Chinnola Gopalrao Pariwar
R K DEVELOPERS · Kamareddy · RERA P00200006631
CHINNOLA GOPALRAO PARIWAR is a plotted development in Devanpalle Revenue Village, Kamareddy Mandal, Kamareddy District. The registered promoter is R K DEVELOPERS. The registered site extent is 3 Acer 1.99 Gts 14761 Sq. Yds, and the tentative layout approval records 23 plots; house configurations are not provided. Its TG-RERA registration is P00200006631, registered 26/07/2023 to 12/04/2025, and the promoter’s Form B undertaking states completion by 12-04-2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | CHINNOLA GOPALRAO PARIWAR |
| Project type | Plotted development RERA record |
| Phase / registered portion | No separate phase identified; the registered project is a plotted layout RERA record |
| TG-RERA registration | P00200006631; registered 26/07/2023 to 12/04/2025 |
| Registration status | Certificate records the above validity period. No extension is shown in the supplied evidence |
| Registered promoter | R K DEVELOPERS, identified as a proprietorship RERA record Corporate record |
| Project completion date | Promoter’s Form B undertaking states completion by 12-04-2025 |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Devanpalle / Devanpalle Revenue Village RERA record |
| Mandal | Kamareddy RERA record |
| District | Kamareddy RERA record |
| PIN | 503111 RERA record |
| Project survey numbers | 128/2-1 and 123/1 |
| Registered site extent | 3 Acer 1.99 Gts 14761 Sq. Yds in the tentative layout approval |
| RERA-filed total / net area | Total area 12342.076 sq. m; net area 12342.08 sq. m RERA filing |
| Boundaries | Not available in the supplied project record Land records |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | KAMAREDDY Municipality/Municipal Corporation |
| Principal approval | Tentative Layout Plan No. 0007/LO/3071/2022, approved 12 April, 2022 |
| Application number | 002125/LO/DTCP/3071/0015/2022 |
| Approved layout scale | 23 plots |
| Approved built-up area | 7620.46 sq. m stated in the RERA project fields RERA filing |
| Buildings / floor configuration | Not applicable to the plotted-layout approval; house design and floor configurations for individual plots are not provided |
| Parking | No project-level parking count or arrangement disclosed RERA filing |
Offering and status
| Item | Record |
|---|---|
| Unit type | Plots; the tentative layout approval records 23 plots RERA record |
| Plot size range | Not available in the supplied evidence; plot-by-plot sizes are not established here Layout record |
| Booked / available counts | Not disclosed in the supplied evidence RERA filing |
| Construction stage | No independently verified site-progress information supplied. The approval requires the applicant to carry out layout infrastructure works; completion status is not established |
| Completion deadline | Promoter-declared 12-04-2025 |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. For this plotted project, the record provided does not establish a project-wide certificate status Document index |
Registration validity is the period stated on the TG-RERA certificate; it is distinct from the promoter’s completion undertaking and from any completion or occupancy certification.
2. The project story
CHINNOLA GOPALRAO PARIWAR is registered as a plotted development in Devanpalle Revenue Village, Kamareddy Mandal, Kamareddy District, on survey numbers 128/2-1 and 123/1. The tentative layout approval describes 23 plots and identifies roads, a park/open space, utility land and a social-infrastructure site. It also states that the applicant is responsible for developing the layout infrastructure. RERA record
The approval lists road formation, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical supply lines, street lights, a transformer, avenue planting, park development and rainwater-harvesting pits as layout works. These are approval conditions or specified works—not evidence that the works have been completed. No independent construction-progress or site-inspection evidence is supplied.
3. Master plan, architecture & building design
The approved drawing is a tentative layout plan, rather than a building plan for houses on the plots. Its stated layout extent is 3 Acer 1.99 Gts 14761 Sq. Yds. The separate RERA land-area fields record total area of 12342.076 sq. m and net area of 12342.08 sq. m. RERA filing
The drawing’s land-use allocation is:
| Layout component | Area stated in approval | Share stated in approval |
|---|---|---|
| Plotted area | 1 Acer 35.32 Gts 9114 Sq. Yds | 61.75% |
| Road area | 0 Acer 27.39 Gts 3314 Sq. Yds | 22.45% |
| Open space (park) | 0 Acer 11.38 Gts 1377 Sq. Yds | 9.33% |
| Social infrastructure | 0 Acer 3.07 Gts 372 Sq. Yds | 2.52% |
| Utilities | 0 Acer 1.27 Gts 154 Sq. Yds | 1.04% |
| Mortgage area | 0 Acer 12.7 Gts 1537 Sq. Yds | 16.86% |
The layout approval identifies mortgage plots IND PLOT -15, IND PLOT -20, IND PLOT -13, IND PLOT -21 and IND PLOT -14, with Mortgage Deed No. 2672-2022 dated 28 March, 2022. It also specifies transfer by registered gift deed of the open space, utility area and roads to the Municipality; the supplied approval refers to a relinquishment-of-mortgage-deed reference as ILLEGIBLE.
The layout drawing extraction records two layout sheets, but its software-derived plot count and sizes are incomplete; no plot-size schedule is established by that extraction. The plan also expressly states that tentative layout approval is not proof of land title. Layout record
4. Homes, configurations & floor plans
This is a plotted project, not an apartment configuration schedule. The tentative layout approval records 23 plots, but plot-by-plot areas, size bands, bookings and availability are not established in the supplied records. Layout record
No house floor plans or measured carpet areas are available. The drawing review reports two layout sheets and no measured dwelling floor plans. Floor plans
5. Parking & vehicle circulation
No sanctioned project-wide parking-space count, visitor or accessible parking provision, or parking-allocation arrangement is disclosed in the supplied evidence. The layout approval does require the applicant to form the roads and says the roads are to be opened for accessibility to neighbouring sites; it does not establish completed road works or plot-specific parking rights. RERA filing
6. Amenities, recreation & open spaces
The tentative layout approval identifies reserved areas and specified infrastructure works. The RERA amenity record contains availability entries for some items, but the supplied record gives 0% progress for all listed items; this is not evidence of completed facilities. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 0 Acer 11.38 Gts 1377 Sq. Yds; 9.33% of layout as stated in approval | Area reserved in tentative approval; completion and handover not verified | |
| Social-infrastructure site | 0 Acer 3.07 Gts 372 Sq. Yds; 2.52% | Reserved in tentative approval; facility type and completion not established | |
| Avenue planting | Specified as a layout development work; no quantity or size stated | Completion not verified | |
| Community buildings | No size or facility details supplied | RERA amenities | RERA amenity record shows 0%; completion not verified |
7. Utilities, building services & safety
The approval describes the following as layout development works: an assured water-supply source, internal water pipelines, an overhead tank/sump, underground drainage lines and a common septic tank/STP, storm-water drains, electrical supply lines, a transformer, street lighting, solid-waste management and rainwater-harvesting pits. The approval gives no capacities or completion evidence for these systems.
The RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting, energy management, fire protection/fire-safety requirements and an electrical meter room/substation/receiving station as “YES”; each listed amenity has 0% progress recorded. These entries are not independent confirmation of installation, commissioning or statutory clearance. RERA amenities
No system capacities, fire-clearance document, waste-management operating details, security arrangements, accessibility provisions or completed-services evidence are supplied. Document index RERA amenities
8. Location, access & connectivity
The registered project location is Devanpalle Revenue Village, Kamareddy Mandal, Kamareddy District, PIN 503111; the project fields give the locality as KAMAREDDY MUNCIPALITY. The tentative layout approval identifies the same revenue village and survey numbers 128/2-1 and 123/1. RERA record
The supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 76.7 km. No approach-road name, public-transport service or additional landmark distance is established in the supplied evidence. Location record
9. Developer & development status
The TG-RERA-registered promoter is R K DEVELOPERS, identified in the project record as a proprietorship. CHINNOLA GOPAL RAO is identified as its authorized signatory. The supplied evidence does not establish a corporate registration identifier or a separate registered-office contact beyond the address recorded at Devanpally, Kamareddy. Corporate record Parties record
The promoter’s Form B declares an undertaking to complete the project by 12-04-2025. The registration certificate records validity through 12/04/2025, but no extension or later completion certificate is supplied. Neither that undertaking nor the registration-validity date establishes that the layout works were completed. Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for CHINNOLA GOPALRAO PARIWAR, registration P00200006631, issued 26/07/2023, valid through 12/04/2025 |
| Tentative layout approval | KAMAREDDY Municipality/Municipal Corporation, Tentative LP No. 0007/LO/3071/2022, dated 12 April, 2022; application No. 002125/LO/DTCP/3071/0015/2022 |
| Mortgage reference in layout approval | Mortgage Deed No. 2672-2022, dated 28 March, 2022 |
| Promoter declaration | Form B declaration by CHINNOLA GOPAL RAO for R K DEVELOPERS; includes the promoter’s completion undertaking and land-title/encumbrance declarations |
| Occupancy / completion certificate | None supplied Document index |
| Building plans / individual plot-house approvals | None supplied in the reviewed project evidence; the available approval is for a tentative plotted layout Document index |
The tentative approval states that final layout proposals require submission of the TG-RERA registration certificate and that the applicant is responsible for the layout’s development works. The supplied evidence does not establish final-layout release or completion of those works.
1. Project at a glance
Project identity
Registered project name: CHINNOLA GOPALRAO PARIWAR
Project type: Plotted development
Phase / registered portion: No separate phase identified; the registered project is a plotted layout
TG-RERA registration: P00200006631; registered 26/07/2023 to 12/04/2025
Registration status: Certificate records the above validity period. No extension is shown in the supplied evidence
Registered promoter: R K DEVELOPERS, identified as a proprietorship
Project completion date: Promoter’s Form B undertaking states completion by 12-04-2025
Land and geographic identity
Locality / revenue village: Devanpalle / Devanpalle Revenue Village
Mandal: Kamareddy
District: Kamareddy
PIN: 503111
Project survey numbers: 128/2-1 and 123/1
Registered site extent: 3 Acer 1.99 Gts 14761 Sq. Yds in the tentative layout approval
RERA-filed total / net area: Total area 12342.076 sq. m; net area 12342.08 sq. m
Boundaries: Not available in the supplied project record
Development identity
Sanctioning authority: KAMAREDDY Municipality/Municipal Corporation
Principal approval: Tentative Layout Plan No. 0007/LO/3071/2022, approved 12 April, 2022
Application number: 002125/LO/DTCP/3071/0015/2022
Approved layout scale: 23 plots
Approved built-up area: 7620.46 sq. m stated in the RERA project fields
Buildings / floor configuration: Not applicable to the plotted-layout approval; house design and floor configurations for individual plots are not provided
Parking: No project-level parking count or arrangement disclosed
Offering and status
Unit type: Plots; the tentative layout approval records 23 plots
Plot size range: Not available in the supplied evidence; plot-by-plot sizes are not established here
Booked / available counts: Not disclosed in the supplied evidence
Construction stage: No independently verified site-progress information supplied. The approval requires the applicant to carry out layout infrastructure works; completion status is not established
Completion deadline: Promoter-declared 12-04-2025
Occupancy / completion certificate: No occupancy or completion certificate is supplied. For this plotted project, the record provided does not establish a project-wide certificate status
Registration validity is the period stated on the TG-RERA certificate; it is distinct from the promoter’s completion undertaking and from any completion or occupancy certification.
2. The project story
CHINNOLA GOPALRAO PARIWAR is registered as a plotted development in Devanpalle Revenue Village, Kamareddy Mandal, Kamareddy District, on survey numbers 128/2-1 and 123/1. The tentative layout approval describes 23 plots and identifies roads, a park/open space, utility land and a social-infrastructure site. It also states that the applicant is responsible for developing the layout infrastructure.
The approval lists road formation, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical supply lines, street lights, a transformer, avenue planting, park development and rainwater-harvesting pits as layout works. These are approval conditions or specified works—not evidence that the works have been completed. No independent construction-progress or site-inspection evidence is supplied.
3. Master plan, architecture & building design
The approved drawing is a tentative layout plan, rather than a building plan for houses on the plots. Its stated layout extent is 3 Acer 1.99 Gts 14761 Sq. Yds. The separate RERA land-area fields record total area of 12342.076 sq. m and net area of 12342.08 sq. m.
The drawing’s land-use allocation is:
| Layout component | Area stated in approval | Share stated in approval |
|---|---|---|
| Plotted area | 1 Acer 35.32 Gts 9114 Sq. Yds | 61.75% |
| Road area | 0 Acer 27.39 Gts 3314 Sq. Yds | 22.45% |
| Open space (park) | 0 Acer 11.38 Gts 1377 Sq. Yds | 9.33% |
| Social infrastructure | 0 Acer 3.07 Gts 372 Sq. Yds | 2.52% |
| Utilities | 0 Acer 1.27 Gts 154 Sq. Yds | 1.04% |
| Mortgage area | 0 Acer 12.7 Gts 1537 Sq. Yds | 16.86% |
The layout approval identifies mortgage plots IND PLOT -15, IND PLOT -20, IND PLOT -13, IND PLOT -21 and IND PLOT -14, with Mortgage Deed No. 2672-2022 dated 28 March, 2022. It also specifies transfer by registered gift deed of the open space, utility area and roads to the Municipality; the supplied approval refers to a relinquishment-of-mortgage-deed reference as ILLEGIBLE.
The layout drawing extraction records two layout sheets, but its software-derived plot count and sizes are incomplete; no plot-size schedule is established by that extraction. The plan also expressly states that tentative layout approval is not proof of land title.
4. Homes, configurations & floor plans
This is a plotted project, not an apartment configuration schedule. The tentative layout approval records 23 plots, but plot-by-plot areas, size bands, bookings and availability are not established in the supplied records.
No house floor plans or measured carpet areas are available. The drawing review reports two layout sheets and no measured dwelling floor plans.
5. Parking & vehicle circulation
No sanctioned project-wide parking-space count, visitor or accessible parking provision, or parking-allocation arrangement is disclosed in the supplied evidence. The layout approval does require the applicant to form the roads and says the roads are to be opened for accessibility to neighbouring sites; it does not establish completed road works or plot-specific parking rights.
6. Amenities, recreation & open spaces
The tentative layout approval identifies reserved areas and specified infrastructure works. The RERA amenity record contains availability entries for some items, but the supplied record gives 0% progress for all listed items; this is not evidence of completed facilities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 0 Acer 11.38 Gts 1377 Sq. Yds; 9.33% of layout as stated in approval | Area reserved in tentative approval; completion and handover not verified | |
| Social-infrastructure site | 0 Acer 3.07 Gts 372 Sq. Yds; 2.52% | Reserved in tentative approval; facility type and completion not established | |
| Avenue planting | Specified as a layout development work; no quantity or size stated | Completion not verified | |
| Community buildings | No size or facility details supplied | RERA amenity record shows 0%; completion not verified |
7. Utilities, building services & safety
The approval describes the following as layout development works: an assured water-supply source, internal water pipelines, an overhead tank/sump, underground drainage lines and a common septic tank/STP, storm-water drains, electrical supply lines, a transformer, street lighting, solid-waste management and rainwater-harvesting pits. The approval gives no capacities or completion evidence for these systems.
The RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting, energy management, fire protection/fire-safety requirements and an electrical meter room/substation/receiving station as “YES”; each listed amenity has 0% progress recorded. These entries are not independent confirmation of installation, commissioning or statutory clearance.
No system capacities, fire-clearance document, waste-management operating details, security arrangements, accessibility provisions or completed-services evidence are supplied.
8. Location, access & connectivity
The registered project location is Devanpalle Revenue Village, Kamareddy Mandal, Kamareddy District, PIN 503111; the project fields give the locality as KAMAREDDY MUNCIPALITY. The tentative layout approval identifies the same revenue village and survey numbers 128/2-1 and 123/1.
The supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 76.7 km. No approach-road name, public-transport service or additional landmark distance is established in the supplied evidence.
9. Developer & development status
The TG-RERA-registered promoter is R K DEVELOPERS, identified in the project record as a proprietorship. CHINNOLA GOPAL RAO is identified as its authorized signatory. The supplied evidence does not establish a corporate registration identifier or a separate registered-office contact beyond the address recorded at Devanpally, Kamareddy.
The promoter’s Form B declares an undertaking to complete the project by 12-04-2025. The registration certificate records validity through 12/04/2025, but no extension or later completion certificate is supplied. Neither that undertaking nor the registration-validity date establishes that the layout works were completed.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for CHINNOLA GOPALRAO PARIWAR, registration P00200006631, issued 26/07/2023, valid through 12/04/2025
Tentative layout approval: KAMAREDDY Municipality/Municipal Corporation, Tentative LP No. 0007/LO/3071/2022, dated 12 April, 2022; application No. 002125/LO/DTCP/3071/0015/2022
Mortgage reference in layout approval: Mortgage Deed No. 2672-2022, dated 28 March, 2022
Promoter declaration: Form B declaration by CHINNOLA GOPAL RAO for R K DEVELOPERS; includes the promoter’s completion undertaking and land-title/encumbrance declarations
Occupancy / completion certificate: None supplied
Building plans / individual plot-house approvals: None supplied in the reviewed project evidence; the available approval is for a tentative plotted layout
The tentative approval states that final layout proposals require submission of the TG-RERA registration certificate and that the applicant is responsible for the layout’s development works. The supplied evidence does not establish final-layout release or completion of those works.
Frequently asked questions
Is CHINNOLA GOPALRAO PARIWAR registered with Telangana RERA?
Yes. CHINNOLA GOPALRAO PARIWAR is registered with the Telangana Real Estate Regulatory Authority as P00200006631; the registration status is New Project.
Who is the developer of CHINNOLA GOPALRAO PARIWAR?
The promoter named in the RERA registration is R K DEVELOPERS.
Where is CHINNOLA GOPALRAO PARIWAR located?
CHINNOLA GOPALRAO PARIWAR is in KAMAREDDY MUNCIPALITY, Devanpalle, Kamareddy, Telangana (503111).
When will CHINNOLA GOPALRAO PARIWAR be completed?
The promoter's proposed date of completion filed with RERA is 12/04/2025. This is the promoter's declaration, not a guarantee.
More projects in Devanpalle