Sign in

Greenpark

GLENTREE HOMES LLP · Nagarkurnool · RERA P01600001530

GREENPARK is a plotted development in Kalwakurthy, Kalwakurthy Mandal, Nagarkurnool District, developed by registered promoter Glentree Homes Llp. It covers 109203.6 sq. m and the layout approval identifies 375 residential plots; the overview does not state a plot-size range in the TG-RERA record. TG-RERA registration number P01600001530 records the project, with the promoter’s Form-B declaration stating proposed completion by 07/11/2022.

More from Glentree Homes LLP · 6 projects →

01What we found

Period endedTG-RERA registration ran to 7 Nov 2022 - check its extension on TG-RERA
10documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Kalwakurthy, Kalwakurthy, Nagarkurnool · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameGREENPARK
Project typePlotted development / layout RERA record
Phase or registered portionNo phase designation disclosed; registration identifies the project as GREENPARK
TG-RERA registrationP01600001530
Registration validity27/12/2019 to 07/11/2022; the certificate states a period of 2 years. This is the registration-validity period, not a statement of current completion or occupancy status.
Registered promoterGlentree Homes Llp
RERA statusThe supplied certificate records the grant of registration; the supplied record does not establish an extension. Current portal status should be confirmed with TG-RERA.

Land and geographic identity

FieldRecord
Locality / revenue villageKalwakurthy; the RERA record also gives locality as KALWARKURTHY RERA record
MandalKalwakurthy RERA record
DistrictNagarkurnool RERA record
PIN509324 RERA record
Project survey numbers733, 752 & 753/P RERA record
Subdivisions in title records733/A, 733/E, 733/EE/A1–A4, 752/A2, 752/E/A1–A4, 753/A1, 753/A2, 753/U/A1–A4; title documents also include references to 752/E/A1–A4 and related survey descriptions. These are title-document identifiers, not a verified reconciliation of every subdivision to the registered project boundary.
Registered site areaThe RERA land record gives 109203.6 sq. m total area and 109203.60 sq. m net area. RERA filing
Sanction document’s stated extentAc.26.975 Cents
Boundaries in RERA land detailsNorth: ROAD; South: OTHER LAND; East: OTHER LAND; West: OTHER LAND RERA filing

Development identity

FieldRecord
Sanctioning authorityDirector of Town and Country Planning, Government of Telangana; the document states release/approval by Kalwakurthy Municipality is required for legal validity.
Principal layout approvalTechnical Layout Pattern TLP No.242/2019/H, approved 07 -11-2019 Approvals record
Other approval referencesFile No. DTCP-HT3/OTH/57/2019-HYD Sec-DTCP; Lr.D.Dis.No. 2804/2019/H; municipality reference G/405/LP/KLKY/2019; RDDTP reference 817/2019/HRO/H1. Approvals record
Layout scale in approval document375 plots
Approved built-up areaNot disclosed in the supplied layout approval. The RERA field records 60431.4 sq. m as “Approved Built up Area”; its relationship to plot-development works is not explained in the supplied materials. RERA filing
Buildings / floorsNo buildings or floor configuration are established for this plotted layout in the supplied approval material. Individual building permissions are to be considered separately under the conditions in the approval.
ParkingNo sanctioned parking count, parking levels or plot-wise parking allocation is established in the supplied records.

Offering and status

FieldRecord
Unit typeResidential plots; the approval records 375 plots.
RERA-filed plot count / size rangePlot-wise unit inventory and RERA-filed plot-size range are not available in the supplied data.
Booked / available countsNot disclosed in the supplied data.
Completion deadlinePromoter’s Form-B declaration states completion by 07/11/2022.
Construction / infrastructure stageNo independently verified site progress is supplied. The RERA amenity record lists several works at 0% and certain layout items at 100%; see sections 6 and 7. RERA amenities
Completion / occupancy certificateNo completion certificate or occupancy certificate is supplied. The materials concern a plotted layout; the supplied record does not establish an OC or completion-certificate status for the layout.

2. The project story

GREENPARK is registered as a plotted-development project in Kalwakurthy, Nagarkurnool District, covering the project identity stated as Survey Nos. 733, 752 & 753/P. The DTCP communication approves a technical layout pattern for 375 plots and reserves land for roads and open space. It describes residential dwelling houses as the permitted building use, with individual building permissions to be considered separately. RERA record

The registration certificate records a registration period ending 07/11/2022, and the promoter’s Form-B declaration gives the same date as the completion undertaking. These are separate records of registration validity and the promoter-declared completion deadline; neither establishes that development was completed. The supplied documents do not include an extension order, a completion certificate or an occupancy certificate.

The available RERA amenity data marks internal roads and footpaths, green strip/tot lot/park, rainwater harvesting and aggregate recreational open space as 100%. It marks water supply, sewerage, storm-water drains, street lighting and several other works as 0%. Those are filed progress entries, not independent site verification. RERA amenities

3. Master plan, architecture & building design

The supplied sanction is a plotted layout, not a building or tower plan. The DTCP communication identifies a total site extent of Ac.26.975 Cents, comprising Ac. 2.697Cents reserved for open space (10 %) and Ac. 9.35Cents for roads (34.66 %); the document identifies 375 plots. It also requires roads and open spaces approved for public purposes to be handed to Kalwakurthy Municipality by registered gift deed, and sets out layout works and conditions including road formation, drains, plantation, fencing and civic services.

The supplied material does not provide plot-by-plot dimensions, a drawing-based plot arrangement, approved building footprints, building heights, floor plans, or a phase-wise development plan. No building configuration should be inferred from the layout approval.

4. Homes, configurations & floor plans

The project is a plotted development. The supplied approval identifies 375 plots, but no RERA unit-inventory schedule with plot-wise counts, size bands, booked/available counts or saleable areas is available. The promoter’s Form-B declaration concerns the project and its completion undertaking; it does not provide plot-level inventory.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots375 in layout approvalNot disclosedNot disclosedNot disclosedNot applicableNot supplied

A promoter/vendor listing describes plot sizes as 1485 - 5022 sq.ft (137.96 - 466.56 sq.m); this is a promoter-marketed claim, not a RERA-filed plot-size schedule. Promoter website

The floor-plan review contains two drawings, but 0 are measured and 2 are scans pending; it does not provide software-measured carpet-area results for this plotted project. Floor plans

5. Parking & vehicle circulation

The supplied layout approval identifies roads and road-formation requirements but does not state parking-space counts, plot-wise parking allocations, visitor parking, accessible spaces, parking structures or parking levels. No legally documented exclusive parking allocation is established by the available materials.

The approval requires internal roads to be formed and kept open to provide access for neighbouring lands. It does not provide road widths in the supplied extracted approval text.

6. Amenities, recreation & open spaces

Public open space / park
Description / sizeAc. 2.697Cents; 10 % of the site as stated in the approval
Evidence sourceDTCP layout communication
Declared progress / verified statusApproval reserves the area; RERA amenity entry for green strip/tot lot/park is 100%. No independent completion verification supplied. RERA amenities
Roads
Description / sizeAc. 9.35Cents; 34.66 % of the site as stated in the approval
Evidence sourceDTCP layout communication
Declared progress / verified statusInternal roads and footpaths recorded as 100% in the RERA amenity data; no independent verification supplied. RERA amenities
Rainwater harvesting
Description / sizeRainwater-harvesting pits are required by the approval
Evidence sourceDTCP layout conditions
Declared progress / verified statusRERA amenity entry is 100%; no independent completion verification supplied. RERA amenities
Children’s play area
Description / sizeNo size or capacity in the supplied RERA records
Evidence sourcePromoter/vendor listing Promoter website
Declared progress / verified statusPromoter-marketed; no RERA progress or independent completion status supplied.
Walking track / landscaped garden / party area / table tennis
Description / sizeNo size or capacity in the supplied RERA records
Evidence sourcePromoter/vendor listing Promoter website
Declared progress / verified statusPromoter-marketed; no RERA progress or independent completion status supplied.

7. Utilities, building services & safety

The DTCP layout communication lists required layout infrastructure, including road formation, side drains, channelisation of nalas for storm-water run-off, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. These are approval conditions, not evidence that the works have been completed.

The RERA amenity record marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Storm Water Drains, Street Lighting, Treatment And Disposal Of Sewage And Sullage Water, Solid Waste Management And Disposal, Energy management, Fire Protection And Fire Safety Requirements, and Electrical Meter Room, Sub-Station, Receiving Station at 0%. It does not provide capacities, system designs or completion verification for these items. RERA amenities

The supplied documents do not specify water source or storage, treatment capacity, electrical capacity, backup supply, waste arrangements, security systems or accessibility provisions.

8. Location, access & connectivity

The registered project location is Kalwakurthy, Kalwakurthy Mandal, Nagarkurnool District, PIN 509324, in the revenue-village identity recorded as Kalwakurthy; the RERA project locality is listed as KALWARKURTHY. The layout approval describes the site as being at Kalwakurthy Municipality. RERA record

The supplied location data gives a cadastral-parcel centroid at 16.66329, 78.52600 and the nearest sampled Outer Ring Road interchange at 63.8 km. The latter is an approximate mapped distance, not a travel-time estimate. Location record

9. Developer & development status

The registered promoter is GLENTREE HOMES LLP, identified as an LLP in the project record. The project registration certificate names the promoter as Glentree Homes Llp. The supplied promoter record lists P ROHIT as authorized signatory and P SPANDANA and K KASINATH as partners. Corporate record Parties record

The registration certificate gives a promoter-office entry of Village: Mandal: District: Hyderabad, Pin: 500081; the supplied entry does not provide a complete street address. The project record also lists a designated account with HDFC Bank, Jubilee Hills, account masked as 8858; the account detail is not evidence of project-fund use or current account status. Parties record

The promoter’s Form-B affidavit, signed by P ROHIT, declares completion by 07/11/2022 and makes the listed title, encumbrance, separate-account, audit and approval disclosures. These are promoter declarations. No independent construction-progress inspection or supplied completion/occupancy certificate establishes delivery status.

10. Approvals, official records & documents

TG-RERA registration certificate
Reference / scopeFORM ‘C’, registration P01600001530, GREENPARK; issued 27/12/2019
What the supplied document establishesRecords registration from 27/12/2019 to 07/11/2022, subject to stated conditions, including the separate-account condition.
DTCP layout approval communication
Reference / scopeTLP No.242/2019/H, file DTCP-HT3/OTH/57/2019-HYD Sec-DTCP, dated 07 -11-2019
What the supplied document establishesApproves and communicates the technical layout pattern for a 375-plot layout over Survey Nos. 733, 752 & 753/P at Kalwakurthy Municipality, subject to conditions. It says the layout is legally valid only upon release/approval by the concerned Municipality and fulfilment of layout conditions.
Form-B promoter declaration
Reference / scopeDeclaration dated 15/05/2019
What the supplied document establishesRecords the promoter’s declarations concerning title basis, encumbrances, project funds, audits, pending approvals and completion by 07/11/2022.
Title opinion / title documents
Reference / scopeAdvocate’s title report 83889; title-document extracts 83888 and 83892
What the supplied document establishesThe supplied extracts include a title opinion and records of sale deeds and a 1987 final decree. They do not constitute a complete, independently reconstructed title chain in this Overview.
Layout-plan filing slot
Reference / scope83883
What the supplied document establishesRERA filing description requests a stamped layout approval/plan or a declaration if the document is not applicable; no drawing is extracted from this entry.

No occupancy or completion certificate is included in the supplied documents. The DTCP approval conditions include a requirement for roads and open spaces to be handed over to Kalwakurthy Municipality by registered gift deed; a completed handover deed is not supplied here.

Frequently asked questions

Is GREENPARK registered with Telangana RERA?

Yes. GREENPARK is registered with the Telangana Real Estate Regulatory Authority as P01600001530; the registration status is New Project.

Who is the developer of GREENPARK?

The promoter named in the RERA registration is GLENTREE HOMES LLP.

Where is GREENPARK located?

GREENPARK is in KALWARKURTHY, Kalwakurthy, Nagarkurnool, Telangana (509324).

When will GREENPARK be completed?

The promoter's proposed date of completion filed with RERA is 07/11/2022. This is the promoter's declaration, not a guarantee.

More projects in Kalwakurthy