Meera Shantivanam Phase3 Plot 7

MEERA SHANTIVANAM PRIVATE LIMITED · Rangareddy · RERA P02400008946

MEERA SHANTIVANAM PHASE3 PLOT 7 is a residential apartment development in Chegur, Nandigama Mandal, Ranga Reddy District. The registered promoter is MEERA SHANTIVANAM PRIVATE LIMITED. The project has a registered site extent of 5,158.89 sq. m and comprises two residential blocks, MEERA (BLOCK 7A) and MEERA (BLOCK 7B), each recorded as 1 Stilt + 5, with 90 homes in 1BHK, 2BHK, 3BHK and unspecified “BHK” configurations. It is registered under TG-RERA number P02400008946, and the project header records proposed completion as 15/10/2030.

More from Meera Shantivanam Pvt Ltd · 14 projects →

01What we found

RegisteredTG-RERA - valid till 15 Jun 2030
58documents on file - each fact links to its page
1court case on this project's land (survey 112, Chegur)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldProject record
Registered nameMEERA SHANTIVANAM PHASE3 PLOT 7 RERA record
Project typeApartment/residential in the project record; the RERA certificate extraction also labels the type “plotted”. The record does not explain that classification difference. RERA record RERA filing
Phase / registered portionPhase 3, Plot 7; the HMDA technical approval describes Blocks 7A and 7B on plots 15 to 28. RERA record
TG-RERA registrationP02400008946 RERA record
Registration validity15 June 2024–15 June 2030 (six years as stated on the certificate). This is registration validity, not the project’s completion deadline. RERA record
Registered promoterMEERA SHANTIVANAM PRIVATE LIMITED RERA record Corporate record
RERA statusRecorded as “New Project”; the supplied certificate is a Form C registration certificate. RERA record

Land and geographic identity

FieldProject record
Locality / plot rangeChegur; plots 15 to 28 are identified in the HMDA technical approval. RERA record RERA filing
Revenue villageChegur is stated in the HMDA technical approval; the RERA certificate extraction says “Nandigama” as village. Confirm the registered revenue-village identity against the underlying records. RERA record
Mandal / district / PINNandigama / Ranga Reddy / 509325 RERA record
Project survey numbers and subdivisions as recorded112/105, 112/106, 112/122, 112/123, 112/124, 112/126, 112/129, 112/130, 112/131, 112/132, 112/133, 13P, 14P RERA record Land records
Registered site extent5,158.89 sq. m in the HMDA technical approval; RERA land details record total area and net area as 5,158.89 sq. m and affected area as 00. RERA filing
BoundariesNorth, south, east and west: “NEIGHBOURS LAND” in the RERA land details. RERA filing

Development identity

FieldProject record
Sanctioning authority / principal approvalHyderabad Metropolitan Development Authority (HMDA); technical approval no. 061688/SMD/R1/U6/HMDA/13082023, dated 15/06/2024. The letter says building plans are to be sanctioned by the Executive Authority in conformity with HMDA’s technical approval. Approvals record
Approved built-up areaHMDA technical-approval extraction lists total built-up area 10,970.66 sq. m. It separately lists proposed built-up area 13,386.29 sq. m; these are distinct figures in the document.
Buildings / floorsTwo residential blocks, MEERA (BLOCK 7A) and MEERA (BLOCK 7B), each recorded as 1 Stilt + 5.
Floor configuration detailThe available drawing labels typical floors from 1st to 5th and a stilt-floor plan. The supplied extraction does not establish basement, podium or parking-floor levels.
Approved versus RERA-declared homesThe HMDA letter states that the number of sanctioned units must not be increased without prior approval, but the supplied extraction does not give a total sanctioned unit count. RERA filing records 90 units across two buildings. RERA unit table
Site services identified in HMDA letterRainwater-harvesting structures, transformer, garbage house, tot-lot and ETP are listed. Their completion is not established by the supplied record.

Offering and status

FieldProject record
RERA-filed configurations1BHK: 20; 2BHK: 20; 3BHK: 10; “BHK” (unspecified): 40. RERA unit table RERA unit details
RERA-filed saleable area1BHK: 14.88 sq. m; 2BHK: 45.54 sq. m; 3BHK: 62.56 sq. m; “BHK” (unspecified): 45.4 sq. m. These are recorded as saleable area, not measured carpet area. RERA unit table RERA unit details
Booked / availablePortal-derived counts show 0 booked and 90 available at the last read; no as-of date is supplied, so these counts are indicative. RERA unit table
Construction stageNo independently verified site-progress measurement is supplied. The HMDA letter refers to commencement and completion notices as requirements; it does not establish that construction has commenced or been completed.
Completion datesRERA Form B declares completion by 15TH JUNE 2030; the project header records proposed completion as 15/10/2030. The supplied record does not explain the difference. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied for either block. The HMDA letter states that an occupancy certificate is compulsory before occupation.

The project story

MEERA SHANTIVANAM PHASE3 PLOT 7 is recorded as a residential apartment development in Chegur, Nandigama Mandal, Ranga Reddy District. Its RERA filing describes two buildings and 90 homes; the HMDA technical-approval letter identifies the buildings as Blocks 7A and 7B, each with a stilt level and five floors. RERA record RERA unit table

The registration record lists four configuration rows, including 40 homes recorded only as “BHK” rather than a specified bedroom count. The portal-derived inventory shows all 90 as available and none booked, but the portal record has no as-of date. That inventory is therefore indicative, not a live availability confirmation. RERA unit details RERA unit table

The project is registered through 15 June 2030. Separately, the promoter’s Form B declaration undertakes completion by 15 June 2030, while the project header records a proposed completion date of 15 October 2030. No construction progress evidence or occupancy/completion certificate for either block is supplied, so the current physical stage and any completed or occupied portion cannot be confirmed from this evidence. RERA record Document index

Master plan, architecture & building design

The HMDA technical approval describes residential Blocks 7A and 7B on plots 15 to 28, with each block recorded as 1 Stilt + 5. It lists total built-up area as 10,970.66 sq. m, and separately lists proposed built-up area as 13,386.29 sq. m. The available extraction does not identify an FSI-counted area, footprint, flats per floor, lift or stair count, or basement/podium arrangement.

A drawing filed for Block 7A is extracted as “Stilt + 5 floors”; its total built-up-area and floor-area figures are illegible. A separate drawing shows typical-floor plans and a stilt-floor plan for the two blocks, but its OCR does not establish an approving authority or approval number. Its extracted area strings are garbled and should not be treated as reliable measurements.

The HMDA technical approval names rainwater-harvesting structures, a transformer, garbage house, tot-lot and ETP. It also states that the tot-lot is to be fenced and maintained as greenery before issue of an occupancy certificate, and requires a BT road before release of that certificate. These are approval-letter requirements or listed provisions; completion is not evidenced.

Homes, configurations & floor plans

The RERA filing lists 90 homes in total. No drawing-based carpet-area measurements are available: both supplied floor-plan drawings are recorded as scans pending measurement. Accordingly, the table reports RERA-filed saleable areas only; it does not substitute them for carpet areas. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK2002014.88 sq. mNot availableNot supplied
2BHK2002045.54 sq. mNot availableNot supplied
3BHK1001062.56 sq. mNot availableNot supplied
Unspecified (“BHK” in filing)4004045.4 sq. mNot availableNot supplied

Saleable area is the area stated in the RERA filing. Carpet area is not established by the supplied measured drawings; the filing provides no loading figure, so the relationship between the filed saleable area and a unit’s carpet area cannot be quantified here. Booked and available counts are indicative because the portal record has no as-of date. RERA unit details RERA unit table Floor plans

Parking & vehicle circulation

The supplied extracts do not establish a parking-space count, allocation by home, visitor or accessible parking, parking level, ramp arrangement, EV charging, or parking allotment terms. The drawings include a stilt-floor plan, but a drawing label alone does not establish the number or legal allocation of parking spaces. Document index

The HMDA letter states that no parking or construction may be made in setback areas. It does not, in the supplied extraction, provide a parking schedule or confirm how parking is arranged within the buildings.

Amenities, recreation & open spaces

The RERA amenities record lists 14 facility categories, but provides no completion evidence; the available progress percentages are 0. The HMDA technical approval also lists site services, including a tot-lot and rainwater-harvesting structures. These entries identify filed or approval-record provisions, not independently verified delivery. RERA amenities

Landscape / open space
FacilityGreen Strip / TOT LOT / Park
Description / sizeSize not supplied; HMDA letter says the tot-lot is to be fenced and maintained as greenery before occupancy-certificate issue.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress recorded as 0%; completion not independently verified.
Landscape / open space
FacilityAggregate area of recreational open space
Description / sizeArea not supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress recorded as 0%; completion not independently verified.
Convenience / community
FacilityCommunity buildings
Description / sizeDetails and size not supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress recorded as 0%; completion not independently verified.
Site infrastructure
FacilityInternal roads and footpaths
Description / sizeDetails and dimensions not supplied.
Evidence sourceRERA amenities
Declared progress / verified statusListed as available “YES”; progress recorded as 0%; completion not independently verified.
Site infrastructure
FacilityStreet lighting
Description / sizeDetails not supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0%; completion not independently verified.

No clubhouse or indoor facility, sports facility, or other recreation feature is described in the supplied records beyond the tot-lot/park and recreational open-space entries. RERA amenities

Utilities, building services & safety

The RERA amenities record lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, water conservation/rainwater harvesting, fire protection and safety, and electrical meter room/sub-station/receiving station. It does not provide capacities, technical specifications, completion evidence or an as-built status. RERA amenities

HMDA’s technical-approval letter lists rainwater-harvesting structures, a transformer, a garbage house and an ETP. The same letter requires a commencement notice before work and a completion notice and occupancy certificate after building completion; it states that an occupancy certificate is compulsory before occupation. These are recorded provisions and conditions, not proof that the facilities or notices have been completed.

The supplied evidence does not state water sources or storage capacity; STP/ETP capacity or reuse arrangements; electrical load or backup generation; lift count or capacity; fire-system specifications, escape-stair arrangements or fire-clearance status; waste-segregation arrangements; CCTV/security systems; or accessible circulation. RERA amenities

Location, access & connectivity

The registered project location is in the Chegur locality, Nandigama Mandal, Ranga Reddy District, PIN 509325. The HMDA technical-approval letter identifies Chegur village and plots 15 to 28. The RERA certificate extraction records the village as Nandigama, so the revenue-village identity should be confirmed from the underlying project and land records. RERA record RERA filing

The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 22.8 km. The point used is the cadastral parcel centroid (17.17366, 78.22346); no other approach-road, public-transport or landmark distances are supplied. Location record Cadastral map

Developer & development status

The registered legal promoter is MEERA SHANTIVANAM PRIVATE LIMITED, recorded as a company. The supplied corporate identifier is GSTIN 36AAMCM1835C1ZM. The project record gives MEERASHANTIVANAM APARTMENTS, CHEGUR, Nandigama, Ranga Reddy, 509325 as the promoter address; no separate official contact details are supplied. Corporate record Parties record RERA record

In Form B, authorized signatory I Siva Kumar declares the project land-title basis and states that the project will be completed by 15TH JUNE 2030. This is a promoter declaration. The registration certificate records validity through 15 June 2030, while the project header records proposed completion as 15/10/2030; the supplied evidence does not explain the differing completion dates. RERA record

The project record identifies two blocks and 90 filed homes, but does not establish construction progress, handover, or occupancy certification for either block. No phase- or block-specific occupancy certificate is supplied. RERA unit table Document index

Approvals, official records & documents

TG-RERA registration certificate
Evidence in supplied fileForm C certificate for MEERA SHANTIVANAM PHASE3 PLOT 7, registration P02400008946; validity 15 June 2024–15 June 2030.
Scope / limitationRegistration record; not an agreement for sale or conveyance to a buyer.
HMDA technical building approval
Evidence in supplied fileApproval no. 061688/SMD/R1/U6/HMDA/13082023, dated 15/06/2024; describes Blocks 7A and 7B and the listed survey numbers.
Scope / limitationThe letter says building plans are to be sanctioned by the Executive Authority in conformity with the technical approval.
Building-plan drawing
Evidence in supplied fileFiled drawing for Block 7A, extracted as Stilt + 5 floors; key area figures are illegible.
Scope / limitationDrawing extract does not supply readable area totals.
Floor-plan drawings
Evidence in supplied fileDrawings for Blocks 7A and 7B, with typical-floor and stilt-plan labels.
Scope / limitationOCR does not identify an approving authority or approval number; both drawings remain unmeasured in the supplied floor-plan record.
Promoter Form B declaration
Evidence in supplied fileAuthorized signatory declaration dated 12/07/2024, including title-basis, encumbrance and completion statements.
Scope / limitationPromoter-declared statements, not independent verification.
Occupancy / completion certificate
Evidence in supplied fileNone supplied for the project or either block. Document index
Scope / limitationCertificate status is not established by the supplied documents.

Frequently asked questions

Is MEERA SHANTIVANAM PHASE3 PLOT 7 registered with Telangana RERA?

Yes. MEERA SHANTIVANAM PHASE3 PLOT 7 is registered with the Telangana Real Estate Regulatory Authority as P02400008946; the registration status is New Project.

Who is the developer of MEERA SHANTIVANAM PHASE3 PLOT 7?

The promoter named in the RERA registration is MEERA SHANTIVANAM PRIVATE LIMITED.

Where is MEERA SHANTIVANAM PHASE3 PLOT 7 located?

MEERA SHANTIVANAM PHASE3 PLOT 7 is in CHEGUR, Nandigama, Rangareddy, Telangana (509325).

When will MEERA SHANTIVANAM PHASE3 PLOT 7 be completed?

The promoter's proposed date of completion filed with RERA is 15/10/2030. This is the promoter's declaration, not a guarantee.