figures should therefore be read under their respective source labels, not treated as interchangeable area measures. RERA filing

The permit lists a 43.71 sq.m. tot-lot, 8 rainwater-harvesting structures, and spaces for a transformer and garbage house. The extracted floor-plan information supports measured layouts for the 2BHK and 3BHK configurations, but the supplied materials do not provide a verified account of building footprint, floor-by-floor flat counts, lift or stair arrangements, circulation, landscaping beyond the tot-lot, or a phase organization. Floor plans

No FSI-counted area, gross built-up-area definition, or independently verified construction drawing measurement is supplied. The approved built-up-area figure above is kept distinct from the RERA-filed saleable areas and the software-measured carpet areas reported below. RERA filing RERA unit table Floor plans

4. Homes, configurations & floor plans

RERA records two configurations and their unit counts and saleable areas. Carpet-area estimates below are software measurements from the approved floor-plan drawing extraction, not RERA-filed carpet-area disclosures; they are based on drawing geometry and should be checked against the drawing. Saleable area is a separate figure and includes the home’s share of common areas; it should not be read as carpet area. RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK505125.42 sq.m.82.8–83.2 sq.m.; median 83.0 sq.m.34%
3BHK10010149.81 sq.m.100.0–101.0 sq.m.; median 100.8 sq.m.33%

The measured 2BHK plan includes a hall, kitchen, two bedrooms, two toilets and balconies; one listed balcony measurement is 2.83 × 1.22 m. The measured 3BHK plan includes a drawing room, hall, kitchen, three bedrooms, three toilets and balconies. These room details are drawing-derived measurements for one example of each configuration, not a guarantee that every unit has identical dimensions. The supplied plan extract does not give balcony dimensions for the measured 3BHK example.

5. Parking & vehicle circulation

The sanctioned configuration identifies a stilt floor, but the supplied evidence does not establish the number or type of parking spaces, whether spaces are resident or visitor parking, any accessible or EV spaces, or a basement, podium or mechanical-parking arrangement. No unit-specific parking allocation or exclusive ownership rights are established by the available records. The permit also refers to a mortgaged built-up area whose registration is permitted only after an occupancy certificate is produced; the supplied extract does not identify the relevant units or parking allocation. RERA filing RERA unit table

6. Amenities, recreation & open spaces

The RERA amenity filing lists facilities and records 0% progress against each listed item. “Available: YES” is a filing field, not independent verification of completion or operation. The permit separately specifies a tot-lot and rainwater-harvesting structures. RERA amenities

Community green strip / tot-lot / park
Description / sizePermit specifies a tot-lot of 43.71 sq.m. and says it is to be fenced and maintained as greenery before occupancy certification.
Evidence sourceBuilding permit; RERA amenity filing RERA amenities
Declared progress / verified statusFiling says available: YES and 0% progress; completion not independently verified.
Aggregate recreational open space
Description / sizeNo area stated in the supplied RERA amenity entry.
Evidence sourceRERA amenity filing RERA amenities
Declared progress / verified statusAvailable: YES; 0% progress; completion not independently verified.
Community buildings
Description / sizeNo facility or size described.
Evidence sourceRERA amenity filing RERA amenities
Declared progress / verified status0% progress; no completion evidence supplied.
Internal roads and footpaths
Description / sizeNo dimensions or specification supplied.
Evidence sourceRERA amenity filing RERA amenities
Declared progress / verified status0% progress.
Street lighting
Description / sizeNo specification supplied.
Evidence sourceRERA amenity filing RERA amenities
Declared progress / verified status0% progress.

No clubhouse, indoor recreation, sports facility or other quantified convenience/community amenity is identified in the supplied evidence.

7. Utilities, building services & safety

The RERA amenity schedule marks water supply, sewerage, rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES,” while recording 0% progress for the listed amenity items. The permit specifically requires rainwater-harvesting percolation pits, transformer space and a garbage house. These records describe filed or sanctioned provisions; they do not independently verify installation, capacity or operation. RERA amenities

ServiceEvidence and limits
WaterRERA amenity filing marks water supply “YES”; source, storage and treatment capacity are not specified. RERA amenities
Sewerage and drainageFiling marks sewerage “YES” and lists storm-water drains and treatment/disposal of sewage and sullage water, but supplies no system specification, capacity or completion evidence. RERA amenities
Rainwater harvestingPermit requires rainwater-harvesting structures (percolation pits) and lists 8 RWHPs; the RERA amenity filing marks water conservation/rainwater harvesting “YES.” RERA amenities
ElectricalFiling marks an electrical meter room/sub-station/receiving station “YES”; the permit requires transformer space. No electrical capacity or backup arrangement is specified. RERA amenities
Fire and life safetyFire protection/fire safety is listed in the RERA amenity schedule, with 0% progress; the supplied evidence does not specify systems, escape stairs, access arrangements or approvals. RERA amenities
WastePermit requires a garbage house; the RERA schedule lists solid-waste management and disposal, with 0% progress. RERA amenities
Lifts, accessibility and securityNo lift details, accessibility features, CCTV or access-control arrangements are established in the supplied evidence.

8. Location, access & connectivity

The registered location is Waddepally Revenue Village, Hanamkonda Mandal, Warangal Urban district, PIN 506001. The permit identifies an 18M road width and records 10 M and 10 MT roads on the west and north boundaries respectively. The supplied material does not identify named approach roads, public transport links or nearby landmarks. RERA record Land records

A connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 155.4 km. It is a supplied sampled distance, not a travel-time claim or a description of a direct route. Location record

9. Developer & development status

The registered promoter is S S Infra, identified as a Partnership in the RERA project information. The RERA address is Sri Laxmi Nilayam, Prashanth Nagar, Waddepeli Revenue, Hanamkonda, Warangal Urban, 506001. The registration certificate gives the promoter office location as Hanamkonda, Warangal Urban, PIN 506001; a more complete office address is not stated there. RERA filing Parties record

The promoter’s Form B, dated 7 June 2020, is a promoter declaration that the project would be completed by 19/11/2024 and that it would maintain the required separate account and obtain pending approvals. The RERA record reports 80% completeness, without a dated independent verification in the supplied evidence. No occupancy/completion certificate is included here. RERA record Document index

10. Approvals, official records & documents

RecordWhat the supplied evidence identifies
TG-RERA registrationFORM “C” certificate for S.S.SNIGDHA, registration P00300002029, granted under section 5; valid 24/08/2020–19/11/2024.
Building permitGreater Warangal Municipal Corporation Building Permit Order 3006/14067/W51/2018, approved 19 November, 2018, for the residential apartment building on the listed survey premises. The permit states that permission does not confer ownership rights and includes completion/occupancy-related conditions.
Plan / subdivision referenceKUDAL004257/2015-17 is listed as the layout/subdivision number in the permit.
Promoter declarationForm B affidavit-cum-declaration by BYRI RAVI KRISHNA for M/s SS INFRA, dated 7 June 2020. Its contents are promoter declarations, including its stated completion and fund-management undertakings.
Occupancy / completion certificateNot identified in the supplied documents. The permit states that an occupancy certificate is compulsory before occupation.
Approved drawingRERA filing includes drawing document 113378, used for the software-measured floor-plan information in this overview; the supplied record does not provide a complete verified drawing specification.

The evidence supplied for this Overview does not include a current occupancy certificate, an independently verified construction-progress report, or a complete set of detailed building-service and parking schedules.

Frequently asked questions

Is S.S.SNIGDHA registered with Telangana RERA?

Yes. S.S.SNIGDHA is registered with the Telangana Real Estate Regulatory Authority as P00300002029; the registration status is On-Going Project.

Who is the developer of S.S.SNIGDHA?

The promoter named in the RERA registration is S S INFRA.

Where is S.S.SNIGDHA located?

S.S.SNIGDHA is in HANAMKONDA, Waddepally, Telangana (506001).

When will S.S.SNIGDHA be completed?

The promoter's proposed date of completion filed with RERA is 19/11/2024. This is the promoter's declaration, not a guarantee.