GREEN PARK CITY is a residential plotted development in Polepalle, Jadcherla mandal, Mahabubnagar district. The registered promoter is Md Miskin Baba and Others. The project covers 10,343.65 sq.m and the approved layout lists 42 residential plots; building count, floors and plot configurations are not disclosed in the supplied project record. It is registered with TG-RERA as P01400007565, with a proposed completion date of 24/06/2025.

01What we found

Period endedTG-RERA registration ran to 24 Jun 2025 - check its extension on TG-RERA
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameGREEN PARK CITY
Project typePlotted development / residential layout RERA record
Phase or registered portionPhase not separately identified; registration is for the project on Survey Nos. 415/P and 417/P
TG-RERA registrationP01400007565
Registration validity13/01/2024 to 24/06/2025, as stated on the certificate. This is the registration period; it is separate from the completion deadline.
Registered promoterMd Miskin Baba and Others; the filing also identifies the promoter as MD MISKIN BABA AND OTHERS. RERA filing
RERA project statusNew Project RERA filing
Completion deadline24/06/2025, as declared by the promoter in Form B.
Occupancy/completion certificateNot identified in the supplied project record. The project is a plotted layout; no phase- or plot-specific occupancy/completion certificate is provided here. Document index

Land and geographic identity

ItemRecord
Locality and revenue villagePolepalle; also rendered as Polepally in the layout approval documents. Revenue village: Polepalle.
Mandal / district / PINJadcherla / Mahabubnagar / 509301 RERA record
Project survey numbers415/P and 417/P
Registered site extent10,343.65 sq.m in the RERA land details. RERA filing
Layout drawing area10,343.56 sq.m, described in the drawing extraction as both the minimum plot area and net plot area.
Boundaries in the RERA land detailsEast: open land of Rajapur Village; West: open land of neighbours; North: open land of neighbours; South: existing 30 feet wide road. RERA filing
Road-widening/FTL/nala-widening area in RERA land details0 sq.m RERA filing

Development identity

ItemRecord
Principal layout approvalTentative Layout Plan approval 288189/LP/GP/205292/0005/2023, by MUDA Urban Development Authority; approved 24-06-2023.
Layout drawing referencePermit_Number TS/034594/2023, dated 18-05-2023; drawing identifies Polepally Grampanchayat as the delegated authority.
Plots in the approved layout42, according to the layout plan and tentative approval record.
Approved built-up area0.00 sq.m in the supplied layout-plan parameters; this is a plotted layout, not a recorded building scheme.
Building, floor and parking-level configurationNot disclosed in the supplied project record; no buildings, floors, or parking levels are identified.
Mortgaged area974.32 sq.m in the layout drawing extraction. The tentative approval separately describes Plot Nos. 21–27, stated as 1,165.287 sq.yds, as mortgaged.

Offering and status

ItemRecord
OfferingResidential plots; the approved layout drawing lists 42 plots.
Plot count and size informationThe drawing-derived layout record identifies 42 plots with sizes read from the drawing; see “Homes, configurations & floor plans.” These are software-measured drawing figures, not a RERA-filed plot-size schedule. Layout record
Booked / available plotsNot established by the supplied record. Document index
Declared project progressRERA project information lists 70% completeness; this is a declared record value, not independent site verification. RERA filing
Construction stageNo independently verified site-stage evidence supplied. The approval requires development works and a work-completion certificate before final layout approval.

2. The project story

GREEN PARK CITY is a residential plotted layout registered with TG-RERA as P01400007565, covering land identified as Survey Nos. 415/P and 417/P in Polepalle revenue village, Jadcherla mandal, Mahabubnagar district. The layout approval record describes 42 residential plots, with land set aside for roads, open space/park, utilities and social infrastructure. It does not describe an apartment, villa or commercial building scheme.

The promoter’s Form B declares a completion deadline of 24 June 2025, while the RERA project information records 70% completeness. Neither item is independent evidence of on-site completion. The supplied record does not establish which infrastructure works have been completed or whether a final layout approval or completion certificate has subsequently been issued. RERA filing

3. Master plan, architecture & building design

The project is organized as a plotted layout rather than a building development. The supplied layout drawing reports a net layout area of 10,343.56 sq.m and allocates it as follows. These figures are taken from the drawing extraction; they are not building floor areas.

Layout useAreaShare shown in drawing
Plotted area6,096.11 sq.m58.94%
Road area2,944.33 sq.m28.47%
Organized open space/park931.30 sq.m9.00%
Social infrastructure266.94 sq.m2.58%
Utility area105.07 sq.m1.02%
Amenity area0.00 sq.m0.00%
Common parking area0.00 sq.m0.00%

The approval drawing lists internal road widths of 7.62m, 9.14MT, 9.00MT and 18.00MT, and also gives road widths as 33'-0", 40'-0" and 50'-0".

No approved built-up area, building footprints, building count, floor configuration or building circulation details are disclosed in the supplied layout record. The tentative approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site.

4. Homes, configurations & floor plans

This is a plotted project, so apartment configurations, carpet areas and apartment saleable areas do not apply. The layout drawing extraction identifies 42 plots. Its plot schedule was read by software and should be checked against the drawing; plot sizes below are not RERA-filed measurements. Layout record

Plot-size band (sq.yd)Plots
100–15010
150–20028
250–3003
300–4001

The software-measured plot-size range is 101.45–332.55 sq.m (121.3–397.7 sq.yd), with a median of 139.14 sq.m (166.4 sq.yd). The most frequent sizes identified from the drawing are 139.14 sq.m (10 plots), 120.77 sq.m (8 plots) and 130.15 sq.m (7 plots). These are plot areas, not house floor areas. Layout record

No plot-wise booking or availability count is established in the supplied evidence. Document index

5. Parking & vehicle circulation

The layout drawing records 0 proposed parkings and 0.00 sq.m of common parking area. The supplied record does not establish visitor, accessible, two-wheeler or EV parking, nor any parking allotment arrangement.

Roads are shown in the layout plan, with widths listed as 7.62m, 9.14MT, 9.00MT and 18.00MT, and also as 33'-0", 40'-0" and 50'-0". The tentative approval requires roads to remain open for access to neighbouring sites. No separate vehicle-entry, ramp or pedestrian-separation design is evidenced.

6. Amenities, recreation & open spaces

The RERA amenity record identifies a number of layout infrastructure categories, but records 0% progress for the listed items. The approval document also specifies infrastructure and handover requirements. These records describe provisions or requirements; they do not establish independent completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Clubhouse / indoor — no facility specifically identifiedNot disclosedRERA amenitiesNot established
Sports / recreation — Green Strip/TOT LOT/ParkPark/open-space allocation: 931.30 sq.m in layout drawing; the tentative approval states Ac 0.23 cents, 1,113.835 sq.yds for open space.RERA amenity record shows 0%; completion not independently verified. RERA amenities
Landscape / open space — organized open space/park931.30 sq.m; 9.00% in the layout drawingCompletion not independently verified
Convenience / community — social infrastructure266.94 sq.m; 2.58% in the layout drawingCompletion not independently verified
Convenience / community — utility area105.07 sq.m; 1.02% in the layout drawingCompletion not independently verified

The tentative approval names possible facilities—including a water reservoir, septic tank/sewerage treatment plant, electric transformer and solid-waste management—and lists pharmacy, clinic, school, play school, creche, dispensary and convenience shops. These are approval-document references, not evidence that those facilities are built or operating.

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage infrastructure (chamber, lines, septic tank/STP), water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station. It also lists storm-water drains, street lighting, sewage and sullage treatment, solid-waste management, energy management and fire protection/safety requirements. The record shows 0% progress against each listed item; no completion verification, system capacities or operating details are supplied. RERA amenities

The tentative layout approval requires the applicant to construct an overhead tank or sump and septic tank, as applicable, and sufficient harvesting pits. It also identifies a water reservoir, septic tank/sewerage treatment plant, electric transformer and solid-waste management among the utility provisions to be handed over. These are approval requirements or stated provisions, not proof of installation or statutory compliance.

No evidence is supplied for water source or storage capacity, sewage-treatment capacity, reuse arrangements, electrical backup, lifts, fire-system specifications, CCTV, access control or accessible circulation. RERA amenities Document index

8. Location, access & connectivity

The registered location is Polepalle, Jadcherla, Mahabubnagar, Telangana 509301, on Survey Nos. 415/P and 417/P. The RERA land record states that the southern boundary is an existing 30 feet wide road; the layout approval also records internal road widths. RERA filing

A cadastral parcel-centroid location is recorded at 16.81633, 78.11087. The nearest sampled Outer Ring Road interchange is listed at approximately 57.2 km; the supplied record does not provide a route, travel time or public-transport details. Cadastral map Location record

9. Developer & development status

The registered promoter is MD MISKIN BABA AND OTHERS; the registration certificate renders the name as Md Miskin Baba and Others. The RERA record describes the organization type as “Others” and its description as “Partnership.” No corporate registration number, registered-office address, official website or project contact details are established in the supplied evidence. RERA filing

MOHAMMED KHASIM signed the Form B declaration as the promoter’s authorized signatory. In that declaration, the promoter states that the project would be completed by 24 June 2025 and reports the land as free from encumbrances. The RERA project information records 70% completeness; no independent site inspection or verified construction-progress report is supplied here. RERA filing

10. Approvals, official records & documents

RecordAvailable evidence
TG-RERA registrationForm C certificate for GREEN PARK CITY, registration P01400007565, valid 13/01/2024–24/06/2025.
Principal layout approvalMUDA Urban Development Authority Tentative Layout Plan approval 288189/LP/GP/205292/0005/2023, dated 24-06-2023, for land in Survey Nos. 415/P and 417/P at Polepalle. The approval states that it is not proof of land title.
Layout drawingProposed residential-plot layout for Survey Nos. 415/P and 417/P; drawing reference TS/034594/2023, dated 18-05-2023, with 42 plots and land-use allocations.
Promoter declarationForm B, signed by MOHAMMED KHASIM as authorized signatory, containing the promoter’s title/encumbrance statements, 70% separate-account undertaking and completion declaration.
Final layout / completion evidenceThe tentative approval requires a licensed technical person’s work-completion certificate for approval of the final layout. No final layout approval or such certificate is included in the supplied evidence.
Occupancy/completion certificateNone identified in the supplied project documents. Document index

Frequently asked questions

Is GREEN PARK CITY registered with Telangana RERA?

Yes. GREEN PARK CITY is registered with the Telangana Real Estate Regulatory Authority as P01400007565; the registration status is New Project.

Who is the developer of GREEN PARK CITY?

The promoter named in the RERA registration is MD MISKIN BABA AND OTHERS.

Where is GREEN PARK CITY located?

GREEN PARK CITY is in Polepalle, Jadcherla, Mahabubnagar, Telangana (509301).

When will GREEN PARK CITY be completed?

The promoter's proposed date of completion filed with RERA is 24/06/2025. This is the promoter's declaration, not a guarantee.

More projects in Polepalle