Noor City
MOHAMMAD · Khammam · RERA P00800006078
NOOR CITY is a residential plotted development in Ambarupeta, Madhira Mandal, Khammam District. The registered promoter is Mohammad Noor. The registered project site covers 25,624.79 sq. m in survey numbers 86/B, 87/B and 88/A, and the approved layout records 81 residential plots. It is registered under TG-RERA number P00800006078, and the promoter’s Form B declaration states a completion date of 23/06/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | NOOR CITY RERA record |
| Project type | Plotted development; the layout approval describes a residential plotted layout. RERA record |
| Phase / registered portion | No phase name is stated. The registered project is identified with survey numbers 86/B, 87/B and 88/A. |
| TG-RERA registration | P00800006078; Form C issued 18/04/2023. RERA record |
| Registration validity | Certificate states validity from 18/04/2023 to 23/06/2025, subject to extension by the Authority. No extension is recorded on the supplied certificate. Registration validity is distinct from the completion deadline below. RERA record |
| Registered promoter | Mohammad Noor (project records also use MOHAMMAD / MOHAMMAD NOOR). Legal entity type is not disclosed. RERA record RERA filing |
| RERA project status | The supplied record identifies the project as “New Project.” This is not evidence that its registration remains current. RERA filing |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Ambarupeta; also written as Ambaru Peta / Ambarpeta in project documents. Revenue village: Ambarupeta. RERA record |
| Mandal / district / PIN | Madhira Mandal; Khammam District; 507203. RERA record |
| Project survey numbers and subdivisions | 86/B, 87/B, 88/A. RERA record |
| Registered project site extent | 25,624.79 sq. m in the RERA land details. RERA filing |
| Net / total area | RERA fields report total area 25,624.79 sq. m, affected area 0 sq. m, and net area 25,624.79 sq. m. RERA filing |
| Boundaries in RERA fields | East: “OTHRES LAND”; west: “OTHRES LAND”; north: SY NO 86; south: EXISTING WIDE ROAD 20. RERA filing |
Development identity
| Item | Record |
|---|---|
| Approving authority | Madhira Municipality / Municipal Corporation. The project record also identifies DTCP as the RERA authority. Approvals record |
| Principal layout approval | Tentative layout approval 0001/LO/3020/2022, dated 23 June 2022; application 003983/LO/DTCP/3020/0001/2022. Approvals record |
| Approved development | Residential plotted layout of 81 plots. |
| Area fields | RERA fields state approved built-up area 14,286.90 sq. m and mortgage area 2,173.09 sq. m. The supplied layout approval describes the project as a plotted layout and separately identifies the mortgage plots. RERA filing |
| Buildings / floors / parking levels | Not disclosed in the supplied project records. The approval is for a plotted layout, not a tower or apartment scheme. |
Offering and status
| Item | Record |
|---|---|
| Unit type | Residential plots. The layout approval records 81 plots. |
| RERA-filed plot sizes / booked and available counts | Plot-by-plot RERA inventory, booked count and available count are not supplied in the evidence used for this Overview. |
| Layout-drawing plot measurements | Software-measured from the approved layout drawing: 81 plots, with sizes from 111.66 sq. m to 370.37 sq. m; median 167.23 sq. m. These are drawing-derived measurements, not the RERA-filed saleable-area schedule. Layout record |
| Construction / development stage | RERA project data reports 80% completeness; this is a reported project figure, not an independent site inspection. RERA record |
| Completion deadline | Promoter’s Form B declaration states 23/06/2025 as the project completion date. This is distinct from RERA registration validity. |
| OC / completion certificate | No occupancy or completion certificate is included in the supplied evidence. The layout approval is described as tentative. Document index |
2. The project story
NOOR CITY is registered as a plotted residential development in Ambarupeta revenue village, Madhira Mandal, Khammam District. Its approved layout covers survey numbers 86/B, 87/B and 88/A and shows 81 residential plots. The layout is organized around internal roads and includes land set aside for open space, utilities and social infrastructure. RERA record
The project’s RERA record reports 80% completeness, while the promoter’s Form B undertaking gives 23 June 2025 as the completion date. The percentage is a reported figure, not independently verified progress. The supplied records do not establish that development has been completed or that a completion/occupancy certificate has been issued. RERA record Document index
3. Master plan, architecture & building design
The supplied layout approval is for a tentative residential plotted layout, not a multi-storey building plan. It records 81 plots and the following land-use allocation:
| Layout use | Area as stated in approval | Share |
|---|---|---|
| Plotted area | 3 Acer 21.21 Gts 17087 Sq. Yds | 56.14% |
| Roads | 1 Acer 38.55 Gts 9505 Sq. Yds | 31.23% |
| Open space (park) | 0 Acer 22.85 Gts 2764 Sq. Yds | 9.08% |
| Social infrastructure | 0 Acer 6.37 Gts 771 Sq. Yds | 2.53% |
| Utilities | 0 Acer 2.56 Gts 309 Sq. Yds | 1.02% |
| Mortgage area | 0 Acer 21.48 Gts 2599 Sq. Yds | 15.15% |
The mortgage area is identified in the approval as plots 38, 39, 40, 41, 42, 43, 5, 4 and 37, under Mortgage Deed No. 1560/2022. RERA fields separately record mortgage area as 2,173.09 sq. m. RERA filing
The drawing-derived layout schedule contains 81 plots. Its plot-area measurements and land-use calculations are software-measured from the drawing; the drawing-derived plotted area is 14,286.42 sq. m, roads 7,946.74 sq. m, parks/open space 2,311.29 sq. m, utilities 258.65 sq. m, and social infrastructure 644.66 sq. m. Layout record No building footprint, floor configuration, tower arrangement or apartment plan is evidenced.
The approval states that the applicant is responsible for the layout’s infrastructure and amenities, and that the roads, open space and utilities are to be handed to the municipality by registered gift deed before release of the tentative layout. It also states that building permissions are not to be approved in the mortgaged area until the required development works are completed and the mortgaged land is released. These are approval conditions; this Overview does not establish completion or release.
4. Homes, configurations & floor plans
The project offers plots, not apartments. The approved layout schedule records 81 plots. Drawing-derived plot sizes are software-measured and should be checked against the drawing; no RERA-filed plot-by-plot saleable-area, booking or availability schedule is supplied here. Layout record
| Plot-size band (drawing-derived) | Plot count |
|---|---|
| 100–150 sq. yd | 3 |
| 150–200 sq. yd | 31 |
| 200–250 sq. yd | 36 |
| 250–300 sq. yd | 7 |
| 300–400 sq. yd | 2 |
| 400–500 sq. yd | 2 |
The drawing-derived smallest plot is 111.66 sq. m, median 167.23 sq. m, and largest 370.37 sq. m. The floor-plan data contains two layout sheets and no apartment floor plans; therefore, apartment configurations, carpet areas and loading are not applicable on the evidence supplied. Layout record Floor plans
5. Parking & vehicle circulation
The supplied project evidence does not establish a sanctioned parking-space count, visitor or accessible parking provision, or plot-specific parking allocations. The layout approval describes roads and a plotted development but does not provide a parking schedule. The approval requires roads to be opened for accessibility to neighbouring sites and prohibits a compound wall or fencing around the site.
6. Amenities, recreation & open spaces
The tentative layout approval identifies infrastructure and facilities to be provided by the applicant. The supplied records do not independently verify their completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 0 Acer 22.85 Gts 2764 Sq. Yds; 9.08% | Tentative layout approval | Reserved in approval; completion not verified. |
| Social infrastructure site | 0 Acer 6.37 Gts 771 Sq. Yds; 2.53% | Tentative layout approval | Reserved in approval; facility details and completion not supplied. |
| Avenue plantation | No size stated | Tentative layout approval | Listed among required layout works; completion not verified. |
| Park development | No size beyond the reserved open-space area | Tentative layout approval | Listed among required layout works; completion not verified. |
The approval also lists street lighting and storm-water drains, which are covered under utilities and services below.
7. Utilities, building services & safety
The tentative layout approval lists the following works or utility provisions. These are approval/document descriptions, not confirmation that the works are complete or operational.
| Evidence in project record | Water reservoir, internal water-supply pipelines and overhead tank |
|---|---|
| Status established by supplied evidence | Listed in approval; capacity, water source and completion are not supplied. |
| Evidence in project record | Septic tank, sewerage treatment plant (STP), common septic tank/STP, underground drainage lines and storm-water drains |
|---|---|
| Status established by supplied evidence | Listed in approval; capacity, reuse arrangements and completion are not supplied. |
| Evidence in project record | Electric transformer and street lights |
|---|---|
| Status established by supplied evidence | Listed in approval; capacity, backup provision and completion are not supplied. |
| Evidence in project record | Solid Waste Management |
|---|---|
| Status established by supplied evidence | Listed in approval; system details and completion are not supplied. |
| Evidence in project record | Rain-water harvesting pits |
|---|---|
| Status established by supplied evidence | Listed in approval; quantity and completion are not supplied. |
| Evidence in project record | No project-specific fire-system, accessible-circulation or emergency-access details are established in the supplied record. |
|---|---|
| Status established by supplied evidence | Not disclosed in the evidence used here. |
8. Location, access & connectivity
The registered location is Ambarupeta revenue village, Madhira Mandal, Khammam District, Telangana, PIN 507203. The project’s cadastral parcel centroid is 16.92387116033517, 80.38491241480617. RERA record Cadastral map
The layout approval identifies the southern boundary as an existing wide road and requires roads to be opened for access to neighbouring sites. RERA filing The location record supplies an approximate distance of 190.3 km to the nearest sampled Outer Ring Road interchange. Location record No other verified public-transport, landmark or approach-road distance is supplied for this Overview.
9. Developer & development status
The registered promoter is Mohammad Noor (project records also use MOHAMMAD / MOHAMMAD NOOR). Legal entity type is not disclosed. RERA record RERA filing The supplied records do not establish a corporate registration identifier or official website/contact details. The RERA certificate lists the promoter office as House No.: 32-26-57/1, Village: Mandal: District: KRISHNA, Pin: 520004, State of Telangana.
The promoter’s Form B is a self-declaration that identifies Mohammad Noor as promoter, states a legal-title basis, declares the land free from encumbrances, and undertakes to complete the project by 23/06/2025. The supplied RERA record reports 80% completeness, but this is not independent verification of site progress. RERA record The registration certificate records validity through 23/06/2025, subject to Authority extension; no extension is recorded on the supplied certificate.
10. Approvals, official records & documents
| Identifier / date | P00800006078; issued 18/04/2023; valid to 23/06/2025 subject to extension |
|---|---|
| What it evidences | Registration of NOOR CITY as a project; no extension is recorded on the supplied certificate. |
| Identifier / date | 0001/LO/3020/2022; 23 June 2022; application 003983/LO/DTCP/3020/0001/2022 |
|---|---|
| What it evidences | Tentative residential plotted layout for 81 plots in survey numbers 86/B, 87/B and 88/A. |
| Identifier / date | 1560/2022; 07 June 2022 |
|---|---|
| What it evidences | Approval records mortgage of specified plots in favour of the Municipality / Municipal Corporation. |
| Identifier / date | Form B |
|---|---|
| What it evidences | Promoter’s declarations and completion undertaking. |
| Identifier / date | Document dated 12/04/2022 |
|---|---|
| What it evidences | Layout-related self-declarations and undertakings concerning the land and proposed municipal mortgage. |
| Identifier / date | Not supplied |
|---|---|
| What it evidences | The available project documents do not establish issuance of a completion or occupancy certificate. Document index |
1. Project at a glance
Project identity
Registered project name: NOOR CITY
Project type: Plotted development; the layout approval describes a residential plotted layout.
Phase / registered portion: No phase name is stated. The registered project is identified with survey numbers 86/B, 87/B and 88/A.
TG-RERA registration: P00800006078; Form C issued 18/04/2023.
Registration validity: Certificate states validity from 18/04/2023 to 23/06/2025, subject to extension by the Authority. No extension is recorded on the supplied certificate. Registration validity is distinct from the completion deadline below.
Registered promoter: Mohammad Noor (project records also use MOHAMMAD / MOHAMMAD NOOR). Legal entity type is not disclosed.
RERA project status: The supplied record identifies the project as “New Project.” This is not evidence that its registration remains current.
Land and geographic identity
Locality / revenue village: Ambarupeta; also written as Ambaru Peta / Ambarpeta in project documents. Revenue village: Ambarupeta.
Mandal / district / PIN: Madhira Mandal; Khammam District; 507203.
Project survey numbers and subdivisions: 86/B, 87/B, 88/A.
Registered project site extent: 25,624.79 sq. m in the RERA land details.
Net / total area: RERA fields report total area 25,624.79 sq. m, affected area 0 sq. m, and net area 25,624.79 sq. m.
Boundaries in RERA fields: East: “OTHRES LAND”; west: “OTHRES LAND”; north: SY NO 86; south: EXISTING WIDE ROAD 20.
Development identity
Approving authority: Madhira Municipality / Municipal Corporation. The project record also identifies DTCP as the RERA authority.
Principal layout approval: Tentative layout approval 0001/LO/3020/2022, dated 23 June 2022; application 003983/LO/DTCP/3020/0001/2022.
Approved development: Residential plotted layout of 81 plots.
Area fields: RERA fields state approved built-up area 14,286.90 sq. m and mortgage area 2,173.09 sq. m. The supplied layout approval describes the project as a plotted layout and separately identifies the mortgage plots.
Buildings / floors / parking levels: Not disclosed in the supplied project records. The approval is for a plotted layout, not a tower or apartment scheme.
Offering and status
Unit type: Residential plots. The layout approval records 81 plots.
RERA-filed plot sizes / booked and available counts: Plot-by-plot RERA inventory, booked count and available count are not supplied in the evidence used for this Overview.
Layout-drawing plot measurements: Software-measured from the approved layout drawing: 81 plots, with sizes from 111.66 sq. m to 370.37 sq. m; median 167.23 sq. m. These are drawing-derived measurements, not the RERA-filed saleable-area schedule.
Construction / development stage: RERA project data reports 80% completeness; this is a reported project figure, not an independent site inspection.
Completion deadline: Promoter’s Form B declaration states 23/06/2025 as the project completion date. This is distinct from RERA registration validity.
OC / completion certificate: No occupancy or completion certificate is included in the supplied evidence. The layout approval is described as tentative.
2. The project story
NOOR CITY is registered as a plotted residential development in Ambarupeta revenue village, Madhira Mandal, Khammam District. Its approved layout covers survey numbers 86/B, 87/B and 88/A and shows 81 residential plots. The layout is organized around internal roads and includes land set aside for open space, utilities and social infrastructure.
The project’s RERA record reports 80% completeness, while the promoter’s Form B undertaking gives 23 June 2025 as the completion date. The percentage is a reported figure, not independently verified progress. The supplied records do not establish that development has been completed or that a completion/occupancy certificate has been issued.
3. Master plan, architecture & building design
The supplied layout approval is for a tentative residential plotted layout, not a multi-storey building plan. It records 81 plots and the following land-use allocation:
| Layout use | Area as stated in approval | Share |
|---|---|---|
| Plotted area | 3 Acer 21.21 Gts 17087 Sq. Yds | 56.14% |
| Roads | 1 Acer 38.55 Gts 9505 Sq. Yds | 31.23% |
| Open space (park) | 0 Acer 22.85 Gts 2764 Sq. Yds | 9.08% |
| Social infrastructure | 0 Acer 6.37 Gts 771 Sq. Yds | 2.53% |
| Utilities | 0 Acer 2.56 Gts 309 Sq. Yds | 1.02% |
| Mortgage area | 0 Acer 21.48 Gts 2599 Sq. Yds | 15.15% |
The mortgage area is identified in the approval as plots 38, 39, 40, 41, 42, 43, 5, 4 and 37, under Mortgage Deed No. 1560/2022. RERA fields separately record mortgage area as 2,173.09 sq. m.
The drawing-derived layout schedule contains 81 plots. Its plot-area measurements and land-use calculations are software-measured from the drawing; the drawing-derived plotted area is 14,286.42 sq. m, roads 7,946.74 sq. m, parks/open space 2,311.29 sq. m, utilities 258.65 sq. m, and social infrastructure 644.66 sq. m. No building footprint, floor configuration, tower arrangement or apartment plan is evidenced.
The approval states that the applicant is responsible for the layout’s infrastructure and amenities, and that the roads, open space and utilities are to be handed to the municipality by registered gift deed before release of the tentative layout. It also states that building permissions are not to be approved in the mortgaged area until the required development works are completed and the mortgaged land is released. These are approval conditions; this Overview does not establish completion or release.
4. Homes, configurations & floor plans
The project offers plots, not apartments. The approved layout schedule records 81 plots. Drawing-derived plot sizes are software-measured and should be checked against the drawing; no RERA-filed plot-by-plot saleable-area, booking or availability schedule is supplied here.
100–150 sq. yd: 3
150–200 sq. yd: 31
200–250 sq. yd: 36
250–300 sq. yd: 7
300–400 sq. yd: 2
400–500 sq. yd: 2
The drawing-derived smallest plot is 111.66 sq. m, median 167.23 sq. m, and largest 370.37 sq. m. The floor-plan data contains two layout sheets and no apartment floor plans; therefore, apartment configurations, carpet areas and loading are not applicable on the evidence supplied.
5. Parking & vehicle circulation
The supplied project evidence does not establish a sanctioned parking-space count, visitor or accessible parking provision, or plot-specific parking allocations. The layout approval describes roads and a plotted development but does not provide a parking schedule. The approval requires roads to be opened for accessibility to neighbouring sites and prohibits a compound wall or fencing around the site.
6. Amenities, recreation & open spaces
The tentative layout approval identifies infrastructure and facilities to be provided by the applicant. The supplied records do not independently verify their completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 0 Acer 22.85 Gts 2764 Sq. Yds; 9.08% | Tentative layout approval | Reserved in approval; completion not verified. |
| Social infrastructure site | 0 Acer 6.37 Gts 771 Sq. Yds; 2.53% | Tentative layout approval | Reserved in approval; facility details and completion not supplied. |
| Avenue plantation | No size stated | Tentative layout approval | Listed among required layout works; completion not verified. |
| Park development | No size beyond the reserved open-space area | Tentative layout approval | Listed among required layout works; completion not verified. |
The approval also lists street lighting and storm-water drains, which are covered under utilities and services below.
7. Utilities, building services & safety
The tentative layout approval lists the following works or utility provisions. These are approval/document descriptions, not confirmation that the works are complete or operational.
| Evidence in project record | Water reservoir, internal water-supply pipelines and overhead tank |
|---|---|
| Status established by supplied evidence | Listed in approval; capacity, water source and completion are not supplied. |
| Evidence in project record | Septic tank, sewerage treatment plant (STP), common septic tank/STP, underground drainage lines and storm-water drains |
|---|---|
| Status established by supplied evidence | Listed in approval; capacity, reuse arrangements and completion are not supplied. |
| Evidence in project record | Electric transformer and street lights |
|---|---|
| Status established by supplied evidence | Listed in approval; capacity, backup provision and completion are not supplied. |
| Evidence in project record | Solid Waste Management |
|---|---|
| Status established by supplied evidence | Listed in approval; system details and completion are not supplied. |
| Evidence in project record | Rain-water harvesting pits |
|---|---|
| Status established by supplied evidence | Listed in approval; quantity and completion are not supplied. |
| Evidence in project record | No project-specific fire-system, accessible-circulation or emergency-access details are established in the supplied record. |
|---|---|
| Status established by supplied evidence | Not disclosed in the evidence used here. |
8. Location, access & connectivity
The registered location is Ambarupeta revenue village, Madhira Mandal, Khammam District, Telangana, PIN 507203. The project’s cadastral parcel centroid is 16.92387116033517, 80.38491241480617.
The layout approval identifies the southern boundary as an existing wide road and requires roads to be opened for access to neighbouring sites. The location record supplies an approximate distance of 190.3 km to the nearest sampled Outer Ring Road interchange. No other verified public-transport, landmark or approach-road distance is supplied for this Overview.
9. Developer & development status
The registered promoter is Mohammad Noor (project records also use MOHAMMAD / MOHAMMAD NOOR). Legal entity type is not disclosed. The supplied records do not establish a corporate registration identifier or official website/contact details. The RERA certificate lists the promoter office as House No.: 32-26-57/1, Village: Mandal: District: KRISHNA, Pin: 520004, State of Telangana.
The promoter’s Form B is a self-declaration that identifies Mohammad Noor as promoter, states a legal-title basis, declares the land free from encumbrances, and undertakes to complete the project by 23/06/2025. The supplied RERA record reports 80% completeness, but this is not independent verification of site progress. The registration certificate records validity through 23/06/2025, subject to Authority extension; no extension is recorded on the supplied certificate.
10. Approvals, official records & documents
| Identifier / date | P00800006078; issued 18/04/2023; valid to 23/06/2025 subject to extension |
|---|---|
| What it evidences | Registration of NOOR CITY as a project; no extension is recorded on the supplied certificate. |
| Identifier / date | 0001/LO/3020/2022; 23 June 2022; application 003983/LO/DTCP/3020/0001/2022 |
|---|---|
| What it evidences | Tentative residential plotted layout for 81 plots in survey numbers 86/B, 87/B and 88/A. |
| Identifier / date | 1560/2022; 07 June 2022 |
|---|---|
| What it evidences | Approval records mortgage of specified plots in favour of the Municipality / Municipal Corporation. |
| Identifier / date | Form B |
|---|---|
| What it evidences | Promoter’s declarations and completion undertaking. |
| Identifier / date | Document dated 12/04/2022 |
|---|---|
| What it evidences | Layout-related self-declarations and undertakings concerning the land and proposed municipal mortgage. |
| Identifier / date | Not supplied |
|---|---|
| What it evidences | The available project documents do not establish issuance of a completion or occupancy certificate. |
Frequently asked questions
Is NOOR CITY registered with Telangana RERA?
Yes. NOOR CITY is registered with the Telangana Real Estate Regulatory Authority as P00800006078; the registration status is New Project.
Who is the developer of NOOR CITY?
The promoter named in the RERA registration is MOHAMMAD.
Where is NOOR CITY located?
NOOR CITY is in MADHIRA, Ambarupeta, Madhira Mandal, Khammam, Telangana (507203).
When will NOOR CITY be completed?
The promoter's proposed date of completion filed with RERA is 23/06/2025. This is the promoter's declaration, not a guarantee.