Sign in

Ayaan S Gokuldham - Block B

AYAAN DEVELOPERS · Suryapet · RERA P01900007526

AYAAN S GOKULDHAM - BLOCK B is a residential apartment project in Pillalamarri, Suryapet Mandal, Suryapet District. The registered promoter is AYAAN DEVELOPERS. The project is on 9813.85 sq. mt. of land and comprises 1 residential apartment building with 1 Cellar + 1 Ground + 5 upper floors and 72 homes: 42 2BHK and 30 3BHK. It is registered under TG-RERA number P01900007526, with proposed completion on 15/01/2027.

More from Ayaan Developers · 2 projects →

01What we found

Period endedTG-RERA registration ran to 15 Sep 2026 - check its extension on TG-RERA
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Pillalamarry, Suryapet, Suryapet · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameAYAAN S GOKULDHAM - BLOCK B RERA record
Project type / registered portionResidential apartment project; registered portion is Block B RERA record
TG-RERA registration numberP01900007526 Approvals record
Registration validity04/01/2024 to 15/09/2026, unless extended by the Authority Approvals record
RERA statusThe record identifies the project as New Project; the registration certificate is on file RERA record
Registered promoterAYAAN DEVELOPERS RERA record Corporate record

Land and geographic identity

ItemRecord
LocalityPillalamarri RERA record Land records
Revenue village(s)Pillalamarry (project identity and RERA record); the building-permit extraction also identifies Pillalamarri and, in its gist, Gandhinagar. Revenue-village identity for the latter reference is not independently verified here. RERA record Land records
Mandal / district / PINSuryapet / Suryapet / 508376 RERA record
Project survey numbers296A/1, 296A/2, 296A/3, 297/A Land records
Registered site extent9813.85 sq. mt. RERA filing
Total and net areaTotal land area 9813.85 sq. m; net area 9813.85 m²; road-affected area recorded as 0 in the building-permit extraction RERA filing
Boundaries recorded in RERA fieldsNorth: 60 Feet Wide Road; south: 100 Feet Wide Road; east and west: Neighbours Land RERA filing

Development identity

ItemRecord
Principal building approval0015/BP/3049/2023, dated 15 September, 2023, issued by Suryapet Municipality/Municipal Corporation Approvals record
Additional approval referenceFile No. 007570/BP/DTCP/3049/0025/2023 Approvals record
Approved built-up area8716.50 m² net built-up area; the plan extraction separately records total built-up area 12006.26 and proposed built-up area including parking 11807.50. These are distinct figures in the filed approval record.
Building count and configuration1 residential apartment building; 1 Cellar + 1 Ground + 5 upper floors
HeightBuilding height 17.95 MT. from GL; total height 20.95mt. as recorded in the layout-plan extraction
Parking provision in approval extractionParking area 3091.00; proposed visitor parking area 897.19; No of Cars Proposed: 8
Unit counts72 units in the building-plan extraction and RERA unit record: 42 2BHK and 30 3BHK RERA unit table

Offering and status

ItemRecord
RERA-filed configurations2BHK and 3BHK RERA unit table
RERA-filed saleable areas2BHK: 123.98 sqm; 3BHK: 142.14 sqm RERA unit table
Booked / available2BHK: 0 booked / 42 available; 3BHK: 0 booked / 30 available. These portal counts have no supplied as-of date and are indicative. RERA unit table
Construction stageNo independently verified site-progress status is supplied. The RERA amenities record shows 0% against its listed progress items; this does not establish the physical construction stage. RERA amenities
Completion dateRERA project information records proposed completion 15/01/2027; the Form B declaration states an undertaking to complete by 15th SEPTEMBER 2026. RERA record
Occupancy certificate (OC)No OC is supplied in the evidence. The commencement/building-permit document states that an OC is compulsory before occupation.

Registration validity, the stated completion timelines and the absence of a supplied OC are separate matters; none should be treated as a statement that construction is complete.

2. The project story

AYAAN S GOKULDHAM - BLOCK B is a registered residential apartment project on 9813.85 sq. mt. of land identified in the RERA record as 296A/1, 296A/2, 296A/3 and 297/A, in Pillalamarry, Suryapet Mandal and District. The filed record describes one apartment building, rather than a multi-tower development. RERA record Land records

The approved building arrangement is a cellar, ground floor and five upper floors. The RERA unit record lists 72 homes: 42 2BHK and 30 3BHK. The evidence does not establish current construction progress through an independently verified site inspection, and no occupancy certificate is supplied. The project should therefore be understood as registered and approved for construction, not as independently verified completed or occupation-certified. RERA unit table

3. Master plan, architecture & building design

The building-plan extraction describes one residential apartment building on a net site area of 9813.85 m², with 8716.50 recorded as net built-up area. It also reports total built-up area 12006.26, proposed built-up area including parking 11807.50, and parking area 3091.00; the record labels these separately, so they should not be treated as interchangeable measures.

The sanctioned floor configuration is 1 Cellar + 1 Ground + 5 upper floors, with a recorded building height of 17.95 MT. from GL and total height 20.95mt. The extraction identifies typical floor plans for floors 2, 3, 4 and 5. It does not provide a verified count of homes per floor, lifts, stairs beyond the listed staircase, or a complete account of internal circulation and common-area distribution.

The plan extraction lists a 4.8M WIDE DRIVEWAY, 5.0M WIDE DRIVEWAY, 4.5M WIDE DRIVEWAY, and a vehicular ramp described as 24.00 mt. long 3.00 mt. High 6.80 mt. Wide Vehicular Ramp. It also lists a green strip, tot-lot, utility, sump, overhead water tank, transformer, lift and lift machine room. These are items in the plan extraction; the evidence does not establish their completion.

4. Homes, configurations & floor plans

The RERA filing supplies the unit counts and saleable areas below. Carpet-area ranges and loading figures are software measurements from approved-plan drawing geometry, not RERA-filed carpet-area disclosures; the source says the measurements need review. Saleable area includes the home’s share of common areas and is not the same measure as carpet area. Balconies are shown separately in the drawings and are excluded from the reported software-measured carpet areas. RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK42042123.98 sqm57.4–81.1 sqm; median 72.3 sqm (software-measured)42% (software-derived)
3BHK30030142.14 sqm75.4–95.5 sqm; median 87.4 sqm (software-measured)39% (software-derived)

One measured 2BHK drawing identifies a drawing room, dining area, kitchen, two bedrooms, two toilets and balconies, including a 1.03 M. WIDE BALC and a 1.33 M. WIDE BALC. One measured 3BHK drawing identifies a drawing room, dining area, kitchen, three bedrooms, three toilets and balconies, including 1.03 M. WIDE BALC entries. These are drawing-based examples, not a statement that every unit has the same arrangement.

The software measurement set covers 14 2BHK designs and 10 3BHK designs from the approved floor-plan document. The supplied measurement summary flags 6 designs in each configuration as needing review. Floor plans RERA unit details

5. Parking & vehicle circulation

The building-plan extraction records parking area 3091.00, required parking area 1917.63, proposed visitor parking area 897.19, and No of Cars Proposed: 8. It does not supply a total count of resident parking spaces, two-wheeler spaces, accessible spaces, or a unit-by-unit parking allocation. A drawn or proposed parking space does not by itself establish exclusive allocation or ownership.

The plan lists one cellar and a vehicular ramp, together with driveways of 4.8M, 5.0M and 4.5M width. The filed plan conditions state that parking places are to be provided with electric-vehicle charging infrastructure in accordance with the cited requirements; the evidence does not confirm installation or the number of chargers.

6. Amenities, recreation & open spaces

The RERA amenities record lists the items below and records 0% progress for each listed item. That portal status is not an independent physical verification. The building-plan extraction separately names several facilities and utilities; their inclusion there indicates plan-filed provision, not delivery. RERA amenities

Green strip / tot-lot / park
Description / sizeListed as a project amenity; no size supplied in the RERA amenities record. Plan extraction lists a green strip and tot-lot.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenities record: 0%; not independently verified complete.
Tot-lot
Description / sizeThe building-permit condition says it is to be fenced and maintained as greenery before OC; no size supplied.
Declared progress / verified statusCondition recorded; completion not verified.
Community buildings
Description / sizeListed in RERA amenities; no description or size supplied.
Evidence sourceRERA amenities
Declared progress / verified status0%; not independently verified complete.
Internal roads and footpaths
Description / sizeListed in RERA amenities; plan extraction also records driveways.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenities record: 0%; not independently verified complete.
Street lighting
Description / sizeListed in RERA amenities; no details supplied.
Evidence sourceRERA amenities
Declared progress / verified status0%; not independently verified complete.

7. Utilities, building services & safety

The RERA amenities record marks water supply, sewerage, storm-water drains, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available, while recording 0% progress for the listed items. “Available: YES” is a filing entry and is not independent evidence that a system is installed or operational. RERA amenities

The building-plan extraction lists a Sump, Overhead WaterTank, RAIN WATER HARVESTING, a rainwater-harvesting structure/percolation pit, a transformer, garbage house, lift, lift machine room and staircase. It also includes a dual-piping-system condition and construction-phase dust and worker-safety directions. The evidence does not specify water sources, storage capacity, treatment capacity, STP capacity, lift count or capacity, backup power, CCTV, access control, or completed accessibility provisions.

The commencement/building-permit document states that an occupancy certificate is compulsory before occupation and that a transformer space is to be provided with resident safety in view. It does not by itself establish that the required systems have been installed, tested or cleared.

8. Location, access & connectivity

The registered project location is Pillalamarry, Suryapet Mandal, Suryapet District, Telangana, PIN 508376. The RERA land-boundary fields describe a 60 Feet Wide Road to the north and a 100 Feet Wide Road to the south. The building-plan extraction also refers to an 18M road and lists 18Mt Old R & B Road, 30.00 MT WIDE EXISTING ROAD and 30.00 MT WIDE PROPOSED ROAD; these are plan-extraction descriptions, not independently verified current road conditions. RERA record RERA filing

The supplied location record gives the nearest sampled Outer Ring Road interchange at 102.2 km. No public-transport details or further measured landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is AYAAN DEVELOPERS, identified in the RERA record as a Partnership. Its supplied corporate identifier is GSTIN 36ABRFA5606L1Z1. The record names RAMANAIAH GUDE as authorized signatory and BALAKOTAIAH KARNATI as partner. Corporate record Parties record

The project Form B declaration, signed by GUDE RAMANAIAH as authorized signatory, states a completion undertaking of 15th SEPTEMBER 2026. The project-information record separately gives 15/01/2027 as proposed completion. No independently verified construction progress or OC is supplied. RERA record

The RERA registration certificate identifies the promoter’s address as Village: Puppalguda, Mandal: Gandipet, District: Ranga Reddy, PIN 500089. The supplied evidence does not provide an official promoter website or contact details.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01900007526; valid 04/01/2024–15/09/2026
Scope and evidenceForm C certificate for AYAAN S GOKULDHAM - BLOCK B; identifies the promoter, project location and survey numbers.
Building permission
Identifier / date0015/BP/3049/2023; 15 September, 2023
Scope and evidenceSuryapet Municipality/Municipal Corporation approval for a residential building on survey numbers 296A/1, 296A/2, 296A/3 and 297/A; records one cellar, ground floor and five upper floors.
Additional building-permit file reference
Identifier / date007570/BP/DTCP/3049/0025/2023
Scope and evidenceReference appearing in the filed building-permit record.
Layout/building-plan document
Identifier / dateFile No. CA/96/19931
Scope and evidencePlan extraction for a proposed residential apartment building, with site and design parameters and listed amenities/utilities.
Form B declaration
Identifier / dateDated 17 day of October 2023
Scope and evidencePromoter declaration, including title and encumbrance statements and a completion undertaking of 15th SEPTEMBER 2026.
Occupancy / completion certificate
Identifier / dateNot supplied
Scope and evidenceThe building-permit document states that completion notice and an occupancy certificate are to be obtained after completion and before occupation.

The supplied evidence does not include an OC or a separate record establishing completed construction. The available extracts also do not provide a complete set of as-built drawings or project-specific service commissioning records.

Other registrations of Ayaan S Gokuldham

Frequently asked questions

Is AYAAN S GOKULDHAM - BLOCK B registered with Telangana RERA?

Yes. AYAAN S GOKULDHAM - BLOCK B is registered with the Telangana Real Estate Regulatory Authority as P01900007526; the registration status is New Project.

Who is the developer of AYAAN S GOKULDHAM - BLOCK B?

The promoter named in the RERA registration is AYAAN DEVELOPERS.

Where is AYAAN S GOKULDHAM - BLOCK B located?

AYAAN S GOKULDHAM - BLOCK B is in Pillalamarri, Pillalamarry, Suryapet, Telangana (508376).

When will AYAAN S GOKULDHAM - BLOCK B be completed?

The promoter's proposed date of completion filed with RERA is 15/01/2027. This is the promoter's declaration, not a guarantee.

More projects in Pillalamarry