Hi-Way Colony

NALLAPATI SRIDHAR,VEMIREDDY JAYANTH REDDY,VEMIREDDY RENUKA · Khammam · RERA P00800007948

HI-WAY COLONY is a plotted development / residential layout at Naikanigudem, Kusumanchi Mandal, Khammam. It is being developed by registered promoters NALLAPATI SRIDHAR, VEMIREDDY JAYANTH REDDY, VEMIREDDY RENUKA. The RERA-filed site area is 15559.20 sqmts, and the draft layout approval records 47 plots offered as open plots; plot configurations are not stated. The project is registered with TG-RERA as P00800007948, and the promoter’s stated completion date is 06/12/2024.

01What we found

Period endedTG-RERA registration ran to 6 Dec 2024 - check its extension on TG-RERA
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Naikanigudem, Kusumanchi, Khammam · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameHI-WAY COLONY
Project typePlotted development / residential layout RERA record
Phase or registered portionNot separately identified as a phase; the RERA record covers the project land listed below. RERA record Land records
TG-RERA registrationP00800007948; recorded as valid from 23 March 2024 to 6 December 2024. The registration certificate states that any extension must be by the Authority; no extension record is supplied here. RERA record Approvals record
Registered promotersNALLAPATI SRIDHAR, VEMIREDDY JAYANTH REDDY, VEMIREDDY RENUKA RERA record
RERA status in supplied recordNew Project. The supplied registration validity has expired; no renewal or extension order is included in the reviewed materials. This is separate from the promoter’s completion undertaking. RERA record

Land and geographic identity

FieldProject record
Locality / revenue villageNaikanigudem (also rendered “Naikangudem” in approval documents) RERA record
Mandal / district / PINKusumanchi Mandal / Khammam / 507002 RERA record
Project survey numbers65/AA, 65/AA/1 & 65/E/1 RERA record Land records
RERA-filed site areaTotal area 15559.20 sqmts; net area 15559.20 sqmts; affected area reported as 0. RERA filing
Boundaries filed with RERAEast: OTHERS LAND; West: EXISTING WIE ROAD 200; North: OTHERS LAND; South: OTHERS LAND. RERA filing
Approval-document area figuresDraft Technical Layout Pattern records Ac. 3.844 Cents.; 18608.66 Sq. Yds layout area and Ac.3.705 Cents.; 17934.11 Sq.Yds. net plot area.

Development identity

FieldProject record
Layout sanctioning authorities shown in filed documentsRegional Deputy Director of Town and Country Planning, Warangal, and Gram Panchayat, G.P. Naikangudem Approvals record
Principal layout approvalDraft Technical Layout Pattern Draft - TLP.No.36/2022/WRO/W, dated 07-12-2022 Approvals record
Panchayat proceedingsSФ1/LP/2023, dated 23.01.2023 Approvals record
Approved built-up area / building count / floor configurationNot disclosed in the supplied project record; the filed approval describes a plotted layout, not an apartment building. RERA filing
RERA-filed mortgage area1553.42 sqmts RERA filing
Layout plot countThe draft layout approval records 47 plots.

Offering and status

FieldProject record
OfferingOpen plots; no RERA-filed plot-size schedule or plot-wise inventory is supplied here. Promoter website
Booked / available countsNot disclosed in the supplied materials. RERA filing
Construction / development stageNo independently verified site-progress information is supplied. The approval specifies development works, but the record here does not establish their completion.
Promoter-stated completion date06/12/2024, stated in the promoter’s Form B declaration.
Occupancy / completion certificate statusNo occupancy or completion certificate is included in the supplied materials. The project is a plotted layout; the supplied record does not establish completion certification for the layout. Document index

2. The project story

HI-WAY COLONY is registered with TG-RERA as a plotted development at Naikanigudem, Kusumanchi Mandal, Khammam district. Its registered land identity is Survey Nos. 65/AA, 65/AA/1 & 65/E/1. The TG-RERA certificate names Nallapati Sridhar, Vemireddy Jayanth Reddy and Vemireddy Renuka as promoters. RERA record Land records

The filed draft layout approval describes a 47-plot plan, with land divided among plots, roads, open space and mortgage plots. It also describes the intended works—including road formation, drains, greenery, street lighting, electricity, sewerage disposal and protected water supply—but the supplied material does not verify that these works have been completed or independently inspected.

The promoter declared a completion undertaking of 06/12/2024. That date is not the same as the TG-RERA registration validity end date, and the supplied record contains no extension order or completion certificate. No site visit or independent construction-progress measurement is provided.

3. Master plan, architecture & building design

This is a plotted layout rather than a multi-storey residential building. The filed Draft Technical Layout Pattern records 47 plots and identifies the project survey numbers as 65/AA, 65/AA/1 and 65/E/1.

The approval document states the following land-use figures:

Layout componentFiled figure
Layout areaAc. 3.844 Cents.; 18608.66 Sq. Yds
Road affected areaAc.0.139 Cents.; 674.55 Sq. Yds.
Net plot areaAc.3.705 Cents.; 17934.11 Sq.Yds.
Open spaceAc. 0.370 Cents.; 1794.00 Sq. Yds. (10.00 %)
Road areaAc. 0.822 Cents; 3979.22 Sq. Yds (22.19%)
Plotted areaAc. 2.513 Cents.; 12160.80 (67.81 %)
Mortgage areaAc. 0.383 Cents.; 1857.88 Sq. Yus. (15.27 %)

The approval identifies mortgage plots 29, 30, 31, 32, 33, 34 & 35. It also states that the open-space and road areas are to be gifted to the Gram Panchayat before release of the final layout, and that the draft layout is not proof of land title. No plot-by-plot dimensions, orientation plan, internal-road widths, landscaping drawing or final-layout document is provided in the materials reviewed for this Overview.

4. Homes, configurations & floor plans

The offering recorded for this project is open plots; an apartment configuration or apartment floor-plan schedule is not supplied. The draft layout approval records 47 plots, but no RERA-filed plot-size bands, individual plot areas, or booked/available counts are included here. Promoter website

The supplied floor-plan record contains two drawings, both scans pending measurement; 0 drawings have been software-measured. Accordingly, no measured carpet areas or room dimensions can be reported. Carpet-area measurement is not applicable to the plotted offering on the evidence provided. Floor plans

5. Parking & vehicle circulation

The vendor record lists Open Parking, but no parking-space count, plot allocation, visitor or accessible parking provision, or parking plan is supplied. The draft layout approval refers to roads and requires roads to be opened for access to neighbouring sites; it does not provide road widths, vehicle-circulation details or parking allocations. A listed open-parking feature does not establish an individually allotted or exclusive parking right. Promoter website

6. Amenities, recreation & open spaces

The filed draft layout approval describes open space and proposed layout infrastructure. The amenity records also list facilities with 0% progress entries; those entries do not establish completion. No independent verification of delivered facilities is supplied.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Open spaceAc. 0.370 Cents.; 1794.00 Sq. Yds. (10.00 %) in the draft layout approvalApproved in the draft layout record; delivery or handover is not established here
Green strip / tot lot / parkListed as available: YES; no size statedRERA amenitiesProgress recorded as 0; completion not independently verified
Community buildingsListed without a supplied size or quantityRERA amenitiesProgress recorded as 0; completion not independently verified
Avenue plantation / greeneryAvenue plantation and greenery are specified as development worksRequired/planned in the approval; completion not verified
Internal roads and footpathsListed as available: YES; no dimensions statedRERA amenitiesProgress recorded as 0; completion not independently verified

7. Utilities, building services & safety

The draft layout approval specifies that the layout owner/developer is to undertake levelling and formation of roads, drains, greenery, fencing of open spaces, street lighting, electricity, sewerage disposal and protected water supply works. It also lists avenue plantation and rain-water-harvesting pits. These are approval-document requirements or described facilities; the supplied record does not establish completion, capacities, operating status or independent inspection.

Water
Evidence in the supplied recordProtected water supply is specified; water supply is listed in the RERA amenity record. RERA amenities
Status limitationSource, storage, treatment and capacity are not stated; completion is not verified.
Sewerage and drainage
Evidence in the supplied recordSewerage disposal, drains and storm-water drains are listed. RERA amenities
Status limitationTreatment arrangements, capacity, reuse and completion status are not established.
Rainwater
Evidence in the supplied recordRain-water-harvesting pits are specified; water conservation/rainwater harvesting is listed. RERA amenities
Status limitationQuantity, capacity and completion are not established.
Electrical and lighting
Evidence in the supplied recordElectricity and street lighting are specified; an electrical meter room/sub-station/receiving station is listed. RERA amenities
Status limitationCapacity, backup power and completion are not established.
Fire and life safety
Evidence in the supplied recordFire protection and fire-safety requirements are listed in the RERA amenity record. RERA amenities
Status limitationNo system details or completed inspection evidence is supplied.
Waste management
Evidence in the supplied recordSolid-waste management and disposal is listed. RERA amenities
Status limitationSystem, capacity and completion are not established.
Accessibility
Evidence in the supplied recordNo accessible circulation or related design details are supplied.
Status limitationNot disclosed.

8. Location, access & connectivity

The registered project location is Naikanigudem, Kusumanchi Mandal, Khammam, 507002, in Survey Nos. 65/AA, 65/AA/1 & 65/E/1. The RERA-filed west boundary is described as EXISTING WIE ROAD 200. The cadastral parcel centroid is recorded at 17.19290, 79.89566; this is a parcel-centroid reference, not a verified project entrance or travel-distance measurement. RERA record RERA filing Cadastral map

The supplied location record gives an approximate distance of 132.2 km to the nearest sampled Outer Ring Road interchange. No other independently measured distances, public-transport routes or travel times are supplied. Location record

9. Developer & development status

The registered promoters are NALLAPATI SRIDHAR, VEMIREDDY JAYANTH REDDY and VEMIREDDY RENUKA. The RERA record labels the organization type “Others”; a specific legal-entity form is not established in the supplied materials. The project promoter address on file is B, SHANKAR VILAS CENTRE, NAIKANGUDEM, KUSUMANCHI, Kusumanchi Mandal, Khammam, 507002. No official promoter website or contact details are supplied here. RERA record Corporate record RERA filing

The promoter’s Form B declaration names SRIDHAR NALLAPATI as declarant and undertakes completion by 06/12/2024. The RERA certificate states validity from 23/03/2024 to 06/12/2024. These are distinct record entries: the completion date is the promoter’s undertaking, while the registration dates describe the certificate’s validity. No extension order, progress certificate, or independent site verification is included in the supplied materials.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for HI-WAY COLONY, registration P00800007948, identifying the promoters and project survey numbers; validity stated as 23/03/2024–06/12/2024.
Draft layout approvalDraft Technical Layout Pattern approval Draft - TLP.No.36/2022/WRO/W, dated 07-12-2022, issued by the Regional Deputy Director of Town and Country Planning, Warangal, for Survey Nos. 65/AA, 65/AA/1 and 65/E/1. The document says it is not proof of land title.
Gram Panchayat proceedingsTemporary layout permission SФ1/LP/2023, dated 23.01.2023, for Survey Nos. 65/e/1, 65/aa and 65/aa/1.
Promoter declarationForm B affidavit-cum-declaration by SRIDHAR NALLAPATI, including the promoter’s stated title basis, encumbrance declaration, RERA-account commitments and completion undertaking.
Occupancy/completion certificateNo occupancy or completion certificate is supplied in the reviewed materials. Document index
Other drawing recordsThe supplied floor-plan record has two scans pending measurement and no measured drawings. Floor plans

The approval documents describe a draft/temporary layout-permission record; a final-layout document is not included in the materials reviewed for this Overview.

Frequently asked questions

Is HI-WAY COLONY registered with Telangana RERA?

Yes. HI-WAY COLONY is registered with the Telangana Real Estate Regulatory Authority as P00800007948; the registration status is New Project.

Who is the developer of HI-WAY COLONY?

The promoter named in the RERA registration is NALLAPATI SRIDHAR,VEMIREDDY JAYANTH REDDY,VEMIREDDY RENUKA.

Where is HI-WAY COLONY located?

HI-WAY COLONY is in KUSUMANCHI, Naikanigudem, Kusumanchi Mandal, Khammam, Telangana (507002).

When will HI-WAY COLONY be completed?

The promoter's proposed date of completion filed with RERA is 06/12/2024. This is the promoter's declaration, not a guarantee.

More projects in Naikanigudem