SMR VINAY ICONIA, PHASE-II, BLOCK-5 is named as EVEREST

SMR BUILDERS PRIVATE LIMITED · Rangareddy · RERA P02400002272

SMR VINAY ICONIA, PHASE-II, BLOCK-5 is named as EVEREST, a residential apartment project in Kondapur, Serilingampally Mandal, Ranga Reddy District. The registered promoter is SMR BUILDERS PRIVATE LIMITED. The project has a site area of 48,419.41 m² and one Block-5 building with 3 basements for parking, Ground + 34 upper floors, and 279 4BHK homes with a filed saleable area of 308.85 m². It is registered under TG-RERA P02400002272, and the project-information field records proposed completion as 02/04/2027.

More from Smr Builders Pvt Ltd · 8 projects →

01What we found

RegisteredTG-RERA
22documents on file - each fact links to its page
4court cases on this project's land (survey 113, 114, Kondapur)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSMR VINAY ICONIA, PHASE-II, BLOCK-5 is named as EVEREST RERA record
Project type and registered portionResidential apartment project; Phase-II, Block-5 (EVEREST) RERA filing
TG-RERA registrationP02400002272 RERA record
TG-RERA validityCertificate records validity from 30/10/2020 to 02/08/2025; no extension is recorded in the supplied certificate
Registered promoterSMR BUILDERS PRIVATE LIMITED RERA record Corporate record
RERA status in supplied recordRegistration certificate supplied; current portal status is not established by these materials

Land and geographic identity

ItemProject record
Locality / revenue villageKondapur / Kondapur RERA record RERA filing
Mandal / district / PINSerilingampally / Ranga Reddy / 500084 RERA record
Project survey numbers and subdivisions113, 114/1, 114/2, 114/3, 115/1, 115/2, 115/3, 116/1, 116/2, 116/3, 117/1, 117/2, 118, 119, 121/1, 122/2, 126 RERA record
Site extentSanction document records Phase-II site area 48,419.41 m² and net area 42,474.38 m²
RERA-form land-area figuresTotal 48,419.41 m²; affected area 594 m²; net area 47,825.41 m² RERA filing
Boundaries as filedNorth: neighbours’ land; South: road; East: neighbours’ land; West: neighbours’ land RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building permit53564/HO/WZ/Cir-11/2016, dated 03 08 2019; file no. 212246/14/02/2019/HO
Approved built-up area67,181.03 m²
Building count / configurationOne Block-5 residential building; 3 basements for parking, Ground + 34 upper floors RERA filing
Sanctioned height101.50 m
Parking levelsThree basement levels are identified for parking; parking-space count is not established in the supplied material
Unit countGHMC permit: 280 residential units; TG-RERA unit record: 279 4BHK homes plus one “ENTRANCE LOBBY FLAT” row classified as a common area, not a home for sale RERA unit table

Offering and status

ItemProject record
RERA-filed homes4BHK, 279 units; filed saleable area 308.85 m² RERA unit table
Booked / available47 booked / 232 available in the RERA portal data supplied; no as-of date is provided, so these counts are indicative RERA unit table
Construction stageThe supplied amenity record reports sewerage infrastructure at 80%; other listed amenity-progress fields show 0%. This is declared portal data, not independent site verification RERA amenities
Completion datesRegistration certificate records 02/08/2025 as its validity end date. Form B declarations state completion undertaking 02-08-2025; the January 2026 declaration states 02-08-2026. The project-information field separately records proposed completion 02/04/2027 RERA filing
Occupancy certificateThe building permit requires an occupancy certificate before occupation. No OC or completion certificate is supplied; the permit extraction records completion_certified: false

2. The project story

This is a single residential tower registered as Phase-II, Block-5 (EVEREST) within the larger SMR VINAY ICONIA development at Kondapur, Serilingampally Mandal, Ranga Reddy District. The GHMC permit describes a multi-storey building with three parking basements and Ground + 34 upper floors, for 280 residential units. The RERA unit schedule identifies 279 4BHK homes; its additional entrance-lobby row is categorized as a common area, not a saleable home. RERA unit table

The RERA record gives a 4BHK saleable area of 308.85 m² and portal booking figures of 47 booked and 232 available, but those counts have no stated retrieval date. The supplied project materials do not establish independently verified construction progress or an occupancy certificate. The available amenity-progress record reports sewerage at 80% and other listed items at 0%; treat these as reported figures rather than confirmation of on-site completion. RERA unit table RERA amenities

3. Master plan, architecture & building design

The GHMC building-permit record describes one building, Block-5, with three basement floors for parking, a ground floor and 34 upper floors. It records a height of 101.50 m and approved built-up area of 67,181.03 m². The permit extraction also lists 23,578.24 m², 4,434.11 m² “for all Blocks,” a road-affected area of 594.05 m² and peripheral-road area of 5,350.98 m²; the supplied extract does not label the area measures sufficiently to treat them as interchangeable.

The permit names the project surveys as 113; 114/1 to 3; 115/1 to 3; 116/1 to 3; 117/1&2; 118; 119; 121/1; 122/2; and 126. RERA also lists the same project parcel identity. The permit records an 18 m road width and 10% organized open space to be handed over to GHMC by registered gift deed before obtaining an OC.

The supplied floor-plan record comprises 12 drawings, with none software-measured and all 12 scans pending. Consequently, details such as typical floor arrangement, flats per floor, building footprint, lifts, stairs, internal circulation and room layouts cannot be described from measured drawings in this review. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
4BHK27947232308.85 m²Not measured; 12 drawing scans pendingNot supplied

The figures above are TG-RERA unit data; bookings and availability are indicative because no portal as-of date is provided. The filed unit schedule also includes one “ENTRANCE LOBBY FLAT” row of 266.73 m², classified in the supplied record as a common area and not a home for sale. RERA unit table

Carpet area was not software-measured because the supplied floor-plan scans remain pending. Saleable area is the RERA-filed figure and should not be treated as a measured carpet-area figure; the supplied record does not provide a loading calculation. Floor plans RERA unit table

5. Parking & vehicle circulation

The sanctioned building configuration includes three basement levels for parking. The GHMC permit says the approved cellar and stilt areas must be used exclusively for vehicle parking, not partitioned or converted to another use. The supplied records do not establish the number of parking spaces, visitor or accessible provision, parking allocation to individual units, ramp configuration, vehicle entry/exit arrangement, two-wheeler provision or EV charging.

A reference to basements for parking does not, by itself, establish exclusive parking rights for a buyer; no unit-specific parking allocation evidence is supplied.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green stripPermit extraction records 4,434.11 m² for all Blocks; permit requires the tot-lot to be fenced and maintained as greenery before OCRERA amenitiesAmenity progress recorded as 0%; not independently verified
Organized open space10% to be handed over to GHMC free of cost through registered gift deed before OCPermit condition; completion/hand-over not evidenced
Internal roads and footpathsListed as available in RERA amenity dataRERA amenities0% progress recorded; not independently verified
Community buildingsListed without a supplied description or sizeRERA amenities0% progress recorded; not independently verified

The evidence supplied does not provide a detailed clubhouse, indoor-facility or sports-amenity schedule for this registered block. The 4,434.11 m² figure is stated in the permit extraction as being for all Blocks, so it should not be attributed solely to Block-5.

7. Utilities, building services & safety

The GHMC permit lists a sewerage treatment plant (STP), water-recycling plant, 10 rainwater-harvesting pits, transformer, garbage house and rainwater-harvesting structure/percolation pit. It also requires storm-water disposal, sewerage, RWH pits and garbage disposal as per plan. These are permit requirements or listed provisions; the supplied evidence does not establish their capacities or independent completion. RERA amenities

The RERA amenity record lists water supply, storm-water drains, sewage treatment/disposal, water conservation and rainwater harvesting, electrical meter room/sub-station, fire protection and street lighting. It reports sewerage at 80% and 0% for the other listed progress fields. RERA amenities

The building permit refers to a provisional Fire Services NOC, RC. No.3438/MSB/CR/RR/2016, dated 29.06.2016, and an AAI NOC, HYDE/SOUTH/B/031815/106988, dated 11.05.2015, and requires compliance with their conditions. The permit also requires lighting conductors. No lift details, backup-power capacity, accessibility arrangements, security systems, CCTV, waste-segregation arrangements or fire-system specifications are supplied here.

8. Location, access & connectivity

The registered location is Kondapur revenue village, Serilingampally Mandal, Ranga Reddy District, Telangana, PIN 500084. The filed site boundaries identify neighbours’ land to the north, east and west, and a road to the south. The GHMC permit records an 18 m road width. RERA record RERA filing

The supplied location record identifies HITEC City at 5.6 km. No travel time, public-transport information or further measured connectivity distances are supplied. Location record

9. Developer & development status

The registered legal promoter is SMR BUILDERS PRIVATE LIMITED, a company. The supplied corporate record gives its office address as SMR HOUSE 5TH FLOOR, NAGARJUNA HILLS, NEAR HCU BUS DEPOT, KONDAPUR, Serilingampally, Ranga Reddy, 500084. No company CIN or project-specific contact telephone/email is established in the supplied data. The promoter website listed in the record is smrholdings.in. Corporate record RERA filing

The GHMC permit identifies M/s. Kondapur Towers Pvt. Ltd. and Others as applicants, represented by M/s. SMR Builders Pvt. Ltd.; the RERA certificate identifies SMR Builders Private Limited as the registered promoter.

The promoter’s Form B declarations are self-declarations. The 2020 and 2023 declarations state a completion undertaking of 02-08-2025; the declaration verified on 27 January 2026 states 02-08-2026. The project-information record separately lists a proposed completion date of 02/04/2027. No independent construction-progress verification or occupancy certificate is supplied. RERA filing

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for P02400002272, issued 30/10/2020; certificate states validity to 02/08/2025
GHMC building permitBuilding Permit Order 53564/HO/WZ/Cir-11/2016, dated 03 08 2019; file no. 212246/14/02/2019/HO
Permit references recordedPermit 53332/HO/Z/Cir-11/2016, dated 09.09.2017; permit 53467/HO/Z/Cir-11/2017, dated 24.04.2018; file references 96505/09/09/2016/HO and 145692/09/10/2017
Commencement / completion / occupancyThe supplied building-permit record is labelled as a commencement-certificate document. It requires commencement and completion notices and an OC before occupation. No OC or completion certificate is supplied; the extraction records completion as not certified
Form B declarationsPromoter declarations dated 4 August 2020, 8 February 2023 and 27 January 2026; the 2026 declaration identifies Block-5 (EVEREST) and states a completion undertaking of 02-08-2026
Board authorizationCertified board-minutes extract dated 4 August 2020 authorizes Ram Reddy Saireddy to sign project registration documents
Title and sale-agreement materialAdvocate title-search report and a blank-form proposed agreement of sale are supplied; the agreement has no completed allottee, unit or consideration particulars
Layout and floor-plan materialsThe RERA file includes a layout-plan document entry and 12 floor-plan drawings; the supplied drawing record says all 12 scans are pending measurement Floor plans

The GHMC permit lists structural proof-checking, environmental, fire and aviation references among its conditions and associated records. This overview reports those references as appearing in the supplied permit extraction; it does not independently verify the status or continuing applicability of each underlying instrument.

Frequently asked questions

Is SMR VINAY ICONIA, PHASE-II, BLOCK-5 is named as EVEREST registered with Telangana RERA?

Yes. SMR VINAY ICONIA, PHASE-II, BLOCK-5 is named as EVEREST is registered with the Telangana Real Estate Regulatory Authority as P02400002272; the registration status is New Project.

Who is the developer of SMR VINAY ICONIA, PHASE-II, BLOCK-5 is named as EVEREST?

The promoter named in the RERA registration is SMR BUILDERS PRIVATE LIMITED.

Where is SMR VINAY ICONIA, PHASE-II, BLOCK-5 is named as EVEREST located?

SMR VINAY ICONIA, PHASE-II, BLOCK-5 is named as EVEREST is in KONDAPUR, Serilingampally, Rangareddy, Telangana (500084).

When will SMR VINAY ICONIA, PHASE-II, BLOCK-5 is named as EVEREST be completed?

The promoter's proposed date of completion filed with RERA is 02/04/2027. This is the promoter's declaration, not a guarantee.