Bs Residency

BALAJI SAI CONSTRUCTIONS · Jagtial · RERA P02800001940

BS RESIDENCY is a residential apartment project in SIVAR DHAROOR, Jagithyal district; the mandal is not disclosed in the canonical project identity. It is being developed by registered promoter BALAJI SAI CONSTRUCTIONS. The project occupies 527.89 sq.m and comprises 1 building with stilt, ground and four floors, and 1 RERA-filed 2BHK home. Its TG-RERA registration is P02800001940, issued 06/07/2020, and its proposed completion date is 19/07/2025.

01What we found

Period endedTG-RERA registration ran to 19 Jul 2025 - check its extension on TG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemTG-RERA record
Registered project nameBS RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified; registered as the project under P02800001940 RERA record
TG-RERA registrationP02800001940, issued 06/07/2020; certificate states validity from 06/07/2020 to 19/07/2025, unless extended by the Authority. No extension is recorded on the supplied certificate. RERA record
Registered promoterBALAJI SAI CONSTRUCTIONS, identified in the filing as a partnership Parties record RERA filing
RERA status in supplied recordCertificate records registration under section 5. Its stated validity ended 19/07/2025; current registration status is not established by the supplied certificate.

Land and geographic identity

ItemTG-RERA record
LocalitySIVAR DHAROOR RERA record RERA filing
Revenue village(s)Sivar Dharoor; the supplied project record identifies this village. RERA record Land records
MandalNot disclosed in the canonical project identity. Land records
DistrictJagithyal in the project header and fields; the supplied building-plan records label the district Jagtial/JAGTIAL. RERA record RERA filing
PIN505327 RERA record RERA filing
Project survey number88/C RERA record Land records
Registered site extent527.89 sq.m appears as the project’s total and net area in the RERA land fields. RERA filing Land records
Boundaries filedNorth: 9M WIDE EXISTING ROAD; South: OPEN LAND OF B SANDEEP RAO; East: OPEN LAND OF KARIPE LINGAM; West: OPEN LAND OF RAVINDER. RERA filing
Survey references in other filed plan recordsSy. No. 88/2 appears in the filed plan and title-document descriptions; Sy.No.88/E appears in the technical-clearance extraction. These are retained as document references and are not treated here as additional confirmed project survey subdivisions.

Development identity

ItemTG-RERA record
Sanctioning authority / principal approvalDirector of Town and Country Planning; B.P.No.48/2019/W, approved date recorded as 8-07-2019 in the technical-clearance extraction. The filed building-plan extraction also records 48 / 2019/W and date 20/07/19. Approvals record
Approved built-up area1091.50 sqm in the filed plan extraction. RERA filing
Buildings / towers1 building/unit in the project fields. RERA filing RERA unit table
Sanctioned floor configurationThe filed plan extraction describes a residential apartment S+G+4: stilt parking, ground floor and first through fourth floors.
Parking levelStilt floor area shown for parking: 238.32 sq.m (21.83%) in the filed plan extraction. No parking-space count is supplied.
Approved versus RERA-declared unitsApproved-plan fields report 1 total building unit and 1 proposed building unit as per agreement; the RERA unit record lists 1 home. RERA filing RERA unit table

Offering and status

ItemTG-RERA record
RERA-filed configuration2BHK, 1 unit RERA unit table RERA unit details
RERA-filed saleable area1490.6 sq.m RERA unit table RERA unit details
Booked / available0 booked / 1 available, as last read from the TG-RERA portal; no as-of date is provided, so these counts are indicative. RERA unit table
Construction stageProject header records 80% completeness; the basis and measurement date are not supplied. This is a recorded progress figure, not an independent site verification. RERA record
Completion datesThe project fields give proposed completion 19/07/2025. Form B separately declares completion within 30 MONTHS. No revised completion date is supplied. RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied records; certificate status is not established. Document index

2. The project story

BS RESIDENCY is registered with TG-RERA as a residential apartment project in SIVAR DHAROOR, PIN 505327. The project record identifies survey 88/C, a single building and one proposed home. The RERA filing lists that home as a 2BHK. The sanctioned-plan extraction describes a stilt-plus-ground-plus-four-upper-floor apartment building, with parking at stilt level. RERA record Land records RERA unit table RERA unit details

The project record reports 80% completeness, but supplies no dated progress certificate or independent site inspection establishing the current physical stage. The completion date shown in the project fields is 19/07/2025; the RERA certificate’s stated registration validity is a separate date and does not itself establish completion. No occupancy or completion certificate is present in the supplied documents, so the project’s OC status cannot be confirmed from this evidence. RERA record RERA filing Document index

3. Master plan, architecture & building design

The filed building-plan extraction describes a residential apartment building with stilt + ground + four floors. It records 218.30 sq.m for each of the ground, first, second, third and fourth floors, and a stilt parking area of 238.32 sq.m (21.83%). The filed plan extraction gives total built-up area as 1091.50 sqm. These are plan-record figures; the evidence does not provide a separately identified FSI-counted area, gross built-up area, or carpet-area total.

The project fields record 527.89 sq.m total and net site area. The filed plan extraction also notes 1.00 M WIDE GREENERY. No verified drawing-based information is supplied on flats per floor, internal circulation, lifts/stairs beyond the plan’s lift notation, or landscaping and open-space delivery. RERA filing

A separate technical-clearance extraction describes Stilt+G+4 Upper Floors and a 19.1.0. m wide continuous green plantation strip in periphery on all sides as a sanctioned parameter. The project’s plan records include these building-design details, but the supplied material does not establish construction completion or implementation of those features.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1011490.6 sq.mNot measuredNot supplied

The 1490.6 sq.m figure is the saleable area recorded in the TG-RERA unit record. No measured carpet area or room dimensions are available: the two supplied drawing records are scans pending measurement. Carpet area, where measured, would be a drawing-based software measurement rather than a RERA disclosure; saleable area is a separate filed figure that can include a share of common areas. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

The filed plan identifies a stilt floor area of 238.32 sq.m (21.83%) for parking. The technical-clearance extraction states that the open parking area shown in the plan must not be used for another purpose. No number of car or two-wheeler spaces, visitor or accessible-space provision, parking allocation to the unit, or EV-charging provision is supplied. A parking area on a drawing does not, by itself, establish an exclusive parking right for a buyer.

6. Amenities, recreation & open spaces

The following items appear in project-filed amenity or plan records. The records do not establish that they are complete or independently verified.

Water supply
Description / sizeListed as available: YES; no source, storage capacity or completion detail supplied
Evidence sourceRERA amenities
Declared progress / verified statusPercentage recorded as 0; not independently verified
Sewerage
Description / size“Sewerage (Chamber, Lines, Septic Tank, STP)” listed as available: YES; plan extraction also notes a septic tank
Evidence sourceRERA amenities
Declared progress / verified statusPercentage recorded as 0; not independently verified
Storm-water drainage
Description / sizeListed as available: YES
Evidence sourceRERA amenities
Declared progress / verified statusPercentage recorded as 0; not independently verified
Water conservation / rainwater harvesting
Description / sizeListed as available: YES; technical-clearance conditions also refer to rainwater-harvesting structures
Evidence sourceRERA amenities
Declared progress / verified statusPercentage recorded as 0; not independently verified
Electrical meter room / sub-station / receiving station
Description / sizeListed as available: YES
Evidence sourceRERA amenities
Declared progress / verified statusPercentage recorded as 0; not independently verified
Green strip / tot lot / park
Description / sizeListed in the project amenity record; filed plan extraction notes a 1.00 M WIDE GREENERY strip
Evidence sourceRERA amenities
Declared progress / verified statusPercentage recorded as 0; not independently verified
Community buildings
Description / sizeListed in the project amenity record; no size or facility description supplied
Evidence sourceRERA amenities
Declared progress / verified statusPercentage recorded as 0; not independently verified
Internal roads and footpaths
Description / sizeListed in the project amenity record; no dimensions supplied
Evidence sourceRERA amenities
Declared progress / verified statusPercentage recorded as 0; not independently verified
Street lighting
Description / sizeListed in the project amenity record; no specifications supplied
Evidence sourceRERA amenities
Declared progress / verified statusPercentage recorded as 0; not independently verified
Solid-waste management and disposal
Description / sizeListed in the project amenity record; no system or capacity details supplied
Evidence sourceRERA amenities
Declared progress / verified statusPercentage recorded as 0; not independently verified
Energy management
Description / sizeListed in the project amenity record; no system details supplied
Evidence sourceRERA amenities
Declared progress / verified statusPercentage recorded as 0; not independently verified
Fire protection and fire safety
Description / sizeListed in the project amenity record; no equipment or clearance details supplied
Evidence sourceRERA amenities
Declared progress / verified statusPercentage recorded as 0; not independently verified
Recreational open space
Description / sizeAggregate area listed, but no area or percentage supplied in the amenity record; technical-clearance conditions refer to 14% open-space charges
Evidence sourceRERA amenities
Declared progress / verified statusPercentage recorded as 0; delivered open space not independently verified

7. Utilities, building services & safety

The technical-clearance conditions say the applicant shall provide water supply, storm-water drain, drainage, sewerage, transformer and garbage chute at the applicant’s cost. They also refer to rainwater-harvesting structures and greenery where applicable. These are approval-condition statements; they do not establish installation, capacity or operational status.

The filed plan extraction identifies a SEPTIC TANK, WATER TANK and LIFT 1.50X2.00; a second filed plan extraction also mentions a PERCOLATION PIT and LIFT MACHINE ROOM. No lift capacity, fire-system specification, emergency-access information, backup-power capacity, water-storage capacity, sewage-treatment capacity, accessibility details or verified service-completion evidence is supplied.

8. Location, access & connectivity

The registered project location is SIVAR DHAROOR, PIN 505327, in the project record’s district field Jagithyal. The filed building-plan extraction identifies SIVER DHAROOR and a Jagtial/JAGTIAL district and mandal reference. The project record does not disclose the mandal in its canonical land identity. The filed project boundaries identify a 9M WIDE EXISTING ROAD to the north. RERA record RERA filing Land records

No project-specific public-transport or landmark distance is supplied in the registered-location evidence. A location connectivity record lists Financial District (Nanakramguda) — 1.2 km, but does not establish the route or travel time. Location record

9. Developer & development status

The registered promoter is BALAJI SAI CONSTRUCTIONS, recorded as a Partnership. The project record names BALMURI SANDEEP RAO as authorized signatory and BALMURI DILIP KUMAR as partner. The promoter’s entity identifier is partially masked as xxxxxx076D in the project fields. The record does not provide a verified registered office address or official contact details. Parties record RERA filing

Form B is a promoter declaration signed by B. Sandeep Rao as managing partner. It declares a legal-title basis involving ANUMALLA RAJENDHAR & 5 OTHERS, states that the land is free from encumbrances, and undertakes completion within 30 MONTHS. These are promoter declarations in the filed affidavit, not independent findings.

See the project progress and completion information in Offering and status above. RERA record RERA filing

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for BS RESIDENCY, registration P02800001940, issued 06/07/2020; states validity through 19/07/2025 unless extended. No extension is recorded on the supplied certificate.
Principal building approval / technical clearanceDirector of Town and Country Planning technical clearance B.P.No.48/2019/W, approved date 8-07-2019, file DTCP-WGLM/BLDG/21/2019-WNGL-DTCP, proceedings Lr.D.Dis.No.2698/2019/W. The extraction describes the clearance as addressed to Dharoor Gram Panchayat and conditional on requirements before release of building permission.
Filed apartment planPlan extraction for a proposed residential apartment S+G+4, recording stilt parking and floor-area details.
Additional filed plan recordPlan extraction describes a proposed apartment in part of land bearing Sy. No. 88/2 and lists built-up and mortgage-area figures.
Commencement / occupancy / completion evidenceA document is filed under the name “Commencement Certificates for each building in each phase,” but its extraction describes a technical clearance and conditions for release of building permission. No occupancy or completion certificate is supplied. Document index
Project declarationTelangana Form B affidavit-cum-declaration by B. Sandeep Rao, managing partner, including the promoter’s title, encumbrance and completion declarations.

The supplied records do not include a verified occupancy or completion certificate, and the evidence does not establish the current TG-RERA registration status. Document index

Frequently asked questions

Is BS RESIDENCY registered with Telangana RERA?

Yes. BS RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02800001940; the registration status is New Project.

Who is the developer of BS RESIDENCY?

The promoter named in the RERA registration is BALAJI SAI CONSTRUCTIONS.

Where is BS RESIDENCY located?

BS RESIDENCY is in SIVAR DHAROOR, Jagtial, Telangana (505327).

When will BS RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 19/07/2025. This is the promoter's declaration, not a guarantee.

More projects in Jagtial