Sign in

Gmr Mukunda

GBR INFRA · Hanamkonda · RERA P00300008652

GMR MUKUNDA is a gated-community villa development in KAZIPET locality, Rampur revenue village, Khazipet, Warangal Urban. The registered promoter is GBR INFRA, a partnership. The site area is 49,654.69 sq.m, and the RERA filing records 130 total building units; the filed configuration data identifies 3BHK TRIPLEX and TRIPLEXQ homes with saleable areas from 109.67 sq.m to 135.64 sq.m. It is registered under TG-RERA number P00300008652, and Form B declares completion by 23.07.2029.

More from Gbr Infra · 2 projects →

01What we found

RegisteredTG-RERA - valid till 23 Jul 2029
21documents on file - each fact links to its page
1court case on this project's land (survey 333, Rampur)
7items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from 99acres.com

1. Project at a glance

Project identity

FieldProject record
Registered name / typeGMR MUKUNDA; TG-RERA certificate identifies the project name and location. The project is described in the filed layout as a gated-community villa development. RERA record
Phase / registered portionA phase designation is not disclosed. The registration and filed drawings identify the project at Rampur; confirm the exact registered scope against the complete registration record and sanctioned set. RERA record
TG-RERA registrationP00300008652. The certificate states validity from 17/08/2024 to 23/07/2029, unless extended by the Authority. Registration validity is distinct from the completion undertaking. RERA record
Registered promoterGBR INFRA; partnership, as recorded in the project information. RERA record RERA filing
RERA statusThe project is recorded as a New Project. No occupancy certificate is supplied in the reviewed project record. RERA record RERA filing Document index

Land and geographic identity

FieldProject record
Locality / revenue villageKAZIPET locality; Rampur revenue village. RERA record
Mandal / district / PINKhazipet, Warangal Urban, 506003. RERA record
Project survey numbers and subdivisions, as recorded332, 322/A1/1, 322/A/1/4, 332/A/1/2/1, 332/A1/A, 332/A/7, 333, 333/A/AA/1, 333/A/AA/2 and 333/A/A/1. These are the registration-certificate identifiers; the filed drawing also lists the survey subdivisions, with some differently rendered in its text extraction. RERA record
Site extentTotal site area 49,654.69 sq.m; net site/layout area 49,341.31 sq.m; road-affected area 313.38 sq.m. Land records
BoundariesEast: Hanumakonda–Hyderabad Road and part of remaining land; west: VMR Polytechnic and Engineering College; north and south: open plots of others. RERA filing

Development identity

FieldProject record
Sanctioning authority / principal approvalFiled approval for the group development scheme: GWMC Municipality/Municipal Corporation, application 006357/LO/GWMC/3006/0176/2024, approved 23 July 2024. The filed layout bears TS-DTCP file number TS/032849/2024. Approvals record
Approved built-up areaThe GWMC approval records total built-up area 48,482.99 sq.m. The layout extraction separately records proposed built-up area 45,223.33 sq.m excluding parking and 47,261.33 sq.m including parking. These are reported as labelled in their respective records.
Building arrangement / heightThe filed layout describes a gated-community villa plan with Ground, First and Second Floors; its extracted parameters also refer to 4 BLDG HT: 13.25 MT and 3 BLDG HT: 9.99 MT. The layout states 131 buildings; the RERA filing records 130 total building units. Building-by-building configuration is not established by the extracted summary. RERA filing
ParkingGWMC approval says cellar and stilt approved in the plan are to be used exclusively for vehicle parking; the supplied extract does not state a total parking-space count.
Unit countRERA filing: 130 total building units. The layout extraction also lists 130 plots/units and 131 buildings; the drawing-based description and counts should be read with the filed plan. RERA filing

Offering and status

FieldProject record
RERA-filed configuration / areaThe portal-derived unit record identifies TRIPLEX and TRIPLEXQ as 3BHK types, with saleable areas from 109.67 sq.m to 135.64 sq.m. The separate filed rows show 388 TRIPLEX units and 2 TRIPLEXQ units. RERA unit table RERA unit details RERA unit table
Booked / availablePortal snapshot lists 0 booked and 390 available; no as-of date is attached, so these counts are indicative, not a current inventory confirmation. RERA unit table RERA unit details
CompletionForm B declares completion by 23.07.2029. The registration certificate ends on 23/07/2029; these dates are completion/registration-record details, not evidence of completion.
Construction stage / OCConstruction progress is not supplied in the reviewed evidence. No occupancy or completion certificate is supplied; no phase- or building-specific OC status can therefore be confirmed. Document index

2. The project story

GMR MUKUNDA is recorded as a residential project at Rampur village in Khazipet mandal, Warangal Urban. Its filed layout describes a gated-community villa scheme organized across a site of 49,654.69 sq.m, with 130 plots/units and a range of villa types, including Type 1 through Type 10 and Type 1A labels in the drawing extraction. RERA record

The project record’s RERA unit data classifies the offered homes as 3BHK TRIPLEX/TRIPLEXQ types, with 390 units in the portal-derived configuration data. The recorded 130 building-unit count and the 390-unit configuration count are both preserved as filed/portal data; the precise relationship of those counts to individual buildings and the registration scope needs confirmation from the full approved plans and unit schedule. RERA filing RERA unit table RERA unit table

The project is registered as a new project. The evidence reviewed does not establish construction progress or completion of any villa, common facility or infrastructure. The completion date in Form B is a promoter undertaking, not an independently verified delivery date. No occupancy certificate is present in the reviewed record. RERA record Document index

3. Master plan, architecture & building design

The filed layout identifies a net layout area of 49,341.31 sq.m and gives this land-use allocation: plots 30,653.14 sq.m; roads 12,375.22 sq.m; organized open space/park 4,947.70 sq.m; utility area 994.24 sq.m; and amenity area 371.00 sq.m. These are drawing-extracted values. The same extraction separately reports 1,855.01 sq.m as “AMENITY AREA” elsewhere in its area schedule; the full drawing should be consulted to interpret that label. Layout record

The plan is described as a gated-community villa layout, with villa types labelled Type 1–10 and Type 1A, including East and West variants. The extracted schedule identifies Ground, First and Second Floors for the villas, and a club house; its block list also contains a club-house entry described as Ground + 3 upper floors. The available extraction does not provide a reliable complete building-by-building schedule or a phase breakdown.

GWMC’s approval records a total built-up area of 48,482.99 sq.m. The layout extraction reports 45,223.33 sq.m proposed built-up area excluding parking and 47,261.33 sq.m including parking. These figures retain their separate labels and sources; the detailed drawings are needed for the full area schedule and individual building design.

The drawing extraction lists internal roads and several stated road widths, including 12.20M WIDE ROAD No. 1, 10.058M WIDE ROAD No. 1 through No. 9, 30.00 MT WIDE EXISTING road and 60.00 MT WIDE PROPOSED ROAD. It does not establish the final as-built road condition.

4. Homes, configurations & floor plans

The TG-RERA-derived configuration schedule records 3BHK homes as TRIPLEX and TRIPLEXQ. Saleable area is a filed figure; carpet area is a separate drawing-based measurement and is not supplied for these RERA-recorded 3BHK configurations. RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK — TRIPLEX3880388109.67 sq.mNot suppliedNot supplied
3BHK — TRIPLEXQ202135.64 sq.mNot suppliedNot supplied

RERA unit details RERA unit table

The approved drawing extraction contains one software-measured 1BHK plan with a measured carpet area of 61.0 sq.m (median, minimum and maximum), but 1BHK is not identified in the TG-RERA configuration data. It is therefore not presented as a RERA-filed offering. The measurement was generated from drawing geometry, requires review against the drawing, and is not a RERA disclosure. Floor plans RERA unit details

Carpet area describes the measured home area in the drawing; the RERA saleable-area figure is a distinct filed measure and may include a share of common areas. No loading figure or measured carpet area for the filed 3BHK types is supplied. Floor plans RERA unit details

5. Parking & vehicle circulation

The GWMC approval states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not converted or partitioned for other uses. The approval also requires one entry and one exit, with minimum width of 4.5mts. and height clearance of 5mts. No total parking-space count, resident/visitor allocation, accessible-bay count, EV provision or legally documented unit-wise parking allocation is available in the supplied evidence.

The layout’s land-use schedule records common parking area as 0.00. A count or allocation of individual parking bays cannot be established from that extracted land-use schedule; a drawn or approved parking area alone does not establish exclusive ownership or allocation to a purchaser.

6. Amenities, recreation & open spaces

The filed drawing identifies a club house, swimming pool, amenity areas, tot-lot and green strip. The project amenities record also marks several infrastructure and community items as available, but the listed progress percentage is 0; this does not establish construction or delivery. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
ClubhouseClub house shown in the layout; a separate area or capacity is not supplied.Shown in drawing; completion not verified.
Swimming poolIdentified in the filed drawing.Completion not verified.
Tot-lotIdentified in the drawing; GWMC approval says it is to be fenced and maintained as greenery before OC where applicable.Completion not verified.
Green strip / park / organized open spaceDrawing records organized open space/park 4,947.70 sq.m and identifies a green strip.Layout recordCompletion not verified.
Amenity areaLayout schedule records 371.00 sq.m as “Amenity Area”; another extracted schedule labels 1,855.01 sq.m “AMENITY AREA.”Drawing-extracted; detailed allocation and completion not verified.
Community buildingsRERA amenities record marks “Community Buildings” as YES.RERA amenitiesProgress percentage recorded as 0; completion not verified.

7. Utilities, building services & safety

The project amenities record marks water supply, sewerage/STP, storm-water drains, street lighting, solid-waste management, rainwater harvesting, energy management, fire protection, electrical meter room/sub-station/receiving station and sewage treatment/disposal as project items. The record does not provide capacities or independently verified completion status; the listed progress percentage is 0. RERA amenities

The filed drawing identifies a sewage treatment plant, rainwater harvesting, distribution transformer and utility area. GWMC’s approval requires a transformer space, garbage house with dry/wet waste segregation, generator as alternate electricity supply, emergency lighting in corridors/common passages/staircases, fire alarms, fire extinguishers and water-storage tanks. It specifies separate underground static storage of 25,000 lits. and a separate residential terrace tank of 25,000 lits. These are approval conditions or drawing features, not evidence of installation or operational readiness.

The GWMC approval also calls for fire-safety provisions including first-aid hose reels as per Fire NOC and automatic sprinklers if basement area exceeds 200 Sq.mts. It requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical personnel. The evidence supplied does not include a project-specific Fire NOC, service-capacity schedule, lift schedule, accessibility plan or completion inspection.

8. Location, access & connectivity

The registered location is Rampur, Khazipet, Warangal Urban, 506003; the project record identifies Kazipet as the locality and the site’s eastern boundary as Hanumakonda–Hyderabad Road. The filed plan also names an existing 30.00 MT WIDE road and a 60.00 MT WIDE PROPOSED ROAD. These are plan-record descriptions, not confirmation of the proposed road’s delivery. RERA record RERA filing

A location geocode is supplied near Arogya Hospital and the Hyderabad-to-Warangal highway in the Kazipet area. The only measured connectivity distance supplied in the location record is the nearest sampled Outer Ring Road interchange at approximately 102.2 km. No public-transport schedule or verified travel time is provided. Location record

9. Developer & development status

The registered promoter is GBR INFRA, recorded as a partnership. The supplied corporate identifier is GSTIN 36AAWFG4630Q1ZK. The project record names Bhupal Reddy Gandra as authorized signatory and lists Abhilash Reddy Gandra, Rupa Gandra and Sai Krishna Reddy Gandra as partners. RERA filing Corporate record Parties record

The RERA registration certificate states the promoter’s registered office as Village: Bhupalpally, Mandal: Bhupalpally, District: Jayashankar, Pin: 506169. The project-site address is separate: Rampur, Khazipet, Warangal Urban, 506003. No official promoter website or contact details are supplied in the evidence reviewed. RERA record

Form B, dated 01s day of August 2024, records the promoter’s undertaking to complete the project by 23.07.2029. The registration certificate states its own validity through 23/07/2029, unless extended. Neither the undertaking nor registration validity establishes physical progress or delivery; no construction-progress certification or OC is available here. Document index

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registrationForm C certificate for GMR MUKUNDA, registration P00300008652, valid 17/08/2024–23/07/2029 unless extended.
GWMC group development scheme approvalApproval dated 23 July 2024, application 006357/LO/GWMC/3006/0176/2024, recording site and building parameters and conditional construction requirements.
TS-DTCP filed layout planLayout file TS/032849/2024, identifying Rampur, Khazipet mandal and the surveyed site, villa layout and land-use schedule.
Permission-related payment recordsTG-bPASS receipts record building-permit-related payment and labour-fee payment on 23 July 2024; the receipts are payment evidence, not independent proof of sanction.
Form B declarationGBR INFRA’s promoter declaration includes title/encumbrance assertions, fund-management commitments and a completion undertaking of 23.07.2029.
Occupancy / completion certificateNot present in the reviewed project documents. No building- or phase-specific OC status can be confirmed. Document index

Frequently asked questions

Is GMR MUKUNDA registered with Telangana RERA?

Yes. GMR MUKUNDA is registered with the Telangana Real Estate Regulatory Authority as P00300008652; the registration status is New Project.

Who is the developer of GMR MUKUNDA?

The promoter named in the RERA registration is GBR INFRA.

Where is GMR MUKUNDA located?

GMR MUKUNDA is in KAZIPET, Rampur, Khazipet, Hanamkonda, Telangana (506003).

When will GMR MUKUNDA be completed?

The promoter's proposed date of completion filed with RERA is 23/11/2029. This is the promoter's declaration, not a guarantee.

More projects in Rampur