Sign in

Smr Vinay Iconia, Phase-Ii, Block-1a, Block-1B And Convenience Shopping Center

SMR BUILDERS PRIVATE LIMITED · Rangareddy · RERA P02400000069

SMR VINAY ICONIA, PHASE-II, BLOCK-1A, BLOCK-1B AND CONVENIENCE SHOPPING CENTER is a mixed development (residential and commercial) in Kondapur, Serilingampally mandal, Ranga Reddy district, developed by SMR BUILDERS PRIVATE LIMITED. The registered site has a total area of 44,982.12 sq.mt., and three building units are recorded in the project fields; the permit extraction records Basements 3 and “Upper floors (26 & 21).” TG-RERA registration number P02400000069 lists 2BHK and 3BHK configurations with saleable areas of 132.77 sq.m and 193.91 sq.m, respectively. The proposed completion date is 08/09/2023.

More from Smr Builders Pvt Ltd · 8 projects →

01What we found

Period endedTG-RERA registration ran to 8 Sep 2023 - check its extension on TG-RERA
36documents on file - each fact links to its page
4court cases on this project's land (survey 113, 114, Kondapur)
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Exact registered nameSMR VINAY ICONIA, PHASE-II, BLOCK-1A, BLOCK-1B AND CONVENIENCE SHOPPING CENTER RERA record
Project typeMixed development (residential and commercial) RERA record RERA filing
Registered portionPhase-II, Blocks 1A and 1B, and Convenience Shopping Center; the engineer’s certificate identifies the residential blocks as STANLEY-A and STANLEY-B
TG-RERA registrationP02400000069
Registration validity11/12/2018 to 08/09/2023; the supplied certificate states a four-year validity and records no extension
Registered promoterSMR BUILDERS PRIVATE LIMITED RERA record Corporate record
RERA status in project recordOn-Going Project RERA record RERA filing

Land and geographic identity

FieldProject record
Locality / revenue villageKondapur RERA record RERA filing
MandalSerilingampally RERA record RERA filing
DistrictRanga Reddy RERA record RERA filing
PIN500084 RERA record
Project survey numbers and subdivisions113, 114/1, 114/2, 114/3, 115/1, 115/2, 115/3, 116/1, 116/2, 116/3, 117/1, 117/2, 118, 119 and 126 RERA record
Site extent filed with TG-RERATotal area 44,982.12 sq.mt.; road-affected area 1,528.41 sq.mt.; net area 43,453.71 sq.mt. RERA filing
Boundaries as filedEast: Land in Sy No 114; West: MARUTHI NAGAR; North: Land in Sy No 113; South: ROAD RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permit53332/HO/WZ/Cir-11/2016, approved 09.09.2017 Approvals record
Approved built-up area96,185.55 sqmts is recorded in the RERA project fields RERA filing
Buildings / blocksThree building units are recorded in the project fields; the permit identifies residential Block-A and Block-B and separate clubhouse/shopping and commercial components RERA filing
Sanctioned floor configurationThe permit extraction records Basements 3 and “Upper floors (26 & 21)”; it does not provide a clear, reliable floor-by-floor configuration for every building in the extracted text
Sanctioned parking levels / spacesThe permit records three basements and requires approved cellar and stilt areas to be used exclusively for parking; a legible total parking-space count is not available in the supplied extraction
Unit countRERA unit records list 613 total units, including 559 in the filed 2BHK and 3BHK configurations and additional rows recorded by unit number or “G”; the unit schedule should be read with the classification note in section 4 RERA unit table RERA unit details

Offering and status

FieldProject record
Filed home configurations2BHK and 3BHK RERA unit table RERA unit details
RERA-filed saleable areas2BHK: 132.77 sq.m; 3BHK: 193.91 sq.m RERA unit table RERA unit details
Booked / available counts351 booked and 262 available out of 613 as last read from the TG-RERA portal; the record has no as-of date, so these counts are indicative RERA unit table
Declared construction progressAn Engineer’s Certificate (F2) dated 12.09.2019 reports cost and progress figures for the registered project; this is a filed certificate, not an independent site inspection
Original / revised completion08/09/2023 / 08/09/2023 RERA record RERA filing
Occupancy / completion certificateNo occupancy or completion certificate for this registered portion is included in the supplied project evidence. The building permit requires completion notice and an occupancy certificate before occupation

2. The project story

This is a mixed residential and commercial development registered for Phase-II: Blocks 1A and 1B, together with a Convenience Shopping Center. The project’s RERA certificate identifies the registered portion and the Kondapur location; the GHMC building permit describes residential blocks as well as clubhouse/shopping and commercial components. The engineer’s certificate names the residential blocks STANLEY-A and STANLEY-B and separately identifies amenities.

The registered site is recorded as 44,982.12 sq.mt. gross, with 1,528.41 sq.mt. affected by road widening and 43,453.71 sq.mt. net. Three building units are entered in the RERA land record. The permit extraction gives basement and upper-floor information, but does not yield a complete, unambiguous building-by-building schedule. RERA filing RERA filing

The project record labels the development “On-Going Project,” and its registered completion date is 08/09/2023. An F2 engineer’s certificate filed in 2019 describes estimated and incurred construction costs, but neither that filing nor the RERA status is independent confirmation of present site progress. No occupancy or completion certificate for this registered portion appears in the supplied evidence. RERA filing RERA record

3. Master plan, architecture & building design

Design / site itemEvidence-backed record
Registered site areaTotal area 44,982.12 sq.mt.; road-affected area 1,528.41 sq.mt.; net area 43,453.71 sq.mt. RERA filing
Approved built-up area96,185.55 sqmts, as entered in the TG-RERA project fields RERA filing
Building organizationThree building units are recorded in RERA. The permit extraction identifies residential Block-A and Block-B and clubhouse/shopping and commercial components; the F2 certificate names STANLEY-A, STANLEY-B and amenities. RERA filing
Floors / basementsGHMC permit extraction: “Basements 3” and “Upper floors (26 & 21).” The supplied text does not establish a complete, building-specific floor schedule.
Site planning elementsThe permit lists a tot-lot of 4,434.11 m², a road-affected portion of 1,528.41 m² to be surrendered to GHMC, and conditions for peripheral greenery, rainwater-harvesting structures and a garbage house. These are permit records/conditions; delivery is not independently verified here.
Layout / floor-plan detailNo extracted floor-plan measurements or layout-sheet data are supplied. The 27 floor-plan drawings are recorded as scans pending measurement. Floor plans

The approved built-up area above is the RERA-filed figure; it is not a carpet-area or saleable-area figure. The permit extraction also contains area entries, but their labels and OCR are not sufficiently clear to assign them confidently to a specific building or area category. RERA filing

4. Homes, configurations & floor plans

TG-RERA records 559 homes in two named configurations. The remaining 54 unit-table rows are recorded as individual door numbers or “G,” rather than as 2BHK/3BHK configurations; they should not be treated as a further disclosed home configuration without clarification. The overall RERA unit summary records 613 total, 351 booked and 262 available. Counts are indicative because the portal record has no as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20613175132.77 sq.mNot measured in supplied drawingsNot supplied
3BHK353202151193.91 sq.mNot measured in supplied drawingsNot supplied

The RERA-filed saleable areas are not carpet areas. The supplied floor-plan record says carpet area is intended to be software-measured from drawing geometry and would require review; all 27 drawings remain scans pending measurement, so no measured carpet area, room dimensions or typical floor arrangement can be reported. RERA unit table Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit records three basement levels and requires approved cellar and stilt areas to be used exclusively for vehicle parking, without partition walls or rolling shutters and without conversion to another use. It also requires a site entry and exit, each with minimum width of 4.5 mts. The extracted permit does not provide a reliable total count of parking spaces or a unit-wise allocation, and the supplied evidence does not establish visitor, accessible, two-wheeler or EV spaces.

A parking requirement in the building permit is not evidence that a particular bay is exclusively allocated to a buyer. Obtain the sanctioned parking drawings and the proposed unit’s executed sale documentation to confirm its parking arrangement.

6. Amenities, recreation & open spaces

The amenities schedule is a RERA-filed status table. Its percentages are declared progress entries, not independent verification of completion. The permit separately specifies certain site features and utility-related conditions; these are identified below as permit requirements rather than verified delivered facilities. RERA amenities

Landscape / open space
FacilityGreen Strip / TOT LOT / Park
Description / sizePermit records tot-lot area 4,434.11 m²; no separate RERA-amenities area is supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA schedule: 100%; permit also requires greenery and tot-lot maintenance. Not independently verified.
Convenience / community
FacilityCommunity Buildings
Description / sizeSize not supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA schedule: 95%; not independently verified.
Convenience / community
FacilityInternal Roads & Footpaths
Description / sizeSize not supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA schedule: 100%; not independently verified.
Convenience / community
FacilityStreet Lighting
Description / sizeSize not supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA schedule: 100%; not independently verified.

No specific clubhouse rooms, indoor recreation facilities or sports facilities are identified in the supplied amenity schedule. The permit identifies “Club House & Shopping,” but the available extraction does not provide a detailed facility schedule or confirm completion. RERA amenities

7. Utilities, building services & safety

The RERA amenities schedule gives declared progress percentages for listed services; it does not provide system capacities or independent completion evidence. The GHMC permit lists requirements and design conditions, which should not be read as proof that each item has been installed or commissioned. RERA amenities

ServiceEvidence supplied
WaterRERA schedule: Water Supply 90%. The permit requires separate underground static water storage of 25,000 lits. capacity and a separate 25,000lits capacity terrace tank for residential buildings. Water source and current operating status are not supplied. RERA amenities
Sewerage / drainageRERA schedule: Sewerage 100%, Storm Water Drains 100%, and Treatment and Disposal of Sewage and Sullage Water 0%. The permit requires provision for services, sewerage disposal and rainwater-harvesting pits. STP capacity, reuse arrangements and commissioning status are not supplied. RERA amenities
Rainwater harvestingRERA schedule: Water Conservation, Rain water Harvesting 80%. The permit requires rainwater-harvesting structures (percolation pits); no capacity or independent completion verification is supplied. RERA amenities
ElectricalRERA schedule: Electrical Meter Room, Sub-Station, Receiving Station 100%. The permit requires transformer space and a generator as an alternate electricity source. Generator capacity and current status are not supplied. RERA amenities
Fire and life safetyRERA schedule: Fire Protection and Fire Safety Requirements 100%. The permit specifies fire-fighting installations, fire-resistant lift swing doors, emergency lighting, manual alarm systems, extinguishers, water storage and conditional basement sprinklers. Compliance and commissioning are not independently verified by the supplied evidence. RERA amenities
WasteRERA schedule: Solid Waste Management and Disposal 0%. The permit requires a garbage house within the premises; operational arrangements are not supplied. RERA amenities
Vertical transportation / accessibilityThe supplied evidence does not state lift counts, capacities, service lifts or accessible circulation details. The permit contains a general requirement for facilities for physically handicapped persons in public and semi-public buildings above 300Sq.mts.

8. Location, access & connectivity

The registered project location is Kondapur village, Serilingampally mandal, Ranga Reddy district, PIN 500084. The RERA filing’s boundary description lists land in Sy No 113 to the north, land in Sy No 114 to the east, MARUTHI NAGAR to the west and a road to the south. RERA record RERA filing RERA filing

The supplied location record lists the Financial District (Nanakramguda) at 1.2 km as an anchor. No approach-road names, public-transport details or travel-time claims are supplied. Location record

9. Developer & development status

The registered legal promoter is SMR BUILDERS PRIVATE LIMITED, a company. Its supplied project address is SMR HOUSE, 5th floor, Nagarjuna Hills, near HCU Bus Depot, Kondapur, Serilingampally, Ranga Reddy, 500084. A company registration number, telephone number and email address are not supplied. The vendor record lists smrholdings.in; it is not identified here as a separate legal promoter. Corporate record Parties record Promoter website

The project’s Form-B declaration, signed by Managing Director Ram Reddy Saireddy on 5 November 2018, states the promoter’s position on title, discloses a project loan secured by deposited title deeds, and undertakes completion by 08-09-2023. Those are promoter declarations. The TG-RERA certificate records validity through 08/09/2023 and no extension in the supplied certificate; no occupancy or completion certificate for the registered portion is included in the evidence reviewed for this Overview. Document index

10. Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA certificate, P02400000069Registration of the named Phase-II project, promoter, registered survey schedule and validity from 11/12/2018 to 08/09/2023
GHMC Building Permit Order, 53332/HO/WZ/Cir-11/2016Building permit issued by GHMC, approved 09.09.2017; the extraction describes Block-A and Block-B and clubhouse/shopping and lists permit conditions
RERA Form-B declarationPromoter’s declaration dated 5 November 2018, including completion undertaking and disclosed project loan secured by deposited title deeds
Board authorizationCertified extract of board minutes dated 5 November 2018 authorizing Ram Reddy Saireddy to sign project-registration documents
Engineer’s Certificate (F2)Filed 12.09.2019 for Phase-II Blocks IA and IB, named STANLEY-A and STANLEY-B, and amenities; it is a project certificate, not a building or layout approval
Sale-agreement and allotment-letter formsA partially completed agreement-of-sale form and blank allotment-letter form are present; they do not establish a specific buyer’s executed agreement or allotment
Occupancy / completion certificateNot present in the supplied project documents for this registered portion Document index
Approved layout plan / extracted floor plansThe supplied layout-plan item is not extracted; the 27 floor-plan drawings are scans pending measurement Document index Floor plans

Frequently asked questions

Is SMR VINAY ICONIA, PHASE-II, BLOCK-1A, BLOCK-1B AND CONVENIENCE SHOPPING CENTER registered with Telangana RERA?

Yes. SMR VINAY ICONIA, PHASE-II, BLOCK-1A, BLOCK-1B AND CONVENIENCE SHOPPING CENTER is registered with the Telangana Real Estate Regulatory Authority as P02400000069; the registration status is On-Going Project.

Who is the developer of SMR VINAY ICONIA, PHASE-II, BLOCK-1A, BLOCK-1B AND CONVENIENCE SHOPPING CENTER?

The promoter named in the RERA registration is SMR BUILDERS PRIVATE LIMITED.

Where is SMR VINAY ICONIA, PHASE-II, BLOCK-1A, BLOCK-1B AND CONVENIENCE SHOPPING CENTER located?

SMR VINAY ICONIA, PHASE-II, BLOCK-1A, BLOCK-1B AND CONVENIENCE SHOPPING CENTER is in KONDAPUR, Serilingampally, Rangareddy, Telangana (500084).

When will SMR VINAY ICONIA, PHASE-II, BLOCK-1A, BLOCK-1B AND CONVENIENCE SHOPPING CENTER be completed?

The promoter's proposed date of completion filed with RERA is 08/09/2023. This is the promoter's declaration, not a guarantee.

More projects in Kondapur