Harsha Gardenia
HARSHA SPACES · Rangareddy · RERA P02400008404
HARSHA GARDENIA is a residential apartment project in Kondapur, Serilingampally Mandal, Ranga Reddy District, developed by registered promoter HARSHA SPACES, a partnership. It is on a registered site extent of 495.95 sq. m and comprises one building with 1 stilt + 5 upper floors and 10 apartments, all in the 3BHK configuration. The project is registered under TG-RERA registration P02400008404, with a proposed completion date of 3 May 2027.
More from Harsha Spaces · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | HARSHA GARDENIA RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Single building is recorded; separate phase name or number is not disclosed RERA filing |
| TG-RERA registration | P02400008404 RERA record |
| Registration validity | 22 June 2024 to 3 May 2027, as printed on the TG-RERA registration certificate |
| Registered promoter | HARSHA SPACES; partnership RERA filing Corporate record |
| RERA status | Registered project; the certificate states validity through 3 May 2027 unless extended by the Authority |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Kondapur / Kondapur RERA record RERA filing |
| Mandal | Serilingampally RERA record |
| District | Ranga Reddy RERA record |
| PIN | 500084 RERA record |
| Project survey number(s) | Survey No. 77; no subdivision is stated in the project record RERA filing |
| Plot identification | Plot Nos. 310 TYPE-C and 311 TYPE-C RERA filing |
| Registered site extent | 495.95 sq. m in the RERA land details RERA filing |
| Plan-record site extent | 495.94 sq. m in the building-permit and plan extracts |
| Net area / affected area | RERA record: net area 495.95 sq. m and road widening/FTL/nala affected area 0 sq. m RERA filing |
| Boundaries | East: Plot Nos. 323 and 322; West: 30 Feet Wide Road; North: Plot No. 309; South: Plot No. 312 RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building permit | 5964/GHMC/SLP/2024-BP; approved 03 May 2024 Approvals record |
| Approved building | One residential building, identified in the permit as “MPL (HARSHA SPACES)” |
| Sanctioned floors | 1 stilt + 5 upper floors |
| Approved built-up area | 1,347.60 sq. m residential floor area, excluding parking, in the permit extract |
| Parking area in permit | 271.6 sq. m |
| Units | 10 units in the building-plan extract and 10 apartments in the RERA filing RERA unit table |
| Survey number on permit | Illegible in the permit extract; the project plan and other project records identify Survey No. 77 |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK; 10 units RERA unit table RERA unit table |
| RERA-filed saleable area | 171.87 sq. m per unit RERA unit table RERA unit table |
| Portal booking snapshot | 4 booked and 6 available; the portal data supplied has no as-of date, so counts are indicative RERA unit table |
| Completion date declared at registration | 3 May 2027 RERA record |
| Completion and OC evidence | Occupancy Certificate No. 012302/GHMC/05508/SWOC/SLP2/2025 is recorded for the building; the certificate extract states completion date 26 December 2025 and issue/approval date 04/04/2026 |
| Architect’s completion certificate | Form–1A states the registered project is completed in all aspects; completion date shown is 02/05/2026 |
| Scope of OC | The supplied OC identifies HARSHA GARDENIA, Plot Nos. 310 TYPE-C and 311 TYPE-C, Survey No. 77, Kondapur, and one building with stilt and five upper floors |
2. The project story
HARSHA GARDENIA is a single-building residential apartment project on Plot Nos. 310 TYPE-C and 311 TYPE-C in Survey No. 77, Kondapur, Serilingampally Mandal, Ranga Reddy District. The building permit describes one residential building with a stilt and five upper floors; the RERA filing records 10 apartments, all in the 3BHK configuration. RERA record RERA filing RERA unit table
The registration materials set a completion undertaking of 3 May 2027. Separately, the supplied municipal Occupancy Certificate identifies the project building as fit for occupation, and the promoter-filed architect’s Form–1A certifies overall completion. These documents describe the project as completed/occupancy-certified; the supplied evidence does not provide an independent site inspection or current physical-progress verification.
3. Master plan, architecture & building design
The project is planned as one residential building on a site identified in the RERA filing as 495.95 sq. m. The building permit and plan extract record a site area of 495.94 sq. m, one stilt plus five upper floors, a building height of 14.95 m, residential built-up area of 1,347.60 sq. m and parking area of 271.6 sq. m. The plan extract also lists total proposed built-up area including parking as 1,619.20 sq. m and total BUA as 1,633.89, with deductions of 25.87 and net BUA of 1,347.60; the supplied extract does not define those separate area labels further. RERA filing
The plan identifies 213.11 sq. m as vacant plot area and records 10 units. It notes a 9.00MT wide main road and an 18 mt. road width. The available material does not establish a detailed floor-by-floor unit arrangement, building footprint, internal circulation plan, lift count or stair count.
The approved-plan extract lists one rain-water-harvesting pit and a tot-lot marked “NA.” It also includes conditions for peripheral tree planting and greenery, a garbage house, a transformer space, parking use in the stilt, and safe clearances from electrical lines. These are plan conditions or listed provisions, not independent confirmation of completed facilities.
The OC extract records a total deviated built-up area of 31.47 sq. m and a completion built-up area of 1,379.066 sq. m against the stated sanctioned 1,347.6 sq. m. It also records completion parking area of 275.81 sq. m against sanctioned 271.6 sq. m. Detailed assessment of those recorded figures is outside this overview.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 4 | 6 | 171.87 sq. m | Software-measured median 105.1 sq. m; range 97.5–114.3 sq. m | 39% |
RERA records all 10 homes as 3BHK apartments with saleable area of 171.87 sq. m each. The booking counts are a portal snapshot without an as-of date. RERA unit table RERA unit table
The carpet measurements are software-measured from the approved floor-plan drawing geometry, not RERA-filed carpet-area disclosures; they should be checked against the drawing. Four 3BHK designs were measured. A supplied example plan labels a drawing room, puja, kitchen, three bedrooms, living/dining, two toilets, utility and balcony; the utility and balcony are excluded from the measured carpet area. Saleable area is a different measure and includes the home’s share of common areas; the supplied evidence does not provide a RERA-filed balcony or utility area by unit. RERA unit details Floor plans
5. Parking & vehicle circulation
The building permit records 271.6 sq. m of parking area and states that the stilt is approved for parking. The plan extract lists a stilt parking area of 271.60 sq. m. No supported count of car or two-wheeler spaces, visitor or accessible spaces, mechanical parking provision, ramp arrangement, EV-charging installation, or unit-by-unit parking allocation is supplied.
The plan conditions state that approved parking areas must be used exclusively for vehicle parking and not partitioned, enclosed or converted to another use. A parking bay shown or an area provided does not, by itself, establish exclusive ownership or a buyer’s allocation.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | RERA amenities record lists this item; plan extract marks “Tot Lot NA” and separately requires peripheral tree planting and greenery | RERA amenities | RERA amenity record shows 100%; no independent completion verification supplied |
| Rain-water harvesting | Plan extract lists one pit; RERA amenities record lists water conservation and rain-water harvesting | RERA amenities | RERA amenity record shows 100%; OC extract also lists one pit |
| Community buildings | RERA amenities record | RERA amenities | 0% recorded |
| Aggregate recreational open space | RERA amenities record | RERA amenities | 0% recorded |
The vendor material also lists a children’s play area, cricket pitch, swimming pool, gym, clubhouse and landscaped garden. These are third-party listing claims, not identified in the supplied sanctioned-plan extract or established as delivered facilities; they are therefore not presented as confirmed project provisions. Promoter website
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rain-water harvesting, and electrical meter room/sub-station/receiving station as available at 100%. It records fire protection and fire-safety requirements at 0%. These are portal-declared progress fields; the supplied material does not independently verify operating status or capacity. RERA amenities
The building-plan extract lists a septic tank, garbage pit, percolating well, distribution transformer, sump, rain-water harvesting, lift, generator, emergency lighting, hose reel/down-comer and automatic sprinkler system. It also states separate underground and terrace water-storage tanks, each with a capacity of 25,000 litres. These are plan-record provisions, not confirmation that each system is installed, commissioned or operating.
The permit conditions assign responsibility for fire-fighting installations and structural and escape safety to the owner, builder/developer, architect and structural engineer, and require an Occupancy Fire NOC before issue of the OC. The supplied material does not include the Fire NOC itself, a lift schedule or capacities, backup-generation capacity, water-source details, STP capacity, CCTV installation confirmation, or an accessibility plan.
8. Location, access & connectivity
The registered project location is Kondapur, Serilingampally Mandal, Ranga Reddy District, Telangana, PIN 500084. The project boundaries identify a 30 Feet Wide Road to the west; the plan extract also refers to a 9.00MT wide main road and an 18 mt. road width. RERA record RERA filing
The supplied location record gives HITEC City as an anchor 3.2 km away. The project location is geocoded to the cadastral parcel centroid at 17.46730, 78.35968; that is a map-derived location reference, not a stated entrance point or measured route distance. No other verified public-transport, road-access or landmark distances are supplied. Location record Cadastral map
9. Developer & development status
The registered promoter is HARSHA SPACES, recorded as a partnership, with GSTIN 36AAPFH7379J1ZK. Its registered-office address on the TG-RERA certificate is Gachi Bowli, Serilingampally, Ranga Reddy, PIN 500032. The RERA project record separately gives a promoter address in Sagar Gardina Apts, Nanakram Guda, Kondapur, PIN 500084. Corporate record RERA filing
The promoter’s Form-B declaration identifies landowners Master Mamidi Kaarthik Reddy and Baby Anisha Anandula and states that development is under Development Agreement Cum General Power of Attorney No. 17653/2023. It declares a project completion date of 3 May 2027.
The project is registered for one building and 10 apartments. The supplied Occupancy Certificate is for the HARSHA GARDENIA building on Plot Nos. 310 TYPE-C and 311 TYPE-C, Survey No. 77, and the architect’s Form–1A states that the registered project is complete.
10. Approvals, official records & documents
| Identifier / date | P02400008404; validity printed as 22/06/2024–03/05/2027 |
|---|---|
| Scope and source | HARSHA GARDENIA; promoter Harsha Spaces |
| Identifier / date | 5964/GHMC/SLP/2024-BP; 03 May 2024 |
|---|---|
| Scope and source | Residential building at Kondapur, one stilt plus five upper floors; Survey No. field in the extracted permit is illegible Approvals record |
| Identifier / date | Survey No. 77; Plot Nos. 310 TYPE-C and 311 TYPE-C |
|---|---|
| Scope and source | Plan showing proposed residential flats; GHMC conditions and building details |
| Identifier / date | 012302/GHMC/05508/SWOC/SLP2/2025; dated 04/04/2026 in the extract |
|---|---|
| Scope and source | Cyberabad Municipal Corporation; HARSHA GARDENIA, Survey No. 77, Plot Nos. 310 TYPE-C and 311 TYPE-C; completion date stated as 26/12/2025 |
| Identifier / date | Form–1A; completion date 02/05/2026 |
|---|---|
| Scope and source | Certifies overall completion of the registered project and cites the Occupancy Certificate number |
| Identifier / date | Form-B; May 2024 |
|---|---|
| Scope and source | Completion undertaking, landowner and development-agreement disclosures, and promoter declarations |
The supplied building-permit extract identifies the plan authority as GHMC. The available records do not include a separate approved-layout certificate or a detailed current construction inspection report.
1. Project at a glance
Project identity
Registered name: HARSHA GARDENIA
Project type: Residential apartment project
Phase / registered portion: Single building is recorded; separate phase name or number is not disclosed
TG-RERA registration: P02400008404
Registration validity: 22 June 2024 to 3 May 2027, as printed on the TG-RERA registration certificate
Registered promoter: HARSHA SPACES; partnership
RERA status: Registered project; the certificate states validity through 3 May 2027 unless extended by the Authority
Land and geographic identity
Locality / revenue village: Kondapur / Kondapur
Mandal: Serilingampally
District: Ranga Reddy
PIN: 500084
Project survey number(s): Survey No. 77; no subdivision is stated in the project record
Plot identification: Plot Nos. 310 TYPE-C and 311 TYPE-C
Registered site extent: 495.95 sq. m in the RERA land details
Plan-record site extent: 495.94 sq. m in the building-permit and plan extracts
Net area / affected area: RERA record: net area 495.95 sq. m and road widening/FTL/nala affected area 0 sq. m
Boundaries: East: Plot Nos. 323 and 322; West: 30 Feet Wide Road; North: Plot No. 309; South: Plot No. 312
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permit: 5964/GHMC/SLP/2024-BP; approved 03 May 2024
Approved building: One residential building, identified in the permit as “MPL (HARSHA SPACES)”
Sanctioned floors: 1 stilt + 5 upper floors
Approved built-up area: 1,347.60 sq. m residential floor area, excluding parking, in the permit extract
Parking area in permit: 271.6 sq. m
Units: 10 units in the building-plan extract and 10 apartments in the RERA filing
Survey number on permit: Illegible in the permit extract; the project plan and other project records identify Survey No. 77
Offering and status
RERA-filed configuration: 3BHK; 10 units
RERA-filed saleable area: 171.87 sq. m per unit
Portal booking snapshot: 4 booked and 6 available; the portal data supplied has no as-of date, so counts are indicative
Completion date declared at registration: 3 May 2027
Completion and OC evidence: Occupancy Certificate No. 012302/GHMC/05508/SWOC/SLP2/2025 is recorded for the building; the certificate extract states completion date 26 December 2025 and issue/approval date 04/04/2026
Architect’s completion certificate: Form–1A states the registered project is completed in all aspects; completion date shown is 02/05/2026
Scope of OC: The supplied OC identifies HARSHA GARDENIA, Plot Nos. 310 TYPE-C and 311 TYPE-C, Survey No. 77, Kondapur, and one building with stilt and five upper floors
2. The project story
HARSHA GARDENIA is a single-building residential apartment project on Plot Nos. 310 TYPE-C and 311 TYPE-C in Survey No. 77, Kondapur, Serilingampally Mandal, Ranga Reddy District. The building permit describes one residential building with a stilt and five upper floors; the RERA filing records 10 apartments, all in the 3BHK configuration.
The registration materials set a completion undertaking of 3 May 2027. Separately, the supplied municipal Occupancy Certificate identifies the project building as fit for occupation, and the promoter-filed architect’s Form–1A certifies overall completion. These documents describe the project as completed/occupancy-certified; the supplied evidence does not provide an independent site inspection or current physical-progress verification.
3. Master plan, architecture & building design
The project is planned as one residential building on a site identified in the RERA filing as 495.95 sq. m. The building permit and plan extract record a site area of 495.94 sq. m, one stilt plus five upper floors, a building height of 14.95 m, residential built-up area of 1,347.60 sq. m and parking area of 271.6 sq. m. The plan extract also lists total proposed built-up area including parking as 1,619.20 sq. m and total BUA as 1,633.89, with deductions of 25.87 and net BUA of 1,347.60; the supplied extract does not define those separate area labels further.
The plan identifies 213.11 sq. m as vacant plot area and records 10 units. It notes a 9.00MT wide main road and an 18 mt. road width. The available material does not establish a detailed floor-by-floor unit arrangement, building footprint, internal circulation plan, lift count or stair count.
The approved-plan extract lists one rain-water-harvesting pit and a tot-lot marked “NA.” It also includes conditions for peripheral tree planting and greenery, a garbage house, a transformer space, parking use in the stilt, and safe clearances from electrical lines. These are plan conditions or listed provisions, not independent confirmation of completed facilities.
The OC extract records a total deviated built-up area of 31.47 sq. m and a completion built-up area of 1,379.066 sq. m against the stated sanctioned 1,347.6 sq. m. It also records completion parking area of 275.81 sq. m against sanctioned 271.6 sq. m. Detailed assessment of those recorded figures is outside this overview.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 4 | 6 | 171.87 sq. m | Software-measured median 105.1 sq. m; range 97.5–114.3 sq. m | 39% |
RERA records all 10 homes as 3BHK apartments with saleable area of 171.87 sq. m each. The booking counts are a portal snapshot without an as-of date.
The carpet measurements are software-measured from the approved floor-plan drawing geometry, not RERA-filed carpet-area disclosures; they should be checked against the drawing. Four 3BHK designs were measured. A supplied example plan labels a drawing room, puja, kitchen, three bedrooms, living/dining, two toilets, utility and balcony; the utility and balcony are excluded from the measured carpet area. Saleable area is a different measure and includes the home’s share of common areas; the supplied evidence does not provide a RERA-filed balcony or utility area by unit.
5. Parking & vehicle circulation
The building permit records 271.6 sq. m of parking area and states that the stilt is approved for parking. The plan extract lists a stilt parking area of 271.60 sq. m. No supported count of car or two-wheeler spaces, visitor or accessible spaces, mechanical parking provision, ramp arrangement, EV-charging installation, or unit-by-unit parking allocation is supplied.
The plan conditions state that approved parking areas must be used exclusively for vehicle parking and not partitioned, enclosed or converted to another use. A parking bay shown or an area provided does not, by itself, establish exclusive ownership or a buyer’s allocation.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | RERA amenities record lists this item; plan extract marks “Tot Lot NA” and separately requires peripheral tree planting and greenery | RERA amenity record shows 100%; no independent completion verification supplied | |
| Rain-water harvesting | Plan extract lists one pit; RERA amenities record lists water conservation and rain-water harvesting | RERA amenity record shows 100%; OC extract also lists one pit | |
| Community buildings | RERA amenities record | 0% recorded | |
| Aggregate recreational open space | RERA amenities record | 0% recorded |
The vendor material also lists a children’s play area, cricket pitch, swimming pool, gym, clubhouse and landscaped garden. These are third-party listing claims, not identified in the supplied sanctioned-plan extract or established as delivered facilities; they are therefore not presented as confirmed project provisions.
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rain-water harvesting, and electrical meter room/sub-station/receiving station as available at 100%. It records fire protection and fire-safety requirements at 0%. These are portal-declared progress fields; the supplied material does not independently verify operating status or capacity.
The building-plan extract lists a septic tank, garbage pit, percolating well, distribution transformer, sump, rain-water harvesting, lift, generator, emergency lighting, hose reel/down-comer and automatic sprinkler system. It also states separate underground and terrace water-storage tanks, each with a capacity of 25,000 litres. These are plan-record provisions, not confirmation that each system is installed, commissioned or operating.
The permit conditions assign responsibility for fire-fighting installations and structural and escape safety to the owner, builder/developer, architect and structural engineer, and require an Occupancy Fire NOC before issue of the OC. The supplied material does not include the Fire NOC itself, a lift schedule or capacities, backup-generation capacity, water-source details, STP capacity, CCTV installation confirmation, or an accessibility plan.
8. Location, access & connectivity
The registered project location is Kondapur, Serilingampally Mandal, Ranga Reddy District, Telangana, PIN 500084. The project boundaries identify a 30 Feet Wide Road to the west; the plan extract also refers to a 9.00MT wide main road and an 18 mt. road width.
The supplied location record gives HITEC City as an anchor 3.2 km away. The project location is geocoded to the cadastral parcel centroid at 17.46730, 78.35968; that is a map-derived location reference, not a stated entrance point or measured route distance. No other verified public-transport, road-access or landmark distances are supplied.
9. Developer & development status
The registered promoter is HARSHA SPACES, recorded as a partnership, with GSTIN 36AAPFH7379J1ZK. Its registered-office address on the TG-RERA certificate is Gachi Bowli, Serilingampally, Ranga Reddy, PIN 500032. The RERA project record separately gives a promoter address in Sagar Gardina Apts, Nanakram Guda, Kondapur, PIN 500084.
The promoter’s Form-B declaration identifies landowners Master Mamidi Kaarthik Reddy and Baby Anisha Anandula and states that development is under Development Agreement Cum General Power of Attorney No. 17653/2023. It declares a project completion date of 3 May 2027.
The project is registered for one building and 10 apartments. The supplied Occupancy Certificate is for the HARSHA GARDENIA building on Plot Nos. 310 TYPE-C and 311 TYPE-C, Survey No. 77, and the architect’s Form–1A states that the registered project is complete.
10. Approvals, official records & documents
| Identifier / date | P02400008404; validity printed as 22/06/2024–03/05/2027 |
|---|---|
| Scope and source | HARSHA GARDENIA; promoter Harsha Spaces |
| Identifier / date | 5964/GHMC/SLP/2024-BP; 03 May 2024 |
|---|---|
| Scope and source | Residential building at Kondapur, one stilt plus five upper floors; Survey No. field in the extracted permit is illegible |
| Identifier / date | Survey No. 77; Plot Nos. 310 TYPE-C and 311 TYPE-C |
|---|---|
| Scope and source | Plan showing proposed residential flats; GHMC conditions and building details |
| Identifier / date | 012302/GHMC/05508/SWOC/SLP2/2025; dated 04/04/2026 in the extract |
|---|---|
| Scope and source | Cyberabad Municipal Corporation; HARSHA GARDENIA, Survey No. 77, Plot Nos. 310 TYPE-C and 311 TYPE-C; completion date stated as 26/12/2025 |
| Identifier / date | Form–1A; completion date 02/05/2026 |
|---|---|
| Scope and source | Certifies overall completion of the registered project and cites the Occupancy Certificate number |
| Identifier / date | Form-B; May 2024 |
|---|---|
| Scope and source | Completion undertaking, landowner and development-agreement disclosures, and promoter declarations |
The supplied building-permit extract identifies the plan authority as GHMC. The available records do not include a separate approved-layout certificate or a detailed current construction inspection report.
Frequently asked questions
Is HARSHA GARDENIA registered with Telangana RERA?
Yes. HARSHA GARDENIA is registered with the Telangana Real Estate Regulatory Authority as P02400008404; the registration status is New Project.
Who is the developer of HARSHA GARDENIA?
The promoter named in the RERA registration is HARSHA SPACES.
Where is HARSHA GARDENIA located?
HARSHA GARDENIA is in Kondapur, Serilingampally, Rangareddy, Telangana (500084).
When will HARSHA GARDENIA be completed?
The promoter's proposed date of completion filed with RERA is 03/05/2027. This is the promoter's declaration, not a guarantee.
More projects in Kondapur







