Sign in

Green Parkphase II

B KHAJAGESUDARAJ AND OTHERS · Mahabubnagar · RERA P01400007642

GREEN PARKPHASE II is a residential plotted development in Teelair, Marikal Mandal, Mahabubnagar. It is being developed by B KHAJAGESUDARAJ AND OTHERS on a registered total site area of 19991.47 sqmts, and the draft layout records 62 plots; plot configurations are not stated. The project is registered with TG-RERA under P01400007642, with a proposed completion date of 18/01/2025.

01What we found

Period endedTG-RERA registration ran to 18 Jan 2025 - check its extension on TG-RERA
21documents on file - each fact links to its page
1court case on this project's land (survey 198, Teelair)
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameGREEN PARKPHASE II RERA record
Project typePlotted development / residential plotted layout RERA record RERA filing
Phase / registered portionPhase II, as named in the TG-RERA registration; the precise relationship to any other phase is not established in the supplied record. RERA record
TG-RERA registration numberP01400007642 RERA record
Registration validity29/01/2024 to 18/01/2025, unless extended by the Authority; no extension record is supplied here. Registration validity is distinct from the completion deadline. RERA record
Registered promoterB KHAJAGESUDARAJ AND OTHERS RERA record RERA filing
TG-RERA status in supplied record“New Project”; no current registration status beyond the certificate’s stated validity is established by the material supplied. RERA filing

Land and geographic identity

FieldProject record
LocalityTeelair (also written TEELAIR) RERA record RERA filing
Revenue villageTeelair RERA record Land records
MandalMarikal
DistrictMahabubnagar in the TG-RERA record; the draft layout papers also state Narayanpet District. RERA record
PIN509351 RERA record
Project survey numbers and subdivisions198AA/AA; 198AA/A/2; 198A/1 RERA record Land records
Registered total site area19991.47 sqmts RERA filing
Net area19267.09 sqmts RERA filing
Area recorded as affected in road widening/FTL of tanks/nala widening724.38 sqmts RERA filing
BoundariesNorth: EXISTING WIDE ROAD; South: BHARATHMALA ROAD; East: OTHERS LAND; West: OTHERS LAND RERA filing
Registered address text“1-8 HYDERABAD ROAD DHANWADA MANDAL NARAYANPET DIST”; the certificate also identifies Teelair, Marikal, Mahabubnagar and PIN 509351. RERA filing

Development identity

FieldProject record
Sanctioning authority shown in project recordDTCP; draft layout material also identifies Teelair Gram Panchayat. RERA filing Approvals record
Principal approval referenceDraft Technical Layout Pattern DTLP NO. o7 IZOZ} /HRO /H1; the supplied record associates it with file Lr.Roc.No.70/2023/HRO/H1 and date 18_01-2023. Approvals record
Approval status evidenced hereThe supplied technical-layout material describes a draft layout pattern. The Gram Panchayat letters are requests forwarding proposals for final layout approval and release of mortgage plots; they do not establish final approval.
Approved built-up area13581.25 sqmts is recorded in the project fields as approved built-up area; the material supplied does not explain its application to this plotted-layout project. RERA filing
Building / tower count and floorsNot disclosed in the supplied record; this is a plotted layout, and no building configuration is established. RERA filing Document index
Plot count62 plots in the draft layout material.
ParkingNo parking count or parking layout is established in the supplied evidence. Document index
Layout land-use components in draft materialDraft technical-layout extraction records net layout area Ac 4 30 44 Gts, open space Ac 0-19 04 Gts (10.00%), road area Ac 0-17-16 Gts (19.51%), plotted area Ac 3,14 24 Gts (70.49%), and mortgage area 15.63% of saleable land.

Offering and status

FieldProject record
OfferingPlots in a residential layout; the draft layout material records 62 plots. Plot-wise sizes, saleable-size bands and unit inventory are not supplied. RERA record
Booked / available countsNot established by the supplied record. Document index
Completion deadlineTG-RERA Form B extraction records 18/01/2025 as the promoter’s completion undertaking.
Other promoter-declared completion dateA separate Form B extraction for “GREEN PARK II” records 15/06/2025.
Construction / development progressThe project header records 70% completeness; the basis, date and independent verification of that figure are not supplied. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. For a plotted layout, no phase- or plot-specific OC status is established here. Document index

2. The project story

GREEN PARKPHASE II is registered with TG-RERA as a plotted development at Teelair village, Marikal Mandal, on survey numbers 198AA/AA, 198AA/A/2 and 198A/1. The RERA record identifies the offering as plots, rather than apartments or villas. The draft layout extraction describes 62 residential plots and sets out areas for plots, roads, open space, a nala buffer and mortgage plots. RERA record

The project header records 70% completeness, but the supplied evidence does not specify which development works are complete, when the percentage was assessed, or whether it was independently inspected. No completion or occupancy certificate is included. RERA record Document index

3. Master plan, architecture & building design

The supplied drawings and extracts concern a plotted residential layout, not a documented apartment or multi-storey building scheme. The RERA land record gives a total area of 19991.47 sqmts, net area of 19267.09 sqmts, and an affected-area entry of 724.38 sqmts. Separately, the draft layout extraction records net layout area Ac 4 30 44 Gts, including open space, roads, plotted area and a mortgage allocation. These are recorded figures from their respective documents; no reconciliation or independently measured site plan is supplied here. RERA filing

The draft technical layout records 62 plots, open space of Ac 0-19 04 Gts (10.00%), road area of Ac 0-17-16 Gts (19.51%), plotted area of Ac 3,14 24 Gts (70.49%), and mortgage area of 15.63% of saleable land. The extraction also lists road widths of 33'-0" and 100'-0". The draft material states that the open space and roads are to be handed over to the Gram Panchayat and identifies plots reserved for mortgage.

No plot-size schedule, detailed final layout drawing, building footprints, floor configuration, or final approval drawing is available in the supplied material. The RERA field’s approved built-up area of 13581.25 sqmts is reported as filed; its relevance to the plotted layout is not explained in the supplied evidence. RERA filing Document index

4. Homes, configurations & floor plans

This project is recorded as a plotted development. The available draft layout extraction states 62 plots, but does not provide plot-wise numbers, dimensions, size bands, booked or available counts, or RERA-filed saleable areas. RERA record

The three supplied floor-plan drawings are scans pending measurement; no measured carpet areas or usable room dimensions are available. Apartment configuration listings and carpet-area comparisons therefore do not apply on the evidence supplied. Floor plans Promoter website

5. Parking & vehicle circulation

No parking-space count, parking allocation, parking layout, visitor or accessible parking provision, or vehicle-entry arrangement is established in the supplied documents. The draft layout extraction identifies internal roads and gives road widths of 33'-0" and 100'-0", but does not provide enough information to describe parking or circulation arrangements in detail.

6. Amenities, recreation & open spaces

The RERA amenity record lists the following items; the recorded completion percentages are 0 where shown, and the supplied evidence does not establish independently verified completion. The draft technical layout describes open space and road-area provisions. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsListed as available: YES; no completion percentage above 0 is recorded.RERA amenitiesListed; completion not independently verified.
Green strip / tot lot / parkListed as available: YES; no size is supplied. Draft layout records open space Ac 0-19 04 Gts (10.00%).RERA amenitiesListed; delivery and development not independently verified.
Community buildingsListed; no size or details supplied.RERA amenitiesCompletion percentage recorded as 0; not independently verified.
Street lightingListed as available: YES.RERA amenitiesListed; completion not independently verified.

7. Utilities, building services & safety

The draft technical-layout material lists proposed street lighting and electricity facilities, a sewerage disposal system, protected water supply, rain water harvesting pits, and fencing of open spaces. The RERA amenity record also lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, and electrical meter room/sub-station/receiving station. The supplied record does not establish capacities, detailed designs, completion, or statutory clearances for these services. RERA amenities

8. Location, access & connectivity

The registered location is Teelair village, Marikal Mandal, on survey numbers 198AA/AA, 198AA/A/2 and 198A/1, PIN 509351. The project record identifies an existing wide road on the north boundary and BHARATHMALA ROAD on the south boundary. A supplied location record lists Financial District (Nanakramguda), 1.2 km from the recorded geocode; this is a data-supplied distance, not a verified travel route or travel time. RERA record RERA filing Location record

9. Developer & development status

The registered promoter is B KHAJAGESUDARAJ AND OTHERS. The legal-entity type, corporate registration identifiers, registered office and official contact details are not established in the supplied record. The certificate names B Khajagesudaraj as promoter and records an address at 1-8 HYDERABAD ROAD, Teelair, Marikal, Mahabubnagar, PIN 509351. RERA record Corporate record

The project header records 70% completeness, without a supplied assessment date or independent verification. The Form B material includes completion undertakings of 18/01/2025 and, in another extraction for “GREEN PARK II,” 15/06/2025; no extension order or completion/occupancy certificate is supplied. RERA record

10. Approvals, official records & documents

RecordWhat the supplied material establishes
TG-RERA registration certificateForm C for GREEN PARKPHASE II, registration P01400007642; states validity from 29/01/2024 to 18/01/2025, unless extended by the Authority.
Draft technical layout patternDTCP draft-layout material for the residential plotted layout in the project survey numbers; records 62 plots, layout components and conditions. It expressly states that layout permission is not proof of land title.
Gram Panchayat correspondenceLetters dated 08-11-2023 forward proposals for final layout approval and release of mortgage plots; the letters do not themselves establish that final approval was granted.
Layout approval filingRERA filing includes a layout-plan document entry associated with Teelair Gram Panchayat; the supplied extraction identifies draft technical layout details.
Form B declarationsPromoter declarations include a title basis naming “salima begum,” an encumbrance declaration, and project completion undertakings.
Completion / occupancy certificateNone is included in the supplied material. Document index

Frequently asked questions

Is GREEN PARKPHASE II registered with Telangana RERA?

Yes. GREEN PARKPHASE II is registered with the Telangana Real Estate Regulatory Authority as P01400007642; the registration status is New Project.

Who is the developer of GREEN PARKPHASE II?

The promoter named in the RERA registration is B KHAJAGESUDARAJ AND OTHERS.

Where is GREEN PARKPHASE II located?

GREEN PARKPHASE II is in TEELAIR, Mahabubnagar, Telangana (509351).

When will GREEN PARKPHASE II be completed?

The promoter's proposed date of completion filed with RERA is 18/01/2025. This is the promoter's declaration, not a guarantee.

More projects in Mahabubnagar