Mercury Township II Phase
C S R DEVELOPERS · Rangareddy · RERA P02400006532
MERCURY TOWNSHIP II PHASE is a plotted development at NAZIDIK SINGARAM, Yacharam, Ranga Reddy, developed by the registered promoter C S R DEVELOPERS. The registered land area is 90,750.75 sq. m, and the draft approval records 296 plots; plot configurations are not stated. The project is registered under TG-RERA number P02400006532, with a proposed completion date of 15/01/2026.
📘 Project brochure from the promoter’s website ↗More from C S R Developers · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | MERCURY TOWNSHIP II PHASE RERA record |
| Project type | Plotted development / plotted layout RERA record |
| Phase / registered portion | Phase II, as named in the TG-RERA registration; registered site comprises the survey numbers listed below RERA record |
| TG-RERA registration | P02400006532 RERA record |
| Registration validity | Certificate states validity from 07/07/2023 to 15/01/2026; no extension is recorded in the supplied certificate |
| RERA status in supplied record | “New Project”; the certificate records registration under section 5 RERA record |
| Registered promoter | C S R DEVELOPERS; partnership RERA record RERA filing |
| Completion date declared to TG-RERA | 15/01/2026, stated in the promoter’s Form B declaration RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Revenue village | Nazidik Singaram; approval document also spells the locality/village “Nazdiksingaram” RERA record |
| Locality | NAZIDIK SINGARAM RERA record |
| Mandal / district / PIN | Yacharam / Ranga Reddy / 501509 RERA record |
| Project survey numbers and subdivisions | 50, 51/P, 54/P and 55 RERA record |
| RERA-filed total/net land area | 90,750.75 sq. m for both total and net area; affected area reported as 0 RERA filing |
| Layout area in draft approval | Ac.22-17 Guntas or Ac.22.425 Cents; 108537.00 Sq. Yds. |
| Boundaries in RERA land details | East: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: PLOTS AND OTHERS LAND RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning; the document describes a draft technical layout pattern and notes delegation to Nazdiksingaram Gram Panchayat Approvals record |
| Principal approval | Draft - TLP.No.12/2023/ H, approved 16-01-2023; file no. Lr.Roc.No.3690/1433/2022/e-Panchayat; application no. 3690/1433 Approvals record |
| Layout approval status | Draft technical layout pattern approval; the supplied record does not include a final layout release |
| Approved layout scale | 296 plots |
| Layout land-use figures in approval | Plotted area: Ac. 13.681 Cents; 66216.04 Sq. Yds. (61.02%); roads: Ac. 6.501 Cents; 31464.84 Sq. Yds. (28.98%); open space: Ac. 2.243 Cents; 10856.12 Sq. Yds. (10.00%) |
| Mortgage area stated in approval | Plot Nos. 85 to 124, stated as Ac.2.104 cents or 10183.36 Sq.Yards; the approval describes this as 15.37% of saleable area |
| Approved built-up area / buildings / floors | Not disclosed in the supplied project record; this is a plotted layout, and the supplied approval does not specify building or floor counts RERA filing |
Offering and status
| Field | Project record |
|---|---|
| Offering | Plots; the draft approval records 296 plots |
| RERA-filed plot size range, booked/available counts | Not available in the supplied project evidence |
| Construction/development stage | No independently verified site-progress information supplied. The amenity record has progress values of 0; these do not establish completed works RERA amenities |
| Original/revised completion dates | Form B declares completion by 15/01/2026; no revised date is supplied |
| Occupancy/completion certificate status | No occupancy certificate or completion certificate is supplied. The project is a plotted layout; the supplied documents do not establish a phase- or plot-specific occupancy/completion certification Document index |
2. The project story
MERCURY TOWNSHIP II PHASE is registered as a plotted development at Nazidik Singaram, Yacharam Mandal, Ranga Reddy District, on Survey Nos. 50, 51/P, 54/P and 55. The TG-RERA record identifies the registered promoter as C S R DEVELOPERS and the registered land area as 90,750.75 sq. m. RERA record RERA filing
The filed layout approval describes a 296-plot scheme. Its draft land-use schedule allocates land to plots, roads and open space, and identifies Plot Nos. 85 to 124 as mortgage plots. The approval also requires development works including roads, drains, greenery and avenue planting, street lighting, electricity, sewerage disposal and protected water supply; these are approval requirements, not evidence that the works have been completed.
The promoter’s Form B declares a completion date of 15/01/2026. The supplied materials do not provide an independently verified construction or infrastructure progress assessment, nor an occupancy or completion certificate. RERA amenities Document index
3. Master plan, architecture & building design
The supplied approved-plan document concerns a plotted layout, rather than apartment buildings. It records a layout area of Ac.22-17 Guntas or Ac.22.425 Cents; 108537.00 Sq. Yds., with 296 plots and the following land-use allocation:
| Layout component | Area as stated in the approval | Share as stated |
|---|---|---|
| Plotted area | Ac. 13.681 Cents; 66216.04 Sq. Yds. | 61.02% |
| Road area | Ac. 6.501 Cents; 31464.84 Sq. Yds. | 28.98% |
| Open space | Ac. 2.243 Cents; 10856.12 Sq. Yds. | 10.00% |
| Mortgage area | Ac. 2.104 Cents; 10183.36 Sq. Yards | 15.37% stated in the document |
The approval identifies mortgage Plot Nos. 85 to 124 in favour of Nazdiksingaram Gram Panchayat. It also requires open-space and road areas to be handed over by registered gift deed before final layout release.
No plot-by-plot layout drawing, individual plot dimensions, road-width schedule, building design, building footprint or sanctioned floor configuration is available in the supplied evidence. The listed built-up area is not a basis for describing individual plots or residential buildings. RERA filing
4. Homes, configurations & floor plans
This is a plotted layout. The approval records 296 plots, but the supplied TG-RERA project data does not provide plot-type counts, plot-size bands, booked or available inventory, or RERA-filed saleable areas. RERA record
The floor-plan record contains two drawings; both are scans pending measurement, and no carpet-area measurement is available. The record states that its potential drawing measurements would be software-measured and not a RERA disclosure; no such measurements can be reported here. Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 296 in the draft approval | Not supplied | Not supplied | Not supplied | Not applicable / not supplied | Not supplied |
5. Parking & vehicle circulation
The supplied approval and project records do not specify parking counts, visitor or accessible parking, parking allocation to individual plots, or a parking layout. The approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site. These conditions do not establish the final internal vehicle-circulation design or the status of completed roads. RERA filing
6. Amenities, recreation & open spaces
The approval requires specified infrastructure and open-space provision, while the RERA amenities register lists facilities as available with progress percentages of 0. The record does not independently verify that any listed facility has been completed. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space | Ac. 2.243 Cents; 10856.12 Sq. Yds. (10.00%) in the draft layout | Approval allocation; completion and handover not verified | |
| Internal roads and footpaths | No dimensions supplied in the RERA amenity entry | RERA amenities | Listed “YES”; progress 0; completion not verified |
| Green strip / tot lot / park | No size or count supplied | RERA amenities | Listed “YES”; progress 0; completion not verified |
| Community buildings | No description or size supplied | RERA amenities | Progress 0; availability not stated |
| Street lighting | Required by the draft approval; no quantity or specification supplied | RERA amenities | Listed “YES”; progress 0; completion not verified |
7. Utilities, building services & safety
The draft approval requires the developer to undertake levelling, road formation, drains and nala channelisation, greenery and avenue planting, fencing of open spaces, street lighting and electricity facilities, sewerage disposal and protected water supply. It also lists rainwater-harvesting pits. These are stated requirements; the supplied record does not establish installation, operational capacity or completion.
The RERA amenities register lists water supply, sewerage (chambers, lines, septic tank and STP), storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, rainwater harvesting, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station. Except for entries marked “YES,” the register provides no availability value; all listed progress percentages are 0. No system capacities, technical specifications, completion evidence or independent verification are supplied. RERA amenities
The supplied records do not specify accessibility provisions, security systems, electricity backup, or fire-access arrangements. No statutory safety or service-compliance conclusion can be drawn from the available descriptions.
8. Location, access & connectivity
The registered location is Nazidik Singaram, Yacharam Mandal, Ranga Reddy District, Telangana, PIN 501509. The supplied cadastral location is a parcel centroid at 17.05253, 78.59792. RERA record Location record
The only supplied measured connectivity reference is the nearest sampled Outer Ring Road interchange, approximately 21.5 km from the mapped location. The evidence does not provide a verified approach-road description, public-transport details or distances to other landmarks. Location record
9. Developer & development status
The registered legal promoter is C S R DEVELOPERS, recorded as a partnership. Its GSTIN is 36ABGFM6061R1ZQ. The supplied registration certificate lists the promoter office as Village: Karmanghat, Mandal: Saroornagar, District: Ranga Reddy, Pin: 500035. No official project contact details are supplied. RERA record RERA filing
The RERA record identifies MERCURY TOWNSHIP II PHASE and registration number P02400006532. The promoter’s Form B declaration states that the project will be completed by 15/01/2026. No verified site-progress report or completion/occupancy certificate is included in the supplied evidence. Document index
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA registration certificate, P02400006532 | Form C registration for MERCURY TOWNSHIP II PHASE; validity stated as 07/07/2023–15/01/2026; survey numbers 50, 51/P, 54/P and 55. |
| Draft technical layout pattern approval, Draft - TLP.No.12/2023/ H | Director of Town and Country Planning approval dated 16-01-2023, file Lr.Roc.No.3690/1433/2022/e-Panchayat, for the proposed plotted layout and 296 plots; includes stated land-use allocation and conditions. |
| Form B declaration | Promoter declaration dated 22 day of APRIL - 2023, including the declared completion date 15/01/2026 and RERA-related undertakings. |
| Layout-plan document entry | The RERA document list requests a letter of layout approval or stamped layout plan; the supplied entry is not extracted, and no final layout-release document is provided. |
| Occupancy/completion certificate | Not included in the supplied records. Document index |
1. Project at a glance
Project identity
Registered name: MERCURY TOWNSHIP II PHASE
Project type: Plotted development / plotted layout
Phase / registered portion: Phase II, as named in the TG-RERA registration; registered site comprises the survey numbers listed below
TG-RERA registration: P02400006532
Registration validity: Certificate states validity from 07/07/2023 to 15/01/2026; no extension is recorded in the supplied certificate
RERA status in supplied record: “New Project”; the certificate records registration under section 5
Registered promoter: C S R DEVELOPERS; partnership
Completion date declared to TG-RERA: 15/01/2026, stated in the promoter’s Form B declaration
Land and geographic identity
Revenue village: Nazidik Singaram; approval document also spells the locality/village “Nazdiksingaram”
Locality: NAZIDIK SINGARAM
Mandal / district / PIN: Yacharam / Ranga Reddy / 501509
Project survey numbers and subdivisions: 50, 51/P, 54/P and 55
RERA-filed total/net land area: 90,750.75 sq. m for both total and net area; affected area reported as 0
Layout area in draft approval: Ac.22-17 Guntas or Ac.22.425 Cents; 108537.00 Sq. Yds.
Boundaries in RERA land details: East: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: PLOTS AND OTHERS LAND
Development identity
Sanctioning authority: Director of Town and Country Planning; the document describes a draft technical layout pattern and notes delegation to Nazdiksingaram Gram Panchayat
Principal approval: Draft - TLP.No.12/2023/ H, approved 16-01-2023; file no. Lr.Roc.No.3690/1433/2022/e-Panchayat; application no. 3690/1433
Layout approval status: Draft technical layout pattern approval; the supplied record does not include a final layout release
Approved layout scale: 296 plots
Layout land-use figures in approval: Plotted area: Ac. 13.681 Cents; 66216.04 Sq. Yds. (61.02%); roads: Ac. 6.501 Cents; 31464.84 Sq. Yds. (28.98%); open space: Ac. 2.243 Cents; 10856.12 Sq. Yds. (10.00%)
Mortgage area stated in approval: Plot Nos. 85 to 124, stated as Ac.2.104 cents or 10183.36 Sq.Yards; the approval describes this as 15.37% of saleable area
Approved built-up area / buildings / floors: Not disclosed in the supplied project record; this is a plotted layout, and the supplied approval does not specify building or floor counts
Offering and status
Offering: Plots; the draft approval records 296 plots
RERA-filed plot size range, booked/available counts: Not available in the supplied project evidence
Construction/development stage: No independently verified site-progress information supplied. The amenity record has progress values of 0; these do not establish completed works
Original/revised completion dates: Form B declares completion by 15/01/2026; no revised date is supplied
Occupancy/completion certificate status: No occupancy certificate or completion certificate is supplied. The project is a plotted layout; the supplied documents do not establish a phase- or plot-specific occupancy/completion certification
2. The project story
MERCURY TOWNSHIP II PHASE is registered as a plotted development at Nazidik Singaram, Yacharam Mandal, Ranga Reddy District, on Survey Nos. 50, 51/P, 54/P and 55. The TG-RERA record identifies the registered promoter as C S R DEVELOPERS and the registered land area as 90,750.75 sq. m.
The filed layout approval describes a 296-plot scheme. Its draft land-use schedule allocates land to plots, roads and open space, and identifies Plot Nos. 85 to 124 as mortgage plots. The approval also requires development works including roads, drains, greenery and avenue planting, street lighting, electricity, sewerage disposal and protected water supply; these are approval requirements, not evidence that the works have been completed.
The promoter’s Form B declares a completion date of 15/01/2026. The supplied materials do not provide an independently verified construction or infrastructure progress assessment, nor an occupancy or completion certificate.
3. Master plan, architecture & building design
The supplied approved-plan document concerns a plotted layout, rather than apartment buildings. It records a layout area of Ac.22-17 Guntas or Ac.22.425 Cents; 108537.00 Sq. Yds., with 296 plots and the following land-use allocation:
| Layout component | Area as stated in the approval | Share as stated |
|---|---|---|
| Plotted area | Ac. 13.681 Cents; 66216.04 Sq. Yds. | 61.02% |
| Road area | Ac. 6.501 Cents; 31464.84 Sq. Yds. | 28.98% |
| Open space | Ac. 2.243 Cents; 10856.12 Sq. Yds. | 10.00% |
| Mortgage area | Ac. 2.104 Cents; 10183.36 Sq. Yards | 15.37% stated in the document |
The approval identifies mortgage Plot Nos. 85 to 124 in favour of Nazdiksingaram Gram Panchayat. It also requires open-space and road areas to be handed over by registered gift deed before final layout release.
No plot-by-plot layout drawing, individual plot dimensions, road-width schedule, building design, building footprint or sanctioned floor configuration is available in the supplied evidence. The listed built-up area is not a basis for describing individual plots or residential buildings.
4. Homes, configurations & floor plans
This is a plotted layout. The approval records 296 plots, but the supplied TG-RERA project data does not provide plot-type counts, plot-size bands, booked or available inventory, or RERA-filed saleable areas.
The floor-plan record contains two drawings; both are scans pending measurement, and no carpet-area measurement is available. The record states that its potential drawing measurements would be software-measured and not a RERA disclosure; no such measurements can be reported here.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 296 in the draft approval | Not supplied | Not supplied | Not supplied | Not applicable / not supplied | Not supplied |
5. Parking & vehicle circulation
The supplied approval and project records do not specify parking counts, visitor or accessible parking, parking allocation to individual plots, or a parking layout. The approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site. These conditions do not establish the final internal vehicle-circulation design or the status of completed roads.
6. Amenities, recreation & open spaces
The approval requires specified infrastructure and open-space provision, while the RERA amenities register lists facilities as available with progress percentages of 0. The record does not independently verify that any listed facility has been completed.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space | Ac. 2.243 Cents; 10856.12 Sq. Yds. (10.00%) in the draft layout | Approval allocation; completion and handover not verified | |
| Internal roads and footpaths | No dimensions supplied in the RERA amenity entry | Listed “YES”; progress 0; completion not verified | |
| Green strip / tot lot / park | No size or count supplied | Listed “YES”; progress 0; completion not verified | |
| Community buildings | No description or size supplied | Progress 0; availability not stated | |
| Street lighting | Required by the draft approval; no quantity or specification supplied | Listed “YES”; progress 0; completion not verified |
7. Utilities, building services & safety
The draft approval requires the developer to undertake levelling, road formation, drains and nala channelisation, greenery and avenue planting, fencing of open spaces, street lighting and electricity facilities, sewerage disposal and protected water supply. It also lists rainwater-harvesting pits. These are stated requirements; the supplied record does not establish installation, operational capacity or completion.
The RERA amenities register lists water supply, sewerage (chambers, lines, septic tank and STP), storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, rainwater harvesting, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station. Except for entries marked “YES,” the register provides no availability value; all listed progress percentages are 0. No system capacities, technical specifications, completion evidence or independent verification are supplied.
The supplied records do not specify accessibility provisions, security systems, electricity backup, or fire-access arrangements. No statutory safety or service-compliance conclusion can be drawn from the available descriptions.
8. Location, access & connectivity
The registered location is Nazidik Singaram, Yacharam Mandal, Ranga Reddy District, Telangana, PIN 501509. The supplied cadastral location is a parcel centroid at 17.05253, 78.59792.
The only supplied measured connectivity reference is the nearest sampled Outer Ring Road interchange, approximately 21.5 km from the mapped location. The evidence does not provide a verified approach-road description, public-transport details or distances to other landmarks.
9. Developer & development status
The registered legal promoter is C S R DEVELOPERS, recorded as a partnership. Its GSTIN is 36ABGFM6061R1ZQ. The supplied registration certificate lists the promoter office as Village: Karmanghat, Mandal: Saroornagar, District: Ranga Reddy, Pin: 500035. No official project contact details are supplied.
The RERA record identifies MERCURY TOWNSHIP II PHASE and registration number P02400006532. The promoter’s Form B declaration states that the project will be completed by 15/01/2026. No verified site-progress report or completion/occupancy certificate is included in the supplied evidence.
10. Approvals, official records & documents
TG-RERA registration certificate, P02400006532: Form C registration for MERCURY TOWNSHIP II PHASE; validity stated as 07/07/2023–15/01/2026; survey numbers 50, 51/P, 54/P and 55.
Draft technical layout pattern approval, Draft - TLP.No.12/2023/ H: Director of Town and Country Planning approval dated 16-01-2023, file Lr.Roc.No.3690/1433/2022/e-Panchayat, for the proposed plotted layout and 296 plots; includes stated land-use allocation and conditions.
Form B declaration: Promoter declaration dated 22 day of APRIL - 2023, including the declared completion date 15/01/2026 and RERA-related undertakings.
Layout-plan document entry: The RERA document list requests a letter of layout approval or stamped layout plan; the supplied entry is not extracted, and no final layout-release document is provided.
Occupancy/completion certificate: Not included in the supplied records.
Frequently asked questions
Is MERCURY TOWNSHIP II PHASE registered with Telangana RERA?
Yes. MERCURY TOWNSHIP II PHASE is registered with the Telangana Real Estate Regulatory Authority as P02400006532; the registration status is New Project.
Who is the developer of MERCURY TOWNSHIP II PHASE?
The promoter named in the RERA registration is C S R DEVELOPERS.
Where is MERCURY TOWNSHIP II PHASE located?
MERCURY TOWNSHIP II PHASE is in NAZIDIK SINGARAM, Yacharam, Rangareddy, Telangana (501509).
When will MERCURY TOWNSHIP II PHASE be completed?
The promoter's proposed date of completion filed with RERA is 15/01/2026. This is the promoter's declaration, not a guarantee.