Ayyappa Township Phase-II
M/S MAHA NIDHI DEVELOPERS · Rajanna Sircilla · RERA P03000008223
AYYAPPA TOWNSHIP PHASE-II is a plotted development in Vemulaguda, Vemulawada Mandal, Rajanna Sircilla District, developed by the registered promoter M/S MAHA NIDHI DEVELOPERS. The open-plot layout covers 15,299.79 sq. mt and has 55 plots; the supplied records do not state plot-size configurations. It is registered with TG-RERA under P03000008223, with a proposed completion date of 16/09/2024.
More from Maha Nidhi Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
14 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | AYYAPPA TOWNSHIP PHASE-II RERA record |
| Project type | Plotted development / open-plot layout RERA record |
| Phase / registered portion | Phase-II; TG-RERA registration is for this named project. A separate phase-wise land or works schedule is not disclosed in the supplied records. RERA record |
| TG-RERA registration | P03000008223 RERA record |
| Registration validity | Certificate records 10/05/2024 to 16/09/2024 unless extended by the Authority. This is the registration period, not a statement of completion or occupancy. Approvals record |
| Registered promoter | M/S MAHA NIDHI DEVELOPERS RERA record Corporate record |
| RERA-recorded status | “On-Going Project” in the project record. The supplied certificate states its validity dates; no extension order is included in the supplied material. RERA record Approvals record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / site description | Vemulaguda; the layout instrument describes the site as within the Thippapur Gram Panchayat area. RERA record RERA filing |
| Revenue village | THIPPAPOOR (PN), also described in the layout approval extraction as Thippappur Revenue Village. |
| Mandal | Vemulawada |
| District | Rajanna Sircilla RERA record RERA filing |
| PIN | 505302 RERA record |
| Survey numbers and subdivisions | 210/C, 210/F and 211/C/2 RERA record Land records |
| Registered site extent | 15,299.79 sq. mt in the project land record. The layout approval extraction also records Total Layout Area 15,299.79 sq.mt and Net Layout Area 15,299.79 sq.mt. RERA filing |
| Boundaries | East: agricultural dry land of T Anil Kumar and others; West: agricultural dry land of T Anil Kumar and others; North: Vorre; South: agricultural dry land of D Narsavva, N Srinivas and others. RERA filing |
| Mandal-level registration detail | Not disclosed in the project’s structured land identity fields; the layout document identifies Vemulawada Mandal. Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Vemulawada Municipality / Municipal Council Vemulawada; the project record also identifies DTCP as authority. Approvals record |
| Principal layout approval | Tentative Layout Plan approval 0005/LO/3017/2022, dated 16 September 2022. Approvals record |
| Other approval reference | Layout drawing reference TS/044274/2022, dated 11-07-2022 in the supplied drawing record. Approvals record |
| Layout type and scale | Open-plot layout; the approval extraction records 55 No’s. |
| Approved built-up area | The project record lists 8,336.74 sq. mts as approved built-up area. The layout approval extraction lists Net BUA Built Up Area 0.00; these are separate recorded fields and are not treated here as equivalent measures. RERA filing |
| Buildings, floors and parking levels | Not applicable as a disclosed multi-storey building scheme; building count, floor configuration and parking levels are not provided. The layout approval records proposed number of parkings as 0. |
Offering and status
| Field | Record |
|---|---|
| Offered product | Plots in an open residential layout; the approval extraction records 55 plots. Individual plot sizes are not available in the supplied data. |
| Booked / available counts | Not disclosed in the supplied records. RERA record Document index |
| Construction / development stage | RERA record describes the project as “On-Going Project” and gives a completeness figure of 70%; the supplied data does not identify the measurement date or provide independent site verification. RERA record |
| Original and revised completion dates | 16/09/2024 and 16/09/2024, respectively, in the project record. The Form B declaration also states a completion undertaking of 16 September 2024. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied records. The available approval is for a tentative layout, not an occupancy certificate. Document index |
2. The project story
AYYAPPA TOWNSHIP PHASE-II is registered as a plotted development on land identified as Survey Nos. 210/C, 210/F and 211/C/2 in THIPPAPOOR (PN) Revenue Village, Vemulawada Mandal, Rajanna Sircilla District. The layout approval describes an open residential layout with 55 plots, internal roads, open space, social-infrastructure land and a utility plot. RERA record
The project record calls the development ongoing and reports 70% completeness. That is a RERA-recorded progress figure; no dated engineer’s certificate or independent site inspection establishing current physical progress is supplied here. The registered completion date shown is 16/09/2024. No occupancy or completion certificate is present in the reviewed material, and the layout approval itself is tentative. RERA record Document index
3. Master plan, architecture & building design
The approved drawing record describes a layout rather than a multi-storey building project. It records a total and net layout area of 15,299.79 sq.mt, with 8,336.74 sq.mt plotted area (54.49%), 4,952.18 sq.mt road area (32.37%), 1,472.27 sq.mt organized open space / park area (9.62%), 383.05 sq.mt social-infrastructure area (2.50%) and 155.57 sq.mt utility area (1.02%). Amenity area is recorded as 0.00 sq.mt.
The layout approval extraction identifies 55 plots and roads of differing stated widths, including a 9.14 mt. Wide InternalRoad, an 18.00 MT WIDE EXISTING ROAD, an 18.00 MT WIDE PROPOSED ROAD, a 60'-0" WIDE ROAD LAYOUT and a 30' WIDE ROAD. The supplied data does not provide a complete plot schedule, plot-size bands, or detailed plot-by-plot arrangement.
The approval records 1,274.28 sq.mt as mortgage area, represented in the tentative layout extraction by plots P-32, P-40, P-33, P-39, P-34, P-35, P-38, P-37 and P-36. The approval also lists proposed parking as 0. There are no building floor plans or residential-unit layouts in the supplied drawing data; the drawing review records two layout sheets and no measured dwelling plans. Floor plans
4. Homes, configurations & floor plans
This is a plotted development, not a disclosed apartment configuration. The approval extraction records 55 plots, but plot numbers by size, individual dimensions and booked/available inventory are not supplied. Document index
The project record lists the following figures; they should not be read as an individual plot-size schedule:
| Record category | Figure | Evidence |
|---|---|---|
| Plotted area | 8,336.74 sq.mt | |
| Approved built-up area in project fields | 8,336.74 sq. mts | RERA filing |
| RERA saleable area or plot-wise areas | Not disclosed | Document index |
| Booked / available plot counts | Not disclosed | Document index |
| Measured carpet area | Not applicable to the plotted layout; no dwelling plans measured | Floor plans |
The 8,336.74 sq.mt plotted-area figure is a layout land-use figure, not a stated unit-level saleable area or carpet area. The drawing records contain no dwelling plans from which plot-specific house configurations or room dimensions could be described. Floor plans
5. Parking & vehicle circulation
The layout approval records Proposed Number of Parkings 0 and 0.00% common parking area. No sanctioned parking spaces, visitor or accessible parking allocation, plot-specific parking entitlement, or EV-charging provision is disclosed.
Road widths are listed in the approved-layout extraction, including a 9.14 mt. Wide InternalRoad and the stated existing, proposed and layout roads. The available record does not specify driveway dimensions, separate pedestrian routes, or vehicle-entry and exit arrangements.
6. Amenities, recreation & open spaces
The approval extraction reserves land for parks, social infrastructure and utilities. The RERA amenities record marks several layout infrastructure items as “YES,” but the supplied data does not establish which have been completed or independently verified. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor: Community buildings | No area or facility details supplied | RERA amenities | No progress percentage supplied |
| Sports / recreation: Tot-lot | Included among approval-listed amenities; no size supplied | Approval-listed; completion not independently verified | |
| Landscape / open space: Organized open space / park | 1,472.27 sq.mt; 9.62% | Approval-listed; completion not independently verified | |
| Convenience / community: Social infrastructure area | 383.05 sq.mt; 2.50% | Approval-listed; completion not independently verified | |
| Convenience / community: Utility plot | 155.57 sq.mt; 1.02% in the layout area statement | Reserved in layout; facilities and completion not independently verified | |
| Internal roads and footpaths | Marked “YES” in the amenities record; road-area allocation 4,952.18 sq.mt in the layout record | RERA amenities | RERA amenities record says “YES”; independent completion verification not supplied |
7. Utilities, building services & safety
The tentative layout approval describes development works to include black-topped roads, storm-water drains, underground drainage lines and a common septic tank / STP, internal water-supply pipelines, an overhead tank, an assured water-supply source, electrical supply lines and street lights, a transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval conditions and stated works; the supplied evidence does not independently verify their construction, capacity or operation.
The RERA amenities record marks water supply, sewerage, storm-water drains, street lighting and water conservation/rainwater harvesting as “YES.” The same record shows 0% for treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, fire protection and safety, and electrical meter room/sub-station/receiving station. No capacities, fire-system details, backup-power arrangements, accessibility features or security systems are supplied. RERA amenities
8. Location, access & connectivity
The registered project location is Vemulaguda, PIN 505302, in Rajanna Sircilla District. The layout document locates the land in THIPPAPOOR (PN) Revenue Village, Vemulawada Mandal, within the limits of Vemulawada Municipality / Municipal Council Vemulawada. It describes the locality as the Thippapur Gram Panchayat Area with Revenue Survey. RERA record
The layout approval lists the roads described in the master-plan section. The supplied connectivity data contains one measured point: Financial District (Nanakramguda), 1.2 km, associated with the supplied location record; it is not further contextualized in that record. No public-transport details or additional landmark distances are supplied. Location record
9. Developer & development status
The registered legal promoter is M/S MAHA NIDHI DEVELOPERS, identified in the project data as a Partnership. The project record gives GSTIN 36ABNFM1303Q1ZX. The supplied corporate identity does not provide a verified registered office address or official website/contact details for the promoter. Corporate record Parties record
The registration and approval records identify Agina Bhaskar as the promoter’s managing partner / authorized signatory. Parties record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form ‘C’ certificate for AYYAPPA TOWNSHIP PHASE-II, registration P03000008223; records validity from 10/05/2024 to 16/09/2024 unless extended. |
| Layout plan reference | Drawing / layout approval reference TS/044274/2022, dated 11-07-2022 in the supplied extraction. |
| Tentative layout approval | Vemulawada Municipality approval 0005/LO/3017/2022, dated 16 September, 2022; application 007718/LO/DTCP/3017/0008/2022. |
| Mortgage and receipts referenced in approval | Mortgage Deed 6107/2022; receipts TS/21422/2022, TS/21423/2022 and TS/21428/2022. |
| Promoter declaration | Form B declaration by A. Bhasker and others, dated 16 day of April 2024, stating a completion undertaking of 16 September 2024 and other promoter declarations. |
| Occupancy / completion certificate | Not included in the supplied records. Document index |
1. Project at a glance
Project identity
Registered project name: AYYAPPA TOWNSHIP PHASE-II
Project type: Plotted development / open-plot layout
Phase / registered portion: Phase-II; TG-RERA registration is for this named project. A separate phase-wise land or works schedule is not disclosed in the supplied records.
TG-RERA registration: P03000008223
Registration validity: Certificate records 10/05/2024 to 16/09/2024 unless extended by the Authority. This is the registration period, not a statement of completion or occupancy.
Registered promoter: M/S MAHA NIDHI DEVELOPERS
RERA-recorded status: “On-Going Project” in the project record. The supplied certificate states its validity dates; no extension order is included in the supplied material.
Land and geographic identity
Locality / site description: Vemulaguda; the layout instrument describes the site as within the Thippapur Gram Panchayat area.
Revenue village: THIPPAPOOR (PN), also described in the layout approval extraction as Thippappur Revenue Village.
Mandal: Vemulawada
District: Rajanna Sircilla
PIN: 505302
Survey numbers and subdivisions: 210/C, 210/F and 211/C/2
Registered site extent: 15,299.79 sq. mt in the project land record. The layout approval extraction also records Total Layout Area 15,299.79 sq.mt and Net Layout Area 15,299.79 sq.mt.
Boundaries: East: agricultural dry land of T Anil Kumar and others; West: agricultural dry land of T Anil Kumar and others; North: Vorre; South: agricultural dry land of D Narsavva, N Srinivas and others.
Mandal-level registration detail: Not disclosed in the project’s structured land identity fields; the layout document identifies Vemulawada Mandal.
Development identity
Sanctioning authority: Vemulawada Municipality / Municipal Council Vemulawada; the project record also identifies DTCP as authority.
Principal layout approval: Tentative Layout Plan approval 0005/LO/3017/2022, dated 16 September 2022.
Other approval reference: Layout drawing reference TS/044274/2022, dated 11-07-2022 in the supplied drawing record.
Layout type and scale: Open-plot layout; the approval extraction records 55 No’s.
Approved built-up area: The project record lists 8,336.74 sq. mts as approved built-up area. The layout approval extraction lists Net BUA Built Up Area 0.00; these are separate recorded fields and are not treated here as equivalent measures.
Buildings, floors and parking levels: Not applicable as a disclosed multi-storey building scheme; building count, floor configuration and parking levels are not provided. The layout approval records proposed number of parkings as 0.
Offering and status
Offered product: Plots in an open residential layout; the approval extraction records 55 plots. Individual plot sizes are not available in the supplied data.
Booked / available counts: Not disclosed in the supplied records.
Construction / development stage: RERA record describes the project as “On-Going Project” and gives a completeness figure of 70%; the supplied data does not identify the measurement date or provide independent site verification.
Original and revised completion dates: 16/09/2024 and 16/09/2024, respectively, in the project record. The Form B declaration also states a completion undertaking of 16 September 2024.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied records. The available approval is for a tentative layout, not an occupancy certificate.
2. The project story
AYYAPPA TOWNSHIP PHASE-II is registered as a plotted development on land identified as Survey Nos. 210/C, 210/F and 211/C/2 in THIPPAPOOR (PN) Revenue Village, Vemulawada Mandal, Rajanna Sircilla District. The layout approval describes an open residential layout with 55 plots, internal roads, open space, social-infrastructure land and a utility plot.
The project record calls the development ongoing and reports 70% completeness. That is a RERA-recorded progress figure; no dated engineer’s certificate or independent site inspection establishing current physical progress is supplied here. The registered completion date shown is 16/09/2024. No occupancy or completion certificate is present in the reviewed material, and the layout approval itself is tentative.
3. Master plan, architecture & building design
The approved drawing record describes a layout rather than a multi-storey building project. It records a total and net layout area of 15,299.79 sq.mt, with 8,336.74 sq.mt plotted area (54.49%), 4,952.18 sq.mt road area (32.37%), 1,472.27 sq.mt organized open space / park area (9.62%), 383.05 sq.mt social-infrastructure area (2.50%) and 155.57 sq.mt utility area (1.02%). Amenity area is recorded as 0.00 sq.mt.
The layout approval extraction identifies 55 plots and roads of differing stated widths, including a 9.14 mt. Wide InternalRoad, an 18.00 MT WIDE EXISTING ROAD, an 18.00 MT WIDE PROPOSED ROAD, a 60'-0" WIDE ROAD LAYOUT and a 30' WIDE ROAD. The supplied data does not provide a complete plot schedule, plot-size bands, or detailed plot-by-plot arrangement.
The approval records 1,274.28 sq.mt as mortgage area, represented in the tentative layout extraction by plots P-32, P-40, P-33, P-39, P-34, P-35, P-38, P-37 and P-36. The approval also lists proposed parking as 0. There are no building floor plans or residential-unit layouts in the supplied drawing data; the drawing review records two layout sheets and no measured dwelling plans.
4. Homes, configurations & floor plans
This is a plotted development, not a disclosed apartment configuration. The approval extraction records 55 plots, but plot numbers by size, individual dimensions and booked/available inventory are not supplied.
The project record lists the following figures; they should not be read as an individual plot-size schedule:
| Record category | Figure | Evidence |
|---|---|---|
| Plotted area | 8,336.74 sq.mt | |
| Approved built-up area in project fields | 8,336.74 sq. mts | |
| RERA saleable area or plot-wise areas | Not disclosed | |
| Booked / available plot counts | Not disclosed | |
| Measured carpet area | Not applicable to the plotted layout; no dwelling plans measured |
The 8,336.74 sq.mt plotted-area figure is a layout land-use figure, not a stated unit-level saleable area or carpet area. The drawing records contain no dwelling plans from which plot-specific house configurations or room dimensions could be described.
5. Parking & vehicle circulation
The layout approval records Proposed Number of Parkings 0 and 0.00% common parking area. No sanctioned parking spaces, visitor or accessible parking allocation, plot-specific parking entitlement, or EV-charging provision is disclosed.
Road widths are listed in the approved-layout extraction, including a 9.14 mt. Wide InternalRoad and the stated existing, proposed and layout roads. The available record does not specify driveway dimensions, separate pedestrian routes, or vehicle-entry and exit arrangements.
6. Amenities, recreation & open spaces
The approval extraction reserves land for parks, social infrastructure and utilities. The RERA amenities record marks several layout infrastructure items as “YES,” but the supplied data does not establish which have been completed or independently verified.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor: Community buildings | No area or facility details supplied | No progress percentage supplied | |
| Sports / recreation: Tot-lot | Included among approval-listed amenities; no size supplied | Approval-listed; completion not independently verified | |
| Landscape / open space: Organized open space / park | 1,472.27 sq.mt; 9.62% | Approval-listed; completion not independently verified | |
| Convenience / community: Social infrastructure area | 383.05 sq.mt; 2.50% | Approval-listed; completion not independently verified | |
| Convenience / community: Utility plot | 155.57 sq.mt; 1.02% in the layout area statement | Reserved in layout; facilities and completion not independently verified | |
| Internal roads and footpaths | Marked “YES” in the amenities record; road-area allocation 4,952.18 sq.mt in the layout record | RERA amenities record says “YES”; independent completion verification not supplied |
7. Utilities, building services & safety
The tentative layout approval describes development works to include black-topped roads, storm-water drains, underground drainage lines and a common septic tank / STP, internal water-supply pipelines, an overhead tank, an assured water-supply source, electrical supply lines and street lights, a transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval conditions and stated works; the supplied evidence does not independently verify their construction, capacity or operation.
The RERA amenities record marks water supply, sewerage, storm-water drains, street lighting and water conservation/rainwater harvesting as “YES.” The same record shows 0% for treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, fire protection and safety, and electrical meter room/sub-station/receiving station. No capacities, fire-system details, backup-power arrangements, accessibility features or security systems are supplied.
8. Location, access & connectivity
The registered project location is Vemulaguda, PIN 505302, in Rajanna Sircilla District. The layout document locates the land in THIPPAPOOR (PN) Revenue Village, Vemulawada Mandal, within the limits of Vemulawada Municipality / Municipal Council Vemulawada. It describes the locality as the Thippapur Gram Panchayat Area with Revenue Survey.
The layout approval lists the roads described in the master-plan section. The supplied connectivity data contains one measured point: Financial District (Nanakramguda), 1.2 km, associated with the supplied location record; it is not further contextualized in that record. No public-transport details or additional landmark distances are supplied.
9. Developer & development status
The registered legal promoter is M/S MAHA NIDHI DEVELOPERS, identified in the project data as a Partnership. The project record gives GSTIN 36ABNFM1303Q1ZX. The supplied corporate identity does not provide a verified registered office address or official website/contact details for the promoter.
The registration and approval records identify Agina Bhaskar as the promoter’s managing partner / authorized signatory.
10. Approvals, official records & documents
TG-RERA registration: Form ‘C’ certificate for AYYAPPA TOWNSHIP PHASE-II, registration P03000008223; records validity from 10/05/2024 to 16/09/2024 unless extended.
Layout plan reference: Drawing / layout approval reference TS/044274/2022, dated 11-07-2022 in the supplied extraction.
Tentative layout approval: Vemulawada Municipality approval 0005/LO/3017/2022, dated 16 September, 2022; application 007718/LO/DTCP/3017/0008/2022.
Mortgage and receipts referenced in approval: Mortgage Deed 6107/2022; receipts TS/21422/2022, TS/21423/2022 and TS/21428/2022.
Promoter declaration: Form B declaration by A. Bhasker and others, dated 16 day of April 2024, stating a completion undertaking of 16 September 2024 and other promoter declarations.
Occupancy / completion certificate: Not included in the supplied records.
Other registrations of Ayyappa Township
Frequently asked questions
Is AYYAPPA TOWNSHIP PHASE-II registered with Telangana RERA?
Yes. AYYAPPA TOWNSHIP PHASE-II is registered with the Telangana Real Estate Regulatory Authority as P03000008223; the registration status is On-Going Project.
Who is the developer of AYYAPPA TOWNSHIP PHASE-II?
The promoter named in the RERA registration is M/S MAHA NIDHI DEVELOPERS.
Where is AYYAPPA TOWNSHIP PHASE-II located?
AYYAPPA TOWNSHIP PHASE-II is in VEMULAGUDA, Rajanna Sircilla, Telangana (505302).
When will AYYAPPA TOWNSHIP PHASE-II be completed?
The promoter's proposed date of completion filed with RERA is 16/09/2024. This is the promoter's declaration, not a guarantee.
More projects in Rajanna Sircilla