ICONIC TOWERS is a residential apartment project in KHANA PURAM, Khammam district; the mandal is not disclosed in the project identity record. The registered promoter is ICONIC BUILDERS, recorded as a partnership. The project records a total/net land area of 618.4 sq. m, one building and one block with 1 Stilt + 5 upper floors, and 10 3BHK apartments. Its TG-RERA registration is P00800002082, and the promoter’s Form B declaration undertakes completion by 23/01/2026.

01What we found

Period endedTG-RERA registration ran to 23 Jan 2026 - check its extension on TG-RERA
14documents on file - each fact links to its page
4court cases on this project's land (survey 88, Khana Puram)
6items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameICONIC TOWERS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registration is for the project recorded as ICONIC TOWERS. RERA record
TG-RERA registrationP00800002082
Registration validity24/08/2020–23/01/2026; the certificate states a five-year term. Registration validity is distinct from the declared completion date. RERA record
Registered promoterICONIC BUILDERS, recorded as a partnership RERA filing Parties record
RERA status in supplied recordNew Project; certificate records registration. Current registration status or any extension is not established by the supplied record. RERA filing

Land and geographic identity

ItemRecord
LocalityKHANA PURAM; the building permit describes Khanapuram (H) (Part)_W6. RERA record
Revenue villageKhana Puram; the title and permit documents also use Khanapuram Haveli / Khanapuram (H). RERA record Land records
MandalNot disclosed in the project identity record. Land records
District / PINKhammam / 507002 RERA record
Survey number(s) and subdivisionsSurvey No. 88; the title report describes the development-agreement land as Sy. No. 88 Part. RERA record Land records
Registered site extent740-00 Sq. Yds. is the schedule extent in the registered Development Agreement-cum-GPA No. 1875/2020; the RERA land record gives a total/net area of 618.4 sq. m. Title record Land records
Total / net area in RERA filingTotal area 618.4 sq. m; net area 618.40 sq. m. RERA filing
Boundaries recorded in RERA filingEast: ROAD WIDTH 9; West: ROAD WIDTH 9; North: PLOT NO 25 31; South: PLOT NO 23 33. RERA filing

Development identity

ItemRecord
Sanctioning authorityKhammam Municipal Corporation Approvals record
Principal building approvalBuilding Permit Order / file 3018/W6/2019/7573, approved 23 January, 2020. Approvals record
Approved built-up area1,783.30 sq. m in the RERA project fields. The building-permit parameters separately state Residential 1,485.30 and Stilt 265.44; the permit’s stated site area is 618.4 m². RERA filing
Buildings / blocksOne building / one block is recorded in the project fields. RERA filing RERA unit table
Sanctioned floor configuration1 Stilt + 5 upper floors; the permit records building height as 15 m. Basement or podium levels are not disclosed.
Parking provisionThe permit identifies the stilt for parking. The RERA record also declares 154.79 sq. m as mortgage area; parking-space counts and a unit-by-unit allocation are not established in the supplied material. RERA filing Land records
Approved / RERA-declared unitsRERA land details record 1 total building unit and 1 proposed building unit; the unit schedule records 10 3BHK apartments. The supplied record does not clarify the meaning of the one-unit field. RERA filing RERA unit table

Offering and status

ItemRecord
RERA-filed configuration3BHK; 10 units RERA unit table
RERA-filed saleable area148.53 sq. m per 3BHK RERA unit table
Booked / available0 booked / 10 available, as last read from TG-RERA; the portal record supplied has no as-of date, so these counts are indicative. RERA unit table
Construction stageRERA project record gives 80% completeness; this is a record-based figure, not an independent site inspection. RERA record
Completion datePromoter’s Form B declaration undertakes completion by 23/01/2026.
Occupancy / completion certificateNo project occupancy or completion certificate is included in the supplied documents. The building permit requires completion notice and an occupancy certificate before occupation. The evidence does not establish a certificate’s current status or the scope of any later issuance.

2. The project story

  • ICONIC TOWERS is recorded with TG-RERA as a residential apartment project on Survey No. 88, in Khana Puram, Khammam district. The building-permit record describes a single dwelling building with one stilt level and five upper floors. The project’s RERA unit schedule lists ten 3BHK apartments, all shown as available and none booked in the portal data supplied; the booking figures have no recorded as-of date. RERA record RERA filing RERA unit table
  • The RERA project record reports 80% completeness, while the promoter’s Form B gives 23/01/2026 as the undertaking completion date. Neither figure independently verifies work on site. The supplied pack does not include an occupancy or completion certificate; the permit states that an occupancy certificate is required before occupation. RERA record Document index

3. Master plan, architecture & building design

  • The project fields identify one building and one block. The building permit describes a residential building of 1 Stilt + 5 upper floors, with a stated height of 15 m. The approved parameters give a site area of 618.4 m², a net area of 618.4 m², and no road-affected area; the RERA project fields state approved built-up area of 1,783.30 sq. m. The permit separately lists Residential 1,485.30 and Stilt 265.44. RERA filing RERA filing
  • The filed plan approval number is 3018/W6/2019/7573. The supplied drawing is identified as an approved floor-plan drawing, but its stamp text is flagged for review; the record does not provide verified details of flats per floor, lift or stair numbers, building footprint, internal circulation, landscape area, or a phase-wise arrangement. Approvals record Floor plans
  • The RERA filing reports a 154.79 sq. m mortgage area. The building permit also refers to a 10% mortgage area. Further design detail about that area is not established here. RERA filing

4. Homes, configurations & floor plans

  • The TG-RERA unit schedule records ten 3BHK apartments, with saleable area of 148.53 sq. m each; the portal count shows zero booked and ten available, with no as-of date. RERA unit table RERA unit details
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010148.53 sq. m111.5–121.5 sq. m; median 119.0 sq. m20%
  • The carpet-area range and median are software measurements from the approved floor-plan drawing, not RERA-filed figures; the supplied measurement is flagged as needing review. Four flat designs were measured. The drawing panel identified for the sample flat is “TYPICAL - 1, 3, 4, 5 FLOOR PLAN.” Floor plans RERA unit details
  • The drawing-derived room schedule includes living/dining, kitchen, three bedrooms and three toilets, as well as an enclosed balcony and utility. Balcony and utility are excluded from the measured carpet area. The RERA saleable area is a separate measure and includes the home’s share of common areas; it should not be treated as carpet area. RERA unit details Floor plans

5. Parking & vehicle circulation

  • The building permit identifies the stilt as parking and requires the approved stilt and any cellar parking shown on the plan to be used exclusively for vehicles, without partition walls or rolling shutters. The supplied evidence does not specify a cellar level, number of car or two-wheeler spaces, visitor or accessible spaces, ramp arrangements, EV charging, or individual parking allocations.
  • See Master plan, architecture & building design above for the RERA-recorded 154.79 sq. m mortgage area and the permit’s 10% mortgage-area reference. That entry does not establish the number of parking bays or exclusive parking rights for any apartment. RERA filing Land records

6. Amenities, recreation & open spaces

  • The RERA amenities record lists project facilities and reports 0% for each listed item; it does not establish completion. The building permit specifically includes a tot-lot, transformer space, garbage house and rainwater-harvesting structure among its conditions. RERA amenities
FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green stripSize not supplied; permit requires a fenced tot-lot maintained as greenery.RERA amenitiesRERA amenities record reports 0%; completion not independently verified.
Community buildingsSize or capacity not supplied.RERA amenitiesListed in RERA amenities record; 0% reported.
Water conservation / rainwater harvestingPermit specifies a rainwater-harvesting structure (percolation pit); size not supplied.RERA amenitiesListed in RERA amenities record; 0% reported.
Internal roads and footpathsDimensions not supplied.RERA amenitiesListed in RERA amenities record; 0% reported.
Street lightingDetails not supplied.RERA amenitiesListed in RERA amenities record; 0% reported.
Aggregate recreational open spaceArea not supplied.RERA amenitiesListed in RERA amenities record; 0% reported.
  • The supplied record does not establish a clubhouse, indoor recreation facilities, sports facilities, or other specific convenience amenities as part of the registered project. RERA amenities Document index

7. Utilities, building services & safety

  • The RERA amenities record lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection, and an electrical meter room/sub-station/receiving station; the listed entries show 0% progress. These are RERA-recorded amenity items, not evidence of completed or operational services. RERA amenities
  • The building permit calls for rainwater harvesting, transformer space and a garbage house. It also requires completion notice and an occupancy certificate before occupation, and assigns responsibility for fire-safety installations and building services—including sanitation, plumbing, lifts and electrical installations—to the owner/builder and relevant technical personnel. The supplied material does not specify water sources or storage, treatment capacity, STP capacity, backup power, lift count or capacity, fire-equipment details, or accessibility features.

8. Location, access & connectivity

  • The registered project location is Khana Puram, Khammam district, PIN 507002; the building permit describes Khanapuram (H) (Part)_W6. The land record gives the village as Khana Puram and survey number 88. The project fields list roads of width 9 on the east and west boundaries; the permit also refers to an 18M road in a condition concerning compound-wall treatment. RERA record Land records
  • The supplied location record gives the Financial District (Nanakramguda) at 1.2 km from a cadastral parcel centroid at 17.41528, 78.35459. No public-transport information or other verified connectivity details are supplied. Location record

9. Developer & development status

  • The registered promoter is ICONIC BUILDERS, recorded as a partnership. The supplied promoter record lists BADDULA VISWA TEJA as a partner and TULLURI NAGESHWAR RAO as authorized signatory. The promoter address recorded is Lotus Apartment, Dwaraka Nagar, Khanapuram Haveli, Khana Puram, Khammam, 507002. The supplied data does not identify a company registration number or provide official contact details or website. RERA filing Parties record
  • The Form B affidavit dated 13/02/2020 is signed by T. Nageshwar Rao as authorized signatory and declares a legal-title basis, no encumbrances, and a completion undertaking of 23/01/2026. The RERA record reports 80% completeness, but no independent construction inspection is supplied. The project record identifies one building and does not provide a separate phase-wise schedule. RERA record RERA filing

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for ICONIC TOWERS, registration P00800002082, issued 24/08/2020; states validity through 23/01/2026 and includes the separate-account condition.
Principal building permitKhammam Municipal Corporation Building Permit Order, file 3018/W6/2019/7573, approved 23 January, 2020; survey number 88; residential building, 1 Stilt + 5 upper floors.
Earlier layout regulation recordProceedings Roc.No.G1 / LRS / 952 / 2013, dated 28-06-2013, concerning plots 24, 25, 26, 30, 31 and 32 in Sy. No. 88; the document says layout regulation does not confer ownership or prove title.
Approved floor-plan drawingDrawing record 105707, page 1; stamp date shown as 29-06-2019 and approval number 3018/W6/2019/7573; drawing-stamp extraction is flagged for review.
Title and development-rights documentsDevelopment Agreement-cum-GPA No. 1875/2020, dated 05-02-2020, and title report dated 07-03-2020 are included in the RERA filing.
Occupancy / completion certificateNo project occupancy or completion certificate is included in the supplied document set. Document index

Frequently asked questions

Is ICONIC TOWERS registered with Telangana RERA?

Yes. ICONIC TOWERS is registered with the Telangana Real Estate Regulatory Authority as P00800002082; the registration status is New Project.

Who is the developer of ICONIC TOWERS?

The promoter named in the RERA registration is ICONIC BUILDERS.

Where is ICONIC TOWERS located?

ICONIC TOWERS is in KHANA PURAM, Khammam, Telangana (507002).

When will ICONIC TOWERS be completed?

The promoter's proposed date of completion filed with RERA is 23/01/2026. This is the promoter's declaration, not a guarantee.