Chatla S Sunshine Resisdency
S.V.L.N BUILDERS & DEVELOPERS · Nizamabad · RERA P03100005090
CHATLA S SUNSHINE RESISDENCY is a residential apartment project in Vinayak Nagar, NIZAMABAD SOUTH, Nizamabad district. The registered promoter is S.V.L.N BUILDERS & DEVELOPERS, a partnership. The project records a land area of 830 sq. m. and one building with 1 Stilt + 5 upper floors, comprising 15 apartments: 10 2BHK and 5 3BHK. It is registered under TG-RERA **P03100005090**, with a proposed completion date of **31/12/2024**.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | CHATLA S SUNSHINE RESISDENCY RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | A single building is identified; a separate phase name or phase number is not disclosed RERA unit table |
| TG-RERA registration | P03100005090, Form C; registration commenced 29/09/2022 and ended 31/12/2024. The supplied certificate states no extension Approvals record |
| Registered promoter | S.V.L.N BUILDERS & DEVELOPERS, a partnership RERA record RERA filing |
| RERA status in supplied record | The registration validity date has passed; no extension is recorded in the supplied certificate. This is separate from the project’s completion undertaking and occupancy-certificate status |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Vinayak Nagar; the approval document further describes the location as “BEHIND SHIRDI SAI NAGAR, VINAYAK NAGAR, NIZAMABAD” RERA record |
| Revenue village | Vinayak Nagar is the project record’s village; the building-permit extraction refers to “Nizambad” and the title documents use “VINAYAKNAGAR” / “Nizamabad shivar.” The exact revenue-village identity is not independently verified in the supplied material RERA record Land records |
| Mandal / district / PIN | NIZAMABAD SOUTH / Nizamabad / 503001 RERA record |
| Survey number(s) | Survey No. 539; the building permit describes SY. NO. 539, Plot No. 1 and part of Plot No. 2. No survey subdivision is supplied Land records |
| Plot reference | Plot No. 1AND2 in the RERA certificate |
| Registered site extent | 830 sq. m. in the RERA land details RERA filing |
| Permit-record areas | Building-permit extraction states site area 830.87 m², road-affected area 104.35 m², and net area 723.89 m² |
| Boundaries | East: 40 FEET WIDE ROAD; West: NEIGHBOURS LAND; North: PART OF PLAT NO 2; South: 10 FEET WIDE ROAD RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Nizamabad Urban Development Authority, as stated in the building-permit extraction |
| Principal approval | Building Permit Order 3146/Nizambad/2021/0585, approved 23 December, 2021; also recorded as the plan approval number Approvals record |
| Approved built-up area | RERA project information records 1,690 sq. m. RERA filing |
| Building count | One residential building is identified in the project record RERA filing |
| Sanctioned configuration | 1 Stilt + 5 upper floors; building-permit extraction gives height 14 m |
| Parking levels / provision | The permit identifies stilt parking and requires parking use; the supplied material does not give a sanctioned parking-space count or establish a separate basement parking level |
| Unit counts | The project record lists 15 units: 10 2BHK and 5 3BHK RERA unit table |
| Approved versus RERA-declared unit counts | One building and 15 total units are shown in the project data. The supplied extracts do not provide a separate, independently reconciled approved unit schedule RERA filing RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| Configurations | 2BHK and 3BHK apartments RERA unit table |
| RERA-filed saleable areas | 2BHK: 133.5 sq. m.; 3BHK: 148.0 sq. m. RERA unit table |
| Portal inventory snapshot | 2BHK: 0 booked / 10 available; 3BHK: 0 booked / 5 available. The portal record has no as-of date, so these counts are indicative rather than a current availability confirmation RERA unit table |
| Construction stage | No independently verified construction-progress record is supplied. The developer-site/vendor description says “under construction,” but that is a vendor claim, not verified site progress Promoter website |
| Completion date | The Form-B declaration undertakes completion by 31/12/2024 |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents; status is not established by the supplied record Document index |
2. The project story
CHATLA S SUNSHINE RESISDENCY is registered as a residential apartment project at Vinayak Nagar, Nizamabad, on Survey No. 539, with the RERA certificate also identifying Plot No. 1AND2. Its filed configuration is one building containing 15 apartments: ten 2BHK and five 3BHK units. The building permit describes one stilt level and five upper floors. RERA record Land records RERA unit table
The promoter’s Form-B declaration gives a completion undertaking of 31/12/2024. That date is not itself evidence that construction was completed. The supplied material does not establish the current physical construction stage or provide an occupancy/completion certificate. The vendor-site listing describes the project as under construction, but this is an attributed vendor statement rather than independently verified progress. Promoter website Document index
3. Master plan, architecture & building design
The filed development is a single residential building on a site recorded in the RERA land details as 830 sq. m.; the permit extraction describes a 830.87 m² site, with 104.35 m² affected by road and 723.89 m² net area. RERA records approved built-up area as 1,690 sq. m. The building permit describes 1 Stilt + 5 upper floors and a height of 14 m. These are separately reported measures; the supplied material does not identify an FSI-counted area or a carpet-area total for the building. RERA filing RERA filing
The approval extraction records residential upper floors and a stilt, but the supplied extract does not establish the detailed floor-by-floor apartment arrangement, number of apartments per floor, lift or stair configuration, internal circulation, or landscaped/open-space area. The listed building-permit amenities include a transformer space, garbage house, rainwater-harvesting structure (percolation pit), and tot-lot.
4. Homes, configurations & floor plans
RERA records two apartment configurations and 15 units in total. The saleable areas below are RERA-filed figures. Carpet areas and loading percentages are software measurements from floor-plan drawing geometry, not RERA disclosures; the measurement source notes that the drawing-based areas need review and should be checked against the drawing. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available* | RERA saleable area | Measured carpet area** | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 133.5 sq. m. | 78.0–90.4 sq. m.; median 84.2 sq. m. | 37% |
| 3BHK | 5 | 0 | 5 | 148.0 sq. m. | 100.7 sq. m. | 32% |
\* Portal inventory snapshot; no as-of date is provided, so confirm availability directly before relying on it. RERA unit table \** Software-measured from drawing geometry, not a RERA-filed carpet-area disclosure. The project record does not provide a separate RERA carpet-area figure. Floor plans
The extracted typical-floor-plan room schedule includes bedrooms, hall, dining, kitchen, foyers and puja space. The measured 2BHK example also includes two toilets and two utility spaces; the 3BHK example includes three bedrooms, three toilets, hall, drawing room, kitchen, foyers and puja space. Room dimensions are drawing-derived measurements, not independent site measurements. RERA unit details
Carpet area, saleable area and loading are different measures: the software-measured carpet area is based on drawing geometry, while the RERA-filed saleable area is the recorded saleable figure. The supplied data does not define a separate quantified common-area share for each unit. RERA unit table Floor plans
5. Parking & vehicle circulation
The building permit states that the stilt is approved for parking and must be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The permit extraction does not provide the number of sanctioned parking bays, the number of two-wheeler spaces, visitor or accessible spaces, or a unit-wise parking allocation. A vendor listing separately mentions “Open Parking”; no count or legally documented allocation is supplied for that claim. Promoter website
The supplied evidence does not establish parking-ramp arrangements, internal driveways, pedestrian separation, or EV charging. A drawn or described parking provision should not be treated as proof of exclusive ownership or allocation to a particular apartment. Promoter website
6. Amenities, recreation & open spaces
The following items are recorded in the building-permit extraction or the RERA amenities data. The RERA amenities entries show 0% progress where a percentage is provided; the material does not independently verify completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Transformer space | Space to be provided on site | Building Permit Order | Required by permit; completion not verified |
| Garbage house | Listed as a permit amenity; size not stated | Building Permit Order | Completion not verified |
| Rainwater-harvesting structure | Percolation pit; size not stated | Building Permit Order | Completion not verified |
| Tot-lot / green strip | Tot-lot is listed in the permit; “Green Strip/TOT LOT/Park” is marked available “YES” in the RERA amenities data | Building Permit Order; RERA amenities | RERA progress recorded as 0%; delivery not independently verified RERA amenities |
| Water supply | RERA amenities entry marked “YES”; details and capacity not stated | RERA amenities | RERA progress recorded as 0%; operating status not verified RERA amenities |
| Sewerage | RERA entry “Sewerage (Chamber, Lines, Septic Tank, STP)” marked “YES”; system type not specified | RERA amenities | RERA progress recorded as 0%; operating status not verified RERA amenities |
| Water conservation / rainwater harvesting | RERA amenities entry marked “YES” | RERA amenities | RERA progress recorded as 0%; completion not verified RERA amenities |
| Internal roads and footpaths | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% RERA amenities |
| Storm-water drains | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% RERA amenities |
| Street lighting | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% RERA amenities |
| Community buildings | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% RERA amenities |
| Sewage and sullage treatment/disposal | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% RERA amenities |
| Solid-waste management and disposal | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% RERA amenities |
| Energy management | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% RERA amenities |
| Fire protection and fire-safety requirements | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% RERA amenities |
| Electrical meter room / substation / receiving station | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% RERA amenities |
| Aggregate recreational open space | Listed in RERA amenities data; area not stated | RERA amenities | Progress recorded as 0% RERA amenities |
7. Utilities, building services & safety
RERA amenities data records water supply, sewerage, water conservation/rainwater harvesting, fire protection, electrical meter room/substation/receiving station and waste-management items. The building-permit extraction specifically lists a transformer space, garbage house and rainwater-harvesting percolation pit. These records establish that the items are listed or required, not that they are complete or operational; the RERA amenity progress percentages supplied are 0% where shown. RERA amenities
The building permit states that occupancy requires an occupancy certificate and includes conditions concerning completion notice, parking use and a transformer space. The supplied documents do not establish water source or storage capacity, STP type or capacity, reuse arrangements, storm-water design, electrical backup, lift count or capacity, fire-system specifications, emergency access, CCTV, security arrangements, or accessibility features. Document index
8. Location, access & connectivity
The registered location is Vinayak Nagar, Nizamabad, Nizamabad South mandal, Nizamabad district, PIN 503001. The building-permit extraction further describes the site as behind Shirdi Sai Nagar, Vinayak Nagar, Nizamabad. The land record gives an eastern boundary of a 40-foot-wide road and a southern boundary of a 10-foot-wide road; the permit also records an 18M road width. RERA record RERA filing
No project-specific public-transport, landmark-distance or measured travel-time information is supplied. The supplied location data includes a Financial District (Nanakramguda) anchor at 1.2 km, but does not establish a route or travel time. Location record
9. Developer & development status
The registered promoter is S.V.L.N BUILDERS & DEVELOPERS, recorded as a partnership. The supplied project record lists GSTIN 36AENFS4607Q1Z8 and the promoter address as NO, VINAYAK NAGAR, HYD ROAD, VINAYAK NAGAR, NIZAMABAD SOUTH, Nizamabad, 503001. Named partners are KALE MAHESH BABU and KULLACHARI SANTOSH; KULLACHARI SANTOSH is listed as authorized signatory. The supplied material does not identify a separate official project website or provide official contact details. RERA filing Corporate record Parties record
The promoter’s Form-B affidavit, signed by SANTOSH KUMAR KULACHARI, undertakes completion by 31/12/2024. The supplied record does not contain a later revised completion date, an extension certificate, independently verified construction progress, or an occupancy/completion certificate. Approvals record Document index
10. Approvals, official records & documents
| Identifier / date | P03100005090, issued 29/09/2022; stated validity through 31/12/2024 |
|---|---|
| Scope and record status | Form C for CHATLA S SUNSHINE RESISDENCY; no extension is recorded in the supplied certificate |
| Identifier / date | 3146/Nizambad/2021/0585, approved 23 December, 2021 |
|---|---|
| Scope and record status | Building-permit extraction identifies Nizamabad Urban Development Authority, Survey No. 539, and 1 Stilt + 5 upper floors Approvals record |
| Identifier / date | 9929/2021 |
|---|---|
| Scope and record status | Cited in the building-permit extraction for the road-affected portion |
| Identifier / date | PROC NO. G1/3498/095-[redacted]/LRS/2015-16 |
|---|---|
| Scope and record status | Reference recorded in the building-permit extraction; full layout approval document is not supplied Approvals record |
| Identifier / date | Dated 14 April 2022 |
|---|---|
| Scope and record status | Promoter declaration includes the 31/12/2024 completion undertaking and statements concerning title basis, encumbrances and RERA obligations |
| Identifier / date | Title report dated 27/03/2022; source documents 236003, 236021, 236022 |
|---|---|
| Scope and record status | Filed title materials include a 2011 sale deed and a 2021 development agreement-cum-irrevocable GPA Document index |
| Identifier / date | Not included in supplied documents |
|---|---|
| Scope and record status | Status is not established by this evidence set Document index |
The supplied material does not include a standalone approved-layout sheet, a full set of sanctioned drawings, or an occupancy/completion certificate. The building-permit extraction identifies the sanction and its stated conditions; further approval detail is outside this overview. Document index
1. Project at a glance
Project identity
Registered name: CHATLA S SUNSHINE RESISDENCY
Project type: Residential apartment project
Phase / registered portion: A single building is identified; a separate phase name or phase number is not disclosed
TG-RERA registration: P03100005090, Form C; registration commenced 29/09/2022 and ended 31/12/2024. The supplied certificate states no extension
Registered promoter: S.V.L.N BUILDERS & DEVELOPERS, a partnership
RERA status in supplied record: The registration validity date has passed; no extension is recorded in the supplied certificate. This is separate from the project’s completion undertaking and occupancy-certificate status
Land and geographic identity
Locality: Vinayak Nagar; the approval document further describes the location as “BEHIND SHIRDI SAI NAGAR, VINAYAK NAGAR, NIZAMABAD”
Revenue village: Vinayak Nagar is the project record’s village; the building-permit extraction refers to “Nizambad” and the title documents use “VINAYAKNAGAR” / “Nizamabad shivar.” The exact revenue-village identity is not independently verified in the supplied material
Mandal / district / PIN: NIZAMABAD SOUTH / Nizamabad / 503001
Survey number(s): Survey No. 539; the building permit describes SY. NO. 539, Plot No. 1 and part of Plot No. 2. No survey subdivision is supplied
Plot reference: Plot No. 1AND2 in the RERA certificate
Registered site extent: 830 sq. m. in the RERA land details
Permit-record areas: Building-permit extraction states site area 830.87 m², road-affected area 104.35 m², and net area 723.89 m²
Boundaries: East: 40 FEET WIDE ROAD; West: NEIGHBOURS LAND; North: PART OF PLAT NO 2; South: 10 FEET WIDE ROAD
Development identity
Sanctioning authority: Nizamabad Urban Development Authority, as stated in the building-permit extraction
Principal approval: Building Permit Order 3146/Nizambad/2021/0585, approved 23 December, 2021; also recorded as the plan approval number
Approved built-up area: RERA project information records 1,690 sq. m.
Building count: One residential building is identified in the project record
Sanctioned configuration: 1 Stilt + 5 upper floors; building-permit extraction gives height 14 m
Parking levels / provision: The permit identifies stilt parking and requires parking use; the supplied material does not give a sanctioned parking-space count or establish a separate basement parking level
Unit counts: The project record lists 15 units: 10 2BHK and 5 3BHK
Approved versus RERA-declared unit counts: One building and 15 total units are shown in the project data. The supplied extracts do not provide a separate, independently reconciled approved unit schedule
Offering and status
Configurations: 2BHK and 3BHK apartments
RERA-filed saleable areas: 2BHK: 133.5 sq. m.; 3BHK: 148.0 sq. m.
Portal inventory snapshot: 2BHK: 0 booked / 10 available; 3BHK: 0 booked / 5 available. The portal record has no as-of date, so these counts are indicative rather than a current availability confirmation
Construction stage: No independently verified construction-progress record is supplied. The developer-site/vendor description says “under construction,” but that is a vendor claim, not verified site progress
Completion date: The Form-B declaration undertakes completion by 31/12/2024
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents; status is not established by the supplied record
2. The project story
CHATLA S SUNSHINE RESISDENCY is registered as a residential apartment project at Vinayak Nagar, Nizamabad, on Survey No. 539, with the RERA certificate also identifying Plot No. 1AND2. Its filed configuration is one building containing 15 apartments: ten 2BHK and five 3BHK units. The building permit describes one stilt level and five upper floors.
The promoter’s Form-B declaration gives a completion undertaking of 31/12/2024. That date is not itself evidence that construction was completed. The supplied material does not establish the current physical construction stage or provide an occupancy/completion certificate. The vendor-site listing describes the project as under construction, but this is an attributed vendor statement rather than independently verified progress.
3. Master plan, architecture & building design
The filed development is a single residential building on a site recorded in the RERA land details as 830 sq. m.; the permit extraction describes a 830.87 m² site, with 104.35 m² affected by road and 723.89 m² net area. RERA records approved built-up area as 1,690 sq. m. The building permit describes 1 Stilt + 5 upper floors and a height of 14 m. These are separately reported measures; the supplied material does not identify an FSI-counted area or a carpet-area total for the building.
The approval extraction records residential upper floors and a stilt, but the supplied extract does not establish the detailed floor-by-floor apartment arrangement, number of apartments per floor, lift or stair configuration, internal circulation, or landscaped/open-space area. The listed building-permit amenities include a transformer space, garbage house, rainwater-harvesting structure (percolation pit), and tot-lot.
4. Homes, configurations & floor plans
RERA records two apartment configurations and 15 units in total. The saleable areas below are RERA-filed figures. Carpet areas and loading percentages are software measurements from floor-plan drawing geometry, not RERA disclosures; the measurement source notes that the drawing-based areas need review and should be checked against the drawing.
| Configuration | Units | Booked | Available* | RERA saleable area | Measured carpet area** | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 133.5 sq. m. | 78.0–90.4 sq. m.; median 84.2 sq. m. | 37% |
| 3BHK | 5 | 0 | 5 | 148.0 sq. m. | 100.7 sq. m. | 32% |
\* Portal inventory snapshot; no as-of date is provided, so confirm availability directly before relying on it. \** Software-measured from drawing geometry, not a RERA-filed carpet-area disclosure. The project record does not provide a separate RERA carpet-area figure.
The extracted typical-floor-plan room schedule includes bedrooms, hall, dining, kitchen, foyers and puja space. The measured 2BHK example also includes two toilets and two utility spaces; the 3BHK example includes three bedrooms, three toilets, hall, drawing room, kitchen, foyers and puja space. Room dimensions are drawing-derived measurements, not independent site measurements.
Carpet area, saleable area and loading are different measures: the software-measured carpet area is based on drawing geometry, while the RERA-filed saleable area is the recorded saleable figure. The supplied data does not define a separate quantified common-area share for each unit.
5. Parking & vehicle circulation
The building permit states that the stilt is approved for parking and must be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The permit extraction does not provide the number of sanctioned parking bays, the number of two-wheeler spaces, visitor or accessible spaces, or a unit-wise parking allocation. A vendor listing separately mentions “Open Parking”; no count or legally documented allocation is supplied for that claim.
The supplied evidence does not establish parking-ramp arrangements, internal driveways, pedestrian separation, or EV charging. A drawn or described parking provision should not be treated as proof of exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
The following items are recorded in the building-permit extraction or the RERA amenities data. The RERA amenities entries show 0% progress where a percentage is provided; the material does not independently verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Transformer space | Space to be provided on site | Building Permit Order | Required by permit; completion not verified |
| Garbage house | Listed as a permit amenity; size not stated | Building Permit Order | Completion not verified |
| Rainwater-harvesting structure | Percolation pit; size not stated | Building Permit Order | Completion not verified |
| Tot-lot / green strip | Tot-lot is listed in the permit; “Green Strip/TOT LOT/Park” is marked available “YES” in the RERA amenities data | Building Permit Order; RERA amenities | RERA progress recorded as 0%; delivery not independently verified |
| Water supply | RERA amenities entry marked “YES”; details and capacity not stated | RERA amenities | RERA progress recorded as 0%; operating status not verified |
| Sewerage | RERA entry “Sewerage (Chamber, Lines, Septic Tank, STP)” marked “YES”; system type not specified | RERA amenities | RERA progress recorded as 0%; operating status not verified |
| Water conservation / rainwater harvesting | RERA amenities entry marked “YES” | RERA amenities | RERA progress recorded as 0%; completion not verified |
| Internal roads and footpaths | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% |
| Storm-water drains | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% |
| Street lighting | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% |
| Community buildings | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% |
| Sewage and sullage treatment/disposal | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% |
| Solid-waste management and disposal | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% |
| Energy management | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% |
| Fire protection and fire-safety requirements | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% |
| Electrical meter room / substation / receiving station | Listed in RERA amenities data | RERA amenities | Progress recorded as 0% |
| Aggregate recreational open space | Listed in RERA amenities data; area not stated | RERA amenities | Progress recorded as 0% |
7. Utilities, building services & safety
RERA amenities data records water supply, sewerage, water conservation/rainwater harvesting, fire protection, electrical meter room/substation/receiving station and waste-management items. The building-permit extraction specifically lists a transformer space, garbage house and rainwater-harvesting percolation pit. These records establish that the items are listed or required, not that they are complete or operational; the RERA amenity progress percentages supplied are 0% where shown.
The building permit states that occupancy requires an occupancy certificate and includes conditions concerning completion notice, parking use and a transformer space. The supplied documents do not establish water source or storage capacity, STP type or capacity, reuse arrangements, storm-water design, electrical backup, lift count or capacity, fire-system specifications, emergency access, CCTV, security arrangements, or accessibility features.
8. Location, access & connectivity
The registered location is Vinayak Nagar, Nizamabad, Nizamabad South mandal, Nizamabad district, PIN 503001. The building-permit extraction further describes the site as behind Shirdi Sai Nagar, Vinayak Nagar, Nizamabad. The land record gives an eastern boundary of a 40-foot-wide road and a southern boundary of a 10-foot-wide road; the permit also records an 18M road width.
No project-specific public-transport, landmark-distance or measured travel-time information is supplied. The supplied location data includes a Financial District (Nanakramguda) anchor at 1.2 km, but does not establish a route or travel time.
9. Developer & development status
The registered promoter is S.V.L.N BUILDERS & DEVELOPERS, recorded as a partnership. The supplied project record lists GSTIN 36AENFS4607Q1Z8 and the promoter address as NO, VINAYAK NAGAR, HYD ROAD, VINAYAK NAGAR, NIZAMABAD SOUTH, Nizamabad, 503001. Named partners are KALE MAHESH BABU and KULLACHARI SANTOSH; KULLACHARI SANTOSH is listed as authorized signatory. The supplied material does not identify a separate official project website or provide official contact details.
The promoter’s Form-B affidavit, signed by SANTOSH KUMAR KULACHARI, undertakes completion by 31/12/2024. The supplied record does not contain a later revised completion date, an extension certificate, independently verified construction progress, or an occupancy/completion certificate.
10. Approvals, official records & documents
| Identifier / date | P03100005090, issued 29/09/2022; stated validity through 31/12/2024 |
|---|---|
| Scope and record status | Form C for CHATLA S SUNSHINE RESISDENCY; no extension is recorded in the supplied certificate |
| Identifier / date | 3146/Nizambad/2021/0585, approved 23 December, 2021 |
|---|---|
| Scope and record status | Building-permit extraction identifies Nizamabad Urban Development Authority, Survey No. 539, and 1 Stilt + 5 upper floors |
| Identifier / date | 9929/2021 |
|---|---|
| Scope and record status | Cited in the building-permit extraction for the road-affected portion |
| Identifier / date | PROC NO. G1/3498/095-[redacted]/LRS/2015-16 |
|---|---|
| Scope and record status | Reference recorded in the building-permit extraction; full layout approval document is not supplied |
| Identifier / date | Dated 14 April 2022 |
|---|---|
| Scope and record status | Promoter declaration includes the 31/12/2024 completion undertaking and statements concerning title basis, encumbrances and RERA obligations |
| Identifier / date | Title report dated 27/03/2022; source documents 236003, 236021, 236022 |
|---|---|
| Scope and record status | Filed title materials include a 2011 sale deed and a 2021 development agreement-cum-irrevocable GPA |
| Identifier / date | Not included in supplied documents |
|---|---|
| Scope and record status | Status is not established by this evidence set |
The supplied material does not include a standalone approved-layout sheet, a full set of sanctioned drawings, or an occupancy/completion certificate. The building-permit extraction identifies the sanction and its stated conditions; further approval detail is outside this overview.
Frequently asked questions
Is CHATLA S SUNSHINE RESISDENCY registered with Telangana RERA?
Yes. CHATLA S SUNSHINE RESISDENCY is registered with the Telangana Real Estate Regulatory Authority as P03100005090; the registration status is New Project.
Who is the developer of CHATLA S SUNSHINE RESISDENCY?
The promoter named in the RERA registration is S.V.L.N BUILDERS & DEVELOPERS.
Where is CHATLA S SUNSHINE RESISDENCY located?
CHATLA S SUNSHINE RESISDENCY is in VINAYAK NAGAR, NIZAMABAD SOUTH, Nizamabad, Telangana (503001).
When will CHATLA S SUNSHINE RESISDENCY be completed?
The promoter's proposed date of completion filed with RERA is 31/12/2024. This is the promoter's declaration, not a guarantee.
More projects in Vinayak Nagar