Saaghar Chittaboina Veerappa Vevanties

SAAGHAR INFRA PVT LTD · Medchal-Malkajgiri · RERA P02200010338

SAAGHAR CHITTABOINA VEERAPPA VEVANTIES is a residential apartment project at Plot No. 763, Uppal Bhagath, Uppal Mandal, Medchal-Malkajgiri District. The registered promoter is SAAGHAR INFRA PVT LTD. The project covers 1671.99 sq. m. and comprises one proposed building with 1 Cellar + 1 Stilt + 5 upper floors and 30 apartments: 10 2BHK and 20 3BHK. It is registered under TG-RERA number P02200010338, and the project header lists proposed completion as 16/07/2027.

More from Saaghar Infra Pvt Ltd · 4 projects →

01What we found

RegisteredTG-RERA - valid till 16 Mar 2027
14documents on file - each fact links to its page
7court cases on this project's land (survey 1, 282, Uppal Bhagath)
9items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSAAGHAR CHITTABOINA VEERAPPA VEVANTIES RERA record
Project type / useResidential apartment project; TG-RERA category is apartment. RERA record RERA filing
Phase / registered portionThe supplied record describes one registered project and does not identify a separate phase. RERA record
TG-RERA registrationP02200010338; registered from 16/03/2024 to 16/03/2027. The certificate states a three-year registration period, unless extended by the Authority. RERA record Approvals record
RERA statusNew Project; registration is shown in the supplied record. Registration validity is not the same as the project completion deadline or occupancy certification. RERA record
Registered promoterSAAGHAR INFRA PVT LTD. RERA record Corporate record

Land and geographic identity

ItemProject record
Locality / plotUppal Bhagath; Plot No. 763. The GHMC permit identifies the site at Laxmi Narayana Colony, Uppal. RERA filing
Revenue villageUppal Bhagath. RERA record Land records
Mandal / district / PINUppal / Medchal-Malkajgiri / 500039. RERA record RERA filing
Survey numbers and subdivisions1 TO 40, 282 TO 368, 369(p), 370 TO 373, 374(p), 375 TO 387, 395 TO 401, 454, 456 TO 459, 505(p), 510 TO 564. RERA record Land records
RERA-filed land areaTotal area 1671.99 sq. m.; net area 1671.99 sq. m.; affected area reported as 0. RERA filing Land records
Site boundariesEast: Plot No. 762; West: Road; North: Plot No. 746; South: Road. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building-permit number / date5799/GHMC/LBN/2024-BP, approved 16 March, 2024. The filed document also identifies file no. 003594/GHMC/1768/LBN1/2023-BP. Approvals record
Sanctioned developmentOne proposed residential building, A (PROPOSED): 1 Cellar + 1 Stilt + 5 upper floors.
Approved built-up areasGHMC permit records Residential 3,739.25 and Total Parking Area 1897.85; the filed plan details record residential net BUA 3739.25 sq. m., total proposed built up area including parking 5568.15 sq. m., and total BUA 5657.94 sq. m. These are the labels and figures in the respective filed records.
Approved / RERA-declared unit countsBuilding-plan details state 30 units; the RERA configuration record lists 30 units: 10 2BHK and 20 3BHK. RERA unit table RERA unit details
Parking provision in filed plan30 proposed parkings are recorded in the plan details. The GHMC permit requires the cellar and stilt approved for parking to be used exclusively for vehicle parking.

Offering and status

ItemProject record
Configurations2BHK and 3BHK apartments. RERA unit table
RERA-filed saleable areas2BHK: 117.0 sq. m.; 3BHK: 167.0 sq. m. RERA unit table RERA unit details
Booked / availablePortal figures show 2BHK: 0 booked / 10 available; 3BHK: 0 booked / 20 available. Counts are indicative: the supplied portal record does not carry an as-of date. RERA unit table RERA unit details
Construction stageNo independently verified site-progress assessment or construction-stage percentage is supplied. The RERA filing’s amenity progress fields show low or zero progress for the listed items; these are filed progress figures, not an independent site inspection. RERA amenities
Completion deadlineThe promoter’s Form B declaration states completion by 16-March-2027. The project header lists proposed completion 16/07/2027; the supplied records do not identify a revised-completion approval. RERA record
Registration validity16/03/2024–16/03/2027, as stated in the RERA certificate.
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The GHMC permit requires an occupancy certificate before occupation.

2. The project story

This is a residential apartment development on Plot No. 763 in Uppal Bhagath, Uppal Mandal, Medchal-Malkajgiri District. The RERA and GHMC-filed records identify one proposed building, Building A, with one cellar, one stilt level and five upper floors. The RERA-listed offering comprises 30 apartments: 10 2BHK and 20 3BHK units. RERA record Land records RERA unit table

The GHMC permit is for a proposed building and makes construction subject to its listed conditions. The evidence supplied does not establish the project’s current physical construction progress or confirm that any portion is complete or occupied. The promoter’s Form B gives a completion undertaking of 16-March-2027; the project header separately records a proposed completion date of 16/07/2027. No occupancy certificate is in the supplied documents. RERA record

3. Master plan, architecture & building design

The filed project land area is 1671.99 sq. m. The building-plan details identify 6.70 sq. m. as splay area, 1665.29 sq. m. as net plot area, 869.71 sq. m. as vacant plot area, and proposed coverage of 795.58 sq. m. (47.58%). The GHMC permit lists residential area of 3,739.25, cellar area of 1050.7, stilt area of 778.2, and total parking area of 1897.85. The plan details also state 3739.25 sq. m. residential net BUA and 5568.15 sq. m. total proposed built-up area including parking. RERA filing

The sanctioned arrangement is one building, A (PROPOSED), with 1 Cellar + 1 Stilt + 5 upper floors. The permit records a building height of 14.79; the separate plan-details record lists 20.49 mt. total height and 17.99 mt. height excluding stilt. The supplied material does not provide verified information on flats per floor, lifts, stairs, entrances and exits, or detailed circulation and landscaping. The permit records a Tot Lot 84.87 and six rainwater-harvesting pits.

Area figures above retain the labels in the filed records; the evidence does not provide a single reconciled area schedule. The project is described as residential, and no separate commercial component or phase-wise organization is identified in the supplied material. RERA record

4. Homes, configurations & floor plans

The TG-RERA configuration record lists 10 2BHK and 20 3BHK apartments. The saleable areas below are RERA-filed. Carpet measurements are software-measured from the supplied floor-plan drawing and are not RERA disclosures; the drawing measurements require review. Saleable area includes a unit’s share of common areas, while the software-measured carpet figure is a separate measurement. RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010117.0 sq. m.59.2–74.7 sq. m.; median 74.5 sq. m. (software-measured)36%
3BHK20020167.0 sq. m.97.2–111.1 sq. m.; median 103.2 sq. m. (software-measured)38%

The supplied drawing extract includes an example 2BHK with living, dining, kitchen, two bedrooms, two toilets and a utility; the utility is marked excluded from the measured carpet area. The example 3BHK includes a living room, dining, kitchen, three bedrooms, three toilets, puja, balcony and utility; balcony and utility are marked excluded from measured carpet area. These are drawing-based room descriptions, not a complete specification of every unit. RERA unit details

5. Parking & vehicle circulation

The filed building-plan details record 30 proposed parking spaces. The GHMC permit states that the cellar and stilt approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit lists Total Parking Area 1897.85; the plan details separately list parking area 1828.90 sq. m.

The supplied records do not establish how spaces are divided among residents, visitors or accessible parking, whether spaces are mechanically parked, or how individual parking spaces are allocated to buyers. A parking bay shown or counted in a plan does not, by itself, establish exclusive ownership or allotment.

6. Amenities, recreation & open spaces

The RERA amenity register records the following items and progress figures. The figures are filing data, not independent verification of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / Tot Lot / ParkGHMC permit records Tot Lot 84.87.RERA amenitiesAmenity register: available YES; 0%. Not independently verified complete.
Community buildingsNo size or capacity supplied.RERA amenitiesAvailable YES; 0%. Not independently verified complete.
Aggregate recreational open spaceNo size supplied.RERA amenitiesAvailable YES; 0%. Not independently verified complete.

The supplied RERA amenity register does not give a detailed clubhouse or indoor-facility schedule, sports-facility list, or facility dimensions beyond the Tot Lot figure. Vendor-listed facilities are not treated here as sanctioned or delivered amenities.

7. Utilities, building services & safety

The filed plan details list water supply, electricity connections, a transformer space, septic tank, generator, emergency lighting, fire-fighting installations, an underground static water storage tank of 25,000 lits, and a terrace tank of 25,000 lits. The same filing lists rainwater harvesting structures (percolation pits), a garbage house, and a space for the transformer. The GHMC permit records 6 rainwater-harvesting pits.

The RERA amenity register shows water supply, sewerage, storm-water drains, solid-waste management and disposal, and electrical meter room/sub-station/receiving station at 0% progress; rainwater harvesting is shown as 6%, and fire protection and fire-safety requirements as 1%. These are declared progress figures, not independent completion or compliance findings. RERA amenities

The supplied records do not specify the water source, STP capacity or reuse arrangements, electrical backup capacity, lift count or capacity, CCTV/security arrangements, or accessibility features. The GHMC permit states that an occupancy certificate is compulsory before occupation and specifies obtaining an occupancy FIRE NOC before issue of the occupancy certificate.

8. Location, access & connectivity

The registered location is Plot No. 763, Uppal Bhagath, Uppal Mandal, Medchal-Malkajgiri District, PIN 500039. The GHMC permit describes the site as Laxmi Narayana Colony, Uppal. RERA record RERA filing

A supplied connectivity record identifies Financial District (Nanakramguda) at 1.2 km from the recorded cadastral parcel centroid. Location record The supplied evidence does not provide a verified approach-road schedule, public-transport distances, or other independently measured landmark distances.

9. Developer & development status

The registered legal promoter is SAAGHAR INFRA PVT LTD, a company. The supplied corporate record gives GSTIN 36AAZCS3836L1ZF and identifies the company as SAAGHAR INFRA PRIVATE LIMITED, CIN U45309TG2017PTC120185. RERA record Corporate record Parties record

The GHMC permit identifies SAAGHAR INFRA PRIVATE LIMITED as the DAIGPA holder for the proposed building. The RERA-filed development agreement records a 50% landowner share and 50% developer share of the super built-up area with proportionate undivided land share, and 50% of parking space for each; specific unit allocation is to be mutually set out after plan approvals. Parties record

The promoter’s Form B declares a completion date of 16-March-2027. No independently verified construction progress, completion certificate or occupancy certificate is included in the supplied evidence. RERA amenities

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for SAAGHAR CHITTABOINA VEERAPPA VEVANTIES, registration P02200010338, valid 16/03/2024–16/03/2027.
Principal GHMC building permitBuilding Permit Order 5799/GHMC/LBN/2024-BP, approved 16 March, 2024, for Building A (PROPOSED), with 1 Cellar + 1 Stilt + 5 upper floors.
Additional permit recordPlan-details document identifies permit number TS/020127/2023, dated 16-03-2023, and records 30 units and the building configuration.
Layout-plan recordA layout-plan document identifies a residential layout at Uppal Bhagath, Uppal Mandal, R.R. District, under HMDA; the supplied extract does not state a distinct layout approval number.
Development agreementRegistered Development Agreement-cum-Irrevocable GPA, registration 1276/2023, dated 23 January 2023; it records development rights and the 50:50 sharing arrangement.
Supplementary deedRegistered Supplementary/Ratification Deed, registration 9240 of 2024, dated 10 July 2024, relating to allocation of flats and related terms.
Title-report documentAdvocate B. Nagender Rao’s legal opinion dated 19/11/2025 concerning the project at Plot No. 763, Uppal Bhagath.
Occupancy / completion certificateNone supplied. The GHMC permit requires an occupancy certificate before occupation.

Frequently asked questions

Is SAAGHAR CHITTABOINA VEERAPPA VEVANTIES registered with Telangana RERA?

Yes. SAAGHAR CHITTABOINA VEERAPPA VEVANTIES is registered with the Telangana Real Estate Regulatory Authority as P02200010338; the registration status is New Project.

Who is the developer of SAAGHAR CHITTABOINA VEERAPPA VEVANTIES?

The promoter named in the RERA registration is SAAGHAR INFRA PVT LTD.

Where is SAAGHAR CHITTABOINA VEERAPPA VEVANTIES located?

SAAGHAR CHITTABOINA VEERAPPA VEVANTIES is in UPPAL BHAGATH, Uppal, Medchal-Malkajgiri, Telangana (500039).

When will SAAGHAR CHITTABOINA VEERAPPA VEVANTIES be completed?

The promoter's proposed date of completion filed with RERA is 16/07/2027. This is the promoter's declaration, not a guarantee.

More projects in Uppal Bhagat