Dhanush Gvs Nilayam
DHANUSHRAJA CONSTRUCTIONS LLP · Hyderabad · RERA P02500010007
DHANUSH GVS NILAYAM is a residential apartment project in Padma Colony, Nallakunta, Amberpet, Amberpet mandal, Hyderabad district, developed by the registered promoter DHANUSHRAJA CONSTRUCTIONS LLP. It is on a plot area of 422.69 sq. m and comprises one building, Building A, with 1 stilt + 5 upper floors and 10 three-bedroom apartments. The project is registered under TG-RERA number P02500010007, and the proposed completion date is 17 January 2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | TG-RERA record |
|---|---|
| Registered project name | DHANUSH GVS NILAYAM RERA record |
| Project type | Residential apartment project RERA filing |
| Phase / registered portion | No phase designation disclosed; registration is for this project RERA record |
| TG-RERA registration | P02500010007; valid from 17 January 2025 to 17 January 2028 RERA record |
| Registered promoter | DHANUSHRAJA CONSTRUCTIONS LLP RERA record |
| RERA status | Registered; the certificate records a three-year validity period. Registration validity is separate from the construction completion deadline below. |
Land and geographic identity
| Field | TG-RERA-filed / sanctioned record |
|---|---|
| Locality | Padma Colony, Nallakunta, Amberpet RERA filing |
| Revenue village | The project record identifies NALLAKUNTA; the building-permit extraction separately labels the village as Amberpet. The evidence does not resolve that village-label variation. RERA record RERA filing |
| Mandal / district / PIN | Amberpet / Hyderabad / 500044 RERA record RERA filing |
| Project survey numbers | Sy. Nos. 31/1 & 2 (OLD) and 59/1 & 2 (NEW) |
| Municipal premises / plot | Municipal Nos. 1-8-702/105, 1-8-702/105/A and 1-8-702/105/B; Plot No. 9 |
| Plot and affected area | Plot area 422.69 sq. m; road-affected area 22.92 sq. m; net plot area 399.77 sq. m |
| Boundaries | North: road; South and East: neighbours’ house; West: Plot Nos. 10 and 11 RERA filing |
| Road references in filed plan | 9.00 m existing road, 12.00 m proposed road, and an 18 m road reference |
Development identity
| Field | Sanctioned / filed record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building-permit number / date | 4363/GHMC/SEC/2025-BP; 17 January 2025 Approvals record |
| Related file number | 010470/GHMC/4824/SEC2/2024-BP |
| Approved building | Building A; residential; 1 stilt + 5 upper floors |
| Height | Building height 14.95 m; the permit also records “Total Height: 19.95mt.” |
| Approved area figures | Residential upper floors: 1,189.50 sq. m; stilt parking area: 225.15 sq. m; total parking area: 238.7 sq. m. The filed plan also lists total proposed built-up area excluding parking as 1,189.50 sq. m, including parking as 1,428.15 sq. m, and total BUA as 1,443.87. These are reported as separately labelled in the source, not reconciled here. |
| Building / unit counts | One building; 10 units stated in the sanctioned-plan extraction. The project record also reports 10 units. RERA unit table |
| Parking provision | Stilt parking is shown; the permit lists one stilt parking level. A separate “cellar” parking description appears in the longer plan conditions, but the supplied permit summary does not establish a cellar level in the sanctioned floor configuration. |
Offering and status
| Field | TG-RERA record |
|---|---|
| Configuration | Three-bedroom apartments; 10 units, recorded as 0 booked and 10 available at the last portal read. The portal counts have no stated as-of date and are indicative. RERA unit table RERA unit details |
| RERA saleable area | 139.44 sq. m per unit RERA unit table RERA unit details |
| Construction stage | No construction-progress percentage or independently verified site-status evidence is supplied. RERA amenities |
| Completion deadline | The Form B declaration undertakes completion by 17 January 2028; the GHMC permit states construction is to be completed before 17 January 2028. |
| Occupancy certificate | No OC or completion certificate is supplied; the permit states an OC is compulsory before occupation. The available evidence does not establish an OC for any building or phase. |
2. The project story
- DHANUSH GVS NILAYAM is a single-building residential apartment project recorded in Nallakunta, in the Padma Colony locality of Amberpet, Hyderabad. The sanctioned building is identified as Building A, with one stilt level and five upper floors, and a total of 10 residential units. The project record identifies all 10 as three-bedroom apartments. RERA record RERA filing RERA unit table
- The GHMC permit is dated 17 January 2025. The promoter’s Form B declaration gives a completion undertaking of 17 January 2028, while the TG-RERA certificate is valid through that date. These are different milestones: the certificate establishes registration validity, and the declaration and permit state the project completion deadline. No construction-progress figure, site inspection, completion certificate or occupancy certificate is included in the supplied evidence, so the stage of physical construction and any completed or occupied portion cannot be confirmed from this record.
3. Master plan, architecture & building design
- The filed and GHMC-supplied plan information describes a residential Building A with 1 stilt + 5 upper floors on a plot recorded as 422.69 sq. m, including 22.92 sq. m affected by road widening, and a net plot area of 399.77 sq. m. The permit lists residential upper-floor area of 1,189.50 sq. m and stilt parking area of 225.15 sq. m. It also records other area labels—total proposed built-up area excluding parking of 1,189.50 sq. m, including parking of 1,428.15 sq. m, and total BUA of 1,443.87. The source does not define or reconcile those latter labels, so they should not be treated as interchangeable.
- The plan records one building, 10 units, one entry and one exit, each with minimum width of 4.5 m and height clearance of 5 m, and a 2.50 m-wide passage in the filed plan. The supplied material does not establish the number of apartments per floor, lifts, staircases beyond the listed staircase provision, apartment entry arrangements, or detailed internal circulation.
- The plan conditions call for periphery greenery and tree planting, a fenced tot-lot maintained as greenery, rainwater harvesting, transformer space and a garbage house. These are plan conditions or listed provisions, not evidence that the features are completed.
4. Homes, configurations & floor plans
The TG-RERA filing records 10 three-bedroom apartments, with 0 booked and 10 available at the last portal read. The booking record has no as-of date, so the counts are indicative. The filed saleable area is 139.44 sq. m per unit. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 139.44 sq. m | 82.2–95.2 sq. m; median 88.6 sq. m | 36% |
- The carpet-area range and median are software-measured from the approved floor-plan drawing geometry for eight flat designs; they are not TG-RERA-filed measurements and the supplied record says the drawing measurements need review. RERA saleable area is a distinct filed figure and must not be substituted for carpet area. The measurement record notes that saleable area also accounts for the home’s share of common areas; it does not separately quantify balcony, utility or common-area components for each unit. Floor plans RERA unit details
- The measured example drawing includes a kitchen, three bedrooms, living and drawing rooms, toilets, a balcony and a utility area. The example labels the balcony and utility as excluded from the software-measured carpet area. No unit-by-unit room schedule or verified room dimensions are established beyond that drawing example. RERA unit details
5. Parking & vehicle circulation
- The GHMC permit records a stilt parking level, with a stilt parking area of 225.15 sq. m and total parking area of 238.7 sq. m. The filed plan separately lists parking area as 238.65 sq. m. Parking is subject to the permit condition that the approved stilt parking area be used exclusively for vehicle parking and not partitioned or otherwise misused. The supplied evidence does not give a sanctioned count of car or two-wheeler spaces, visitor or accessible bays, EV charger count, or a unit-wise parking allocation.
- The permit requires parking places to have electric-vehicle charging infrastructure, but the record does not establish installation or operational status. The plan records one entry and one exit, each with a minimum width of 4.5 m and a 5 m height clearance; no ramp details or pedestrian-vehicle separation information are supplied.
6. Amenities, recreation & open spaces
The following facilities appear in the TG-RERA amenity record or the GHMC plan/permit. The recorded progress fields are 0 where supplied; these are not independent completion checks. RERA amenities
| Facility | Tot-lot / green strip |
|---|---|
| Description / size | Tot-lot identified in the plan conditions; no size supplied |
| Declared progress / verified status | Plan condition; progress recorded as 0 in amenity record. Completion not verified. RERA amenities |
| Facility | Periphery greenery and tree planting |
|---|---|
| Description / size | Periphery strip and tree planting required by plan conditions; no area supplied |
| Declared progress / verified status | Required by plan conditions; completion not verified. |
| Facility | Rainwater harvesting |
|---|---|
| Description / size | One rainwater-harvesting pit recorded in the permit; percolation pit described in plan conditions |
| Declared progress / verified status | Permit/plan provision; completion not verified. |
| Facility | Water supply |
|---|---|
| Description / size | Listed as available “YES” in the amenity record; no source or capacity supplied |
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress recorded as 0; operating status not independently verified. |
| Facility | Sewerage / STP |
|---|---|
| Description / size | Sewerage (chambers, lines, septic tank, STP) listed as available “YES”; plan also lists STP |
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress recorded as 0; installation and operation not verified. |
| Facility | Garbage house / waste management |
|---|---|
| Description / size | Garbage house required within the premises; waste-management/disposal item appears in the amenity record |
| Evidence source | RERA amenities |
| Declared progress / verified status | Plan condition / recorded amenity; completion not verified. |
| Facility | Transformer space |
|---|---|
| Description / size | Required in the site under the permit and plan conditions |
| Declared progress / verified status | Plan/permit requirement; completion not verified. |
| Facility | Street lighting, storm-water drains, community buildings, energy management, fire protection, electrical room/sub-station, recreational open space |
|---|---|
| Description / size | Listed in the RERA amenity schedule; no sizes or further specifications supplied |
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress recorded as 0; completion not verified. |
7. Utilities, building services & safety
Water and drainage: Water supply is marked “YES” in the RERA amenity record, without a stated source or supply capacity. The GHMC plan records separate underground static water storage and terrace tanks, each with a capacity of 25,000 litres. Rainwater harvesting is required, and one pit is recorded in the permit. STP and WTP are listed in the plan’s amenities/utilities, while sewerage and treatment of sewage appear in the amenity schedule; no treatment capacity, reuse specification or completed status is supplied. RERA amenities
Electrical and vertical services: The plan lists a lift, lift machine room, electrical transformer and overhead water tank. Transformer space is required by the permit. No lift count, capacity, backup-power provision or electrical supply capacity is established in the project approval evidence.
Fire, life safety and access: The permit requires a fire extinguisher on each floor and an occupancy fire NOC from the Director (EV&DM) before an OC is issued. It also states that structural and fire-safety requirements are the responsibility of the owner, builder/developer, architect and site engineer. These are permit conditions; the supplied evidence does not establish installation, clearance or OC issuance. The permit records one entry and one exit, with minimum width of 4.5 m and height clearance of 5 m.
Waste, security and other conditions: The permit requires CCTV installation, twin bins for each tenement, and transfer of construction-and-demolition waste to a designated collection point. It also requires construction-worker safety measures. These are recorded requirements, not verified completed services. No accessibility design details or capacities are supplied.
8. Location, access & connectivity
- The registered location is Padma Colony, Nallakunta, Amberpet mandal, Hyderabad district, PIN 500044. The supplied location record places the project at approximately 17.4016628, 78.5063421 and identifies Padma Colony, Vidyanagar, Ward 85 Adikmet, Greater Hyderabad Municipal Corporation Central Zone. RERA record RERA filing Location record
- The project’s filed building plan identifies a 9.00 m existing road, a 12.00 m proposed road and an 18 m road reference; the building-permit extraction also records an 18 m road. The plan and permit require surrender of the 22.92 sq. m road-affected portion to GHMC without compensation.
- The supplied location data lists HITEC City at 14.5 km. No public-transport details or additional independently verified connectivity measurements are provided. Location record
9. Developer & development status
- The registered legal promoter is DHANUSHRAJA CONSTRUCTIONS LLP, an LLP, with GSTIN 36AATFD1600Q1Z2. The project record names RAGHAVENDRA PAGADALA as authorized signatory and as the promoter’s representative on the TG-RERA certificate. The supplied promoter address is DHANUSH CONSTRUCTION, Road No. 12, Padma Colony, Amberpet, Hyderabad, 500044. No official website or project-specific contact details are supplied. Corporate record Parties record RERA filing
- The project record identifies one landowner, VARANASI SESHENDRA LAKSHMI, and an AreaShare agreement type. The supplied material does not establish construction progress or completion of any building portion. The promoter’s Form B declaration undertakes completion by 17 January 2028; the GHMC permit also states that construction is to be completed before that date. No OC or completion certificate is supplied. Parties record
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration certificate, P02500010007 | Registration of DHANUSH GVS NILAYAM, valid from 17 January 2025 to 17 January 2028. |
| GHMC building permit, 4363/GHMC/SEC/2025-BP | Permit dated 17 January 2025 for Building A, residential, 1 stilt + 5 upper floors. Related file: 010470/GHMC/4824/SEC2/2024-BP. |
| Filed plan document | Plan for residential construction at municipal premises 1-8-702/105, 1-8-702/105/A and 1-8-702/105/B, Plot No. 9, in Sy. Nos. 31/1 & 2 (OLD) and 59/1 & 2 (NEW). The extracted approval number in this document is shown as “PERMIT_NUMBER”; the principal permit number is available in the building-permit order. |
| Form B promoter declaration | Promoter-declared completion undertaking of 17 January 2028 and declarations concerning project funds, approvals and encumbrances. |
| Layout approval record | The supplied file is a RERA-uploaded layout-plan document containing the project plan and conditions; a separate approved-layout number is recorded as “PERMIT No. 42/41.” |
| Occupancy/completion record | No occupancy certificate or completion certificate supplied. The GHMC permit states that an OC is compulsory before occupation and specifies an occupancy fire NOC as a precondition to OC. |
The permit lists requirements including rainwater harvesting, transformer space, parking use, C&D waste handling, CCTV and fire-safety provisions. These are approval conditions; their implementation and any later amendments or clearances are not established by the documents supplied here.
1. Project at a glance
Project identity
Registered project name: DHANUSH GVS NILAYAM
Project type: Residential apartment project
Phase / registered portion: No phase designation disclosed; registration is for this project
TG-RERA registration: P02500010007; valid from 17 January 2025 to 17 January 2028
Registered promoter: DHANUSHRAJA CONSTRUCTIONS LLP
RERA status: Registered; the certificate records a three-year validity period. Registration validity is separate from the construction completion deadline below.
Land and geographic identity
Locality: Padma Colony, Nallakunta, Amberpet
Revenue village: The project record identifies NALLAKUNTA; the building-permit extraction separately labels the village as Amberpet. The evidence does not resolve that village-label variation.
Mandal / district / PIN: Amberpet / Hyderabad / 500044
Project survey numbers: Sy. Nos. 31/1 & 2 (OLD) and 59/1 & 2 (NEW)
Municipal premises / plot: Municipal Nos. 1-8-702/105, 1-8-702/105/A and 1-8-702/105/B; Plot No. 9
Plot and affected area: Plot area 422.69 sq. m; road-affected area 22.92 sq. m; net plot area 399.77 sq. m
Boundaries: North: road; South and East: neighbours’ house; West: Plot Nos. 10 and 11
Road references in filed plan: 9.00 m existing road, 12.00 m proposed road, and an 18 m road reference
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit number / date: 4363/GHMC/SEC/2025-BP; 17 January 2025
Related file number: 010470/GHMC/4824/SEC2/2024-BP
Approved building: Building A; residential; 1 stilt + 5 upper floors
Height: Building height 14.95 m; the permit also records “Total Height: 19.95mt.”
Approved area figures: Residential upper floors: 1,189.50 sq. m; stilt parking area: 225.15 sq. m; total parking area: 238.7 sq. m. The filed plan also lists total proposed built-up area excluding parking as 1,189.50 sq. m, including parking as 1,428.15 sq. m, and total BUA as 1,443.87. These are reported as separately labelled in the source, not reconciled here.
Building / unit counts: One building; 10 units stated in the sanctioned-plan extraction. The project record also reports 10 units.
Parking provision: Stilt parking is shown; the permit lists one stilt parking level. A separate “cellar” parking description appears in the longer plan conditions, but the supplied permit summary does not establish a cellar level in the sanctioned floor configuration.
Offering and status
Configuration: Three-bedroom apartments; 10 units, recorded as 0 booked and 10 available at the last portal read. The portal counts have no stated as-of date and are indicative.
RERA saleable area: 139.44 sq. m per unit
Construction stage: No construction-progress percentage or independently verified site-status evidence is supplied.
Completion deadline: The Form B declaration undertakes completion by 17 January 2028; the GHMC permit states construction is to be completed before 17 January 2028.
Occupancy certificate: No OC or completion certificate is supplied; the permit states an OC is compulsory before occupation. The available evidence does not establish an OC for any building or phase.
2. The project story
- DHANUSH GVS NILAYAM is a single-building residential apartment project recorded in Nallakunta, in the Padma Colony locality of Amberpet, Hyderabad. The sanctioned building is identified as Building A, with one stilt level and five upper floors, and a total of 10 residential units. The project record identifies all 10 as three-bedroom apartments.
- The GHMC permit is dated 17 January 2025. The promoter’s Form B declaration gives a completion undertaking of 17 January 2028, while the TG-RERA certificate is valid through that date. These are different milestones: the certificate establishes registration validity, and the declaration and permit state the project completion deadline. No construction-progress figure, site inspection, completion certificate or occupancy certificate is included in the supplied evidence, so the stage of physical construction and any completed or occupied portion cannot be confirmed from this record.
3. Master plan, architecture & building design
- The filed and GHMC-supplied plan information describes a residential Building A with 1 stilt + 5 upper floors on a plot recorded as 422.69 sq. m, including 22.92 sq. m affected by road widening, and a net plot area of 399.77 sq. m. The permit lists residential upper-floor area of 1,189.50 sq. m and stilt parking area of 225.15 sq. m. It also records other area labels—total proposed built-up area excluding parking of 1,189.50 sq. m, including parking of 1,428.15 sq. m, and total BUA of 1,443.87. The source does not define or reconcile those latter labels, so they should not be treated as interchangeable.
- The plan records one building, 10 units, one entry and one exit, each with minimum width of 4.5 m and height clearance of 5 m, and a 2.50 m-wide passage in the filed plan. The supplied material does not establish the number of apartments per floor, lifts, staircases beyond the listed staircase provision, apartment entry arrangements, or detailed internal circulation.
- The plan conditions call for periphery greenery and tree planting, a fenced tot-lot maintained as greenery, rainwater harvesting, transformer space and a garbage house. These are plan conditions or listed provisions, not evidence that the features are completed.
4. Homes, configurations & floor plans
The TG-RERA filing records 10 three-bedroom apartments, with 0 booked and 10 available at the last portal read. The booking record has no as-of date, so the counts are indicative. The filed saleable area is 139.44 sq. m per unit.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 139.44 sq. m | 82.2–95.2 sq. m; median 88.6 sq. m | 36% |
- The carpet-area range and median are software-measured from the approved floor-plan drawing geometry for eight flat designs; they are not TG-RERA-filed measurements and the supplied record says the drawing measurements need review. RERA saleable area is a distinct filed figure and must not be substituted for carpet area. The measurement record notes that saleable area also accounts for the home’s share of common areas; it does not separately quantify balcony, utility or common-area components for each unit.
- The measured example drawing includes a kitchen, three bedrooms, living and drawing rooms, toilets, a balcony and a utility area. The example labels the balcony and utility as excluded from the software-measured carpet area. No unit-by-unit room schedule or verified room dimensions are established beyond that drawing example.
5. Parking & vehicle circulation
- The GHMC permit records a stilt parking level, with a stilt parking area of 225.15 sq. m and total parking area of 238.7 sq. m. The filed plan separately lists parking area as 238.65 sq. m. Parking is subject to the permit condition that the approved stilt parking area be used exclusively for vehicle parking and not partitioned or otherwise misused. The supplied evidence does not give a sanctioned count of car or two-wheeler spaces, visitor or accessible bays, EV charger count, or a unit-wise parking allocation.
- The permit requires parking places to have electric-vehicle charging infrastructure, but the record does not establish installation or operational status. The plan records one entry and one exit, each with a minimum width of 4.5 m and a 5 m height clearance; no ramp details or pedestrian-vehicle separation information are supplied.
6. Amenities, recreation & open spaces
The following facilities appear in the TG-RERA amenity record or the GHMC plan/permit. The recorded progress fields are 0 where supplied; these are not independent completion checks.
| Facility | Tot-lot / green strip |
|---|---|
| Description / size | Tot-lot identified in the plan conditions; no size supplied |
| Declared progress / verified status | Plan condition; progress recorded as 0 in amenity record. Completion not verified. |
| Facility | Periphery greenery and tree planting |
|---|---|
| Description / size | Periphery strip and tree planting required by plan conditions; no area supplied |
| Declared progress / verified status | Required by plan conditions; completion not verified. |
| Facility | Rainwater harvesting |
|---|---|
| Description / size | One rainwater-harvesting pit recorded in the permit; percolation pit described in plan conditions |
| Declared progress / verified status | Permit/plan provision; completion not verified. |
| Facility | Water supply |
|---|---|
| Description / size | Listed as available “YES” in the amenity record; no source or capacity supplied |
| Declared progress / verified status | Progress recorded as 0; operating status not independently verified. |
| Facility | Sewerage / STP |
|---|---|
| Description / size | Sewerage (chambers, lines, septic tank, STP) listed as available “YES”; plan also lists STP |
| Declared progress / verified status | Progress recorded as 0; installation and operation not verified. |
| Facility | Garbage house / waste management |
|---|---|
| Description / size | Garbage house required within the premises; waste-management/disposal item appears in the amenity record |
| Declared progress / verified status | Plan condition / recorded amenity; completion not verified. |
| Facility | Transformer space |
|---|---|
| Description / size | Required in the site under the permit and plan conditions |
| Declared progress / verified status | Plan/permit requirement; completion not verified. |
| Facility | Street lighting, storm-water drains, community buildings, energy management, fire protection, electrical room/sub-station, recreational open space |
|---|---|
| Description / size | Listed in the RERA amenity schedule; no sizes or further specifications supplied |
| Declared progress / verified status | Progress recorded as 0; completion not verified. |
7. Utilities, building services & safety
Water and drainage: Water supply is marked “YES” in the RERA amenity record, without a stated source or supply capacity. The GHMC plan records separate underground static water storage and terrace tanks, each with a capacity of 25,000 litres. Rainwater harvesting is required, and one pit is recorded in the permit. STP and WTP are listed in the plan’s amenities/utilities, while sewerage and treatment of sewage appear in the amenity schedule; no treatment capacity, reuse specification or completed status is supplied.
Electrical and vertical services: The plan lists a lift, lift machine room, electrical transformer and overhead water tank. Transformer space is required by the permit. No lift count, capacity, backup-power provision or electrical supply capacity is established in the project approval evidence.
Fire, life safety and access: The permit requires a fire extinguisher on each floor and an occupancy fire NOC from the Director (EV&DM) before an OC is issued. It also states that structural and fire-safety requirements are the responsibility of the owner, builder/developer, architect and site engineer. These are permit conditions; the supplied evidence does not establish installation, clearance or OC issuance. The permit records one entry and one exit, with minimum width of 4.5 m and height clearance of 5 m.
Waste, security and other conditions: The permit requires CCTV installation, twin bins for each tenement, and transfer of construction-and-demolition waste to a designated collection point. It also requires construction-worker safety measures. These are recorded requirements, not verified completed services. No accessibility design details or capacities are supplied.
8. Location, access & connectivity
- The registered location is Padma Colony, Nallakunta, Amberpet mandal, Hyderabad district, PIN 500044. The supplied location record places the project at approximately 17.4016628, 78.5063421 and identifies Padma Colony, Vidyanagar, Ward 85 Adikmet, Greater Hyderabad Municipal Corporation Central Zone.
- The project’s filed building plan identifies a 9.00 m existing road, a 12.00 m proposed road and an 18 m road reference; the building-permit extraction also records an 18 m road. The plan and permit require surrender of the 22.92 sq. m road-affected portion to GHMC without compensation.
- The supplied location data lists HITEC City at 14.5 km. No public-transport details or additional independently verified connectivity measurements are provided.
9. Developer & development status
- The registered legal promoter is DHANUSHRAJA CONSTRUCTIONS LLP, an LLP, with GSTIN 36AATFD1600Q1Z2. The project record names RAGHAVENDRA PAGADALA as authorized signatory and as the promoter’s representative on the TG-RERA certificate. The supplied promoter address is DHANUSH CONSTRUCTION, Road No. 12, Padma Colony, Amberpet, Hyderabad, 500044. No official website or project-specific contact details are supplied.
- The project record identifies one landowner, VARANASI SESHENDRA LAKSHMI, and an AreaShare agreement type. The supplied material does not establish construction progress or completion of any building portion. The promoter’s Form B declaration undertakes completion by 17 January 2028; the GHMC permit also states that construction is to be completed before that date. No OC or completion certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration certificate, P02500010007: Registration of DHANUSH GVS NILAYAM, valid from 17 January 2025 to 17 January 2028.
GHMC building permit, 4363/GHMC/SEC/2025-BP: Permit dated 17 January 2025 for Building A, residential, 1 stilt + 5 upper floors. Related file: 010470/GHMC/4824/SEC2/2024-BP.
Filed plan document: Plan for residential construction at municipal premises 1-8-702/105, 1-8-702/105/A and 1-8-702/105/B, Plot No. 9, in Sy. Nos. 31/1 & 2 (OLD) and 59/1 & 2 (NEW). The extracted approval number in this document is shown as “PERMIT_NUMBER”; the principal permit number is available in the building-permit order.
Form B promoter declaration: Promoter-declared completion undertaking of 17 January 2028 and declarations concerning project funds, approvals and encumbrances.
Layout approval record: The supplied file is a RERA-uploaded layout-plan document containing the project plan and conditions; a separate approved-layout number is recorded as “PERMIT No. 42/41.”
Occupancy/completion record: No occupancy certificate or completion certificate supplied. The GHMC permit states that an OC is compulsory before occupation and specifies an occupancy fire NOC as a precondition to OC.
The permit lists requirements including rainwater harvesting, transformer space, parking use, C&D waste handling, CCTV and fire-safety provisions. These are approval conditions; their implementation and any later amendments or clearances are not established by the documents supplied here.
Frequently asked questions
Is DHANUSH GVS NILAYAM registered with Telangana RERA?
Yes. DHANUSH GVS NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02500010007; the registration status is New Project.
Who is the developer of DHANUSH GVS NILAYAM?
The promoter named in the RERA registration is DHANUSHRAJA CONSTRUCTIONS LLP.
Where is DHANUSH GVS NILAYAM located?
DHANUSH GVS NILAYAM is in PADMA COLONY, NALLAKUNTA, Amberpet, Hyderabad, Telangana (500044).
When will DHANUSH GVS NILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 17/05/2028. This is the promoter's declaration, not a guarantee.
More projects in Nallakunta