Green Metro Infratech And Projects PVT.LTD
GREEN METRO INFRATECH & PROJECTS PVT LTD · Vikarabad · RERA P02100001896
GREEN METRO INFRATECH AND PROJECTS PVT.LTD is a plotted development in Mekavanampally, Mominpet, Vikarabad. The registered promoter is GREEN METRO INFRATECH & PROJECTS PVT LTD. The layout approval states an extent of Ac.20.04 Cents; 96993.60 Sq. Yds and identifies 285 plots; the supplied record does not state plot configurations, towers or floors. The project is registered under TG-RERA registration P02100001896, with proposed completion 05/07/2025.
More from Greenmetro Infratech & Projects Pvt Ltd · 12 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | GREEN METRO INFRATECH AND PROJECTS PVT.LTD RERA record |
| Project type | Plotted development / plotted layout RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; registered project scope is not further specified RERA record |
| TG-RERA registration | P02100001896 Approvals record |
| Registration validity | 21/03/2020 to 05/07/2025; the certificate states five years and the supplied record indicates no extension Approvals record |
| Registered promoter | GREEN METRO INFRATECH & PROJECTS PVT LTD Corporate record |
| RERA status | Registration period ended on 05/07/2025; current registration status beyond that date is not established by the supplied certificate Approvals record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Mekavanampally; the layout approval identifies Mekavanampally Gram Panchayat RERA record |
| Mandal / district / PIN | Mominpet / Vikarabad / 501202 RERA record |
| Survey numbers in the layout approval | 22/P, 23/P and 29/P |
| Survey numbers in RERA land identity | Not disclosed in the supplied RERA land record Land records |
| Layout approval extent | Ac.20.04 Cents; 96993.60 Sq. Yds |
| RERA land record areas | Total area 135468 sqmts; net area 96093.00 sqmts; area affected in road widening/FTL of tanks/nala widening 39375 sqmts RERA filing |
| Boundaries in RERA land record | East: NAIGHOUBERS LAND; West: NAIGHBOURS LAND; North: NAIGHBOURS LAND; South: NAIGHBOURS LAND RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning (DTCP); the approval refers to delegation to Mekavanampally Gram Panchayat Approvals record |
| Principal approval | TLP.No.44/2019/ H, approved -03-2019; file no. DTCP-HT2/CTH/9/2019-HYD Sec-DTCP; proceedings no. Lr.Roc.No.556/2019/H Approvals record |
| Approval described in document | “Draft Technical Layout Pattern - Approved”; the document states that a final-layout proposal is to follow completion of development works and compliance with conditions |
| Approved layout content | 285 plots |
| Land-use figures in layout approval | Layout area Ac. 20.04 Cents; 96993.60 Sq. Yds; plotted area Ac. 12.10 Cents; 58564.00 Sq. Yds. (60.37%); road area Ac. 5.94 Cents; 28749.60 Sq. Yds (29.63%); open space Ac. 2.00 Cents; 9680.00 Sq. Yds. (10.00%); mortgage area Ac. 1.83 Cents; 8857.20 Sq. Yds. (15.12%) |
| Plots reserved for Gram Panchayat mortgage | Plot Nos. 1 to 25 and 105 to 115, extent Ac. 1.83 Cents; 8857.20 Sq. Yds. |
| Approved built-up area | The RERA fields record approved built-up area as 135468 sqmts; the supplied layout approval extraction does not provide a building built-up-area schedule RERA filing |
| Buildings / floors / parking levels | Not disclosed in the supplied evidence; this is a plotted layout, and no apartment-building configuration is provided Document index |
Offering and status
| Item | Record |
|---|---|
| Offering | Plots; plot-wise sizes and plot numbers offered for sale are not itemised in the supplied material RERA record |
| Plot count | 285 plots are identified in the DTCP draft layout approval |
| RERA unit inventory / booked and available counts | Not supplied Document index |
| Construction / layout-development stage | No independently verified site-progress record is supplied. The layout approval requires development works and a subsequent final-layout proposal |
| Completion dates in supplied records | RERA certificate: validity ends 05/07/2025. Form B declaration: project completion undertaking by 25th July 2025. The project header lists proposed completion 05/07/2025 RERA record |
| Occupancy / completion certificate | Not supplied; the evidence reviewed does not establish issuance or status Document index |
2. The project story
This is a registered plotted-development project in Mekavanampally, Mominpet Mandal, Vikarabad District. The DTCP document describes a 285-plot draft technical layout on Survey Nos. 22/P, 23/P and 29/P, with plotted land, roads, open space and plots reserved for Gram Panchayat mortgage. It also makes further development and final-layout steps conditional on compliance with the approval conditions.
The supplied material does not establish which individual plots are currently available, booked, serviced or completed, nor does it provide independently verified construction progress. The promoter’s Form B affidavit states a completion undertaking of 25th July 2025; that is a promoter declaration, not independent evidence of completion. The RERA certificate records registration validity through 05/07/2025, which is distinct from physical completion and from any completion/occupancy certificate.
3. Master plan, architecture & building design
The project is evidenced as a plotted layout, not as an apartment or multi-storey building scheme. The DTCP draft layout approval identifies 285 plots and allocates the approved layout area among plots, roads, open space and mortgage-reserved plots. No plot-by-plot schedule, plot-size bands, road widths, orientation plan or final layout drawing is included in the supplied extracts.
The RERA fields report total land area of 135468 sqmts, net area of 96093.00 sqmts, and 39375 sqmts affected in road widening/FTL of tanks/nala widening. The layout approval separately states an extent of Ac.20.04 Cents; 96993.60 Sq. Yds. These are recorded here as the figures appearing in their respective RERA and approval records; the supplied material does not provide a parcel-level reconciliation. RERA filing
The RERA form records approved built-up area of 135468 sqmts and mortgage area of 12240 sqmts. The supplied layout approval extraction does not explain those field labels through a building-area or plot schedule. No building footprints, floor configurations, parking levels, dwelling plans or building-specific architectural features are provided. RERA filing
4. Homes, configurations & floor plans
This is a plotted development; the supplied record does not provide plot-wise configuration counts, booked/available inventory or saleable-area ranges. The DTCP approval identifies 285 plots, but no schedule listing individual plot numbers and dimensions is supplied.
Two drawings are recorded as pending scan review, and no carpet-area measurements were produced. The supplied vendor configuration list includes apartment labels, but it does not establish apartment inventory for this registered plotted project; those labels are therefore not used as RERA plot configurations. Floor plans Promoter website
5. Parking & vehicle circulation
The approved layout record gives a road area of Ac. 5.94 Cents; 28749.60 Sq. Yds (29.63%), but the supplied extract does not specify road widths, driveway geometry, vehicle entry/exit points, parking counts, visitor parking or plot-specific parking allocations. No exclusive parking entitlement is established by the evidence supplied.
6. Amenities, recreation & open spaces
The DTCP layout approval identifies Ac. 2.00 Cents; 9680.00 Sq. Yds. (10.00%) as open space. The RERA-filed amenities list marks several proposed infrastructure/facility categories “YES,” but the recorded progress is 0 for the listed entries; these are filing disclosures, not evidence of completion. RERA amenities
| Description / size | Ac. 2.00 Cents; 9680.00 Sq. Yds. (10.00%) |
|---|---|
| Evidence source | DTCP layout approval |
| Declared progress / verified status | Approved layout allocation; completion not independently verified |
| Description / size | Listed as “YES”; no separate size or quantity supplied |
|---|---|
| Evidence source | RERA amenities RERA amenities |
| Declared progress / verified status | Recorded progress 0; completion not independently verified |
| Description / size | Listed without a supplied size or quantity |
|---|---|
| Evidence source | RERA amenities RERA amenities |
| Declared progress / verified status | Recorded progress 0; completion not independently verified |
| Description / size | Listed as “YES”; layout approval identifies road area Ac. 5.94 Cents; 28749.60 Sq. Yds (29.63%) |
|---|---|
| Evidence source | RERA amenities RERA amenities; DTCP layout approval |
| Declared progress / verified status | Listed in filing; completed status not independently verified |
No clubhouse, indoor recreation or sports facility is identified in the supplied project-specific evidence. RERA amenities Document index
7. Utilities, building services & safety
The RERA-filed amenities list identifies water supply, sewerage (including chambers, lines, septic tank and STP), storm-water drains, street lighting, solid-waste management and disposal, rainwater harvesting/water conservation, energy management, and fire protection/fire-safety requirements as “YES.” Each is recorded with progress 0; the supplied documents do not give capacities, technical designs, construction status or independent verification. RERA amenities
The filing also lists an electrical meter room, sub-station and receiving station, and treatment/disposal of sewage and sullage water, without a supplied progress value or technical particulars. No specific water source, storage or treatment capacity, STP capacity, backup-power capacity, security system, accessibility design or completed statutory clearance is evidenced in the materials reviewed. RERA amenities
8. Location, access & connectivity
The official project identity places the site in Mekavanampally village, Mominpet Mandal, Vikarabad District, Telangana, PIN 501202. The layout approval identifies Mekavanampally Gram Panchayat and Survey Nos. 22/P, 23/P and 29/P. A cadastral-parcel centroid is recorded at 17.56900, 77.91574. RERA record Location record
The supplied location data records the nearest sampled Outer Ring Road interchange at approximately 36.8 km. No project-specific approach-road description, public-transport service, local landmark distances or verified travel times are supplied. Location record
9. Developer & development status
The registered promoter is GREEN METRO INFRATECH & PROJECTS PVT LTD, a company. The RERA record identifies Ashok Boddu as an authorised signatory; the Form B affidavit is made by BODDU ASHOK BABU in that capacity. The supplied record lists promoter office/address information as APURUPA TURBO, RD NO 36, Mekavanampally, Mominpet, Vikarabad, Telangana, 501202; the TG-RERA certificate separately prints the promoter-office field as “Village: Mandal: District: Hyderabad, Pin: 500033.” Corporate record Parties record
The RERA certificate records registration from 21/03/2020 to 05/07/2025 and the supplied record indicates no extension. The Form B affidavit declares completion by 25th July 2025. Neither record, by itself, verifies physical completion; no completion/occupancy certificate or independently verified progress report is supplied. Document index
10. Approvals, official records & documents
| Details | Form C; project GREEN METRO INFRATECH AND PROJECTS PVT.LTD; registration P02100001896; valid 21/03/2020–05/07/2025 |
|---|
| Details | DTCP TLP.No.44/2019/ H; file DTCP-HT2/CTH/9/2019-HYD Sec-DTCP; proceedings Lr.Roc.No.556/2019/H; approved date recorded as -03-2019; “Draft Technical Layout Pattern - Approved” |
|---|
| Details | Lr.No.Nil, 31-12-2018; Circular Memo.No.1637/2018/P, 18-05-2018 and 19-05-2018; Act 5 of 2018; G.O.Ms.No.67, 26-02-2002 |
|---|
| Details | By BODDU ASHOK BABU as authorised signatory; dated 16/10/2019; includes promoter declarations concerning title, encumbrances, project funds, pending approvals and completion undertaking |
|---|
| Details | Not supplied in the evidence reviewed |
|---|---|
| Evidence | Document index |
| Details | The supplied approval extract says final-layout proposals are to be submitted after development works and compliance; no final approval document is supplied |
|---|
The layout approval states that the draft layout is subject to annexed conditions, including ground demarcation, mortgage of specified plots to the Gram Panchayat, payment of fees and charges, submission of mortgage-related records and photographs, and later submission of final-layout proposals through the Gram Panchayat.
1. Project at a glance
Project identity
Registered project name: GREEN METRO INFRATECH AND PROJECTS PVT.LTD
Project type: Plotted development / plotted layout
Phase / registered portion: Phase not separately identified in the supplied record; registered project scope is not further specified
TG-RERA registration: P02100001896
Registration validity: 21/03/2020 to 05/07/2025; the certificate states five years and the supplied record indicates no extension
Registered promoter: GREEN METRO INFRATECH & PROJECTS PVT LTD
RERA status: Registration period ended on 05/07/2025; current registration status beyond that date is not established by the supplied certificate
Land and geographic identity
Locality / revenue village: Mekavanampally; the layout approval identifies Mekavanampally Gram Panchayat
Mandal / district / PIN: Mominpet / Vikarabad / 501202
Survey numbers in the layout approval: 22/P, 23/P and 29/P
Survey numbers in RERA land identity: Not disclosed in the supplied RERA land record
Layout approval extent: Ac.20.04 Cents; 96993.60 Sq. Yds
RERA land record areas: Total area 135468 sqmts; net area 96093.00 sqmts; area affected in road widening/FTL of tanks/nala widening 39375 sqmts
Boundaries in RERA land record: East: NAIGHOUBERS LAND; West: NAIGHBOURS LAND; North: NAIGHBOURS LAND; South: NAIGHBOURS LAND
Development identity
Sanctioning authority: Director of Town and Country Planning (DTCP); the approval refers to delegation to Mekavanampally Gram Panchayat
Principal approval: TLP.No.44/2019/ H, approved -03-2019; file no. DTCP-HT2/CTH/9/2019-HYD Sec-DTCP; proceedings no. Lr.Roc.No.556/2019/H
Approval described in document: “Draft Technical Layout Pattern - Approved”; the document states that a final-layout proposal is to follow completion of development works and compliance with conditions
Approved layout content: 285 plots
Land-use figures in layout approval: Layout area Ac. 20.04 Cents; 96993.60 Sq. Yds; plotted area Ac. 12.10 Cents; 58564.00 Sq. Yds. (60.37%); road area Ac. 5.94 Cents; 28749.60 Sq. Yds (29.63%); open space Ac. 2.00 Cents; 9680.00 Sq. Yds. (10.00%); mortgage area Ac. 1.83 Cents; 8857.20 Sq. Yds. (15.12%)
Plots reserved for Gram Panchayat mortgage: Plot Nos. 1 to 25 and 105 to 115, extent Ac. 1.83 Cents; 8857.20 Sq. Yds.
Approved built-up area: The RERA fields record approved built-up area as 135468 sqmts; the supplied layout approval extraction does not provide a building built-up-area schedule
Buildings / floors / parking levels: Not disclosed in the supplied evidence; this is a plotted layout, and no apartment-building configuration is provided
Offering and status
Offering: Plots; plot-wise sizes and plot numbers offered for sale are not itemised in the supplied material
Plot count: 285 plots are identified in the DTCP draft layout approval
RERA unit inventory / booked and available counts: Not supplied
Construction / layout-development stage: No independently verified site-progress record is supplied. The layout approval requires development works and a subsequent final-layout proposal
Completion dates in supplied records: RERA certificate: validity ends 05/07/2025. Form B declaration: project completion undertaking by 25th July 2025. The project header lists proposed completion 05/07/2025
Occupancy / completion certificate: Not supplied; the evidence reviewed does not establish issuance or status
2. The project story
This is a registered plotted-development project in Mekavanampally, Mominpet Mandal, Vikarabad District. The DTCP document describes a 285-plot draft technical layout on Survey Nos. 22/P, 23/P and 29/P, with plotted land, roads, open space and plots reserved for Gram Panchayat mortgage. It also makes further development and final-layout steps conditional on compliance with the approval conditions.
The supplied material does not establish which individual plots are currently available, booked, serviced or completed, nor does it provide independently verified construction progress. The promoter’s Form B affidavit states a completion undertaking of 25th July 2025; that is a promoter declaration, not independent evidence of completion. The RERA certificate records registration validity through 05/07/2025, which is distinct from physical completion and from any completion/occupancy certificate.
3. Master plan, architecture & building design
The project is evidenced as a plotted layout, not as an apartment or multi-storey building scheme. The DTCP draft layout approval identifies 285 plots and allocates the approved layout area among plots, roads, open space and mortgage-reserved plots. No plot-by-plot schedule, plot-size bands, road widths, orientation plan or final layout drawing is included in the supplied extracts.
The RERA fields report total land area of 135468 sqmts, net area of 96093.00 sqmts, and 39375 sqmts affected in road widening/FTL of tanks/nala widening. The layout approval separately states an extent of Ac.20.04 Cents; 96993.60 Sq. Yds. These are recorded here as the figures appearing in their respective RERA and approval records; the supplied material does not provide a parcel-level reconciliation.
The RERA form records approved built-up area of 135468 sqmts and mortgage area of 12240 sqmts. The supplied layout approval extraction does not explain those field labels through a building-area or plot schedule. No building footprints, floor configurations, parking levels, dwelling plans or building-specific architectural features are provided.
4. Homes, configurations & floor plans
This is a plotted development; the supplied record does not provide plot-wise configuration counts, booked/available inventory or saleable-area ranges. The DTCP approval identifies 285 plots, but no schedule listing individual plot numbers and dimensions is supplied.
Two drawings are recorded as pending scan review, and no carpet-area measurements were produced. The supplied vendor configuration list includes apartment labels, but it does not establish apartment inventory for this registered plotted project; those labels are therefore not used as RERA plot configurations.
5. Parking & vehicle circulation
The approved layout record gives a road area of Ac. 5.94 Cents; 28749.60 Sq. Yds (29.63%), but the supplied extract does not specify road widths, driveway geometry, vehicle entry/exit points, parking counts, visitor parking or plot-specific parking allocations. No exclusive parking entitlement is established by the evidence supplied.
6. Amenities, recreation & open spaces
The DTCP layout approval identifies Ac. 2.00 Cents; 9680.00 Sq. Yds. (10.00%) as open space. The RERA-filed amenities list marks several proposed infrastructure/facility categories “YES,” but the recorded progress is 0 for the listed entries; these are filing disclosures, not evidence of completion.
| Description / size | Ac. 2.00 Cents; 9680.00 Sq. Yds. (10.00%) |
|---|---|
| Evidence source | DTCP layout approval |
| Declared progress / verified status | Approved layout allocation; completion not independently verified |
| Description / size | Listed as “YES”; no separate size or quantity supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Recorded progress 0; completion not independently verified |
| Description / size | Listed without a supplied size or quantity |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Recorded progress 0; completion not independently verified |
| Description / size | Listed as “YES”; layout approval identifies road area Ac. 5.94 Cents; 28749.60 Sq. Yds (29.63%) |
|---|---|
| Evidence source | RERA amenities; DTCP layout approval |
| Declared progress / verified status | Listed in filing; completed status not independently verified |
No clubhouse, indoor recreation or sports facility is identified in the supplied project-specific evidence.
7. Utilities, building services & safety
The RERA-filed amenities list identifies water supply, sewerage (including chambers, lines, septic tank and STP), storm-water drains, street lighting, solid-waste management and disposal, rainwater harvesting/water conservation, energy management, and fire protection/fire-safety requirements as “YES.” Each is recorded with progress 0; the supplied documents do not give capacities, technical designs, construction status or independent verification.
The filing also lists an electrical meter room, sub-station and receiving station, and treatment/disposal of sewage and sullage water, without a supplied progress value or technical particulars. No specific water source, storage or treatment capacity, STP capacity, backup-power capacity, security system, accessibility design or completed statutory clearance is evidenced in the materials reviewed.
8. Location, access & connectivity
The official project identity places the site in Mekavanampally village, Mominpet Mandal, Vikarabad District, Telangana, PIN 501202. The layout approval identifies Mekavanampally Gram Panchayat and Survey Nos. 22/P, 23/P and 29/P. A cadastral-parcel centroid is recorded at 17.56900, 77.91574.
The supplied location data records the nearest sampled Outer Ring Road interchange at approximately 36.8 km. No project-specific approach-road description, public-transport service, local landmark distances or verified travel times are supplied.
9. Developer & development status
The registered promoter is GREEN METRO INFRATECH & PROJECTS PVT LTD, a company. The RERA record identifies Ashok Boddu as an authorised signatory; the Form B affidavit is made by BODDU ASHOK BABU in that capacity. The supplied record lists promoter office/address information as APURUPA TURBO, RD NO 36, Mekavanampally, Mominpet, Vikarabad, Telangana, 501202; the TG-RERA certificate separately prints the promoter-office field as “Village: Mandal: District: Hyderabad, Pin: 500033.”
The RERA certificate records registration from 21/03/2020 to 05/07/2025 and the supplied record indicates no extension. The Form B affidavit declares completion by 25th July 2025. Neither record, by itself, verifies physical completion; no completion/occupancy certificate or independently verified progress report is supplied.
10. Approvals, official records & documents
| Details | Form C; project GREEN METRO INFRATECH AND PROJECTS PVT.LTD; registration P02100001896; valid 21/03/2020–05/07/2025 |
|---|
| Details | DTCP TLP.No.44/2019/ H; file DTCP-HT2/CTH/9/2019-HYD Sec-DTCP; proceedings Lr.Roc.No.556/2019/H; approved date recorded as -03-2019; “Draft Technical Layout Pattern - Approved” |
|---|
| Details | Lr.No.Nil, 31-12-2018; Circular Memo.No.1637/2018/P, 18-05-2018 and 19-05-2018; Act 5 of 2018; G.O.Ms.No.67, 26-02-2002 |
|---|
| Details | By BODDU ASHOK BABU as authorised signatory; dated 16/10/2019; includes promoter declarations concerning title, encumbrances, project funds, pending approvals and completion undertaking |
|---|
| Details | Not supplied in the evidence reviewed |
|---|
| Details | The supplied approval extract says final-layout proposals are to be submitted after development works and compliance; no final approval document is supplied |
|---|
The layout approval states that the draft layout is subject to annexed conditions, including ground demarcation, mortgage of specified plots to the Gram Panchayat, payment of fees and charges, submission of mortgage-related records and photographs, and later submission of final-layout proposals through the Gram Panchayat.
Frequently asked questions
Is GREEN METRO INFRATECH AND PROJECTS PVT.LTD registered with Telangana RERA?
Yes. GREEN METRO INFRATECH AND PROJECTS PVT.LTD is registered with the Telangana Real Estate Regulatory Authority as P02100001896; the registration status is New Project.
Who is the developer of GREEN METRO INFRATECH AND PROJECTS PVT.LTD?
The promoter named in the RERA registration is GREEN METRO INFRATECH & PROJECTS PVT LTD.
Where is GREEN METRO INFRATECH AND PROJECTS PVT.LTD located?
GREEN METRO INFRATECH AND PROJECTS PVT.LTD is in MEKAVANAMPALLY, Mominpet, Vikarabad, Telangana (501202).
When will GREEN METRO INFRATECH AND PROJECTS PVT.LTD be completed?
The promoter's proposed date of completion filed with RERA is 05/07/2025. This is the promoter's declaration, not a guarantee.