Central Associates
CENTRAL ASSOCIATES · Medchal-Malkajgiri · RERA P02200001783
CENTRAL ASSOCIATES is a plotted development at KUNDANPALLE in Keesara Mandal, Medchal-Malkajgiri District. The registered promoter developing it is CENTRAL ASSOCIATES, identified as a partnership. The project has a total site area of 33235.45 sq.m, a net site area of 31231.11 sq.m and residential plots; the supplied records do not disclose a tower or floor configuration or a RERA-filed plot count or plot-size schedule. It is registered with TG-RERA as P02200001783, with registration validity from 20/03/2020–24/01/2023; Form B records the promoter’s completion undertaking as Feb 2022.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | CENTRAL ASSOCIATES RERA record |
| Project type | Plotted development / draft open-plot layout RERA record |
| Phase or registered portion | Not separately identified; the RERA record refers to one project. RERA record |
| TG-RERA registration | P02200001783; Form ‘C’ issued under section 5, dated 20/03/2020. RERA record |
| Registration validity | 20/03/2020–24/01/2023; the certificate records no extension. This is the registration period, not a statement of completion or occupancy. RERA record |
| Registered promoter | CENTRAL ASSOCIATES, identified as a partnership. RERA record RERA filing Corporate record |
| Project status in RERA header | New Project. RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | KUNDANPALLE / Kundanpalle; the HMDA draft-layout letter identifies Kundanpalle Village. RERA record |
| Mandal | Keesara. RERA record |
| District | Medchal-Malkajgiri. RERA record |
| PIN | 501301. RERA record |
| Project survey numbers and subdivisions | Survey Nos. 2/P, 3/P and 180/P in the HMDA draft-layout letter. The Dammaiguda Municipality draft-layout letter also lists 1, 2/P and 3/P. The RERA land record itself does not disclose survey numbers. Land records |
| Site-area figures | Total site area 33235.45 sq.m; master-plan road-affected area 2004.34 sq.m; net site area 31231.11 sq.m. Land records |
| Boundaries recorded in RERA land details | East: survey no 1 and 2; west: existing road; north: survey no 180p an d3p; south: existing road. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) is named on the layout permit; the RERA approvals list also records a Dammaiguda Municipality letter. Approvals record |
| Principal layout approval | HMDA Layout Permit 000041/LO/Plg/HMDA/2019, approved 18 February, 2019. Approvals record |
| Other approval reference | Lr. No. 8/2019 and HMDA proceedings reference 014968/GHT/LT/U6/HMDA/06.09.2018 appear in the Dammaiguda Municipality letter. Approvals record |
| Approved built-up area | RERA field: 31231.11 sq.m. This is the area recorded in the RERA built-up-area field; it is not a disclosed home-by-home saleable or carpet-area schedule. RERA filing |
| Buildings, floors and parking levels | Not disclosed as applicable to this plotted layout; no tower or floor configuration is established by the supplied project record. RERA record |
| Layout-scale land-use figures in HMDA letter | Plotted area 20262.31; open space 2536.9; park 787.08; social infrastructure 7644.83; layout roads 7644.83 Sq.mtrs. The letter’s printed component labels and figures are reproduced as recorded. |
| HMDA-mortgaged plots | Plots 91 to 95 (Total 05 plots), area 3103.35 Sqm., recorded as mortgaged in favour of the Metropolitan Commissioner, HMDA. RERA filing |
Offering and status
| Item | Record |
|---|---|
| Unit type | Residential plots; the RERA record identifies a plotted development. RERA record |
| RERA-filed plot count and plot-size schedule | Not available in the supplied structured RERA unit schedule. The layout drawing’s software-measured plot count is marked incomplete, and no plot sizes were extracted. Layout record |
| Booked / available plots | Not disclosed in the supplied project data. RERA record |
| Construction stage | No independently verified site-progress status is supplied. The HMDA letter sets out layout-development works and a three-year period to complete them, but that condition is not evidence of completion. |
| Completion dates | The registration certificate is valid through 24/01/2023. Separately, Form B records the promoter’s completion undertaking as Feb 2022. These are different record items, not a verified completion status. |
| Completion / occupancy certificate | No completion or occupancy certificate is identified in the supplied records. No phase- or plot-wise certificate status is available. Document index |
2. The project story
CENTRAL ASSOCIATES is registered with TG-RERA as a plotted development at Kundanpalle in Keesara Mandal, Medchal-Malkajgiri District. The registered land description gives a total site area of 33235.45 sq.m, including a recorded 2004.34 sq.m master-plan road-affected area and 31231.11 sq.m net site area. The HMDA layout record identifies the project land as Survey Nos. 2/P, 3/P and 180/P. RERA record Land records
The approval material describes an open-plot layout, with roads, open space, park and social-infrastructure areas, rather than a residential building or tower scheme. The HMDA letter also records five mortgaged plots, Nos. 91 to 95, pending the specified layout development and release process. The RERA-filed unit-level inventory, booked/available plot counts and plot-size schedule were not supplied, so the number and size of plots currently purchasable cannot be established from this review. Layout record
The promoter’s Form B undertaking states Feb 2022 as the project completion period; the TG-RERA certificate records registration validity through 24/01/2023. Neither date alone establishes that the layout works were completed. No site-verified progress update or completion/occupancy certificate is supplied. Document index
3. Master plan, architecture & building design
This is a plotted layout, not a building plan for flats. The HMDA draft-layout letter records a net site area of 31231.11 sq.m from a total site area of 33235.45 sq.m, with 2004.34 sq.m affected by the master-plan road. It lists a plotted area of 20262.31, open space of 2536.9, park of 787.08, social infrastructure of 7644.83, and layout roads of 7644.83 Sq.mtrs. These are the layout-record figures; no separate FSI-counted area, gross building area or residential/commercial building distribution is disclosed.
The HMDA letter specifies internal roads, including references to 30 mts, 9 mts, and roads 18 mts and above. It also requires road formation, storm-water drainage, underground drainage and common septic tank/STP, internal water supply, an overhead tank, electrical lines and street lighting, avenue planting, park development and rainwater-harvesting pits. These are approval conditions, not evidence that the works have been completed.
The drawing-derived layout record reports 20262.31 sq.m of plotted area and an amenity-area line of 0.00; the HMDA letter separately lists open space, park and social-infrastructure figures. The software-extracted plot count is incomplete, and no plot sizes were extracted from the drawing. Layout record
4. Homes, configurations & floor plans
The registered project is a plotted development, so apartment configurations, carpet areas and flat floor plans are not applicable on the evidence supplied. No RERA-filed plot inventory with counts, booked/available status or plot-size schedule was provided. The layout drawing review is incomplete: plot count and sizes have not been established. RERA record Layout record
The vendor record lists example residential-plot sizes, but these are vendor-provided, not the RERA-filed plot schedule: 1475, 1776, 1808, 2045, 2164, 2196, 2207, 2239, 2260, 2314, 2347, 2368, 2379, 2756, 2863, 3369, 4359, 8331, 8913 and 11194 sq.ft. No measured carpet area, loading or plot-by-plot availability is supplied. Promoter website
5. Parking & vehicle circulation
The supplied records do not establish a sanctioned parking count, visitor or accessible parking provision, parking allocation to individual plots, or dedicated parking levels. The HMDA letter describes layout roads and requires them to remain accessible to neighbouring sites; it does not establish individual plot parking rights.
A vendor listing mentions “covered car parking,” but no quantity, location, sanctioned provision or legally documented allocation is supplied. Treat that as a vendor claim, not confirmation of a project-wide parking arrangement. Promoter website
6. Amenities, recreation & open spaces
The HMDA letter records layout open space, park and social-infrastructure areas and specifies park development and avenue planting. It also lists layout infrastructure and utilities; those site services are described separately below. The approval conditions do not establish that the listed works are complete.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space | 2536.9 | HMDA draft-layout letter | Recorded in the layout figures; completion not independently verified. |
| Park | 787.08 | HMDA draft-layout letter | Park development required; completion not independently verified. |
| Social infrastructure | 7644.83 | HMDA draft-layout letter | Area recorded; the specific facilities and delivery status are not established. |
| Clubhouse, swimming pool, gym, indoor games, children’s play facilities and landscaped gardens | No size or capacity supplied | Vendor listing Promoter website | Vendor-listed; not established as sanctioned or delivered by the supplied project records. |
7. Utilities, building services & safety
The HMDA draft-layout letter specifies proposed internal water-supply pipelines, an overhead tank, an assured water-supply source, an independent sewerage-disposal system and protected water supply including an OHT and sumps. It also requires storm-water drains, drainage/channelisation of nalas, underground drainage lines and a common septic tank/STP, together with rainwater-harvesting pits. These are recorded layout-development requirements; the supplied evidence does not verify their present operating status or capacity.
The same letter specifies electrical supply lines, street lighting, transformers and underground ducting for utilities. It does not provide supply or backup capacity, an EV-charging provision, or completion evidence.
The RERA amenity record marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/TOT LOT/park, street lighting and energy management as “YES,” with 0% recorded progress. Community buildings, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, fire-safety requirements, electrical meter/substation/receiving station and aggregate recreational open space have no “YES” status in that record. These fields do not independently establish completion or statutory compliance. RERA amenities
No project-specific evidence supplied here establishes fire-system design or clearance, waste-management arrangements, CCTV or access control, accessibility features, or completed safety installations. Document index RERA amenities
8. Location, access & connectivity
The registered location is KUNDANPALLE, Keesara Mandal, Medchal-Malkajgiri District, Telangana 501301. The HMDA draft-layout letter identifies Kundanpalle Village. RERA record
The approval material describes proposed layout roads and refers to a 30 mts master-plan road-affected area and a 9 mts road-affected area; it also requires roads to be opened for access to neighbouring sites.
The available location dataset lists an Outer Ring Road nearest sampled interchange at approximately 8.5 km, KSR Degree College at 1.1 km, an unnamed hospital at 0.1 km, Melkote Park at 0.5 km, and an unnamed school at 0.4 km. These are location-dataset distances, not RERA-filed measurements. No verified public-transport routes or travel times are supplied. Location record
9. Developer & development status
The registered promoter is CENTRAL ASSOCIATES, recorded as a partnership. The project record names ALLAMARAJU BHANUPRAKASH as authorized signatory and MUNAGALA RAVINDERRAO as partner. The supplied RERA address is CENTRAL ASSOCIATE, ABID ROAD, KUNDANPALLE, KUNDANPALLE, Keesara, Medchal-Malkajgiri, 501301. RERA record RERA filing Parties record Corporate record
The promoter’s Form B states a completion undertaking of Feb 2022 and makes declarations about title, encumbrances, the RERA separate account and approvals. These are promoter declarations in the filed affidavit, not independent findings about land status or project completion.
The supplied record does not establish completed layout works, a revised completion date, or a completion/occupancy certificate. The HMDA letter sets out development requirements and a three-year development period; no subsequent release or completion confirmation is included here. Document index
10. Approvals, official records & documents
| Record | What it establishes in the supplied material |
|---|---|
| TG-RERA Form ‘C’, project P02200001783 | Registration of CENTRAL ASSOCIATES from 20/03/2020 through 24/01/2023; certificate includes a separate-account condition. |
| HMDA draft layout letter, Layout Permit 000041/LO/Plg/HMDA/2019 | Draft open-plot layout for Survey Nos. 2/P, 3/P and 180/P at Kundanpalle Village; approved 18 February, 2019. |
| Dammaiguda Municipality letter, Lr. No. 8/2019 | Draft-layout material referencing survey numbers 1, 2/P and 3/P, proposed 9.14m-wide roads, park and utility area. |
| Promoter Form B declaration | Promoter’s declarations on title basis, encumbrances, project account obligations and completion undertaking of Feb 2022. |
| Title search report, dated 07-01-2020 | Advocate’s search report concerning the layout land, reviewing title and approval materials and expressing a title opinion. |
| Land-conversion permission | RDO, Keesara Division permission for Survey Nos. 2, 3/Part and 180/Part, totaling Ac.09-37 Gts; the supplied document summary states that it authorizes conversion from agricultural to non-agricultural use but does not confer ownership. |
| Completion / occupancy certificate | No completion or occupancy certificate is identified among the supplied records. Document index |
1. Project at a glance
Project identity
Registered project name: CENTRAL ASSOCIATES
Project type: Plotted development / draft open-plot layout
Phase or registered portion: Not separately identified; the RERA record refers to one project.
TG-RERA registration: P02200001783; Form ‘C’ issued under section 5, dated 20/03/2020.
Registration validity: 20/03/2020–24/01/2023; the certificate records no extension. This is the registration period, not a statement of completion or occupancy.
Registered promoter: CENTRAL ASSOCIATES, identified as a partnership.
Project status in RERA header: New Project.
Land and geographic identity
Locality / revenue village: KUNDANPALLE / Kundanpalle; the HMDA draft-layout letter identifies Kundanpalle Village.
Mandal: Keesara.
District: Medchal-Malkajgiri.
PIN: 501301.
Project survey numbers and subdivisions: Survey Nos. 2/P, 3/P and 180/P in the HMDA draft-layout letter. The Dammaiguda Municipality draft-layout letter also lists 1, 2/P and 3/P. The RERA land record itself does not disclose survey numbers.
Site-area figures: Total site area 33235.45 sq.m; master-plan road-affected area 2004.34 sq.m; net site area 31231.11 sq.m.
Boundaries recorded in RERA land details: East: survey no 1 and 2; west: existing road; north: survey no 180p an d3p; south: existing road.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA) is named on the layout permit; the RERA approvals list also records a Dammaiguda Municipality letter.
Principal layout approval: HMDA Layout Permit 000041/LO/Plg/HMDA/2019, approved 18 February, 2019.
Other approval reference: Lr. No. 8/2019 and HMDA proceedings reference 014968/GHT/LT/U6/HMDA/06.09.2018 appear in the Dammaiguda Municipality letter.
Approved built-up area: RERA field: 31231.11 sq.m. This is the area recorded in the RERA built-up-area field; it is not a disclosed home-by-home saleable or carpet-area schedule.
Buildings, floors and parking levels: Not disclosed as applicable to this plotted layout; no tower or floor configuration is established by the supplied project record.
Layout-scale land-use figures in HMDA letter: Plotted area 20262.31; open space 2536.9; park 787.08; social infrastructure 7644.83; layout roads 7644.83 Sq.mtrs. The letter’s printed component labels and figures are reproduced as recorded.
HMDA-mortgaged plots: Plots 91 to 95 (Total 05 plots), area 3103.35 Sqm., recorded as mortgaged in favour of the Metropolitan Commissioner, HMDA.
Offering and status
Unit type: Residential plots; the RERA record identifies a plotted development.
RERA-filed plot count and plot-size schedule: Not available in the supplied structured RERA unit schedule. The layout drawing’s software-measured plot count is marked incomplete, and no plot sizes were extracted.
Booked / available plots: Not disclosed in the supplied project data.
Construction stage: No independently verified site-progress status is supplied. The HMDA letter sets out layout-development works and a three-year period to complete them, but that condition is not evidence of completion.
Completion dates: The registration certificate is valid through 24/01/2023. Separately, Form B records the promoter’s completion undertaking as Feb 2022. These are different record items, not a verified completion status.
Completion / occupancy certificate: No completion or occupancy certificate is identified in the supplied records. No phase- or plot-wise certificate status is available.
2. The project story
CENTRAL ASSOCIATES is registered with TG-RERA as a plotted development at Kundanpalle in Keesara Mandal, Medchal-Malkajgiri District. The registered land description gives a total site area of 33235.45 sq.m, including a recorded 2004.34 sq.m master-plan road-affected area and 31231.11 sq.m net site area. The HMDA layout record identifies the project land as Survey Nos. 2/P, 3/P and 180/P.
The approval material describes an open-plot layout, with roads, open space, park and social-infrastructure areas, rather than a residential building or tower scheme. The HMDA letter also records five mortgaged plots, Nos. 91 to 95, pending the specified layout development and release process. The RERA-filed unit-level inventory, booked/available plot counts and plot-size schedule were not supplied, so the number and size of plots currently purchasable cannot be established from this review.
The promoter’s Form B undertaking states Feb 2022 as the project completion period; the TG-RERA certificate records registration validity through 24/01/2023. Neither date alone establishes that the layout works were completed. No site-verified progress update or completion/occupancy certificate is supplied.
3. Master plan, architecture & building design
This is a plotted layout, not a building plan for flats. The HMDA draft-layout letter records a net site area of 31231.11 sq.m from a total site area of 33235.45 sq.m, with 2004.34 sq.m affected by the master-plan road. It lists a plotted area of 20262.31, open space of 2536.9, park of 787.08, social infrastructure of 7644.83, and layout roads of 7644.83 Sq.mtrs. These are the layout-record figures; no separate FSI-counted area, gross building area or residential/commercial building distribution is disclosed.
The HMDA letter specifies internal roads, including references to 30 mts, 9 mts, and roads 18 mts and above. It also requires road formation, storm-water drainage, underground drainage and common septic tank/STP, internal water supply, an overhead tank, electrical lines and street lighting, avenue planting, park development and rainwater-harvesting pits. These are approval conditions, not evidence that the works have been completed.
The drawing-derived layout record reports 20262.31 sq.m of plotted area and an amenity-area line of 0.00; the HMDA letter separately lists open space, park and social-infrastructure figures. The software-extracted plot count is incomplete, and no plot sizes were extracted from the drawing.
4. Homes, configurations & floor plans
The registered project is a plotted development, so apartment configurations, carpet areas and flat floor plans are not applicable on the evidence supplied. No RERA-filed plot inventory with counts, booked/available status or plot-size schedule was provided. The layout drawing review is incomplete: plot count and sizes have not been established.
The vendor record lists example residential-plot sizes, but these are vendor-provided, not the RERA-filed plot schedule: 1475, 1776, 1808, 2045, 2164, 2196, 2207, 2239, 2260, 2314, 2347, 2368, 2379, 2756, 2863, 3369, 4359, 8331, 8913 and 11194 sq.ft. No measured carpet area, loading or plot-by-plot availability is supplied.
5. Parking & vehicle circulation
The supplied records do not establish a sanctioned parking count, visitor or accessible parking provision, parking allocation to individual plots, or dedicated parking levels. The HMDA letter describes layout roads and requires them to remain accessible to neighbouring sites; it does not establish individual plot parking rights.
A vendor listing mentions “covered car parking,” but no quantity, location, sanctioned provision or legally documented allocation is supplied. Treat that as a vendor claim, not confirmation of a project-wide parking arrangement.
6. Amenities, recreation & open spaces
The HMDA letter records layout open space, park and social-infrastructure areas and specifies park development and avenue planting. It also lists layout infrastructure and utilities; those site services are described separately below. The approval conditions do not establish that the listed works are complete.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space | 2536.9 | HMDA draft-layout letter | Recorded in the layout figures; completion not independently verified. |
| Park | 787.08 | HMDA draft-layout letter | Park development required; completion not independently verified. |
| Social infrastructure | 7644.83 | HMDA draft-layout letter | Area recorded; the specific facilities and delivery status are not established. |
| Clubhouse, swimming pool, gym, indoor games, children’s play facilities and landscaped gardens | No size or capacity supplied | Vendor listing | Vendor-listed; not established as sanctioned or delivered by the supplied project records. |
7. Utilities, building services & safety
The HMDA draft-layout letter specifies proposed internal water-supply pipelines, an overhead tank, an assured water-supply source, an independent sewerage-disposal system and protected water supply including an OHT and sumps. It also requires storm-water drains, drainage/channelisation of nalas, underground drainage lines and a common septic tank/STP, together with rainwater-harvesting pits. These are recorded layout-development requirements; the supplied evidence does not verify their present operating status or capacity.
The same letter specifies electrical supply lines, street lighting, transformers and underground ducting for utilities. It does not provide supply or backup capacity, an EV-charging provision, or completion evidence.
The RERA amenity record marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/TOT LOT/park, street lighting and energy management as “YES,” with 0% recorded progress. Community buildings, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, fire-safety requirements, electrical meter/substation/receiving station and aggregate recreational open space have no “YES” status in that record. These fields do not independently establish completion or statutory compliance.
No project-specific evidence supplied here establishes fire-system design or clearance, waste-management arrangements, CCTV or access control, accessibility features, or completed safety installations.
8. Location, access & connectivity
The registered location is KUNDANPALLE, Keesara Mandal, Medchal-Malkajgiri District, Telangana 501301. The HMDA draft-layout letter identifies Kundanpalle Village.
The approval material describes proposed layout roads and refers to a 30 mts master-plan road-affected area and a 9 mts road-affected area; it also requires roads to be opened for access to neighbouring sites.
The available location dataset lists an Outer Ring Road nearest sampled interchange at approximately 8.5 km, KSR Degree College at 1.1 km, an unnamed hospital at 0.1 km, Melkote Park at 0.5 km, and an unnamed school at 0.4 km. These are location-dataset distances, not RERA-filed measurements. No verified public-transport routes or travel times are supplied.
9. Developer & development status
The registered promoter is CENTRAL ASSOCIATES, recorded as a partnership. The project record names ALLAMARAJU BHANUPRAKASH as authorized signatory and MUNAGALA RAVINDERRAO as partner. The supplied RERA address is CENTRAL ASSOCIATE, ABID ROAD, KUNDANPALLE, KUNDANPALLE, Keesara, Medchal-Malkajgiri, 501301.
The promoter’s Form B states a completion undertaking of Feb 2022 and makes declarations about title, encumbrances, the RERA separate account and approvals. These are promoter declarations in the filed affidavit, not independent findings about land status or project completion.
The supplied record does not establish completed layout works, a revised completion date, or a completion/occupancy certificate. The HMDA letter sets out development requirements and a three-year development period; no subsequent release or completion confirmation is included here.
10. Approvals, official records & documents
TG-RERA Form ‘C’, project P02200001783: Registration of CENTRAL ASSOCIATES from 20/03/2020 through 24/01/2023; certificate includes a separate-account condition.
HMDA draft layout letter, Layout Permit 000041/LO/Plg/HMDA/2019: Draft open-plot layout for Survey Nos. 2/P, 3/P and 180/P at Kundanpalle Village; approved 18 February, 2019.
Dammaiguda Municipality letter, Lr. No. 8/2019: Draft-layout material referencing survey numbers 1, 2/P and 3/P, proposed 9.14m-wide roads, park and utility area.
Promoter Form B declaration: Promoter’s declarations on title basis, encumbrances, project account obligations and completion undertaking of Feb 2022.
Title search report, dated 07-01-2020: Advocate’s search report concerning the layout land, reviewing title and approval materials and expressing a title opinion.
Land-conversion permission: RDO, Keesara Division permission for Survey Nos. 2, 3/Part and 180/Part, totaling Ac.09-37 Gts; the supplied document summary states that it authorizes conversion from agricultural to non-agricultural use but does not confer ownership.
Completion / occupancy certificate: No completion or occupancy certificate is identified among the supplied records.
Frequently asked questions
Is CENTRAL ASSOCIATES registered with Telangana RERA?
Yes. CENTRAL ASSOCIATES is registered with the Telangana Real Estate Regulatory Authority as P02200001783; the registration status is New Project.
Who is the developer of CENTRAL ASSOCIATES?
The promoter named in the RERA registration is CENTRAL ASSOCIATES.
Where is CENTRAL ASSOCIATES located?
CENTRAL ASSOCIATES is in KUNDANPALLE, Keesara, Medchal-Malkajgiri, Telangana (501301).
When will CENTRAL ASSOCIATES be completed?
The promoter's proposed date of completion filed with RERA is 24/01/2023. This is the promoter's declaration, not a guarantee.