Grow Fast Township
GROW FAST VENTURES · Nirmal · RERA P02300008397
GROW FAST TOWNSHIP is a residential plotted development in RATNAPUR KANDI, Nirmal Rural Mandal, Nirmal District. The registered promoter is GROW FAST VENTURES, and the registered site area is 132303.87 sq m. The filed layout describes 414 residential plots over Ac.32.693 Cents; tower or block and floor counts are not disclosed. The project is registered with TG-RERA under P02300008397, and the promoter-declared completion date is 28th March, 2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | GROW FAST TOWNSHIP RERA record |
| Project type | Plotted development; the DTCP document describes a proposed residential plotted layout RERA record |
| Phase / registered portion | No separate phase name or phase number disclosed; TG-RERA registration covers the project identified as GROW FAST TOWNSHIP |
| TG-RERA registration | P02300008397 |
| Registration validity | 22/06/2024 to 28/03/2026; the certificate records no extension |
| Registered promoter | GROW FAST VENTURES |
| RERA status in supplied record | The project is identified as a new project; the registration certificate states its validity through 28/03/2026. A separate current-status entry is not supplied RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | RATNAPUR KANDI RERA record |
| Revenue village(s) named in project records | Ratnapur Kandi; the filed records also use variants including Ratnapur Kandli and Rathnapur Kandly RERA record |
| Mandal / district / PIN | Nirmal Rural / Nirmal / 504106 RERA record |
| Project survey numbers and subdivisions | 165/2, 165/3, 165/4, 165/5, 165/6, 166/AA, 166/E, 166/AAA, 166/EE, 166/U, 167, 168/AA/1/1, 169/A/2, 169/AA, 170, 171/A, 171/AA, 173/AA2, 173/A/2, 173/AA/1, 174/A, 174AA, 176/2/1, 176/2/2 and 176/3 RERA record |
| Registered site area | 132303.87 sq m; recorded as both total and net area RERA record |
| Boundaries | East: ROAD; South: ROAD; West: OTHERS LAND; North: OTHERS LAND RERA record |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning (DTCP); the filed records also include a Gram Panchayat works-commencement order Approvals record |
| Principal layout approval | Revised Draft-TLP.No.53/2024/W, approved 28-03-2024; file no. E.P. C.No.11149/96/2024/W |
| Gram Panchayat order | Proc.No.01/GPRK/2024, dated 20.05.2024; described as a draft technical layout pattern approval and works commencement order |
| Approved layout scale | 414 plots over Ac.32.693 Cents; the DTCP document identifies 158234.12 Sq. Yds. |
| Approved built-up area | Not disclosed in the supplied approval documents. A RERA field records 76291.33 sq m as “Approved Built up Area” RERA filing |
| Buildings / floors | Not disclosed; this is a plotted layout rather than a tower or apartment development |
| Layout land-use figures in DTCP record | Plotted area: 57.67%, Ac. 18.852 Cents; roads: 32.33%, Ac. 10.572 Cents; open space: 10%, Ac. 3.269 Cents. The document separately lists mortgage area on plotted land as 15.36%, Ac. 2.896 Cents |
Offering and status
| Field | Record |
|---|---|
| Offering | 414 residential plots in the draft layout; individual plot dimensions, plot-size bands and inventory counts are not supplied |
| Booked / available plots | Not disclosed in the supplied evidence |
| Construction stage | The RERA registration record labels the project “New Project.” An architect’s Form–1A certifies overall project completion and records an occupancy certificate dated 19/02/2026; this is document-reported completion, not an independent site inspection RERA record |
| Promoter-declared completion date | 28th March, 2026 in the Form B declaration |
| Architect’s certificate date | The Form–1A records completion date as 31-03-2026 |
| Occupancy certificate | Form–1A records GHMC Lr.No.183/2026/DT&CPO/NRML dated 19/02/2026; the supplied extract does not specify separate tower or plot-wise scope |
2. The project story
GROW FAST TOWNSHIP is a residential plotted-layout project registered with TG-RERA under P02300008397. The registered site is identified at Ratnapur Kandi in Nirmal Rural Mandal, Nirmal District, and covers the listed survey numbers from 165/2 through 176/3, including the subdivisions set out above. The filed layout approval describes 414 plots over Ac.32.693 Cents and divides the layout into plotted land, roads and open space RERA record.
The DTCP instrument is expressly titled a Revised Draft Technical Layout Pattern. It requires the draft layout to be executed within two years from Gram Panchayat approval and says the layout becomes legally valid only upon release or approval by the concerned Gram Panchayat after conditions are fulfilled. The Gram Panchayat order dated 20.05.2024 is described as a draft-layout approval and works commencement order. These are layout and commencement records, not evidence in themselves of the present physical state of roads, services or plots.
A Form–1A filed by the architect certifies overall completion and records a GHMC occupancy certificate dated 19/02/2026. The available extract does not provide plot-by-plot delivery information or a site-inspection record.
3. Master plan, architecture & building design
The approved plan is a plotted layout, not a multi-storey building scheme. The DTCP document records a total extent of Ac.32.693 Cents (158234.12 Sq. Yds.) and allocates the land to plots, roads and open space. It identifies 414 plots, with a plotted area of 57.67% (Ac. 18.852 Cents), roads area of 32.33% (Ac. 10.572 Cents), and open space of 10% (Ac. 3.269 Cents).
The same document identifies a mortgage area of 15.36% of plotted area—Ac. 2.896 Cents—and specifies plots 26 to 34, 44, 45 and 218 to 273. It also requires the open-space and road areas to be gifted to the Gram Panchayat before release of the final layout. The draft-plan record states that building permission for plots 4 to 10 and 17 to 25 is not to be permitted until the L.T. electrical line is shifted along the proposed roads.
No plot-size schedule, detailed dimensions, building footprints, residential building count, floor configuration, or final released-layout drawing is supplied. The available records therefore support a layout-level description, not a building-design or plot-by-plot specification. The drawing-based floor-plan data says two drawings are scans pending measurement; no software-measured areas are available Promoter website.
4. Homes, configurations & floor plans
This is a plotted development. The filed DTCP document identifies 414 plots, but the supplied evidence does not include a plot-wise inventory, plot-size bands, booked or available counts, or RERA saleable-area figures for individual plots.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 414 in the filed draft layout | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
The two supplied drawing records are scans pending measurement. No software-measured carpet or room dimensions are available; the RERA filing does not provide unit-level plot dimensions in the evidence supplied Promoter website.
5. Parking & vehicle circulation
The vendor record lists “Open Parking,” but does not state a number of spaces, location, allocation method or whether spaces are for residents or visitors Promoter website. No sanctioned parking count, accessible parking provision, vehicle-entry arrangement or internal circulation details are available in the supplied records. The layout approval describes roads but does not provide a parking schedule.
6. Amenities, recreation & open spaces
The filed draft-layout document lists certain layout services and open-space features. The RERA amenities list records several facilities as available with 0% progress; the supplied data does not establish independent completion or provide facility-specific verification. The table distinguishes these records from the DTCP plan’s proposed provisions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | Ac. 3.269 Cents; 10% in the DTCP approval | DTCP draft layout | Reserved in plan; delivery or independent completion not verified |
| Green strip / TOT LOT / park | Size not supplied | RERA amenities record Promoter website | Listed “YES”; 0% recorded; independent completion not verified |
| Avenue plantation | In public open spaces; no quantity or size supplied | DTCP approval conditions | Approval-document provision; implementation not verified |
| Community buildings | No description or size supplied | RERA amenities record Promoter website | No “available” value recorded; 0% recorded |
| Open parking | Quantity and layout not supplied | Vendor record Promoter website | Vendor-listed; not independently verified |
7. Utilities, building services & safety
The layout approval lists rain water harvesting pits, street lighting and electricity facilities, a sewerage disposal system, and protected water supply as proposed layout facilities. It also refers to avenue plantation in public open spaces. The RERA amenities list marks water supply, sewerage, storm-water drains, street lighting, electrical meter room/sub-station/receiving station, and water conservation/rainwater harvesting as “YES,” while recording 0% progress; those entries are filing data, not independent completion evidence Promoter website.
The supplied records do not specify water source or storage capacity; sewerage or storm-water capacity; sewage-treatment or reuse arrangements; electrical-substation capacity or backup; fire systems; waste-management details; security systems; or accessibility features. No statutory-compliance conclusion can be drawn from the facility lists alone.
8. Location, access & connectivity
The project’s registered location is RATNAPUR KANDI, Ratnapur Kandi village, Nirmal Rural Mandal, Nirmal District, PIN 504106 RERA record. The approval documents refer to roads within the layout and identify the east and south boundaries as ROAD; the other two boundaries are recorded as other land RERA record.
The supplied location data gives one mapped anchor: Financial District (Nanakramguda), at 1.2 km Promoter website. The same data describes the coordinate as a cadastral parcel centroid; it does not provide a verified route, travel time, public-transport information or named approach road.
9. Developer & development status
The registered promoter is GROW FAST VENTURES, recorded as a partnership in the RERA promoter information. The supplied corporate identifier is GSTIN 36AAXFG9319B1Z2. Mohammed Israr Hussain is listed as authorized signatory; the partner names recorded are Allola Revanth Reddy, Habeeb Shoaib Asad Al Jilani and Md Tanveer Siddiqui RERA filing Corporate record Parties record.
The registration certificate gives promoter-office particulars as “Village: Mandal: District: Hyderabad, Pin: 504106”; the supplied record does not provide a complete, independently verified office address, official contact details or official website.
The Form B affidavit declares completion by 28th March, 2026. The architect’s Form–1A records overall completion dated 31-03-2026 and cites the GHMC occupancy certificate; these are filed declarations and certifications rather than an independent site inspection.
10. Approvals, official records & documents
| Identifier / date | P02300008397; issued 22/06/2024; valid to 28/03/2026 |
|---|---|
| What the supplied evidence records | Form C registration for GROW FAST TOWNSHIP; includes a 70% separate-account condition |
| Identifier / date | Revised Draft-TLP.No.53/2024/W; 28-03-2024; file no. E.P. C.No.11149/96/2024/W |
|---|---|
| What the supplied evidence records | Draft technical layout pattern for 414 plots |
| Identifier / date | T.L.P. NO.53 / 2024/W; references T.L.P.N.O.6/2024W |
|---|---|
| What the supplied evidence records | States the layout is legally valid only upon release/approval by the concerned Gram Panchayat after fulfilment of conditions |
| Identifier / date | Proc.No.01/GPRK/2024; 20.05.2024 |
|---|---|
| What the supplied evidence records | Draft technical layout pattern approval and works commencement order |
| Identifier / date | 18 May 2024 |
|---|---|
| What the supplied evidence records | Promoter affidavit declaring, among other items, a completion undertaking of 28th March, 2026 |
| Identifier / date | GHMC Lr.No.183/2026/DT&CPO/NRML; 19/02/2026 |
|---|---|
| What the supplied evidence records | Architect’s certificate states overall completion; the extract records an occupancy certificate |
The evidence supplied does not include a final-layout release document or a plot-wise sale/inventory schedule. The DTCP and Gram Panchayat records contain conditions governing layout release, development and handover of specified land.
1. Project at a glance
Project identity
Registered project name: GROW FAST TOWNSHIP
Project type: Plotted development; the DTCP document describes a proposed residential plotted layout
Phase / registered portion: No separate phase name or phase number disclosed; TG-RERA registration covers the project identified as GROW FAST TOWNSHIP
TG-RERA registration: P02300008397
Registration validity: 22/06/2024 to 28/03/2026; the certificate records no extension
Registered promoter: GROW FAST VENTURES
RERA status in supplied record: The project is identified as a new project; the registration certificate states its validity through 28/03/2026. A separate current-status entry is not supplied
Land and geographic identity
Locality: RATNAPUR KANDI
Revenue village(s) named in project records: Ratnapur Kandi; the filed records also use variants including Ratnapur Kandli and Rathnapur Kandly
Mandal / district / PIN: Nirmal Rural / Nirmal / 504106
Project survey numbers and subdivisions: 165/2, 165/3, 165/4, 165/5, 165/6, 166/AA, 166/E, 166/AAA, 166/EE, 166/U, 167, 168/AA/1/1, 169/A/2, 169/AA, 170, 171/A, 171/AA, 173/AA2, 173/A/2, 173/AA/1, 174/A, 174AA, 176/2/1, 176/2/2 and 176/3
Registered site area: 132303.87 sq m; recorded as both total and net area
Boundaries: East: ROAD; South: ROAD; West: OTHERS LAND; North: OTHERS LAND
Development identity
Sanctioning authority: Director of Town and Country Planning (DTCP); the filed records also include a Gram Panchayat works-commencement order
Principal layout approval: Revised Draft-TLP.No.53/2024/W, approved 28-03-2024; file no. E.P. C.No.11149/96/2024/W
Gram Panchayat order: Proc.No.01/GPRK/2024, dated 20.05.2024; described as a draft technical layout pattern approval and works commencement order
Approved layout scale: 414 plots over Ac.32.693 Cents; the DTCP document identifies 158234.12 Sq. Yds.
Approved built-up area: Not disclosed in the supplied approval documents. A RERA field records 76291.33 sq m as “Approved Built up Area”
Buildings / floors: Not disclosed; this is a plotted layout rather than a tower or apartment development
Layout land-use figures in DTCP record: Plotted area: 57.67%, Ac. 18.852 Cents; roads: 32.33%, Ac. 10.572 Cents; open space: 10%, Ac. 3.269 Cents. The document separately lists mortgage area on plotted land as 15.36%, Ac. 2.896 Cents
Offering and status
Offering: 414 residential plots in the draft layout; individual plot dimensions, plot-size bands and inventory counts are not supplied
Booked / available plots: Not disclosed in the supplied evidence
Construction stage: The RERA registration record labels the project “New Project.” An architect’s Form–1A certifies overall project completion and records an occupancy certificate dated 19/02/2026; this is document-reported completion, not an independent site inspection
Promoter-declared completion date: 28th March, 2026 in the Form B declaration
Architect’s certificate date: The Form–1A records completion date as 31-03-2026
Occupancy certificate: Form–1A records GHMC Lr.No.183/2026/DT&CPO/NRML dated 19/02/2026; the supplied extract does not specify separate tower or plot-wise scope
2. The project story
GROW FAST TOWNSHIP is a residential plotted-layout project registered with TG-RERA under P02300008397. The registered site is identified at Ratnapur Kandi in Nirmal Rural Mandal, Nirmal District, and covers the listed survey numbers from 165/2 through 176/3, including the subdivisions set out above. The filed layout approval describes 414 plots over Ac.32.693 Cents and divides the layout into plotted land, roads and open space.
The DTCP instrument is expressly titled a Revised Draft Technical Layout Pattern. It requires the draft layout to be executed within two years from Gram Panchayat approval and says the layout becomes legally valid only upon release or approval by the concerned Gram Panchayat after conditions are fulfilled. The Gram Panchayat order dated 20.05.2024 is described as a draft-layout approval and works commencement order. These are layout and commencement records, not evidence in themselves of the present physical state of roads, services or plots.
A Form–1A filed by the architect certifies overall completion and records a GHMC occupancy certificate dated 19/02/2026. The available extract does not provide plot-by-plot delivery information or a site-inspection record.
3. Master plan, architecture & building design
The approved plan is a plotted layout, not a multi-storey building scheme. The DTCP document records a total extent of Ac.32.693 Cents (158234.12 Sq. Yds.) and allocates the land to plots, roads and open space. It identifies 414 plots, with a plotted area of 57.67% (Ac. 18.852 Cents), roads area of 32.33% (Ac. 10.572 Cents), and open space of 10% (Ac. 3.269 Cents).
The same document identifies a mortgage area of 15.36% of plotted area—Ac. 2.896 Cents—and specifies plots 26 to 34, 44, 45 and 218 to 273. It also requires the open-space and road areas to be gifted to the Gram Panchayat before release of the final layout. The draft-plan record states that building permission for plots 4 to 10 and 17 to 25 is not to be permitted until the L.T. electrical line is shifted along the proposed roads.
No plot-size schedule, detailed dimensions, building footprints, residential building count, floor configuration, or final released-layout drawing is supplied. The available records therefore support a layout-level description, not a building-design or plot-by-plot specification. The drawing-based floor-plan data says two drawings are scans pending measurement; no software-measured areas are available.
4. Homes, configurations & floor plans
This is a plotted development. The filed DTCP document identifies 414 plots, but the supplied evidence does not include a plot-wise inventory, plot-size bands, booked or available counts, or RERA saleable-area figures for individual plots.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 414 in the filed draft layout | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
The two supplied drawing records are scans pending measurement. No software-measured carpet or room dimensions are available; the RERA filing does not provide unit-level plot dimensions in the evidence supplied.
5. Parking & vehicle circulation
The vendor record lists “Open Parking,” but does not state a number of spaces, location, allocation method or whether spaces are for residents or visitors. No sanctioned parking count, accessible parking provision, vehicle-entry arrangement or internal circulation details are available in the supplied records. The layout approval describes roads but does not provide a parking schedule.
6. Amenities, recreation & open spaces
The filed draft-layout document lists certain layout services and open-space features. The RERA amenities list records several facilities as available with 0% progress; the supplied data does not establish independent completion or provide facility-specific verification. The table distinguishes these records from the DTCP plan’s proposed provisions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | Ac. 3.269 Cents; 10% in the DTCP approval | DTCP draft layout | Reserved in plan; delivery or independent completion not verified |
| Green strip / TOT LOT / park | Size not supplied | RERA amenities record | Listed “YES”; 0% recorded; independent completion not verified |
| Avenue plantation | In public open spaces; no quantity or size supplied | DTCP approval conditions | Approval-document provision; implementation not verified |
| Community buildings | No description or size supplied | RERA amenities record | No “available” value recorded; 0% recorded |
| Open parking | Quantity and layout not supplied | Vendor record | Vendor-listed; not independently verified |
7. Utilities, building services & safety
The layout approval lists rain water harvesting pits, street lighting and electricity facilities, a sewerage disposal system, and protected water supply as proposed layout facilities. It also refers to avenue plantation in public open spaces. The RERA amenities list marks water supply, sewerage, storm-water drains, street lighting, electrical meter room/sub-station/receiving station, and water conservation/rainwater harvesting as “YES,” while recording 0% progress; those entries are filing data, not independent completion evidence.
The supplied records do not specify water source or storage capacity; sewerage or storm-water capacity; sewage-treatment or reuse arrangements; electrical-substation capacity or backup; fire systems; waste-management details; security systems; or accessibility features. No statutory-compliance conclusion can be drawn from the facility lists alone.
8. Location, access & connectivity
The project’s registered location is RATNAPUR KANDI, Ratnapur Kandi village, Nirmal Rural Mandal, Nirmal District, PIN 504106. The approval documents refer to roads within the layout and identify the east and south boundaries as ROAD; the other two boundaries are recorded as other land.
The supplied location data gives one mapped anchor: Financial District (Nanakramguda), at 1.2 km. The same data describes the coordinate as a cadastral parcel centroid; it does not provide a verified route, travel time, public-transport information or named approach road.
9. Developer & development status
The registered promoter is GROW FAST VENTURES, recorded as a partnership in the RERA promoter information. The supplied corporate identifier is GSTIN 36AAXFG9319B1Z2. Mohammed Israr Hussain is listed as authorized signatory; the partner names recorded are Allola Revanth Reddy, Habeeb Shoaib Asad Al Jilani and Md Tanveer Siddiqui.
The registration certificate gives promoter-office particulars as “Village: Mandal: District: Hyderabad, Pin: 504106”; the supplied record does not provide a complete, independently verified office address, official contact details or official website.
The Form B affidavit declares completion by 28th March, 2026. The architect’s Form–1A records overall completion dated 31-03-2026 and cites the GHMC occupancy certificate; these are filed declarations and certifications rather than an independent site inspection.
10. Approvals, official records & documents
| Identifier / date | P02300008397; issued 22/06/2024; valid to 28/03/2026 |
|---|---|
| What the supplied evidence records | Form C registration for GROW FAST TOWNSHIP; includes a 70% separate-account condition |
| Identifier / date | Revised Draft-TLP.No.53/2024/W; 28-03-2024; file no. E.P. C.No.11149/96/2024/W |
|---|---|
| What the supplied evidence records | Draft technical layout pattern for 414 plots |
| Identifier / date | T.L.P. NO.53 / 2024/W; references T.L.P.N.O.6/2024W |
|---|---|
| What the supplied evidence records | States the layout is legally valid only upon release/approval by the concerned Gram Panchayat after fulfilment of conditions |
| Identifier / date | Proc.No.01/GPRK/2024; 20.05.2024 |
|---|---|
| What the supplied evidence records | Draft technical layout pattern approval and works commencement order |
| Identifier / date | 18 May 2024 |
|---|---|
| What the supplied evidence records | Promoter affidavit declaring, among other items, a completion undertaking of 28th March, 2026 |
| Identifier / date | GHMC Lr.No.183/2026/DT&CPO/NRML; 19/02/2026 |
|---|---|
| What the supplied evidence records | Architect’s certificate states overall completion; the extract records an occupancy certificate |
The evidence supplied does not include a final-layout release document or a plot-wise sale/inventory schedule. The DTCP and Gram Panchayat records contain conditions governing layout release, development and handover of specified land.
Frequently asked questions
Is GROW FAST TOWNSHIP registered with Telangana RERA?
Yes. GROW FAST TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P02300008397; the registration status is New Project.
Who is the developer of GROW FAST TOWNSHIP?
The promoter named in the RERA registration is GROW FAST VENTURES.
Where is GROW FAST TOWNSHIP located?
GROW FAST TOWNSHIP is in RATNAPUR KANDI, Nirmal Rural, Nirmal, Telangana (504106).
When will GROW FAST TOWNSHIP be completed?
The promoter's proposed date of completion filed with RERA is 28/03/2026. This is the promoter's declaration, not a guarantee.