Sign in

Alekya Brundavan Phase 5

ALEKYA PROJECTS · Rangareddy · RERA P02400009081

ALEKYA BRUNDAVAN PHASE 5 is a plotted residential development in Pedda Vemuloni Bai Thanda, Kadthal Mandal, Ranga Reddy District, developed by registered promoter ALEKYA PROJECTS, a partnership. The layout covers Ac.7-24 Guntas or Ac.7.60 Cents; 36784.00 Sq. Yds. and includes 96 residential plots, with no plot configurations stated. It is registered under TG-RERA number P02400009081, with proposed completion recorded as 30/11/2026.

01What we found

Period endedTG-RERA registration ran to 18 Jun 2026 - check its extension on TG-RERA
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered projectALEKYA BRUNDAVAN PHASE 5 RERA record
Project typePlotted development; residential layout RERA record RERA filing
Phase / registered portionPhase 5; the registration and layout documents identify the project by this name. RERA record
TG-RERA registrationP02400009081 RERA record
Registration validity18 June 2024 to 18 June 2026, unless extended by the Authority RERA record
Registered promoterALEKYA PROJECTS, a partnership RERA record Corporate record RERA filing
RERA statusThe supplied record identifies this as a “New Project”; registration is recorded. Current registration status after 18 June 2026 is not established by the supplied evidence. RERA record RERA filing

Land and geographic identity

ItemRecord
Revenue villageKadthal Revenue Village RERA record RERA filing
LocalityPedda Vemuloni Bai Thanda; the RERA record also gives Kadthal Revenue Village as the locality.
Mandal / district / PINKadthal Mandal; Ranga Reddy District; 509358 RERA record
Project survey numbers495/P, 496/P and 501/P RERA record Land records
Site extent in layout approvalAc.7-24 Guntas or Ac.7.60 Cents; 36784.00 Sq. Yds.
RERA land-area entryTotal area 30756.11 sq. m; net area 30756.11 sq. m; affected area recorded as 0. RERA filing Land records
Layout-area breakdownLayout area: Ac. 7.60 Cents; 36784.00 Sq. Yds.; buffer area: Ac. 0.028 Cents; 135.52 Sq. Yds.; net layout area: Ac. 7.572 Cents; 36648.48 Sq. Yds.
Boundaries recorded in RERA filingEast: EXISTING DTCP LAYOUT; West: OTHERS LAND; North: OTHERS LAND; South: EXISTING DTCP LAYOU. RERA filing
Site location referenceCadastral parcel centroid: 16.97180, 78.49656. Location record

Development identity

ItemRecord
Sanctioning / approving recordDirector of Town and Country Planning letter for a Draft Technical Layout Pattern, delegated to Pedda Vemuloni Bai Thanda Gram Panchayat Approvals record
Principal approval identifiersDraft - TLP.No.87/2024/H; application 20067/145; letter Lr.Roc.No.20067/145/2024/H/e-Panchayat; approved date 18-06-2024 Approvals record
Layout scale1"=100'-0"
Plots in layout96
Land-use split in approval recordOpen space: 10.00 %, Ac. 0.758 Cents; 3668.72 Sq. Yds.; roads: 25.55 %, Ac. 1.934 Cents; 9360.56 Sq. Yds.; plotted area: 64.45 %, Ac. 4.880 Cents; 23619.20 Sq. Yds.
Mortgage area shown in layout record15.27 %, Ac. 0.745 Cents; 3605.80 Sq. Yds.; specified plots are 17, 18, 21 to 32 and 36.
Buildings, floors and approved built-up areaNot applicable to the filed plotted-layout description; no building or floor configuration, parking-level plan, or approved built-up area is disclosed in the supplied project record. RERA filing Approvals record
Layout approval statusThe supplied approval document describes a draft technical layout pattern and states that it is legally valid only upon release/approval by the concerned Gram Panchayat after fulfilment of layout conditions. Final release is not established in the supplied evidence.

Offering and status

ItemRecord
Offer typeResidential plots; the filed layout identifies 96 plots. Plot-wise RERA saleable areas and inventory counts by size are not supplied here. RERA unit table
Construction stageNo project construction-progress percentage or independently verified site-progress report is supplied. The layout approval lists development works and facilities; that does not establish their completion.
Proposed completion30/11/2026 in the project header; the Form B declaration states completion by 18t June, 2026. The supplied evidence does not establish an approved revision or extension. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. This is a plotted layout; the evidence does not specify an OC scope for plots or any buildings. Document index
Registration validity versus completionRegistration validity is recorded through 18 June 2026, unless extended; this is distinct from the completion dates stated in the project record and Form B. RERA record

2. The project story

  • Alekya Brundavan Phase 5 is registered as a plotted residential development at Pedda Vemuloni Bai Thanda in Kadthal Revenue Village, Kadthal Mandal, Ranga Reddy District. Its approved-plan documents describe land in Sy.Nos. 495/P, 496/P and 501/P and a proposed 96-plot layout. The plan allocates land among plots, roads, open space and a buffer area. RERA record
  • The filed approval is for a Draft Technical Layout Pattern and includes conditions requiring specified plots to be mortgaged to the Gram Panchayat as security for development works. The supplied document says the draft layout is legally valid only upon release/approval by the concerned Gram Panchayat and fulfilment of its conditions. The evidence does not establish final layout release, completion of infrastructure, current construction progress, or completion certification.

3. Master plan, architecture & building design

This is a plotted layout rather than a tower or apartment scheme. The layout approval records 96 plots and the following land-use allocation:

Layout componentArea and share in approval record
Total layout areaAc. 7.60 Cents; 36784.00 Sq. Yds.
Buffer areaAc. 0.028 Cents; 135.52 Sq. Yds.
Net layout areaAc. 7.572 Cents; 36648.48 Sq. Yds.
Plotted areaAc. 4.880 Cents; 23619.20 Sq. Yds.; 64.45%
Road areaAc. 1.934 Cents; 9360.56 Sq. Yds.; 25.55%
Open spaceAc. 0.758 Cents; 3668.72 Sq. Yds.; 10.00%
Mortgage area within plotted areaAc. 0.745 Cents; 3605.80 Sq. Yds.; 15.27%
  • The mortgage plots are listed as Plot Nos. 17, 18, 21 to 32 and 36. The approval says these plots are to be mortgaged to Pedda Vemuloni Bai Thanda Gram Panchayat and are not for sale while under mortgage.
  • The supplied drawing-derived record does not provide plot-by-plot dimensions or arrangement details beyond the approval’s area allocations and plot count. It contains no apartment floor plans or building-level design data. The approval document identifies the plan scale as 1"=100'-0". Floor plans

4. Homes, configurations & floor plans

  • The RERA-filed offering is a plotted layout, not an apartment configuration. The supplied record identifies 96 plots, but does not provide RERA-filed plot-size bands, plot-wise saleable areas, or booked and available counts. RERA unit table
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots96 in the approved-plan recordNot suppliedNot suppliedPlot-wise areas not suppliedNot applicable / not measuredNot supplied
  • Two layout drawings remain pending scanning and no drawing-based plot measurements are available in the supplied evidence. The third-party listing includes plot-size figures, but those are not presented here as TG-RERA-filed sizes. Floor plans Promoter website

5. Parking & vehicle circulation

  • The supplied approval record does not state parking-space counts, visitor or accessible parking provision, or a parking allocation for buyers. It describes roads within the layout and requires that all roads be opened for access to neighbouring sites; it also says the developer shall not construct a compound wall or fencing around the site. No road-width figures or detailed driveway/circulation plan are provided in the approval facts supplied for this section.
  • The RERA amenity record marks Internal Roads & Footpaths as “YES,” but records 0% progress. This is a filed status entry, not evidence that roads or footpaths are complete. RERA amenities

6. Amenities, recreation & open spaces

Clubhouse / indoor

No clubhouse, indoor recreation facility, or community-building size or capacity is established by the supplied layout-approval documents. A third-party listing names a clubhouse, fitness center and gym; these are not treated as RERA-filed or approved facilities here. Promoter website

Sports / recreation

No specific sports facility is identified in the supplied layout approval. A third-party listing names a swimming pool, yoga areas, jogging/cycle track and sports areas, but the supplied RERA layout record does not establish these as approved or delivered amenities. Promoter website

Landscape / open space

The layout approval provides 10.00% open space, recorded as Ac. 0.758 Cents; 3668.72 Sq. Yds. It also lists avenue plantation in public open spaces. The supplied record does not establish the planting or open space as completed.

Convenience / community

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsNo dimensions or completed-area figures suppliedRERA amenities record“YES”; 0% recorded; completion not independently verified RERA amenities
Water supplyApproval lists protected water supply system; no capacity suppliedDraft layout approvalProposed/listed; completion not established
Sewerage disposalApproval lists a sewerage disposal system; no capacity suppliedDraft layout approvalProposed/listed; completion not established
Rainwater harvestingApproval lists rain water harvesting pitsDraft layout approvalProposed/listed; completion not established
Street lighting and electricityApproval lists street lighting and electricity facilitiesDraft layout approvalProposed/listed; completion not established
Solid-waste managementRERA amenities record marks “YES”; no capacity or method suppliedRERA amenities record0% recorded; completion not independently verified RERA amenities
Open space / parkAc. 0.758 Cents; 3668.72 Sq. Yds.; 10.00%Draft layout approvalArea allocated in plan; delivery and landscaping not verified

The RERA amenities record also lists storm-water drains, water conservation/rainwater harvesting, energy management, fire protection and safety requirements, electrical meter room/sub-station/receiving station, community buildings, sewage/sullage treatment and an aggregate recreational open-space area. The supplied record does not provide capacities or establish completion for these items; several entries have no “YES” status and show 0%. RERA amenities

7. Utilities, building services & safety

  • The draft layout approval lists a protected water supply system, sewerage disposal system, rain water harvesting pits, and street lighting and electricity facilities. It does not state water source, storage or treatment capacities; sewage treatment specifications; storm-water drainage design; electrical-supply capacity or backup; or fire-system details. The RERA amenities record lists storm-water drains, energy management, fire protection and an electrical meter room/sub-station/receiving station, but provides no capacities and records 0% for the listed items. These entries establish filed or listed provisions, not completed facilities or statutory compliance. RERA amenities
  • No evidence is supplied on waste segregation arrangements beyond the RERA-listed solid-waste management and disposal entry, or on security systems, accessibility features, lifts or building life-safety arrangements. These building-specific services are not established for the plotted layout in the supplied records. RERA amenities Document index

8. Location, access & connectivity

  • The registered project location is Kadthal, Kadthal Mandal, Ranga Reddy District, Telangana 509358, in Kadthal Revenue Village. The layout approval identifies Pedda Vemuloni Bai Thanda Gram Panchayat and the survey parcels 495/P, 496/P and 501/P. The recorded cadastral parcel centroid is 16.97180, 78.49656. RERA record Location record
  • The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 29.6 km. No route, travel-time estimate, public-transport service details, or additional verified nearby landmarks are supplied. Location record

9. Developer & development status

  • The TG-RERA-registered promoter is ALEKYA PROJECTS, identified in the supplied record as a partnership. The registered promoter GSTIN is 36ABUFA4605N2ZW. The RERA record identifies SRINIVAS REDDY KESIREDDY as an authorized signatory. Corporate record RERA filing Parties record
  • The registration certificate gives the project registration number P02400009081 and a validity period from 18/06/2024 to 18/06/2026, unless extended by the Authority. The promoter’s Form B declaration states that the project would be completed by 18t June, 2026; the project header separately records 30/11/2026 as proposed completion. No extension order, current progress certification or site verification is supplied here. RERA record
  • The supplied promoter address is Plot No 3, Green Hills Colony, Road No 2, Pedda Vemulori Bai Thanda, Kadthal Revenue Village, Kadthal, Ranga Reddy, 509358. The registration certificate also records an address for Alekya Projects at Village: Mandal: Saroornagar, District: Ranga Reddy, Pin: 500035. No official website or contact details are supplied. Parties record

10. Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registrationForm C registration certificate for ALEKYA BRUNDAVAN PHASE 5, registration P02400009081, valid from 18/06/2024 to 18/06/2026 unless extended
Draft technical layout approvalDirector of Town and Country Planning letter Draft - TLP.No.87/2024/H, dated 18-06-2024, for Sy.Nos. 495/P, 496/P and 501/P, delegated to Pedda Vemuloni Bai Thanda Gram Panchayat; states 96 plots and lists layout conditions
Gram Panchayat draft layout recordT.L.P. No. 87/2024/H; file C.NO. 20067 / 145 / 2024 / e-panchayat; records site-area breakdown, roads, open space, plot area and mortgage plots. The document states that legal validity depends on release/approval by the concerned Gram Panchayat and fulfilment of conditions.
Layout drawingsDraft technical layout pattern; plan scale 1"=100'-0". Final layout release is not established by the supplied documents.
Form B promoter declarationDeclaration by Kesireddy Srinivas Reddy for the project; dated 11* day of Nov, 2024; includes title, encumbrance and completion declarations.
Occupancy / completion certificateNot supplied; no certificate status for this plotted layout is established by the available documents. Document index

Frequently asked questions

Is ALEKYA BRUNDAVAN PHASE 5 registered with Telangana RERA?

Yes. ALEKYA BRUNDAVAN PHASE 5 is registered with the Telangana Real Estate Regulatory Authority as P02400009081; the registration status is New Project.

Who is the developer of ALEKYA BRUNDAVAN PHASE 5?

The promoter named in the RERA registration is ALEKYA PROJECTS.

Where is ALEKYA BRUNDAVAN PHASE 5 located?

ALEKYA BRUNDAVAN PHASE 5 is in Kadthal Revenue Village, Kadthal, Rangareddy, Telangana (509358).

When will ALEKYA BRUNDAVAN PHASE 5 be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Kadthal