Aravind Infra Projects
KALAPATI · Rangareddy · RERA P02400005816
ARAVIND INFRA PROJECTS is a plotted development in TALAKONDAPALLY, Thalakondapally Mandal, Ranga Reddy District. The TG-RERA certificate names Kalapati Deepika as the registered promoter developing the project. The filed draft-layout approval records 156 residential plots; the supplied record does not state a tower or block count, floor count, or plot configurations. The project is registered under TG-RERA registration P02400005816, and the promoter’s Form B declaration gives 05/02/2025 as the project completion date.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | ARAVIND INFRA PROJECTS RERA record |
| Project type | Plotted development; the filed approval documents describe an open-plotted residential layout. RERA filing |
| Phase / registered portion | No separate phase name or phase-wise extent is disclosed. The RERA certificate identifies Survey Nos. 305/P and 306/P. |
| TG-RERA registration | P02400005816 |
| Registration validity | 15/03/2023 to 05/02/2025; the certificate records no extension. This is the registration period, not a statement of current project completion or occupancy. |
| Registered promoter | The certificate names Kalapati Deepika; the project identity record lists the promoter as KALAPATI. Corporate record |
| RERA status in supplied record | Certificate records registration under TG-RERA. No extension is recorded on the certificate. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | TALAKONDAPALLY RERA record RERA filing |
| Revenue village | Talakondapally Revenue Village; also rendered as Talakondapalle/Talakondapally in filed documents. RERA filing |
| Mandal | Thalakondapally RERA record |
| District | Ranga Reddy RERA record |
| PIN | 509321 RERA record |
| Project survey numbers / subdivisions | 305/P and 306/P; the registration certificate and layout approval use these identifiers. |
| Registered site extent | RERA land details state 40,569.73 sq. m total area, 10,327.57 sq. m affected in road widening/FTL of tanks/nala widening, and 30,242.16 sq. m net area. RERA filing |
| Layout approval extent | The filed draft-layout approval states Ac. 10-01 Guntas or Ac. 10.025 Cents; 48521,00 Sq. Yds. |
| Boundaries in RERA filing | East: 40FT ROAD; West: OTHERS LAND; North: OTHERS LAND; South: WIDE ROAD. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning; the filed approval records delegation to Talakondapally Gram Panchayat. Approvals record |
| Principal draft-layout approval | Draft - TLP.No.28/2022/H, reference Lr.Roc.No.10327/253/2022/e-Panchayat, dated 05-02-2022. Approvals record |
| Subsequent approval order | GP/TKP/32-2022, application 10327/263/2022/E-Panchayat, with an approval date recorded as 01/12 2024. Approvals record |
| Approved layout scale | The draft-layout document records 156 plots. It allocates 10.00 % to open space, 25.45 % to roads and 64.55 % to plotted area. |
| Approved built-up area | Not disclosed in the supplied record; this is a plotted layout, not a filed multi-storey building project. RERA filing |
| Buildings, floors and parking levels | No building count, floor configuration or parking-level plan is established by the supplied project documents. Document index |
Offering and status
| Item | Record |
|---|---|
| Offered product | Residential plots in an open-plotted layout; the filed draft-layout approval records 156 plots. |
| Plot sizes / plot-wise inventory | Not disclosed in the supplied extracted project records. RERA unit table Layout record |
| Booked / available plots | Not available in the supplied evidence. RERA unit table |
| Completion deadline | The promoter’s Form B declaration gives 05/02/2025 as the project completion date. |
| Construction / development stage | RERA amenity-progress entries supplied here show 0 for each of the 14 listed infrastructure or facility categories; this is a filed progress figure, not an independent site inspection. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied record. The evidence concerns a plotted layout; it does not establish completed or occupancy-certified portions. Document index |
2. The project story
ARAVIND INFRA PROJECTS is registered as a plotted development at Talakondapally, in Ranga Reddy District. Its registered land identity is Survey Nos. 305/P and 306/P, and the filed draft-layout approval describes a residential open-plotted layout with 156 plots.
The layout document allocates land among plotted area, roads and open space, and records development obligations including roads, drains, street lighting, electricity, sewerage disposal and protected water supply. The promoter’s Form B declares 05/02/2025 as the completion date. The supplied RERA progress entries show 0 for the listed infrastructure categories; no independent site-progress verification or completion/occupancy certificate is supplied. RERA amenities
3. Master plan, architecture & building design
The project evidence describes a plotted layout, not a block or tower scheme. The filed draft-layout plan records 156 plots and a land-use allocation of 64.55 % plotted area, 25.45 % road area and 10.00 % open space. It also identifies Plot Nos. 23 to 48, covering 4772.24 Sq. Yards (stated as 15.23 %), as the area to be mortgaged to Talakondapally Gram Panchayat.
The layout conditions call for formation of roads, drains and nala channelization, greenery, fencing of open spaces, street lighting, electricity, sewerage disposal and protected water supply. The approval also states that the open-space and road areas are to be handed over to the Gram Panchayat by registered gift deed before release of the final layout. These are approval conditions; the supplied record does not establish their completion.
No building footprint, floor plan, approved building height, apartment arrangement or approved built-up area is provided. The available floor-plan set has two drawings, but both are scans pending measurement; no software-measured carpet area is available. RERA filing Floor plans
4. Homes, configurations & floor plans
This is a plotted project, and the supplied records do not include a plot-wise RERA inventory, plot-size bands, booked/available counts or saleable-area schedule. The approval records 156 plots; that is the approved layout count, not evidence of current inventory or sales status. RERA unit table Layout record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 156 in the filed draft-layout approval | Not available | Not available | Not disclosed | Not applicable | Not supplied |
The two available floor-plan drawings remain unmeasured scans. No room dimensions, unit orientations, balcony/utility areas or carpet-area measurements can therefore be reported. Floor plans
5. Parking & vehicle circulation
The supplied project records do not establish parking-space counts, visitor or accessible parking, parking arrangements, or a plot-wise parking allocation. The layout approval requires roads to be opened for access to neighbouring sites and calls for roads to be formed, but does not provide a road-width schedule or a vehicle-circulation drawing in the extracted evidence. Document index
6. Amenities, recreation & open spaces
The filed layout approval identifies open space and several development works. RERA progress entries list 14 infrastructure/facility categories, each with a progress value of 0; no independent verification of completion is supplied. RERA amenities
| Description / size | 10.00 %; Ac. 1.003 Cents; 4854.52 Sq. Yds. in the draft-layout document |
|---|---|
| Declared progress / verified status | Approval allocation; RERA progress entry 0; completion not independently verified. |
| Description / size | 25.45 %; Ac. 2.552 Cents; 12351.68 Sq. Yds. |
|---|---|
| Declared progress / verified status | Approval allocation; RERA progress entry for internal roads and footpaths 0; completion not independently verified. |
| Description / size | Approval conditions refer to greenery and fencing of open spaces; no facility size or planting quantity is stated. |
|---|---|
| Declared progress / verified status | Required in the approval conditions; RERA green-strip/park progress entry 0. |
| Description / size | Listed as a RERA progress category; no specific building or size is disclosed. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress entry 0; no independent verification. |
| Description / size | Listed among layout development works. |
|---|---|
| Declared progress / verified status | RERA progress entry 0; no independent verification. |
7. Utilities, building services & safety
The layout approval requires the developer to undertake electricity, sewerage disposal and protected-water-supply works, as well as drains and nala channelization. The RERA progress register also lists water supply, sewerage and storm-water drains, solid-waste management, rainwater harvesting, energy management, fire protection, and electrical meter/sub-station/receiving-station facilities; each supplied progress value is 0. The documents do not state capacities, system designs or completion status, and no independent service or safety inspection is supplied. RERA amenities
The evidence does not specify water sources or storage, a treatment plant or reuse capacity, electrical supply or backup capacity, fire-system design, accessibility provisions, CCTV or access-control arrangements. These details cannot be confirmed from the supplied project record. Document index RERA amenities
8. Location, access & connectivity
The registered location is TALAKONDAPALLY, Talakondapally Revenue Village, Thalakondapally Mandal, Ranga Reddy District, Telangana, 509321. The project location record provides a cadastral parcel centroid of 16.890740045194715, 78.44013246813682. RERA record RERA filing Location record
The supplied connectivity record lists the nearest sampled Outer Ring Road interchange at approximately 37.7 km. No other measured road, public-transport or landmark distances are available in the project evidence. Location record
9. Developer & development status
The TG-RERA certificate identifies Kalapati Deepika as promoter; the project identity record uses KALAPATI. The supplied records do not establish the promoter’s legal-entity type, corporate registration identifiers, registered office details, official website or project contact details. Corporate record Parties record
The promoter’s Form B declaration gives 05/02/2025 as the completion date. The supplied RERA progress entries show 0 across the listed project infrastructure categories, but no site inspection or independently verified construction-progress report is included. No occupancy or completion certificate is provided. RERA amenities Document index
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA Form C certificate | Project ARAVIND INFRA PROJECTS, registration P02400005816, promoter Kalapati Deepika, Survey Nos. 305/P and 306/P; certificate validity 15/03/2023 to 05/02/2025, with no extension recorded on the certificate. |
| Draft Technical Layout Pattern approval | Director of Town and Country Planning approval Draft - TLP.No.28/2022/H, reference Lr.Roc.No.10327/253/2022/e-Panchayat; records a 156-plot layout and conditions for development and final-layout release. |
| Subsequent layout approval order | GP/TKP/32-2022, application 10327/263/2022/E-Panchayat; the extracted record describes approval of a residential draft open-plotted layout. |
| Promoter Form B declaration | Form B declaration dated 03-12-2022; identifies Kalapati Deepika and states a completion date of 05/02/2025. |
| Layout plan document | The RERA filing includes a layout-plan document entry, but the supplied record does not provide an extracted plan from which plot-wise dimensions or the complete drawing can be described. |
| Completion / occupancy record | No completion or occupancy certificate is supplied. Document index |
1. Project at a glance
Project identity
Registered project name: ARAVIND INFRA PROJECTS
Project type: Plotted development; the filed approval documents describe an open-plotted residential layout.
Phase / registered portion: No separate phase name or phase-wise extent is disclosed. The RERA certificate identifies Survey Nos. 305/P and 306/P.
TG-RERA registration: P02400005816
Registration validity: 15/03/2023 to 05/02/2025; the certificate records no extension. This is the registration period, not a statement of current project completion or occupancy.
Registered promoter: The certificate names Kalapati Deepika; the project identity record lists the promoter as KALAPATI.
RERA status in supplied record: Certificate records registration under TG-RERA. No extension is recorded on the certificate.
Land and geographic identity
Locality: TALAKONDAPALLY
Revenue village: Talakondapally Revenue Village; also rendered as Talakondapalle/Talakondapally in filed documents.
Mandal: Thalakondapally
District: Ranga Reddy
PIN: 509321
Project survey numbers / subdivisions: 305/P and 306/P; the registration certificate and layout approval use these identifiers.
Registered site extent: RERA land details state 40,569.73 sq. m total area, 10,327.57 sq. m affected in road widening/FTL of tanks/nala widening, and 30,242.16 sq. m net area.
Layout approval extent: The filed draft-layout approval states Ac. 10-01 Guntas or Ac. 10.025 Cents; 48521,00 Sq. Yds.
Boundaries in RERA filing: East: 40FT ROAD; West: OTHERS LAND; North: OTHERS LAND; South: WIDE ROAD.
Development identity
Sanctioning authority: Director of Town and Country Planning; the filed approval records delegation to Talakondapally Gram Panchayat.
Principal draft-layout approval: Draft - TLP.No.28/2022/H, reference Lr.Roc.No.10327/253/2022/e-Panchayat, dated 05-02-2022.
Subsequent approval order: GP/TKP/32-2022, application 10327/263/2022/E-Panchayat, with an approval date recorded as 01/12 2024.
Approved layout scale: The draft-layout document records 156 plots. It allocates 10.00 % to open space, 25.45 % to roads and 64.55 % to plotted area.
Approved built-up area: Not disclosed in the supplied record; this is a plotted layout, not a filed multi-storey building project.
Buildings, floors and parking levels: No building count, floor configuration or parking-level plan is established by the supplied project documents.
Offering and status
Offered product: Residential plots in an open-plotted layout; the filed draft-layout approval records 156 plots.
Plot sizes / plot-wise inventory: Not disclosed in the supplied extracted project records.
Booked / available plots: Not available in the supplied evidence.
Completion deadline: The promoter’s Form B declaration gives 05/02/2025 as the project completion date.
Construction / development stage: RERA amenity-progress entries supplied here show 0 for each of the 14 listed infrastructure or facility categories; this is a filed progress figure, not an independent site inspection.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied record. The evidence concerns a plotted layout; it does not establish completed or occupancy-certified portions.
2. The project story
ARAVIND INFRA PROJECTS is registered as a plotted development at Talakondapally, in Ranga Reddy District. Its registered land identity is Survey Nos. 305/P and 306/P, and the filed draft-layout approval describes a residential open-plotted layout with 156 plots.
The layout document allocates land among plotted area, roads and open space, and records development obligations including roads, drains, street lighting, electricity, sewerage disposal and protected water supply. The promoter’s Form B declares 05/02/2025 as the completion date. The supplied RERA progress entries show 0 for the listed infrastructure categories; no independent site-progress verification or completion/occupancy certificate is supplied.
3. Master plan, architecture & building design
The project evidence describes a plotted layout, not a block or tower scheme. The filed draft-layout plan records 156 plots and a land-use allocation of 64.55 % plotted area, 25.45 % road area and 10.00 % open space. It also identifies Plot Nos. 23 to 48, covering 4772.24 Sq. Yards (stated as 15.23 %), as the area to be mortgaged to Talakondapally Gram Panchayat.
The layout conditions call for formation of roads, drains and nala channelization, greenery, fencing of open spaces, street lighting, electricity, sewerage disposal and protected water supply. The approval also states that the open-space and road areas are to be handed over to the Gram Panchayat by registered gift deed before release of the final layout. These are approval conditions; the supplied record does not establish their completion.
No building footprint, floor plan, approved building height, apartment arrangement or approved built-up area is provided. The available floor-plan set has two drawings, but both are scans pending measurement; no software-measured carpet area is available.
4. Homes, configurations & floor plans
This is a plotted project, and the supplied records do not include a plot-wise RERA inventory, plot-size bands, booked/available counts or saleable-area schedule. The approval records 156 plots; that is the approved layout count, not evidence of current inventory or sales status.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 156 in the filed draft-layout approval | Not available | Not available | Not disclosed | Not applicable | Not supplied |
The two available floor-plan drawings remain unmeasured scans. No room dimensions, unit orientations, balcony/utility areas or carpet-area measurements can therefore be reported.
5. Parking & vehicle circulation
The supplied project records do not establish parking-space counts, visitor or accessible parking, parking arrangements, or a plot-wise parking allocation. The layout approval requires roads to be opened for access to neighbouring sites and calls for roads to be formed, but does not provide a road-width schedule or a vehicle-circulation drawing in the extracted evidence.
6. Amenities, recreation & open spaces
The filed layout approval identifies open space and several development works. RERA progress entries list 14 infrastructure/facility categories, each with a progress value of 0; no independent verification of completion is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space | 10.00 %; Ac. 1.003 Cents; 4854.52 Sq. Yds. in the draft-layout document | Approval allocation; RERA progress entry 0; completion not independently verified. | |
| Roads | 25.45 %; Ac. 2.552 Cents; 12351.68 Sq. Yds. | Approval allocation; RERA progress entry for internal roads and footpaths 0; completion not independently verified. | |
| Greenery / open-space treatment | Approval conditions refer to greenery and fencing of open spaces; no facility size or planting quantity is stated. | Required in the approval conditions; RERA green-strip/park progress entry 0. | |
| Community buildings | Listed as a RERA progress category; no specific building or size is disclosed. | RERA progress entry 0; no independent verification. | |
| Street lighting | Listed among layout development works. | RERA progress entry 0; no independent verification. |
7. Utilities, building services & safety
The layout approval requires the developer to undertake electricity, sewerage disposal and protected-water-supply works, as well as drains and nala channelization. The RERA progress register also lists water supply, sewerage and storm-water drains, solid-waste management, rainwater harvesting, energy management, fire protection, and electrical meter/sub-station/receiving-station facilities; each supplied progress value is 0. The documents do not state capacities, system designs or completion status, and no independent service or safety inspection is supplied.
The evidence does not specify water sources or storage, a treatment plant or reuse capacity, electrical supply or backup capacity, fire-system design, accessibility provisions, CCTV or access-control arrangements. These details cannot be confirmed from the supplied project record.
8. Location, access & connectivity
The registered location is TALAKONDAPALLY, Talakondapally Revenue Village, Thalakondapally Mandal, Ranga Reddy District, Telangana, 509321. The project location record provides a cadastral parcel centroid of 16.890740045194715, 78.44013246813682.
The supplied connectivity record lists the nearest sampled Outer Ring Road interchange at approximately 37.7 km. No other measured road, public-transport or landmark distances are available in the project evidence.
9. Developer & development status
The TG-RERA certificate identifies Kalapati Deepika as promoter; the project identity record uses KALAPATI. The supplied records do not establish the promoter’s legal-entity type, corporate registration identifiers, registered office details, official website or project contact details.
The promoter’s Form B declaration gives 05/02/2025 as the completion date. The supplied RERA progress entries show 0 across the listed project infrastructure categories, but no site inspection or independently verified construction-progress report is included. No occupancy or completion certificate is provided.
10. Approvals, official records & documents
TG-RERA Form C certificate: Project ARAVIND INFRA PROJECTS, registration P02400005816, promoter Kalapati Deepika, Survey Nos. 305/P and 306/P; certificate validity 15/03/2023 to 05/02/2025, with no extension recorded on the certificate.
Draft Technical Layout Pattern approval: Director of Town and Country Planning approval Draft - TLP.No.28/2022/H, reference Lr.Roc.No.10327/253/2022/e-Panchayat; records a 156-plot layout and conditions for development and final-layout release.
Subsequent layout approval order: GP/TKP/32-2022, application 10327/263/2022/E-Panchayat; the extracted record describes approval of a residential draft open-plotted layout.
Promoter Form B declaration: Form B declaration dated 03-12-2022; identifies Kalapati Deepika and states a completion date of 05/02/2025.
Layout plan document: The RERA filing includes a layout-plan document entry, but the supplied record does not provide an extracted plan from which plot-wise dimensions or the complete drawing can be described.
Completion / occupancy record: No completion or occupancy certificate is supplied.
Frequently asked questions
Is ARAVIND INFRA PROJECTS registered with Telangana RERA?
Yes. ARAVIND INFRA PROJECTS is registered with the Telangana Real Estate Regulatory Authority as P02400005816; the registration status is New Project.
Who is the developer of ARAVIND INFRA PROJECTS?
The promoter named in the RERA registration is KALAPATI.
Where is ARAVIND INFRA PROJECTS located?
ARAVIND INFRA PROJECTS is in TALAKONDAPALLY, Thalakondapally, Rangareddy, Telangana (509321).
When will ARAVIND INFRA PROJECTS be completed?
The promoter's proposed date of completion filed with RERA is 05/02/2025. This is the promoter's declaration, not a guarantee.