MADHUVANAM PHASE II is a residential apartment project at KANHA, CHEGUR VILLAGE, Nandigama mandal, Ranga Reddy district, developed by SAHAJ KALYAN GRUHA PRIVATE LIMITED. The RERA record states a land area of 32,809.41 sq m, 12 building units and 297 homes: 122 1BHK, 102 2BHK and 73 3BHK. The residential blocks are described as Stilt +5 upper floor, with an amenities block of G +2 upper floor. Its TG-RERA registration is P02400002023, and the proposed completion date is 31/12/2022.

01What we found

Period endedTG-RERA registration ran to 31 Dec 2022 - check its extension on TG-RERA
33documents on file - each fact links to its page
1court case on this project's land (survey 112, Nandhigam)
12items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Nandhigam, Nandigama, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered nameMADHUVANAM PHASE II RERA record
Project type / registered portionResidential apartment project; the registered portion is Phase II. The HMDA approval describes a residential building project, with blocks A–L and an amenities block. RERA record
TG-RERA registrationP02400002023, granted under section 5; certificate issued 06/07/2020.
Registration validityCertificate states validity from 06/07/2020 to 31/12/2022; it records no extension. This is the registration period, not a statement that construction was completed.
Registered promoterSAHAJ KALYAN GRUHA PRIVATE LIMITED, a company. RERA record Corporate record
RERA-record statusOn-Going Project in the supplied RERA record. RERA record RERA filing

Land and geographic identity

ItemProject record
Locality / project addressKANHA, CHEGUR VILLAGE RERA record RERA filing
Revenue villageChegur Village in the HMDA approval and title report; the RERA identity fields also state Nandhigam. RERA record
Mandal / district / PINNandigama / Ranga Reddy / 509325 RERA record
All project survey numbers as recordedRERA certificate: 112/35, 112/36, 112/76, 112/77, 122/78, 112/79, 112/80 and 185. HMDA approval: 112/35, 112/36, 112/76, 112/77, 112/78, 112/79, 112/80 and 185. The project identity field separately records “112/35112/36 112/76 112/77 122/78 112/79 112/80 & 185”; cadastral records include a combined survey-string entry. These are retained as recorded rather than normalized into a single survey description. RERA filing Cadastral map
Site extentRERA land-details field: 32,809.41 sq m total and net area; affected area 0. The HMDA approval also states 1,07,070.56 sq.mtrs or Ac.26-18.56gts. RERA filing
Boundaries in RERA recordEast: PROPOSED SKGPL PHASE III; West: SKGPL PHASE I; North: RESIDENTIAL LAYOUT KANHA SHANTI VANAM PHASE I; South: LAND BELONGS TO SMSF. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal approvalFile 105064/BP/Plg/HMDA/2013, approved 19.04.2018; described as technical approval for an extension-cum-revised residential building project. Approvals record
Approved built-up area31,549.69 sq m in the RERA project record. RERA filing
Building countRERA record: 12 total and proposed building units. The HMDA approval describes residential Blocks A–L and an amenities block. RERA filing
Sanctioned floor configuration shown in available approval extractBlocks A–L: Stilt +5 upper floor; amenities block: G +2 upper floor. The extract also separately refers to Block-G and Block-H upper floors.
Parking levels / approved provisionHMDA approval states that stilt/cellar space is to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied extract does not establish a sanctioned parking-space count or the number of parking levels for this RERA phase.
Unit countRERA filing: 297 units—122 1BHK, 102 2BHK and 73 3BHK. RERA unit table RERA unit details

Offering and status

ItemProject record
RERA-filed configurations and saleable areas1BHK: 22.16 sq m; 2BHK: 31.85 sq m; 3BHK: 83.91 sq m. RERA unit table RERA unit details
Booked / available2 booked; 295 available in the supplied RERA unit record: 1BHK 0/122, 2BHK 0/102, 3BHK 2/71. The portal extract has no as-of date for these counts, so they are indicative rather than a current inventory confirmation. RERA unit table RERA unit details
Construction stageRERA lists the project as On-Going Project. The supplied records do not provide an independently verified site-progress inspection. RERA record RERA filing
Completion datesRERA project information lists proposed and revised completion as 31/12/2022. The Form B declaration states completion by 30.12.2022. RERA record RERA filing
Occupancy / completion certificateNo occupancy or completion certificate for Phase II, or for a specified tower within Phase II, is included in the supplied records. Document index

2. The project story

Madhuvanam Phase II is registered with TG-RERA as a residential apartment project at Kanha, Chegur Village, in Nandigama mandal, Ranga Reddy district. The RERA record describes a 12-building development and lists 297 apartments across 1BHK, 2BHK and 3BHK configurations. The HMDA approval extract describes Blocks A–L, together with an amenities block; its stated floor forms are Stilt +5 upper floors for the residential blocks and G +2 upper floors for the amenities block. RERA record RERA filing RERA filing RERA unit table

The RERA record labels the project ongoing and gives 31/12/2022 as both the proposed and revised completion date. That is a registered timeline, not evidence of present construction progress or completion. The available documents do not establish current progress tower by tower, an occupancy certificate, or which portions—if any—have been completed and certified. RERA record Document index

3. Master plan, architecture & building design

The RERA record gives a site area of 32,809.41 sq m, a net area of 32,809.41 sq m, an affected area of 0, and approved built-up area of 31,549.69 sq m. These are the supplied RERA-record figures; the available material does not identify FSI-counted area, gross built-up area, carpet area, building footprints, or open-space area for this phase. RERA filing RERA filing

The HMDA technical approval identifies Blocks A–L as residential and an amenities block as G +2 upper floors; residential blocks are described as Stilt +5 upper floors. The approval extract also refers specifically to upper floors of Block-G and Block-H, but does not provide a complete tower-by-tower drawing schedule, floor-by-floor unit arrangement, lifts, stair counts, circulation plan, or building footprints.

The supplied RERA record lists 12 total and proposed building units, while the approval extract names A–L plus an amenities block. The available material does not establish the precise mapping between those RERA building units and the approval’s block and amenity descriptions. No approved layout drawing or readable floor-plan geometry is supplied for a more detailed architectural description. RERA filing Document index

4. Homes, configurations & floor plans

The following counts and saleable areas are from the TG-RERA unit record. No carpet-area measurement is available: the supplied floor-plan set has 14 drawings, none yet measured, with all 14 scans pending. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK122012222.16 sq mNot measuredNot supplied
2BHK102010231.85 sq mNot measuredNot supplied
3BHK7327183.91 sq mNot measuredNot supplied

Saleable area is the area stated in the RERA unit record. Carpet area is not available from the supplied drawings; the floor-plan measurement process describes drawing-derived carpet area as software-measured and not a RERA disclosure, and notes that saleable area includes the home’s share of common areas. No room dimensions, balcony or utility areas, orientation, or typical floor arrangement are established by the available records. RERA unit details Floor plans

5. Parking & vehicle circulation

The HMDA approval says the stilt/cellar space is to be used exclusively for vehicle parking and not divided by partition walls or rolling shutters. It does not provide a parking-space count for Phase II in the supplied extract. The RERA unit record identifies 2BHK and 3BHK configurations as mortgaged, but does not establish parking allotment for individual units. RERA unit table

The RERA document list includes an HMDA approval reference to a 10% built-up-area mortgage in favour of HMDA; this is a regulatory mortgage entry, not evidence of parking ownership or individual buyer allocation. Visitor, accessible, two-wheeler, surface or mechanical parking, ramps, driveway dimensions, pedestrian separation and EV charging are not established in the supplied project records. Document index

6. Amenities, recreation & open spaces

The amenities information below is from the RERA-record amenity list, which records whether an item is listed and, where present, a percentage value. Those percentages are reported as recorded; they are not independent site-verification findings. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsNo size statedRERA amenity recordListed “YES”; 86% recorded; not independently verified
Water supplyNo capacity or source statedRERA amenity recordListed “YES”; 86% recorded; not independently verified
Sewerage (chamber, lines, septic tank, STP)No capacity statedRERA amenity recordListed “YES”; 100% recorded; not independently verified
Storm-water drainsNo size statedRERA amenity recordListed “YES”; 95% recorded; not independently verified
Green strip / tot lot / parkNo area statedRERA amenity recordListed “YES”; 50% recorded; not independently verified
Street lightingNo quantity statedRERA amenity recordListed “YES”; 50% recorded; not independently verified
Community buildingsNo size or facility detail statedRERA amenity recordListed “YES”; 0% recorded; not independently verified
Treatment and disposal of sewage and sullage waterNo capacity statedRERA amenity recordListed “YES”; 50% recorded; not independently verified
Solid-waste management and disposalNo capacity statedRERA amenity recordListed “YES”; 60% recorded; not independently verified
Water conservation / rainwater harvestingNo capacity statedRERA amenity recordListed “YES”; 60% recorded; not independently verified
Energy managementNo system or capacity statedRERA amenity recordListed “YES”; 0% recorded; not independently verified
Fire protection and fire-safety requirementsNo system detail statedRERA amenity record0% recorded; not independently verified
Electrical meter room, sub-station, receiving stationNo capacity statedRERA amenity recordListed “YES”; 96% recorded; not independently verified
Aggregate recreational open spaceNo area statedRERA amenity record0% recorded; not independently verified
Formation of external road worksNo size statedRERA amenity recordListed “YES”; 55% recorded; not independently verified

The HMDA approval also lists a service apartment building, transformers, garbage houses and rainwater-harvesting structures, and specifies solar water-heating and solar lighting systems. These appear in the approval extract as approval-related provisions or requirements; the supplied record does not independently confirm their installation or delivery.

7. Utilities, building services & safety

The HMDA approval identifies a cellar allocation for non-habitation utilities, including an A/C plant room, generator room, STP, electrical installations and laundry. It also lists transformers, garbage houses, rainwater-harvesting structures, solar water-heating and solar lighting systems. These are approval-extract provisions; capacities and completion status are not established.

The approval requires Fire Services clearance before applying for an occupancy certificate and requires compliance with the TSPCB consent-for-establishment conditions. It also requires development of rainwater-harvesting structures and specifies an approach-road widening/development condition. The supplied documents do not include evidence of the required Fire Services clearance, an occupancy certificate, installed fire systems, lift capacities, water source or storage capacity, sewage-treatment capacity, backup-power capacity, CCTV, access control or accessibility arrangements.

8. Location, access & connectivity

The project’s registered location is KANHA, CHEGUR VILLAGE, Nandigama mandal, Ranga Reddy district, PIN 509325. The supplied location record identifies the mapped point as Kanha Shanti Vanam - Main Entrance, Vivekananda Marg, Chegur, Nandigama mandal, Ranga Reddy, Telangana, 509325. RERA record RERA filing Location record

The location data gives the nearest sampled Outer Ring Road interchange as approximately 23.2 km away. This is a measured distance in the supplied location record; no travel time or public-transport service information is provided. Location record

9. Developer & development status

The registered legal promoter is SAHAJ KALYAN GRUHA PRIVATE LIMITED, a company. The RERA record lists its address as Vijaya Court, Ramchandra Mission Road, Kanha, Chegur Village, Nandigama, Ranga Reddy, PIN 509325. No official website or project contact details are supplied here. Corporate record Parties record RERA filing

The Form B affidavit is signed by GANNI VENKATA RAO as promoter and declares legal title, no encumbrances, a completion undertaking of 30.12.2022, and commitments concerning the separate account, withdrawals, audits and pending approvals. These are promoter declarations in the filed document.

The RERA project record says the project is ongoing, with proposed and revised completion dates of 31/12/2022. The available evidence does not establish present physical progress or an occupancy certificate for Phase II or any tower within it. RERA record RERA filing Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400002023; issued 06/07/2020; validity stated to 31/12/2022
What the supplied record establishesForm C certificate for MADHUVANAM PHASE II, issued under section 5; it includes the separate-account condition.
HMDA technical approval / building permit
Identifier / date105064/BP/Plg/HMDA/2013; approved 19.04.2018
What the supplied record establishesExtension-cum-revised residential building approval extract, identifying Blocks A–L and an amenities block, project land information and approval conditions.
Form B promoter declaration
Identifier / dateDocument 23810
What the supplied record establishesPromoter affidavit covering title, encumbrances, completion undertaking and project-fund commitments.
Legal title report
Identifier / dateDocument 24094, dated 25/06/2009
What the supplied record establishesPreliminary title opinion concerning Survey No. 112 and subdivisions at Chegur Village.
Encumbrance statement
Identifier / dateDocument 24000
What the supplied record establishesFiled encumbrance statement covering the period 01-09-2018 to 28-12-2018.
HMDA mortgage reference
Identifier / dateRegistered mortgage deed 846/2018, dated 25.01.2018
What the supplied record establishesThe approval extract records a 10% built-up-area mortgage of 3213.00 Sq.Mts in favour of the Commissioner, HMDA.
Approved layout / floor plans
Identifier / dateNot established in the supplied extract
What the supplied record establishesRERA records contain layout-plan and building-floor-plan document entries, but the listed files are not extracted as readable approved drawings here; the available floor-plan set has 14 scans pending measurement. Document index Floor plans
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesNo Phase II or tower-specific occupancy/completion certificate is included in the supplied documents. Document index

Frequently asked questions

Is MADHUVANAM PHASE II registered with Telangana RERA?

Yes. MADHUVANAM PHASE II is registered with the Telangana Real Estate Regulatory Authority as P02400002023; the registration status is On-Going Project.

Who is the developer of MADHUVANAM PHASE II?

The promoter named in the RERA registration is SAHAJ KALYAN GRUHA PRIVATE LIMITED.

Where is MADHUVANAM PHASE II located?

MADHUVANAM PHASE II is in KANHA, CHEGUR VILLAGE, Nandhigam, Nandigama, Rangareddy, Telangana (509325).

When will MADHUVANAM PHASE II be completed?

The promoter's proposed date of completion filed with RERA is 31/12/2022. This is the promoter's declaration, not a guarantee.

More projects in Nandhigam