Sign in

Hampton Park

HEARTLAND INFRA · Medchal-Malkajgiri · RERA P02200004178

HAMPTON PARK is a residential apartment project in Yapral Village, Malkajgiri mandal, Medchal-Malkajgiri district. It is being developed by the registered promoter HEARTLAND INFRA. The project covers 520.73 m² and comprises one residential building with 1 Stilt + 5 upper floors and 10 3BHK apartments. Its TG-RERA registration number is P02200004178, issued 25/02/2022, and the proposed completion date is 24-11-2026.

More from Heartland Infra · 3 projects →

01What we found

RegisteredTG-RERA - valid till 24 Nov 2026
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameHAMPTON PARK RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registered project covers the building at Plots 5 and 6
TG-RERA registrationP02200004178, issued 25/02/2022; validity stated as 25/02/2022 to 24/11/2026. Registration validity is distinct from the project’s completion date and its occupancy certificate.
Registered promoterHEARTLAND INFRA, recorded as a proprietorship; Ganesh Posina is identified as proprietor/authorised signatory. Corporate record RERA filing
RERA status in supplied recordRegistered; the registration certificate states the validity period above. No later extension is recorded in the supplied evidence.

Land and geographic identity

ItemProject record
Locality / revenue villageYapral Village; the building-permit extract also gives locality as Mahalakshmipuri Excise Colony. RERA record RERA filing
Mandal / district / PINMalkajgiri / Medchal-Malkajgiri / 500087 RERA record RERA filing
Project survey numbersSurvey No. 161 PART and Survey No. 185; the title material also refers to Survey Nos. 161P & 185 and 161 Part & 185. RERA filing
Plot numbersPlots 5 and 6 RERA filing
Registered site extent520.73 m²; RERA land details give total area and net area as 520.73 m², and the building permit and occupancy certificate also record an extent/net area of 520.73 m². RERA filing
Boundaries recorded in RERAEast: 30 FT ROAD; west: PLOT NO 1 AND 2; north: PLOTS; south: PLOT NO 7. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Building permitApproval No. 1/C28/11973/2020, dated 24 November 2020; file No. 1/C28/23122/2019.
Approved built-up areaProposed covered built-up area: 1,343.25 m² in the building-permit record.
Building count and configurationOne residential building, identified in the permit as PROP-1 (BUILDING); sanctioned configuration is 1 Stilt + 5 upper floors.
Height and parking levelSanctioned height: 14.98 m; one stilt parking floor, with parking area 253.40 m².
Approved versus RERA-filed homesThe building-permit extract does not state a numerical sanctioned unit count. The RERA record lists 10 3BHK units. RERA unit table
Other permit-record featuresFour rainwater-harvesting pits, 25 trees, transformer space and a garbage house are listed. The permit lists tot-lot area as 0 m².

Offering and status

ItemProject record
Unit type3BHK apartments RERA unit table
RERA-filed saleable area159.78 m² per listed unit RERA unit table RERA unit details
Booked / available0 booked and 10 available in the portal-derived record; no as-of date is supplied, so these counts are indicative rather than current inventory confirmation. RERA unit table RERA unit details
Construction deadlineThe promoter’s Form B declaration undertakes completion by 24-11-2026; the RERA registration certificate ends on that date as well.
Occupancy certificateGHMC issued an occupancy certificate dated 22 November 2022 for the residential apartment at Plots 5 and 6, Survey Nos. 161 PART and 185, Yapral. Its stated scope is that building; the supplied record does not establish any separate phase or tower.
Completion statusThe OC document certifies the inspected building fit for occupation. This is not a statement of independently verified current site or maintenance conditions.

2. The project story

HAMPTON PARK is a residential apartment development registered with TG-RERA as P02200004178. The filed identity places it at Plots 5 and 6 in Yapral Village, on Survey No. 161 PART and Survey No. 185, within Malkajgiri mandal, Medchal-Malkajgiri district. RERA record RERA filing

The GHMC building permit describes one residential building with 1 Stilt + 5 upper floors, and the RERA filing lists ten 3BHK apartments. The project’s GHMC occupancy certificate records the residential apartment as fit for occupation and is dated 22 November 2022. The documents therefore evidence a sanctioned and occupancy-certified building, while the RERA certificate separately records registration validity through 24 November 2026 and the promoter’s declared completion deadline. RERA unit table

3. Master plan, architecture & building design

The building-permit record identifies a single residential building, PROP-1 (BUILDING), on a site extent of 520.73 m². Its sanctioned configuration is 1 Stilt + 5 upper floors, with a stated height of 14.98 m and proposed covered built-up area of 1,343.25 m². These are permit-record figures; no FSI-counted area is supplied.

The permit records a stilt parking area of 253.40 m², four rainwater-harvesting pits, 25 trees, transformer space and a garbage house. It records tot-lot area as 0 m². The supplied extracts do not describe floor-by-floor apartment placement, lifts, staircases, building footprint, internal circulation, landscaped area or a phase-wise arrangement.

The GHMC occupancy certificate records a site building-plan floor area of 1,372 m², alongside the sanctioned-plan floor area of 1,343.25 m². It also records setback deviations. These are document entries, not a new independent measurement in this Overview.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010159.78 m² per unitSoftware-measured range: 91.4–105.2 m²; median 98.3 m²38%

RERA’s unit record lists ten 3BHK homes and a saleable area of 159.78 m² per unit; booking and availability counts are portal-derived and have no supplied as-of date. The floor-plan measurement record reports software-measured carpet areas across four measured flat designs, with two designs flagged as needing review. These drawing measurements are not RERA-filed carpet-area declarations and should be checked against the plan. RERA unit table RERA unit details Floor plans

The measured plan extract identifies bedrooms, living/dining, kitchen, toilet, wash and balconies. Balconies are excluded from the software-measured carpet area. Saleable area and carpet area are different measures; the supplied measurement note says saleable area also includes the home’s share of common areas. RERA unit details Floor plans

5. Parking & vehicle circulation

The GHMC building-permit extract records one stilt parking floor with an area of 253.40 m² and says the approved cellar and stilts, where provided, are to be used exclusively for vehicle parking. The supplied extract does not state a sanctioned number of car or two-wheeler spaces, visitor or accessible-space provision, a parking-allocation arrangement, or details of ramps and internal vehicle circulation. A parking area on the plan does not by itself establish exclusive parking rights for a particular apartment.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Rainwater harvestingFour rainwater-harvesting pits listed in the building-permit record; rainwater harvesting also appears in the occupancy-certificate extract.Permit-record provision; the supplied extracts do not establish current operational condition.
Trees25 trees listed.Permit-record entry; current planting or survival is not independently verified.
Tot-lotArea recorded as 0 m².Permit-record figure.

No clubhouse, indoor recreation facility, sports facility, or separate community facility is described in the supplied evidence. The RERA amenities record includes a Green Strip/TOT LOT/Park item but reports 0% progress; it also reports 0% for the listed community buildings and aggregate recreational open space. These portal progress entries do not establish whether a facility is physically present or operational. RERA amenities

7. Utilities, building services & safety

The building permit lists transformer space, a garbage house, rainwater-harvesting structures and 25 trees. It also contains conditions requiring the sanctioned plan to be followed, a commencement notice before construction, a completion notice and occupancy certificate before occupation, and an occupancy fire NOC from the Director (EV&DM) before issue of the occupancy certificate. The occupancy certificate is recorded as issued, but the supplied evidence does not separately provide the fire NOC itself.

The RERA amenities record lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection and an electrical meter room/sub-station/receiving station; each is shown with 0% progress. Rainwater harvesting is marked “YES,” also with 0% progress. The supplied documents do not state system capacities, water source or storage, sewage-treatment capacity, reuse arrangements, backup power, lift provision, security systems, accessibility features or current operating status. RERA amenities

8. Location, access & connectivity

The registered location is Yapral Village, Malkajgiri mandal, Medchal-Malkajgiri district, Telangana 500087. The building-permit extract additionally identifies the locality as MAHALAKSHMIPURI EXCISE COLONY. The RERA-recorded site boundaries include a 30 FT ROAD on the east. RERA record RERA filing RERA filing

The supplied location record lists Financial District (Nanakramguda), 1.2 km as a connectivity point, but it does not identify a measurement method. No approach-road route, public-transport service or travel time is specified in the available material. Location record

9. Developer & development status

The TG-RERA registered promoter is HEARTLAND INFRA, recorded as a proprietorship. Ganesh Posina is identified in the permit and Form B declaration as proprietor/authorised signatory. The supplied RERA record lists the promoter address as LAKSHMI PARK VIEW, VENGAL RAO NAGAR, MAHALAKSHIMIPURI EXCISE, YAPRAL VILLAGE, Malkajgiri, Medchal-Malkajgiri, 500087. Corporate record RERA filing

The promoter’s Form B declares a completion date of 24-11-2026. That declaration and the RERA certificate’s validity date are distinct from the GHMC occupancy certificate, which is recorded for the residential apartment and dated 22 November 2022. The supplied record does not document a later registration extension.

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02200004178; issued 25/02/2022; valid to 24/11/2026
What the supplied record showsRegisters HAMPTON PARK and records promoter conditions, including the separate-account requirement.
GHMC building permit
Identifier / dateApproval No. 1/C28/11973/2020; 24 November 2020; file No. 1/C28/23122/2019
What the supplied record showsBuilding permission for a residential building at Plots 5 and 6, Survey Nos. 161 PART and 185, Yapral; permit includes conditions.
GHMC occupancy certificate
Identifier / dateApproval/proceedings No. 4215/GHMC/SEC/2022-OC; 22 November 2022; application No. 011709/GHMC/5746/SEC2/2022-OC
What the supplied record showsOccupancy certificate for the residential apartment at Plots 5 and 6, Survey Nos. 161 PART and 185, Yapral.
Promoter Form B declaration
Identifier / dateDeclaration text gives completion undertaking 24-11-2026
What the supplied record showsPromoter declaration of title basis, no encumbrances and project commitments; these are the promoter’s statements.
Project floor-plan material
Identifier / dateDocument 188213
What the supplied record showsUsed for software measurement of four 3BHK flat designs; the measurements are not RERA-filed area declarations.

The RERA registration and GHMC permit and occupancy certificate identify the project by its name, promoter, location and/or survey numbers as noted above. This overview is limited to the supplied records; it does not treat unprovided documents or portal checks as confirmed.

Frequently asked questions

Is HAMPTON PARK registered with Telangana RERA?

Yes. HAMPTON PARK is registered with the Telangana Real Estate Regulatory Authority as P02200004178; the registration status is New Project.

Who is the developer of HAMPTON PARK?

The promoter named in the RERA registration is HEARTLAND INFRA.

Where is HAMPTON PARK located?

HAMPTON PARK is in YAPRAL VILLAGE, Malkajgiri, Medchal-Malkajgiri, Telangana (500087).

When will HAMPTON PARK be completed?

The promoter's proposed date of completion filed with RERA is 24/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Yapral