SREE SUMERU by Sukhii and Pravara
M/s SUKHII PROJECTS LLP · Medchal-Malkajgiri · RERA P02200005226
SREE SUMERU by Sukhii and Pravara is a residential apartment project at Uppal Bagayath Village, Uppal mandal, Medchal-Malkajgiri district. The registered promoter is M/s SUKHII PROJECTS LLP. The project covers 5,371.11 sq. m and comprises one building with 2 Cellar + 1 Stilt + 17 upper floors and 168 apartments: 22 2BHK and 146 3BHK, with RERA-filed saleable areas of 65.12 sq. m and 80.22 sq. m, respectively. Its TG-RERA registration is P02200005226, and the proposed completion date recorded in the RERA header is 03/11/2028.
More from Sukhii Projects LLP · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
13 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SREE SUMERU by Sukhii and Pravara RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Not separately identified as a phase in the supplied record; the registration covers the project associated with plots C1 and C2. |
| TG-RERA registration | P02200005226 RERA record |
| Registration validity | 28/10/2022 to 03/07/2028; the certificate states five years and records no extension. This is registration validity, not the building-permit completion deadline or evidence of completion. Approvals record |
| RERA status in supplied record | Registered; the filing identifies the project as “New Project.” RERA record RERA filing |
| Registered promoter | M/s SUKHII PROJECTS LLP RERA record Corporate record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Uppal Bagayath Village; the building permit describes the locality as Old Uppal, Uppal. RERA record RERA filing |
| Mandal | Uppal RERA record RERA filing |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500039 RERA record |
| Survey numbers | 403, 404, 405 and 428; no subdivision is stated in the project identity or supplied building-permit survey list. RERA record Land records |
| Plots | C1, C2 RERA filing |
| Registered site extent | 5,371.11 sq. m in the RERA filing; the building permit states 5,372.11 sq. m. RERA filing |
| Total / net area | RERA filing: total area 5,371.11 sq. m and net area 5,371.11 sq. m. Building-permit extraction: plot area 5,372.11 sq. m, road-affected area 0.0, nala-affected area 0.0, and net plot area 5,372.11 sq. m. RERA filing |
| Boundaries (RERA filing) | East: 80 Feet Road; west: 60 Feet Road; north: Plot No 66 and Temple HMDA Land; south: Plot No C3. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | 3475/GHMC/LBN/2022-BP, approved 01 October 2022; building-permit file no. 007180/GHMC/3568/LBN1/2022-BP. Approvals record |
| Approved built-up area | 38,814.88 sq. m as recorded in the RERA filing. RERA filing |
| Building count | One building / one proposed building unit in the RERA filing; the building permit identifies “RESI (APTS).” RERA filing |
| Sanctioned configuration | 2 Cellar + 1 Stilt + 17 upper floors. The permit states building height 50.99; no unit for that height is provided in the extracted record. |
| Parking levels / approved parking area | Cellars and stilt are approved for parking; total parking area stated as 10,201.45 in the permit, without a unit in the extraction. The permit does not provide a car-space count in the supplied extract. |
| Approved versus RERA-declared units | The RERA filing records 1 building unit and 168 apartments: 146 3BHK and 22 2BHK. A separate sanctioned apartment-unit count is not supplied in the extracted building-permit information. RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations and saleable area | 2BHK: 65.12 sq. m; 3BHK: 80.22 sq. m. RERA unit table RERA unit details |
| Booked / available | 2BHK: 6 booked / 16 available; 3BHK: 46 booked / 100 available; total: 52 booked / 116 available. Counts are from the TG-RERA portal record, which carries no as-of date; treat them as indicative. RERA unit table |
| Construction stage | RERA-filed progress indicators: internal roads and footpaths 15%; water supply 35%; sewerage 40%; storm-water drains 10%; sewage/sullage treatment and disposal 25%; rainwater harvesting 5%; fire protection and safety 30%; electrical meter room/substation/receiving station 10%; recreational open space 10%. These are filed progress figures, not independent site verification. RERA amenities |
| Completion dates stated in records | The building permit sets a completion deadline of 01 October 2028. The Form B declaration states completion on or before 30.11.2027. The RERA header separately records proposed completion 03/11/2028. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project evidence. The building permit requires an occupancy certificate before occupation. |
2. The project story
SREE SUMERU is registered as a residential apartment project at Uppal Bagayath Village, Uppal mandal, in Medchal-Malkajgiri district. The RERA filing identifies survey numbers 403, 404, 405 and 428 and plots C1 and C2. The GHMC building-permit order describes one residential apartment building, “RESI (APTS),” at Old Uppal, Uppal. RERA record RERA filing
The sanctioned building form is 2 cellar levels, a stilt and 17 upper floors. The RERA unit schedule records 168 apartments: 22 2BHK and 146 3BHK. The portal’s booking snapshot shows 52 booked and 116 available, but no snapshot date is supplied. RERA unit table
RERA-filed progress percentages are available for several site works and services, but they are declarations in the project record, not an independent inspection. The supplied evidence does not establish a completed portion, a tower-wise handover, or an issued occupancy certificate. RERA amenities
3. Master plan, architecture & building design
The GHMC building-permit order records a plot area and net plot area of 5,372.11 sq. m, with residential area 26,728.96, commercial area 806.50, cellar area 8,034.2, and stilt area 1,600.7; units for these extracted component figures are not shown in the supplied data. The RERA filing separately records approved built-up area of 38,814.88 sq. m. These figures are presented as recorded and are not treated as interchangeable area measures. RERA filing
The permit identifies one building, “RESI (APTS),” with 2 Cellar + 1 Stilt + 17 upper floors and building height 50.99 (unit not stated in the extraction). It records setbacks of front 13, rear 13.03 and sides I and II 13; the extracted values have no units. The permit also records road-affected area and nala-affected area as 0.0.
The evidence supplied here does not specify flats per floor, lift or stair counts, building footprint, detailed circulation, or a complete internal layout. The GHMC permit lists a tot-lot of 546.77 and says cellars and stilt approved for parking are to be used exclusively for vehicle parking; the extracted area figures do not include units.
4. Homes, configurations & floor plans
The following unit counts and saleable areas are from the TG-RERA filing. The portal booking counts have no stated as-of date and are indicative. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 22 | 6 | 16 | 65.12 sq. m | Not measured in supplied drawing review | Not supplied |
| 3BHK | 146 | 46 | 100 | 80.22 sq. m | 73.9–75.5 sq. m; median 74.7 sq. m, software-measured from approved floor-plan drawing geometry; not a RERA-filed carpet-area disclosure | Not supplied |
For the measured 3BHK drawing, one representative flat plan labels living/drawing room, three bedrooms, dining/kitchen, two toilets, a balcony and a utility. The software-measured room areas include 14.69 sq. m for the living/drawing room, 10.72 sq. m each for two bedrooms, 12.93 sq. m for the third bedroom, 13.5 sq. m for dining/kitchen, and 3.98 sq. m each for two toilets. A utility is labelled 1.44 × 8.2 m and software-measured at 11.81 sq. m; the balcony is labelled 1.53 m wide. These are drawing-based measurements, not RERA disclosures, and the drawing review notes that measurement needs review. RERA unit details Floor plans
Saleable area and carpet area are different measures: the supplied drawing-review note says saleable area also counts the home’s share of common areas, while the software-measured carpet area is taken from drawing geometry and excludes balcony and utility. No common-area loading figure is supplied. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC building permit states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters, and records total parking area 10,201.45 (unit not provided in the extraction). It does not state a parking-space count, visitor or accessible-space provision, or a unit-by-unit parking allocation.
The RERA filing marks both the 2BHK and 3BHK configurations as mortgaged. The supplied evidence does not establish that any particular parking bay is allocated to, or owned by, an individual allottee. RERA unit table
6. Amenities, recreation & open spaces
The project’s TG-RERA amenity record marks the following facilities “YES” and gives progress percentages. These are filed progress indicators, not independently verified completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | No size or capacity supplied | RERA amenities | 0%; not independently verified |
| Green strip / tot-lot / park | GHMC permit specifies a tot-lot of 546.77 (unit not stated); requires it to be fenced and maintained as greenery before OC | RERA amenities | 0% in RERA amenity record; not independently verified |
| Aggregate recreational open space | Area not supplied | RERA amenities | 10%; not independently verified |
No clubhouse, sports facility or indoor recreation facility is established by the supplied TG-RERA amenity record. The building permit’s listed tot-lot is a sanctioned item; it is not evidence that the facility has been delivered. RERA amenities
7. Utilities, building services & safety
The RERA amenity record reports progress for selected services; it does not provide capacities or establish independent completion. RERA amenities
| Evidence in the project record | Listed in RERA amenity record; source, storage and treatment capacity not supplied |
|---|---|
| Declared progress / status | 35%; not independently verified |
| Evidence in the project record | Sewerage (chamber, lines, septic tank, STP) and treatment/disposal are listed; capacities and reuse details are not supplied |
|---|---|
| Declared progress / status | 40% and 25%, respectively; not independently verified |
| Evidence in the project record | Listed; system details not supplied |
|---|---|
| Declared progress / status | 10%; not independently verified |
| Evidence in the project record | RERA amenity record lists water conservation and rainwater harvesting; GHMC permit specifies 9 rainwater-harvesting pits |
|---|---|
| Declared progress / status | 5% in RERA record; not independently verified |
| Evidence in the project record | Meter room, substation and receiving station listed; GHMC permit says space for a transformer shall be provided on site |
|---|---|
| Declared progress / status | 10% for the RERA-listed electrical item; not independently verified |
| Evidence in the project record | Fire protection and fire-safety requirements listed; permit requires an occupancy Fire NOC from the Director (EV&DM) before OC |
|---|---|
| Declared progress / status | 30% in RERA record; no Fire NOC is supplied |
| Evidence in the project record | Solid-waste management and disposal listed; details not supplied |
|---|---|
| Declared progress / status | 0%; not independently verified |
| Evidence in the project record | Listed; details not supplied |
|---|---|
| Declared progress / status | 0%; not independently verified |
| Evidence in the project record | Capacities or project-specific provision not supplied in the reviewed evidence |
|---|---|
| Declared progress / status | Not established |
8. Location, access & connectivity
The registered location is Uppal Bagayath Village, Uppal mandal, Medchal-Malkajgiri district, PIN 500039. The building-permit order describes the locality as Old Uppal, Uppal. RERA record RERA filing
The RERA filing records boundaries of 80 Feet Road to the east and 60 Feet Road to the west. It also records Plot No 66 and Temple HMDA Land to the north and Plot No C3 to the south. RERA filing
A supplied location record identifies the Financial District (Nanakramguda) at 1.2 km from the cadastral parcel centroid. The supplied evidence does not provide measured public-transport access or travel times. Location record
9. Developer & development status
The registered legal promoter is M/s SUKHII PROJECTS LLP, an LLP. Its supplied GSTIN is 36AEAFS6906HIZY. The project’s Form B declaration identifies Kanday Srinivaulu and Ramesh Kanday as authorised signatories. Corporate record
The RERA registration certificate lists a promoter office as “Village: Mandal: District: Hyderabad, Pin: 500034.” The supplied corporate record separately gives the promoter address as Sagar Society, Road No 2, Uppal Bagayath Layout Phase II, Uppal Bagayath Village, Uppal, Medchal-Malkajgiri, 500039. No official contact details are supplied in the reviewed corporate record. Corporate record
The promoter’s Form B declaration undertakes completion on or before 30.11.2027. The GHMC building-permit order gives a completion deadline of 01 October 2028, while the RERA header records proposed completion 03/11/2028. The RERA registration remains valid to 03/07/2028 unless extended. These are separate recorded dates; the supplied record does not establish completed construction or an issued OC. RERA record
10. Approvals, official records & documents
| Supplied evidence | Form C; registration P02200005226, issued 28/10/2022, valid to 03/07/2028 as recorded in the certificate |
|---|---|
| Scope | SREE SUMERU by Sukhii and Pravara; survey numbers 403, 404, 405 and 428; plots C1 and C2 |
| Supplied evidence | Approval 3475/GHMC/LBN/2022-BP, approved 01 October 2022; file no. 007180/GHMC/3568/LBN1/2022-BP |
|---|---|
| Scope | Residential apartment building at Uppal Bagayath; records 2 Cellar + 1 Stilt + 17 upper floors and permit conditions |
| Supplied evidence | October 2022 declaration by M/s SUKHII PROJECTS LLP, represented by authorised signatories |
|---|---|
| Scope | Promoter declarations on title, encumbrances, completion undertaking, separate account and pending approvals |
| Supplied evidence | Not present in the supplied project evidence |
|---|---|
| Scope | No OC or completion certification established for the building Document index |
| Supplied evidence | The building-permit extraction lists LP. No.14741/PLG/HMDA/2018. The supplied HMDA layout lookup is unavailable through the public portal; no layout plan or separate layout approval document is supplied here. HMDA |
|---|
| Supplied evidence | Contractor’s All Risk Policy No. E0083479 (05 July 2022); registration number 11837/2022 (06 August 2022); TDR DRC No. 01063/TDR/2021 |
|---|---|
| Scope | Identifiers recorded in the building-permit extraction |
The building permit states that permission does not confer ownership rights, requires a commencement notice before construction and a completion notice after construction, and makes an occupancy certificate compulsory before occupation. The detailed conditions are part of the GHMC permit record.
1. Project at a glance
Project identity
Registered project name: SREE SUMERU by Sukhii and Pravara
Project type: Residential apartment project
Phase / registered portion: Not separately identified as a phase in the supplied record; the registration covers the project associated with plots C1 and C2.
TG-RERA registration: P02200005226
Registration validity: 28/10/2022 to 03/07/2028; the certificate states five years and records no extension. This is registration validity, not the building-permit completion deadline or evidence of completion.
RERA status in supplied record: Registered; the filing identifies the project as “New Project.”
Registered promoter: M/s SUKHII PROJECTS LLP
Land and geographic identity
Locality / revenue village: Uppal Bagayath Village; the building permit describes the locality as Old Uppal, Uppal.
Mandal: Uppal
District: Medchal-Malkajgiri
PIN: 500039
Survey numbers: 403, 404, 405 and 428; no subdivision is stated in the project identity or supplied building-permit survey list.
Plots: C1, C2
Registered site extent: 5,371.11 sq. m in the RERA filing; the building permit states 5,372.11 sq. m.
Total / net area: RERA filing: total area 5,371.11 sq. m and net area 5,371.11 sq. m. Building-permit extraction: plot area 5,372.11 sq. m, road-affected area 0.0, nala-affected area 0.0, and net plot area 5,372.11 sq. m.
Boundaries (RERA filing): East: 80 Feet Road; west: 60 Feet Road; north: Plot No 66 and Temple HMDA Land; south: Plot No C3.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: 3475/GHMC/LBN/2022-BP, approved 01 October 2022; building-permit file no. 007180/GHMC/3568/LBN1/2022-BP.
Approved built-up area: 38,814.88 sq. m as recorded in the RERA filing.
Building count: One building / one proposed building unit in the RERA filing; the building permit identifies “RESI (APTS).”
Sanctioned configuration: 2 Cellar + 1 Stilt + 17 upper floors. The permit states building height 50.99; no unit for that height is provided in the extracted record.
Parking levels / approved parking area: Cellars and stilt are approved for parking; total parking area stated as 10,201.45 in the permit, without a unit in the extraction. The permit does not provide a car-space count in the supplied extract.
Approved versus RERA-declared units: The RERA filing records 1 building unit and 168 apartments: 146 3BHK and 22 2BHK. A separate sanctioned apartment-unit count is not supplied in the extracted building-permit information.
Offering and status
RERA-filed configurations and saleable area: 2BHK: 65.12 sq. m; 3BHK: 80.22 sq. m.
Booked / available: 2BHK: 6 booked / 16 available; 3BHK: 46 booked / 100 available; total: 52 booked / 116 available. Counts are from the TG-RERA portal record, which carries no as-of date; treat them as indicative.
Construction stage: RERA-filed progress indicators: internal roads and footpaths 15%; water supply 35%; sewerage 40%; storm-water drains 10%; sewage/sullage treatment and disposal 25%; rainwater harvesting 5%; fire protection and safety 30%; electrical meter room/substation/receiving station 10%; recreational open space 10%. These are filed progress figures, not independent site verification.
Completion dates stated in records: The building permit sets a completion deadline of 01 October 2028. The Form B declaration states completion on or before 30.11.2027. The RERA header separately records proposed completion 03/11/2028.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project evidence. The building permit requires an occupancy certificate before occupation.
2. The project story
SREE SUMERU is registered as a residential apartment project at Uppal Bagayath Village, Uppal mandal, in Medchal-Malkajgiri district. The RERA filing identifies survey numbers 403, 404, 405 and 428 and plots C1 and C2. The GHMC building-permit order describes one residential apartment building, “RESI (APTS),” at Old Uppal, Uppal.
The sanctioned building form is 2 cellar levels, a stilt and 17 upper floors. The RERA unit schedule records 168 apartments: 22 2BHK and 146 3BHK. The portal’s booking snapshot shows 52 booked and 116 available, but no snapshot date is supplied.
RERA-filed progress percentages are available for several site works and services, but they are declarations in the project record, not an independent inspection. The supplied evidence does not establish a completed portion, a tower-wise handover, or an issued occupancy certificate.
3. Master plan, architecture & building design
The GHMC building-permit order records a plot area and net plot area of 5,372.11 sq. m, with residential area 26,728.96, commercial area 806.50, cellar area 8,034.2, and stilt area 1,600.7; units for these extracted component figures are not shown in the supplied data. The RERA filing separately records approved built-up area of 38,814.88 sq. m. These figures are presented as recorded and are not treated as interchangeable area measures.
The permit identifies one building, “RESI (APTS),” with 2 Cellar + 1 Stilt + 17 upper floors and building height 50.99 (unit not stated in the extraction). It records setbacks of front 13, rear 13.03 and sides I and II 13; the extracted values have no units. The permit also records road-affected area and nala-affected area as 0.0.
The evidence supplied here does not specify flats per floor, lift or stair counts, building footprint, detailed circulation, or a complete internal layout. The GHMC permit lists a tot-lot of 546.77 and says cellars and stilt approved for parking are to be used exclusively for vehicle parking; the extracted area figures do not include units.
4. Homes, configurations & floor plans
The following unit counts and saleable areas are from the TG-RERA filing. The portal booking counts have no stated as-of date and are indicative.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 22 | 6 | 16 | 65.12 sq. m | Not measured in supplied drawing review | Not supplied |
| 3BHK | 146 | 46 | 100 | 80.22 sq. m | 73.9–75.5 sq. m; median 74.7 sq. m, software-measured from approved floor-plan drawing geometry; not a RERA-filed carpet-area disclosure | Not supplied |
For the measured 3BHK drawing, one representative flat plan labels living/drawing room, three bedrooms, dining/kitchen, two toilets, a balcony and a utility. The software-measured room areas include 14.69 sq. m for the living/drawing room, 10.72 sq. m each for two bedrooms, 12.93 sq. m for the third bedroom, 13.5 sq. m for dining/kitchen, and 3.98 sq. m each for two toilets. A utility is labelled 1.44 × 8.2 m and software-measured at 11.81 sq. m; the balcony is labelled 1.53 m wide. These are drawing-based measurements, not RERA disclosures, and the drawing review notes that measurement needs review.
Saleable area and carpet area are different measures: the supplied drawing-review note says saleable area also counts the home’s share of common areas, while the software-measured carpet area is taken from drawing geometry and excludes balcony and utility. No common-area loading figure is supplied.
5. Parking & vehicle circulation
The GHMC building permit states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters, and records total parking area 10,201.45 (unit not provided in the extraction). It does not state a parking-space count, visitor or accessible-space provision, or a unit-by-unit parking allocation.
The RERA filing marks both the 2BHK and 3BHK configurations as mortgaged. The supplied evidence does not establish that any particular parking bay is allocated to, or owned by, an individual allottee.
6. Amenities, recreation & open spaces
The project’s TG-RERA amenity record marks the following facilities “YES” and gives progress percentages. These are filed progress indicators, not independently verified completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | No size or capacity supplied | 0%; not independently verified | |
| Green strip / tot-lot / park | GHMC permit specifies a tot-lot of 546.77 (unit not stated); requires it to be fenced and maintained as greenery before OC | 0% in RERA amenity record; not independently verified | |
| Aggregate recreational open space | Area not supplied | 10%; not independently verified |
No clubhouse, sports facility or indoor recreation facility is established by the supplied TG-RERA amenity record. The building permit’s listed tot-lot is a sanctioned item; it is not evidence that the facility has been delivered.
7. Utilities, building services & safety
The RERA amenity record reports progress for selected services; it does not provide capacities or establish independent completion.
| Evidence in the project record | Listed in RERA amenity record; source, storage and treatment capacity not supplied |
|---|---|
| Declared progress / status | 35%; not independently verified |
| Evidence in the project record | Sewerage (chamber, lines, septic tank, STP) and treatment/disposal are listed; capacities and reuse details are not supplied |
|---|---|
| Declared progress / status | 40% and 25%, respectively; not independently verified |
| Evidence in the project record | Listed; system details not supplied |
|---|---|
| Declared progress / status | 10%; not independently verified |
| Evidence in the project record | RERA amenity record lists water conservation and rainwater harvesting; GHMC permit specifies 9 rainwater-harvesting pits |
|---|---|
| Declared progress / status | 5% in RERA record; not independently verified |
| Evidence in the project record | Meter room, substation and receiving station listed; GHMC permit says space for a transformer shall be provided on site |
|---|---|
| Declared progress / status | 10% for the RERA-listed electrical item; not independently verified |
| Evidence in the project record | Fire protection and fire-safety requirements listed; permit requires an occupancy Fire NOC from the Director (EV&DM) before OC |
|---|---|
| Declared progress / status | 30% in RERA record; no Fire NOC is supplied |
| Evidence in the project record | Solid-waste management and disposal listed; details not supplied |
|---|---|
| Declared progress / status | 0%; not independently verified |
| Evidence in the project record | Listed; details not supplied |
|---|---|
| Declared progress / status | 0%; not independently verified |
| Evidence in the project record | Capacities or project-specific provision not supplied in the reviewed evidence |
|---|---|
| Declared progress / status | Not established |
8. Location, access & connectivity
The registered location is Uppal Bagayath Village, Uppal mandal, Medchal-Malkajgiri district, PIN 500039. The building-permit order describes the locality as Old Uppal, Uppal.
The RERA filing records boundaries of 80 Feet Road to the east and 60 Feet Road to the west. It also records Plot No 66 and Temple HMDA Land to the north and Plot No C3 to the south.
A supplied location record identifies the Financial District (Nanakramguda) at 1.2 km from the cadastral parcel centroid. The supplied evidence does not provide measured public-transport access or travel times.
9. Developer & development status
The registered legal promoter is M/s SUKHII PROJECTS LLP, an LLP. Its supplied GSTIN is 36AEAFS6906HIZY. The project’s Form B declaration identifies Kanday Srinivaulu and Ramesh Kanday as authorised signatories.
The RERA registration certificate lists a promoter office as “Village: Mandal: District: Hyderabad, Pin: 500034.” The supplied corporate record separately gives the promoter address as Sagar Society, Road No 2, Uppal Bagayath Layout Phase II, Uppal Bagayath Village, Uppal, Medchal-Malkajgiri, 500039. No official contact details are supplied in the reviewed corporate record.
The promoter’s Form B declaration undertakes completion on or before 30.11.2027. The GHMC building-permit order gives a completion deadline of 01 October 2028, while the RERA header records proposed completion 03/11/2028. The RERA registration remains valid to 03/07/2028 unless extended. These are separate recorded dates; the supplied record does not establish completed construction or an issued OC.
10. Approvals, official records & documents
| Supplied evidence | Form C; registration P02200005226, issued 28/10/2022, valid to 03/07/2028 as recorded in the certificate |
|---|---|
| Scope | SREE SUMERU by Sukhii and Pravara; survey numbers 403, 404, 405 and 428; plots C1 and C2 |
| Supplied evidence | Approval 3475/GHMC/LBN/2022-BP, approved 01 October 2022; file no. 007180/GHMC/3568/LBN1/2022-BP |
|---|---|
| Scope | Residential apartment building at Uppal Bagayath; records 2 Cellar + 1 Stilt + 17 upper floors and permit conditions |
| Supplied evidence | October 2022 declaration by M/s SUKHII PROJECTS LLP, represented by authorised signatories |
|---|---|
| Scope | Promoter declarations on title, encumbrances, completion undertaking, separate account and pending approvals |
| Supplied evidence | Not present in the supplied project evidence |
|---|---|
| Scope | No OC or completion certification established for the building |
| Supplied evidence | The building-permit extraction lists LP. No.14741/PLG/HMDA/2018. The supplied HMDA layout lookup is unavailable through the public portal; no layout plan or separate layout approval document is supplied here. |
|---|
| Supplied evidence | Contractor’s All Risk Policy No. E0083479 (05 July 2022); registration number 11837/2022 (06 August 2022); TDR DRC No. 01063/TDR/2021 |
|---|---|
| Scope | Identifiers recorded in the building-permit extraction |
The building permit states that permission does not confer ownership rights, requires a commencement notice before construction and a completion notice after construction, and makes an occupancy certificate compulsory before occupation. The detailed conditions are part of the GHMC permit record.
Frequently asked questions
Is SREE SUMERU by Sukhii and Pravara registered with Telangana RERA?
Yes. SREE SUMERU by Sukhii and Pravara is registered with the Telangana Real Estate Regulatory Authority as P02200005226; the registration status is New Project.
Who is the developer of SREE SUMERU by Sukhii and Pravara?
The promoter named in the RERA registration is M/s SUKHII PROJECTS LLP.
Where is SREE SUMERU by Sukhii and Pravara located?
SREE SUMERU by Sukhii and Pravara is in Uppal Bagayath Village, Uppal, Medchal-Malkajgiri, Telangana (500039).
When will SREE SUMERU by Sukhii and Pravara be completed?
The promoter's proposed date of completion filed with RERA is 03/11/2028. This is the promoter's declaration, not a guarantee.
More projects in Uppal Bhagayath