EDLA LAXMI NILAYAM is a residential apartment project in AREPALLY ROAD, Karimnagar urban mandal, Karimnagar district. The registered promoter is PRAGNYA CONSTRUCTIONS. The project occupies 532.22 sq m and comprises one residential building with 1 Stilt + 5 upper floors and 10 3BHK units, each with a RERA-filed saleable area of 105.66 sq m. It is registered under TG-RERA number P02700001644, with a proposed completion date of 23/08/2025.

More from Pragnya Constructions · 7 projects →

01What we found

Period endedTG-RERA registration ran to 23 Aug 2025 - check its extension on TG-RERA
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered nameEDLA LAXMI NILAYAM RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo separate phase is identified in the supplied record; the registration and occupancy certificate refer to the project/building. RERA record
TG-RERA registrationP02700001644 RERA record
Registration validity13 February 2020 to 23 August 2025; the supplied certificate says five years and records no extension. Registration validity is distinct from the occupancy certificate. RERA record
Registered promoterPRAGNYA CONSTRUCTIONS; identified as a partnership in the RERA-filed promoter information. RERA record RERA filing
RERA statusThe supplied registration record shows validity ending 23 August 2025. A current status beyond that date is not established by the supplied certificate.

Land and geographic identity

FieldProject record
LocalityAREPALLY ROAD RERA record RERA filing
Revenue villageBank colony(50th ward), as recorded in the project identity; the permit and occupancy certificate also use Ward 50 / KARIMNAGAR. RERA record RERA filing
MandalKarimnagar urban RERA record RERA filing
DistrictKarimnagar RERA record RERA filing
PIN505001 RERA record RERA filing
Survey number(s)1355/1 RERA record RERA filing
Site extentTotal area: 532.22 sq m; net area: 532.22 sq m. The project filing records affected area as 0 sq m. RERA filing
Boundaries in project filingEast: H NO 10 3 588 1 OF THER; West: 30 FEET WIDE ROAD; North: LAND OF EDLA RAJENDER AND KOUSALYA; South: REMAINING PART OF EDLA SHIVA. RERA filing

Development identity

FieldProject record
Sanctioning authorityKarimnagar Municipal Corporation (also rendered as KARIMNAGAR Municipal Corporation in the building permit). Approvals record
Principal building approvalBuilding Permit No. 3011/W50/2019/4930, approved 23 August 2019. Approvals record
Approved built-up / floor area1,242.15 sq m recorded as residential area in the building permit; the occupancy certificate records floor area of 1,242.15 m² as per both sanctioned and site building plans. RERA filing
Building count and configurationOne residential building; 1 Stilt + 5 upper floors. The supplied records do not identify a basement or podium. RERA record RERA filing
HeightBuilding permit: 14.95 m; occupancy certificate: 15.83 m as per both sanctioned and site building plans.
Units10 units in the RERA unit record; the approved plan record lists one building unit, not a dwelling-unit count. RERA unit table
Parking provision recordedStilt area 234.30 m² in the permit; occupancy certificate records parking area 234.3 m² in both sanctioned and site building plans. Parking-space count and allocations are not supplied.

Offering and status

FieldProject record
RERA-filed configuration3BHK; 10 units. RERA unit table
RERA-filed saleable area105.66 sq m per unit. RERA unit table
Booked / available10 booked; 0 available, as last read from the TG-RERA portal; the record provides no as-of date, so these counts are indicative. RERA unit table
Completion deadlineProposed completion date recorded in the project filing: 23/08/2025. RERA record RERA filing
Occupancy certificateCertificate No. 0096/OC/3011/2023, approved 09 December 2023, for the residential building at Survey No. 1355/1; the certificate describes the inspected building as fit for occupation. Approvals record
Completion evidenceThe occupancy certificate records completion notice submission on 05 October, 2023; the architect’s Form 1A certifies overall project completion and identifies that occupancy certificate.

2. The project story

EDLA LAXMI NILAYAM is a single-building residential apartment project in the AREPALLY ROAD area of Karimnagar, on the RERA-recorded parcel 1355/1 in Bank colony(50th ward). The project record states a site area of 532.22 sq m. The building permit describes one residential building with a stilt and five upper floors. RERA record RERA filing

The RERA unit record lists ten 3BHK apartments, all shown as booked and none as available; the portal extract has no as-of date, so this is an indicative record rather than a current availability confirmation. RERA unit table

The occupancy certificate and architect’s Form 1A completion evidence are set out above. This is certificate evidence, not an independent inspection of current condition.

3. Master plan, architecture & building design

The building permit identifies a single residential building on a 532.22 m² site, with 1 Stilt + 5 upper floors, building height 14.95 m, residential area 1,242.15 m², and stilt area 234.30 m². The occupancy certificate records 1,242.15 m² floor area and a height of 15.83 m in both its sanctioned-plan and site-building-plan entries.

The supplied project record also identifies 130.19 m² as the mortgage area. The permit describes 130.19 m² as third-floor handed-over area; the detailed allocation and any associated conditions are documented in the permit. RERA filing

The permit lists six rainwater-harvesting structures. The supplied drawing record is not extracted sufficiently to describe the building footprint, flat arrangement by floor, lifts, stairs, circulation, open-space layout, or common-area distribution.

The unit’s RERA-filed saleable area and software-measured drawing carpet-area estimates are distinct measures; see the Homes section. No FSI-counted area is supplied.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10100105.66 sq m88.1–92.5 sq m; median 90.6 sq m (software-measured)Not supplied

The RERA filing supplies the configuration, unit count, booking count and saleable area. The carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed measurements; the extraction notes that the drawing-based measurement needs review. RERA unit table RERA unit details Floor plans

The measured third-floor plan example shows three bedrooms, a hall, a kitchen, three toilets and a balcony. Individual room dimensions appear in the drawing extraction; they are drawing measurements, not separate RERA area disclosures. A balcony is outside the measured carpet area in that extraction. Saleable area is reported separately as filed and should not be treated as the same measurement as carpet area. RERA unit details Floor plans RERA unit table

5. Parking & vehicle circulation

The approved permit records a 234.30 m² stilt area, and the occupancy certificate records 234.3 m² of parking area in both sanctioned and site-plan entries. The building permit states that the approved stilt parking is to be used exclusively for vehicle parking without partition walls or rolling shutters.

The supplied documents do not establish the number of car or two-wheeler spaces, visitor or accessible parking, parking allocation to individual units, or the vehicle ramp and internal circulation arrangement. A parking area in the approval does not, by itself, establish an exclusive allotment to a particular home.

6. Amenities, recreation & open spaces

The table reflects facilities named in the RERA project record or supplied project documents. No facility progress percentages above zero are recorded in the supplied amenities list; the occupancy certificate is not an item-by-item verification of facility delivery. RERA amenities

Internal roads & footpaths
Description / sizeNo size supplied
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusProgress recorded as 0%
Green strip / tot lot / park
Description / sizeTot-lot area recorded as 0 in the occupancy certificate; permit includes tot-lot conditions.
Evidence sourceRERA amenities record; occupancy certificate; permit
Declared progress / verified statusAmenities progress recorded as 0%; certificate records tot-lot area 0
Community buildings
Description / sizeNo size or facility detail supplied
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusProgress recorded as 0%
Water supply
Description / sizeDetails and capacity not supplied
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusMarked “YES”; progress recorded as 0%
Sewerage / treatment and disposal
Description / sizeSystem details and capacity not supplied
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusSewerage marked “YES”; listed progress recorded as 0%
Water conservation / rainwater harvesting
Description / sizeSix rainwater-harvesting structures listed in the permit and occupancy certificate.
Evidence sourceBuilding permit and occupancy certificate
Declared progress / verified statusCertificate records six in sanctioned and site building plans; no independent operating-status detail supplied
Electrical meter room / sub-station / receiving station
Description / sizeNo capacity or equipment details supplied
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusMarked “YES”; progress recorded as 0%
Solid-waste management and disposal
Description / sizeNo facility details supplied
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusProgress recorded as 0%
Street lighting; storm-water drains; energy management; fire protection
Description / sizeNo detailed specifications supplied
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusEach listed with progress recorded as 0%

7. Utilities, building services & safety

The RERA amenities record marks water supply, sewerage and electrical meter-room/sub-station/receiving-station provision as “YES,” but supplies no capacities, design details or operating-status evidence. Rainwater harvesting is specified as six structures in the permit and occupancy certificate. RERA amenities

The building permit requires a rainwater-harvesting structure, transformer space and a garbage house. It also states that the sanctioned plan is to be followed and that occupancy certification is required before occupation. The occupancy certificate records the building as fit for occupation, but the supplied evidence does not detail fire systems, lifts, emergency power, sewerage treatment capacity, waste segregation, CCTV, security arrangements, accessibility features or system commissioning.

8. Location, access & connectivity

The registered project location is AREPALLY ROAD, Bank colony(50th ward), Karimnagar urban mandal, Karimnagar district, PIN 505001. The project filing describes the site’s western boundary as a 30 FEET WIDE ROAD. The building permit also records an 18M road width; no route or road-network plan is supplied to clarify its relationship to the boundary road. RERA record RERA filing RERA filing

The supplied location record gives a sampled distance of 112.9 km to the nearest sampled Outer Ring Road interchange; it is an approximate mapped anchor, not a travel-time estimate. Location record No public-transport details or other verified nearby landmarks are supplied.

9. Developer & development status

The registered promoter is PRAGNYA CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AAOFP3122C1ZJ. The RERA-filed address is MANKAMMATHOTA, AREPALLY ROAD, AREPALLY ROAD, Karimnagar urban, Karimnagar, 505001. JANAGAM ANIL is listed as authorised signatory. No official website or contact details are supplied. Corporate record Parties record

The project’s proposed completion date in the RERA project information is 23/08/2025. The occupancy certificate and architect’s Form 1A completion evidence are set out above. The supplied evidence does not provide an independently verified construction-progress percentage. RERA record RERA filing

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02700001644; issued 13/02/2020; validity through 23/08/2025
What the supplied record establishesRegistration for EDLA LAXMI NILAYAM and stated registration conditions.
Building permit
Identifier / date3011/W50/2019/4930; 23 August 2019
What the supplied record establishesKarimnagar Municipal Corporation permit for a residential building with 1 stilt and 5 upper floors on Survey No. 1355/1.
Occupancy certificate
Identifier / date0096/OC/3011/2023; 09 December 2023
What the supplied record establishesOccupancy certification for the residential building at Survey No. 1355/1; records completion notice submission on 05 October, 2023.
Architect’s completion certificate (Form 1A)
Identifier / dateRefers to occupancy certificate 0096/OC/3011/2023
What the supplied record establishesCertifies overall completion of the registered project.
Form B promoter declaration
Identifier / dateDocument 77034
What the supplied record establishesContains promoter declarations on title basis, encumbrances, project funds, audits, approvals and non-discrimination; the completion-period field is blank.
Approved drawing record
Identifier / dateDocument 70690
What the supplied record establishesFloor-plan drawing record used for software measurement; the supplied drawing extraction is incomplete for a full architectural description.

Frequently asked questions

Is EDLA LAXMI NILAYAM registered with Telangana RERA?

Yes. EDLA LAXMI NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02700001644; the registration status is New Project.

Who is the developer of EDLA LAXMI NILAYAM?

The promoter named in the RERA registration is PRAGNYA CONSTRUCTIONS.

Where is EDLA LAXMI NILAYAM located?

EDLA LAXMI NILAYAM is in AREPALLY ROAD, Bank colony(50th ward), Karimnagar urban, Karimnagar, Telangana (505001).

When will EDLA LAXMI NILAYAM be completed?

The promoter's proposed date of completion filed with RERA is 23/08/2025. This is the promoter's declaration, not a guarantee.