ROYAL CITY is a new residential plotted development in Macharam, Jadcherla Mandal, Mahabubnagar District, Telangana. The registered promoter is Mohd Taher. The project covers 6070 sq.m. and comprises 27 plots; no tower, floor or plot-configuration details are stated in the TG-RERA record. It is registered under TG-RERA number P01400007794, with proposed completion on 20/09/2025.

01What we found

Period endedTG-RERA registration ran to 20 Sep 2025 - check its extension on TG-RERA
15documents on file - each fact links to its page
1court case on this project's land (survey 126, Macharam)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemRecord
Registered project nameROYAL CITY RERA record
Project typeNew plotted development / layout for residential plots RERA record
Phase / registered portionNo separate phase designation is identified; TG-RERA registration is P01400007794. RERA record
Registration validityThe certificate states validity from 01/03/2024 to 20/09/2025. This is the stated registration period, not a statement that the project was completed. RERA record
Registered promoterMohd Taher on the TG-RERA certificate; the RERA project record lists MOHD as promoter. RERA record
RERA statusThe supplied record classifies the project as New Project. Current registration status after the stated validity end date is not established by the supplied evidence. RERA record Approvals record

Land and geographic identity

ItemRecord
Locality / revenue villageMacharam; the layout approval identifies MACHARAM VILLAGE / Macharam Revenue Village. RERA record
Mandal / district / PINJadcherla Mandal, Mahabubnagar District, Telangana; 509301. RERA record
Project survey numbers126/U/1, 126/LU, 126/LUU. RERA record
RERA-filed site area6070 sq.m. total and net area in the project record. RERA filing
Layout-plan area6070.00 sq.mt; the layout area statement gives total net layout as 6069.98.
Boundaries in RERA land detailsEast: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: OTHERS LAND. RERA filing

Development identity

ItemRecord
Principal approvalTentative Layout Plan approval 317853/LP/GP/205285/0004/2023, dated 21-09-2023; the approval document identifies MUDA as authority. Approvals record
Other approval referenceFile No. TS/054004/2023 is recorded with the layout-plan material.
Approved developmentResidential layout with 27 proposed plots. The layout-plan record states proposed built-up area 0.00, both excluding and including parking.
Buildings / floorsNot applicable to the supplied layout approval: no residential building count or floor configuration is provided. The approval describes plots, not apartment blocks.
ParkingLayout-plan area statement records common parking area as 0.00; individual plot parking allocations are not provided.

Offering and status

ItemRecord
RERA-filed offering27 plots in the approved tentative layout.
Plot sizes / booked or available countsRERA unit inventory and booked/available counts are not supplied. Drawing-derived plot size bands are set out below under Homes, configurations & floor plans. Layout record
Declared completion dateThe promoter’s Form B declares completion before 21 September 2025; the RERA header lists proposed completion as 20/09/2025. RERA record
Construction stageThe header records 80% completeness; the supplied data does not establish whether this is a site-verified construction measure. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project documents. Document index

The project story

ROYAL CITY is recorded with TG-RERA as a new residential plotted layout in Macharam Revenue Village, Jadcherla Mandal, Mahabubnagar District. Its registered land description lists Survey Nos. 126/U/1, 126/LU and 126/LUU, and the filed site area is 6070 sq.m. RERA record

The filed layout approval describes 27 individual plots, with no proposed built-up area. Its area statement allocates land to plots, roads, an organized open space/park, social infrastructure and utilities. The approval also identifies plots 4, 14, 15 and 17 as mortgage-reserved plots in connection with the layout development.

The project header records 80% completeness, but the supplied evidence does not specify which infrastructure works that percentage measures or independently verify on-site progress. No completion or occupancy certificate is provided. The promoter’s Form B gives a completion undertaking before 21 September 2025; the RERA certificate separately states registration validity through 20/09/2025. These are distinct recorded dates and do not establish completion or certificate issuance. RERA record

Master plan, architecture & building design

The supplied approval material concerns a residential plotted layout, not apartment or tower buildings. The recorded layout area is 6070.00 sq.mt; the layout area statement gives 6069.98 as total net layout. The plan records 27 plots and a proposed built-up area of 0.00. No building footprints, floor plans, tower heights, or building circulation plans are evidenced.

The layout-plan area statement allocates land as follows:

Layout useAreaShare
Plotted area3350.05 sq.mt55.19%
Road area1954.37 sq.mt32.20%
Organized open space / park552.50 sq.mt9.10%
Social infrastructure152.06 sq.mt2.51%
Utility area61.00 sq.mt1.00%
Amenity area0.00 sq.mt0.00%
Total net layout6069.98100.00%

The approval record lists 9.14 MT internal-road widths and 60.00 MT existing and proposed road references. It lists a tot-lot, utility and social-infrastructure areas as layout provisions; it does not provide a detailed design or completion status for these facilities.

The software-read layout schedule identifies 27 plots and reports plot sizes from 56.59 sq.m to 203.36 sq.m, with a median of 106.0 sq.m. These are drawing-derived figures, not a substitute for the registered plot schedule or individual plot documents. Layout record

Homes, configurations & floor plans

This is a plotted development, so apartment configurations, carpet area and apartment floor-plan comparisons are not applicable. The RERA-filed offering is 27 plots; unit-level booked and available counts are not supplied. RERA unit table

The plot schedule and size bands below were read from the approved layout drawing by software. The pack notes that the plot count and sizes should be verified against the drawing. Layout record

Plot measure / size bandNumber of plots
Total plots stated in schedule27
0–100 sq.yd (0–84 sq.m)6
100–150 sq.yd (84–125 sq.m)10
150–200 sq.yd (125–167 sq.m)4
200–250 sq.yd (167–209 sq.m)7
Smallest measured plot56.59 sq.m (67.7 sq.yd)
Median measured plot106.0 sq.m (126.8 sq.yd)
Largest measured plot203.36 sq.m (243.2 sq.yd)

Layout record

No plot-by-plot RERA inventory, booking status or confirmed saleable-area schedule is supplied. The figures above are layout-drawing measurements, not RERA-filed unit-level areas. Layout record RERA unit table

Parking & vehicle circulation

The layout area statement records 0.00 common parking area. No sanctioned count of individual car or two-wheeler spaces, visitor parking, accessible spaces, or plot-specific parking allocations is supplied. The layout approval refers to 9.14 MT internal roads and 60.00 MT existing and proposed road references, but the available evidence does not describe separate pedestrian routes, entry/exit arrangements or parking facilities.

Amenities, recreation & open spaces

The approved layout area statement identifies open space, social-infrastructure and utility land. The RERA amenity record lists internal roads and footpaths, a green strip/tot-lot/park, street lighting, and water conservation/rainwater harvesting as “YES”; each recorded percentage is 0. The supplied data does not establish that these facilities are complete or independently verified. RERA amenities

Landscape / open space
FacilityOrganized open space / park
Description / size552.50 sq.mt; 9.10% in the layout area statement
Declared progress / verified statusIncluded in the layout plan; completion not established
Sports / recreation
FacilityTot-lot
Description / sizeListed as a layout provision; no size stated
Declared progress / verified statusApproval-record item; completion not established
Convenience / community
FacilitySocial infrastructure
Description / size152.06 sq.mt; 2.51% in the layout area statement
Declared progress / verified statusEarmarked in the layout; facility details and completion not established
Convenience / community
FacilityUtility area
Description / size61.00 sq.mt; 1.00% in the layout area statement
Declared progress / verified statusEarmarked in the layout; completion not established
Convenience / community
FacilityStreet lighting
Description / sizeListed as available in the RERA amenity record
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0%; not independently verified
Convenience / community
FacilityWater conservation / rainwater harvesting
Description / sizeListed as available in the RERA amenity record
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0%; not independently verified
Convenience / community
FacilityInternal roads and footpaths
Description / sizeListed as available in the RERA amenity record; layout records road area of 1954.37 sq.mt
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0%; not independently verified

The approval document also requires development of infrastructure and amenities and specifies water-reservoir, septic-tank or sewerage-treatment works and harvesting pits as applicable. These are approval conditions, not evidence that the works have been completed.

Utilities, building services & safety

The approval conditions refer to a water reservoir, a septic tank or sewerage treatment plant as applicable, an electric transformer, solid-waste management and harvesting pits. The RERA amenity record separately lists water supply, sewerage, storm-water drains, sewage/sullage treatment, solid-waste management, energy management, fire-protection requirements and an electrical meter room/substation/receiving station. The recorded progress for these listed items is 0% where a percentage is supplied; no capacities or independent completion evidence are provided. RERA amenities

No evidence is supplied for water source or storage capacity, treatment or reuse capacity, drainage design, electrical supply or backup capacity, EV charging, fire-system specifications, security systems, or accessibility features. The layout approval requires infrastructure works and a licensed technical person’s work-completion certificate for final-layout approval; the supplied documents do not include that completion certificate.

Location, access & connectivity

The registered location is Macharam, Jadcherla Mandal, Mahabubnagar District, Telangana, 509301. The supplied cadastral centroid is 16.79608, 78.14004. RERA record Location record

The location dataset reports these approximate distances:

Nearby referenceDistanceEvidence
Outer Ring Road, nearest sampled interchange57.3 kmLocation record
TGSRTC Bus Station, Jadcherla2.8 kmLocation record
Sub Centre, Kaverammapet1.6 kmLocation record

The layout-plan material records internal roads of 9.14 MT and references a 60.00 MT existing road and a 60.00 MT proposed road. The supplied material does not identify a public-transport route serving the site or provide travel-time estimates.

Developer & development status

The TG-RERA certificate names Mohd Taher as promoter and gives the address as House No. 10-18, Jadcherla, Mahabubnagar, Telangana, PIN 509301. The RERA project record uses MOHD as the promoter name and records GSTIN 36AAICM7550J1Z3; the legal-entity type is not identified in the supplied data. RERA record Corporate record

The project header records 80% completeness, without an accompanying site-verification basis or itemized work-progress schedule. The promoter’s Form B declares completion before 21 September 2025 and records undertakings about project funds and approvals. No completion or occupancy certificate is included in the supplied evidence. RERA record Document index

Approvals, official records & documents

TG-RERA registration certificate
Reference / contentsP01400007794, ROYAL CITY; stated validity 01/03/2024–20/09/2025
Scope or limitationForm C certificate; identifies Mohd Taher and the project location and survey numbers.
Tentative layout-plan approval
Reference / contentsMUDA approval 317853/LP/GP/205285/0004/2023, dated 21-09-2023
Scope or limitationFor a 27-plot residential layout in Survey Nos. 126/U/1, 126/LU and 126/LUU, Macharam. The approval states tentative layout approval is not proof of land title and is subject to development conditions and final-layout approval.
Layout-plan record
Reference / contentsFile No. TS/054004/2023; layout area 6070.00 sq.mt
Scope or limitationRecords the plot count, land-use allocation, road references and mortgage-reserved plots.
Form B promoter declaration
Reference / contentsDated “— day of December, 2023”
Scope or limitationPromoter declaration concerning ownership, encumbrances, completion, funds and approvals; it is a declaration, not an independent title or completion certificate.
Commencement-certificate upload
Reference / contentsOCR fragment includes reference 205285/0004/2023, date 21/09/2023, and a reference to Survey No. 126/8
Scope or limitationThe supplied extraction does not identify a legible commencement-certificate instrument or a clear approval decision.
Completion / occupancy records
Reference / contentsNot supplied
Scope or limitationNo completion or occupancy certificate is identified in the supplied documents. Document index

Frequently asked questions

Is ROYAL CITY registered with Telangana RERA?

Yes. ROYAL CITY is registered with the Telangana Real Estate Regulatory Authority as P01400007794; the registration status is New Project.

Who is the developer of ROYAL CITY?

The promoter named in the RERA registration is MOHD.

Where is ROYAL CITY located?

ROYAL CITY is in MACHRAM, Macharam, Jadcherla, Mahabubnagar, Telangana (509301).

When will ROYAL CITY be completed?

The promoter's proposed date of completion filed with RERA is 20/09/2025. This is the promoter's declaration, not a guarantee.