Green Valley
SUNKARA SRINIVASA · Yadadri Bhuvanagiri · RERA P02000003919
Green Valley is a plotted development in ALAIR, Alair Mandal, Yadadri Bhuvanagiri District. The TG-RERA certificate names Mr./Ms. Sunkara Srinivasa Reddy as the registered promoter. The project has a registered site extent of 68,673 sq. m, and the DTCP layout communication records 208 plots; plot-size configurations are not stated. It is registered under TG-RERA number P02000003919, with proposed completion on 30/11/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | Green Valley. RERA record |
| Project type / registered portion | Plotted development; the registration record identifies the project, but does not specify a separate phase or phase-wise portion. RERA record Approvals record |
| TG-RERA registration | P02000003919, granted under section 5; certificate issued 17/01/2022, valid from 17/01/2022 to 13/03/2026. The certificate says registration is not extended; validity is distinct from the completion date and from any completion/occupancy certificate. Approvals record |
| Registered promoter | Mr./Ms. Sunkara Srinivasa Reddy on the TG-RERA certificate; the project identity record gives SUNKARA SRINIVASA. Legal entity type is not disclosed in the supplied identity data. RERA record Corporate record |
| RERA status | The supplied certificate records registration; the pack does not establish the project’s current registration status beyond the stated validity period. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Locality: ALAIR. Revenue village: the project filing identifies ALER; the layout approval describes Alair Revenue Village. RERA record RERA filing |
| Mandal / district / PIN | Alair, Yadadri Bhuvanagiri, 508101. RERA record |
| Project survey numbers | 79, 80, 81, 84, 85, 87, 88, 89, 90, 91, 106. No subdivisions are supplied in the project identity record. RERA record Land records |
| Registered site extent | 68,673 sq. m total and net area, with 0 sq. m recorded as affected by road widening/FTL/nala widening. The filing records mortgage area as 0 sq. m. RERA filing |
| Boundaries | East: ROAD; west, north and south: OTHERS LAND. RERA filing |
| Layout approval extent | The DTCP communication records a layout area of Ac. 16.975 and separately describes the land extent as Ac. 16-39 gts. |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority / principal approval | Director of Town and Country Planning, Government of Telangana; TLP No. 79/2020/H, approved 16-03-2020. The approval communication identifies Alair Municipality as the authority to release/approve the layout subject to conditions. Approvals record |
| Other approval identifiers | File No. DTCP-HT3/0TH/68/2019-HYD Sec-DTCP; proceedings No. Lr.D.Dis. No. 3265/2020/H; layout plan identifier ILP.No. 792020/H. Approvals record |
| Approved built-up area | 37,770 sq. m is recorded in the project information; the supplied record does not explain how this figure applies to a plotted layout. RERA filing |
| Layout scale | DTCP communication records 208 plots. It also records open space of Ac. 1.698 (10%) and roads area of Ac. 5.95 (35.05%). |
| Buildings / floors / parking | Building or tower count, floor configuration and parking count/levels are not disclosed in the supplied project record. RERA filing |
Offering and status
| Field | Record |
|---|---|
| RERA-registered offering | Plotted development; the supplied structured RERA data does not give plot-size bands or a plot inventory. RERA record RERA unit table |
| Booked / available plots | Not disclosed in the supplied RERA data. RERA unit table |
| Completion timeline | Project identity record gives proposed completion 30/11/2026. A separate Form B document contains a completion undertaking of 23-01-2026, but its project/promoter particulars are internally unclear in the supplied extraction; see the document index below. RERA record |
| Construction / development stage | RERA amenity records show 20% for internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/TOT LOT/park, and aggregate recreational open space; other listed items show 0%. These are filed progress figures, not independent site verification. RERA amenities |
| Completion / occupancy certificate | No completion certificate or occupancy certificate is included in the supplied project documents. Document index |
2. The project story
Green Valley is registered with TG-RERA as a plotted development in Alair, Alair Mandal, Yadadri Bhuvanagiri District. The filed project land is identified by survey numbers 79, 80, 81, 84, 85, 87, 88, 89, 90, 91 and 106, with a reported total/net extent of 68,673 sq. m. RERA record Land records
The DTCP layout communication describes a planned layout of 208 plots, with designated road and open-space areas. It also states that the layout becomes legally valid only upon release/approval by the concerned Municipality and fulfillment of the stated layout conditions, including forming internal roads and gifting roads and open spaces to the Municipality. The record supplied here does not establish whether those steps have been completed.
The project information gives a proposed completion date of 30/11/2026. The registration certificate’s validity ended on 13/03/2026 and is marked as not extended in the supplied certificate record; these are separate dates and the supplied materials do not establish a current extension or completion/occupancy certification. RERA-filed progress percentages for several infrastructure items are 20%, while others are 0%; they should not be read as independently inspected construction progress. RERA record RERA amenities
3. Master plan, architecture & building design
The approval document is a plotted-layout approval, not a building or tower design record. It identifies 208 plots, a layout area of Ac. 16.975, open space of Ac. 1.698 (10%), and roads area of Ac. 5.95 (35.05%). It also states that building sites shown in ILP.No. 792020/H are for residential dwelling houses. Plot dimensions, plot-size distribution, individual plot numbering, the remaining land-use split, and a drawing-based layout sheet are not available in the supplied extracted records.
The project filing separately records a total/net land area of 68,673 sq. m and approved built-up area of 37,770 sq. m; no supporting building plans or explanation linking the built-up-area figure to the plotted layout is supplied here. No building count, floor configuration, height, footprint, lifts, stairs or apartment floor arrangements are disclosed. RERA filing RERA filing Document index
4. Homes, configurations & floor plans
This is registered as a plotted development. The supplied RERA unit data does not include plot counts by size, plot-size bands, booked/available counts or RERA-filed saleable area. The approval communication states 208 plots. RERA record RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 208 in the DTCP layout communication; RERA inventory count not supplied | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Two drawing records are noted, but both are scans pending measurement; no software-measured carpet or room dimensions are available. Third-party/vendor configuration entries include apartment-size and plot-size claims, but are not used here as RERA-filed offering details. Floor plans Promoter website
5. Parking & vehicle circulation
The approval document allocates Ac. 5.95 (35.05%) to roads area and requires internal roads to be formed and kept open for access to neighbouring lands. It does not provide a parking count, designated visitor or accessible parking, parking allocation by plot, or details of parking levels, ramps, EV charging or pedestrian separation.
The RERA filing records mortgage area as 0 sq. m; this is not a parking figure. A plot-specific or exclusive parking entitlement is not established in the supplied evidence. RERA filing Document index
6. Amenities, recreation & open spaces
The layout approval records public-purpose open space and roads; RERA-filed amenity progress is shown separately below. These percentages are filed progress figures, not independently verified completion status. RERA amenities
| Description / size | Ac. 1.698 (10%) of the approved layout area; approval calls for handover to Alair Municipality through registered gift deed. |
|---|---|
| Evidence source | DTCP layout communication |
| Declared progress / verified status | Sanction-recorded; completion and handover not established. |
| Description / size | Ac. 5.95 (35.05%) of the approved layout area; internal roads are required to be formed and roads handed over to the Municipality. |
|---|---|
| Evidence source | DTCP layout communication |
| Declared progress / verified status | Sanction-recorded; RERA lists internal roads and footpaths at 20%; not independently verified. RERA amenities |
| Description / size | No area or quantity supplied. |
|---|---|
| Evidence source | RERA-filed amenity record |
| Declared progress / verified status | 20% declared; not independently verified. RERA amenities |
| Description / size | No additional size supplied in the RERA progress record. |
|---|---|
| Evidence source | RERA-filed amenity record |
| Declared progress / verified status | 20% declared; not independently verified. RERA amenities |
| Description / size | No size or facility description supplied. |
|---|---|
| Evidence source | RERA-filed amenity record |
| Declared progress / verified status | 0% declared. RERA amenities |
No clubhouse or indoor recreation schedule is disclosed in the supplied project records. RERA amenities Document index
7. Utilities, building services & safety
The DTCP communication lists water supply, sewerage, drainage-disposal systems, street lighting, rainwater-harvesting structure and other civic amenities as layout services. It does not give capacity, design details or completion evidence for these facilities.
| Evidence in the supplied record | Layout communication lists water supply; RERA lists Water Supply. No source, storage, treatment or capacity is supplied. |
|---|---|
| Declared progress / status | RERA progress: 20%; not independently verified. RERA amenities |
| Evidence in the supplied record | Layout communication lists sewerage and drainage disposal systems; RERA lists sewerage and storm-water drains. No STP capacity, reuse or storm-water design is supplied. |
|---|---|
| Declared progress / status | Sewerage and storm-water drains: 20% each in the RERA record; not independently verified. RERA amenities |
| Evidence in the supplied record | Layout communication lists street lighting. RERA lists street lighting and an electrical meter room/sub-station/receiving station. No electrical capacity or backup details are supplied. |
|---|---|
| Declared progress / status | Street lighting and electrical meter room/sub-station/receiving station: 0% in the RERA record. RERA amenities |
| Evidence in the supplied record | Listed in the layout communication and RERA amenity schedule; no system details or capacity supplied. |
|---|---|
| Declared progress / status | RERA progress: 0%. RERA amenities |
| Evidence in the supplied record | Solid waste management and disposal is listed in the RERA amenity schedule. |
|---|---|
| Declared progress / status | 0% declared. RERA amenities |
| Evidence in the supplied record | Fire protection and fire-safety requirements are listed in the RERA amenity schedule; no design or clearance information supplied. |
|---|---|
| Declared progress / status | 0% declared. RERA amenities |
| Evidence in the supplied record | No project-specific RERA drawing or specification establishing lifts, accessible circulation, CCTV/access control or power-backup arrangements is supplied. |
|---|---|
| Declared progress / status | Not established in the supplied project records. Document index |
8. Location, access & connectivity
The project’s filed location is ALAIR, Alair Mandal, Yadadri Bhuvanagiri District, Telangana, PIN 508101. The village is recorded as ALER in the project identity fields, while the DTCP communication describes Alair Revenue Village and Alair Municipality. RERA record RERA filing
The project boundary information identifies a road on the east and other land on the west, north and south. A supplied location record gives the project-area geocode as 17.6467579, 79.0738512 and an approximate sampled distance of 47.1 km to the nearest sampled Outer Ring Road interchange. No approach-road name, public-transport details or other landmark distances are supplied. RERA filing Location record
9. Developer & development status
The project identity record names SUNKARA SRINIVASA as promoter; the TG-RERA certificate names Mr./Ms. Sunkara Srinivasa Reddy. The supplied data does not establish a legal entity type, corporate registration identifier, registered office or official contact details. RERA record Corporate record
The DTCP layout communication identifies M/S. Sree Somehwara Constructions as owner/applicant, represented by managing partner Sri. V. Venkatesh. The project-party record also identifies SREE SOMESHWARA CONSTRUCTIONS as a landowner under a revenue-share arrangement. Parties record
The supplied records do not provide independently verified on-site progress. RERA-listed infrastructure progress and the proposed completion date are summarized above. RERA amenities RERA record
10. Approvals, official records & documents
| Record | Available evidence |
|---|---|
| TG-RERA registration | Form C for Green Valley, registration P02000003919, issued 17/01/2022, validity through 13/03/2026. |
| Principal layout approval | DTCP TLP No. 79/2020/H, approved 16-03-2020, for a plotted layout at Alair; communication identifies file and proceedings numbers and layout plan ILP.No. 792020/H. |
| Approval conditions / release | The DTCP communication says legal validity depends on release/approval by the concerned Municipality and fulfillment of layout conditions, including formation and gifting of roads and open spaces. The supplied material does not establish completion of those steps. |
| Title-report materials | Supplied title-report documents include a sale deed, rectification deed, declaration and development-agreement material. Document index |
| Form B declaration | Document 184192 is extracted as a Form B affidavit, but its extraction identifies S SRINIVASA REDDY as declarant and also names CENTURY HOMES in the completion clause; the supplied document record does not establish that these particulars relate to Green Valley. It is therefore not treated here as verified project-specific evidence of title, encumbrances or completion undertaking. |
| Completion / occupancy certificate | None supplied in the project document register. Document index |
| Layout-plan document | A layout-plan filing is listed, but the supplied document record is not extracted. Document index |
1. Project at a glance
Project identity
Registered project name: Green Valley.
Project type / registered portion: Plotted development; the registration record identifies the project, but does not specify a separate phase or phase-wise portion.
TG-RERA registration: P02000003919, granted under section 5; certificate issued 17/01/2022, valid from 17/01/2022 to 13/03/2026. The certificate says registration is not extended; validity is distinct from the completion date and from any completion/occupancy certificate.
Registered promoter: Mr./Ms. Sunkara Srinivasa Reddy on the TG-RERA certificate; the project identity record gives SUNKARA SRINIVASA. Legal entity type is not disclosed in the supplied identity data.
RERA status: The supplied certificate records registration; the pack does not establish the project’s current registration status beyond the stated validity period.
Land and geographic identity
Locality / revenue village: Locality: ALAIR. Revenue village: the project filing identifies ALER; the layout approval describes Alair Revenue Village.
Mandal / district / PIN: Alair, Yadadri Bhuvanagiri, 508101.
Project survey numbers: 79, 80, 81, 84, 85, 87, 88, 89, 90, 91, 106. No subdivisions are supplied in the project identity record.
Registered site extent: 68,673 sq. m total and net area, with 0 sq. m recorded as affected by road widening/FTL/nala widening. The filing records mortgage area as 0 sq. m.
Boundaries: East: ROAD; west, north and south: OTHERS LAND.
Layout approval extent: The DTCP communication records a layout area of Ac. 16.975 and separately describes the land extent as Ac. 16-39 gts.
Development identity
Sanctioning authority / principal approval: Director of Town and Country Planning, Government of Telangana; TLP No. 79/2020/H, approved 16-03-2020. The approval communication identifies Alair Municipality as the authority to release/approve the layout subject to conditions.
Other approval identifiers: File No. DTCP-HT3/0TH/68/2019-HYD Sec-DTCP; proceedings No. Lr.D.Dis. No. 3265/2020/H; layout plan identifier ILP.No. 792020/H.
Approved built-up area: 37,770 sq. m is recorded in the project information; the supplied record does not explain how this figure applies to a plotted layout.
Layout scale: DTCP communication records 208 plots. It also records open space of Ac. 1.698 (10%) and roads area of Ac. 5.95 (35.05%).
Buildings / floors / parking: Building or tower count, floor configuration and parking count/levels are not disclosed in the supplied project record.
Offering and status
RERA-registered offering: Plotted development; the supplied structured RERA data does not give plot-size bands or a plot inventory.
Booked / available plots: Not disclosed in the supplied RERA data.
Completion timeline: Project identity record gives proposed completion 30/11/2026. A separate Form B document contains a completion undertaking of 23-01-2026, but its project/promoter particulars are internally unclear in the supplied extraction; see the document index below.
Construction / development stage: RERA amenity records show 20% for internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/TOT LOT/park, and aggregate recreational open space; other listed items show 0%. These are filed progress figures, not independent site verification.
Completion / occupancy certificate: No completion certificate or occupancy certificate is included in the supplied project documents.
2. The project story
Green Valley is registered with TG-RERA as a plotted development in Alair, Alair Mandal, Yadadri Bhuvanagiri District. The filed project land is identified by survey numbers 79, 80, 81, 84, 85, 87, 88, 89, 90, 91 and 106, with a reported total/net extent of 68,673 sq. m.
The DTCP layout communication describes a planned layout of 208 plots, with designated road and open-space areas. It also states that the layout becomes legally valid only upon release/approval by the concerned Municipality and fulfillment of the stated layout conditions, including forming internal roads and gifting roads and open spaces to the Municipality. The record supplied here does not establish whether those steps have been completed.
The project information gives a proposed completion date of 30/11/2026. The registration certificate’s validity ended on 13/03/2026 and is marked as not extended in the supplied certificate record; these are separate dates and the supplied materials do not establish a current extension or completion/occupancy certification. RERA-filed progress percentages for several infrastructure items are 20%, while others are 0%; they should not be read as independently inspected construction progress.
3. Master plan, architecture & building design
The approval document is a plotted-layout approval, not a building or tower design record. It identifies 208 plots, a layout area of Ac. 16.975, open space of Ac. 1.698 (10%), and roads area of Ac. 5.95 (35.05%). It also states that building sites shown in ILP.No. 792020/H are for residential dwelling houses. Plot dimensions, plot-size distribution, individual plot numbering, the remaining land-use split, and a drawing-based layout sheet are not available in the supplied extracted records.
The project filing separately records a total/net land area of 68,673 sq. m and approved built-up area of 37,770 sq. m; no supporting building plans or explanation linking the built-up-area figure to the plotted layout is supplied here. No building count, floor configuration, height, footprint, lifts, stairs or apartment floor arrangements are disclosed.
4. Homes, configurations & floor plans
This is registered as a plotted development. The supplied RERA unit data does not include plot counts by size, plot-size bands, booked/available counts or RERA-filed saleable area. The approval communication states 208 plots.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 208 in the DTCP layout communication; RERA inventory count not supplied | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Two drawing records are noted, but both are scans pending measurement; no software-measured carpet or room dimensions are available. Third-party/vendor configuration entries include apartment-size and plot-size claims, but are not used here as RERA-filed offering details.
5. Parking & vehicle circulation
The approval document allocates Ac. 5.95 (35.05%) to roads area and requires internal roads to be formed and kept open for access to neighbouring lands. It does not provide a parking count, designated visitor or accessible parking, parking allocation by plot, or details of parking levels, ramps, EV charging or pedestrian separation.
The RERA filing records mortgage area as 0 sq. m; this is not a parking figure. A plot-specific or exclusive parking entitlement is not established in the supplied evidence.
6. Amenities, recreation & open spaces
The layout approval records public-purpose open space and roads; RERA-filed amenity progress is shown separately below. These percentages are filed progress figures, not independently verified completion status.
| Description / size | Ac. 1.698 (10%) of the approved layout area; approval calls for handover to Alair Municipality through registered gift deed. |
|---|---|
| Evidence source | DTCP layout communication |
| Declared progress / verified status | Sanction-recorded; completion and handover not established. |
| Description / size | Ac. 5.95 (35.05%) of the approved layout area; internal roads are required to be formed and roads handed over to the Municipality. |
|---|---|
| Evidence source | DTCP layout communication |
| Declared progress / verified status | Sanction-recorded; RERA lists internal roads and footpaths at 20%; not independently verified. |
| Description / size | No area or quantity supplied. |
|---|---|
| Evidence source | RERA-filed amenity record |
| Declared progress / verified status | 20% declared; not independently verified. |
| Description / size | No additional size supplied in the RERA progress record. |
|---|---|
| Evidence source | RERA-filed amenity record |
| Declared progress / verified status | 20% declared; not independently verified. |
| Description / size | No size or facility description supplied. |
|---|---|
| Evidence source | RERA-filed amenity record |
| Declared progress / verified status | 0% declared. |
No clubhouse or indoor recreation schedule is disclosed in the supplied project records.
7. Utilities, building services & safety
The DTCP communication lists water supply, sewerage, drainage-disposal systems, street lighting, rainwater-harvesting structure and other civic amenities as layout services. It does not give capacity, design details or completion evidence for these facilities.
| Evidence in the supplied record | Layout communication lists water supply; RERA lists Water Supply. No source, storage, treatment or capacity is supplied. |
|---|---|
| Declared progress / status | RERA progress: 20%; not independently verified. |
| Evidence in the supplied record | Layout communication lists sewerage and drainage disposal systems; RERA lists sewerage and storm-water drains. No STP capacity, reuse or storm-water design is supplied. |
|---|---|
| Declared progress / status | Sewerage and storm-water drains: 20% each in the RERA record; not independently verified. |
| Evidence in the supplied record | Layout communication lists street lighting. RERA lists street lighting and an electrical meter room/sub-station/receiving station. No electrical capacity or backup details are supplied. |
|---|---|
| Declared progress / status | Street lighting and electrical meter room/sub-station/receiving station: 0% in the RERA record. |
| Evidence in the supplied record | Listed in the layout communication and RERA amenity schedule; no system details or capacity supplied. |
|---|---|
| Declared progress / status | RERA progress: 0%. |
| Evidence in the supplied record | Solid waste management and disposal is listed in the RERA amenity schedule. |
|---|---|
| Declared progress / status | 0% declared. |
| Evidence in the supplied record | Fire protection and fire-safety requirements are listed in the RERA amenity schedule; no design or clearance information supplied. |
|---|---|
| Declared progress / status | 0% declared. |
| Evidence in the supplied record | No project-specific RERA drawing or specification establishing lifts, accessible circulation, CCTV/access control or power-backup arrangements is supplied. |
|---|---|
| Declared progress / status | Not established in the supplied project records. |
8. Location, access & connectivity
The project’s filed location is ALAIR, Alair Mandal, Yadadri Bhuvanagiri District, Telangana, PIN 508101. The village is recorded as ALER in the project identity fields, while the DTCP communication describes Alair Revenue Village and Alair Municipality.
The project boundary information identifies a road on the east and other land on the west, north and south. A supplied location record gives the project-area geocode as 17.6467579, 79.0738512 and an approximate sampled distance of 47.1 km to the nearest sampled Outer Ring Road interchange. No approach-road name, public-transport details or other landmark distances are supplied.
9. Developer & development status
The project identity record names SUNKARA SRINIVASA as promoter; the TG-RERA certificate names Mr./Ms. Sunkara Srinivasa Reddy. The supplied data does not establish a legal entity type, corporate registration identifier, registered office or official contact details.
The DTCP layout communication identifies M/S. Sree Somehwara Constructions as owner/applicant, represented by managing partner Sri. V. Venkatesh. The project-party record also identifies SREE SOMESHWARA CONSTRUCTIONS as a landowner under a revenue-share arrangement.
The supplied records do not provide independently verified on-site progress. RERA-listed infrastructure progress and the proposed completion date are summarized above.
10. Approvals, official records & documents
TG-RERA registration: Form C for Green Valley, registration P02000003919, issued 17/01/2022, validity through 13/03/2026.
Principal layout approval: DTCP TLP No. 79/2020/H, approved 16-03-2020, for a plotted layout at Alair; communication identifies file and proceedings numbers and layout plan ILP.No. 792020/H.
Approval conditions / release: The DTCP communication says legal validity depends on release/approval by the concerned Municipality and fulfillment of layout conditions, including formation and gifting of roads and open spaces. The supplied material does not establish completion of those steps.
Title-report materials: Supplied title-report documents include a sale deed, rectification deed, declaration and development-agreement material.
Form B declaration: Document 184192 is extracted as a Form B affidavit, but its extraction identifies S SRINIVASA REDDY as declarant and also names CENTURY HOMES in the completion clause; the supplied document record does not establish that these particulars relate to Green Valley. It is therefore not treated here as verified project-specific evidence of title, encumbrances or completion undertaking.
Completion / occupancy certificate: None supplied in the project document register.
Layout-plan document: A layout-plan filing is listed, but the supplied document record is not extracted.
Frequently asked questions
Is Green Valley registered with Telangana RERA?
Yes. Green Valley is registered with the Telangana Real Estate Regulatory Authority as P02000003919; the registration status is New Project.
Who is the developer of Green Valley?
The promoter named in the RERA registration is SUNKARA SRINIVASA.
Where is Green Valley located?
Green Valley is in ALAIR, ALER, Yadadri Bhuvanagiri, Telangana (508101).
When will Green Valley be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.