Surya Enclave

KSHETRA REALTY · Medchal-Malkajgiri · RERA P02200007554

SURYA ENCLAVE is a residential apartment project in Maithri Enclave, Kapra mandal, Medchal-Malkajgiri district, developed by registered promoter Kshetra Realty. It occupies 371.09 sq. mts. and comprises one residential building with 1 Stilt + 5 upper floors and 10 2BHK homes, each with a RERA-filed saleable area of 105.12 sq. mt. Its TG-RERA registration is P02200007554, and the proposed completion date is 16/02/2027.

01What we found

Period endedTG-RERA registration ran to 16 Oct 2026 - check its extension on TG-RERA
16documents on file - each fact links to its page
3court cases on this project's land (survey 634, 635, 638, Kapra)
12items to check - 6 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered name and typeSURYA ENCLAVE — residential apartment project. RERA record
Registered portion / phasePlot No. 211 WESTERN PART; the registration and approval records describe one building. No separate phase name is disclosed.
TG-RERA registrationP02200007554, granted under section 5; recorded as valid from 10/01/2024 to 16/10/2026. This is the registration validity period, not a statement that construction is complete.
Registered promoterKshetra Realty (also styled M/s KSHETRA REALTY in filed documents); partnership. RERA record RERA filing
RERA statusRegistration certificate on file. Current registration status beyond the certificate’s stated validity dates is not established by the supplied record.

Land and geographic identity

ItemProject record
Locality / site descriptionMaithri Enclave, Kapra; Plot No. 211 WESTERN PART.
Revenue villageKapra is the RERA-recorded project village. RERA record RERA filing
Mandal / district / PINKapra mandal; Medchal-Malkajgiri district; 500062. RERA record
Project survey numbers633 PART, 634 PART, 635, 638. The records identify the project land as parts of survey numbers 633 and 634, and survey numbers 635 and 638; no further subdivision identifiers are supplied.
Site extent371.09 sq. mts. total plot area and 371.09 sq. mts. net plot area in the building-permit order; road-affected and nala-affected areas are each recorded as 0.0 there.
BoundariesEast: Plot No. 211 Eastern Part and Plot No. 210; west: neighbours’ land; north: part of Plot No. 205; south: 60 feet wide road. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building-permit approval3841/GHMC/LBN/2023-BP, dated 16 October, 2023. Approvals record
Approved built-up area996.10 sq. mt. proposed built-up area excluding parking; 1195.30 sq. mt. including parking, as stated in the plan record. These are approved-plan figures, not saleable or carpet area.
Building count / floorsOne residential building; 1 Stilt + 5 upper floors. The order lists the building height as 14.75; the supplied extraction does not specify a unit for that figure.
ParkingThe order records Total Parking Area 199.2 (unit not stated in that extracted field). No number of parking spaces is supplied.
Unit countsThe building-plan extraction records 10 units; RERA unit data also records 10 units. RERA unit table

Offering and status

ItemProject record
RERA-filed configuration and area2BHK, saleable area 105.12 sq. mt. RERA unit table RERA unit details
Booked / available0 booked / 10 available, as last read from the TG-RERA portal; the portal record has no stated as-of date, so counts are indicative. RERA unit table
Construction stageNo reliable construction-progress figure or independently verified site-stage evidence is supplied. RERA amenity-progress entries are recorded at 0%. RERA amenities
Completion dateTG-RERA registration record gives proposed completion as 16/02/2027. The GHMC permit states construction to be completed before 16 October, 2026, and the Form-B declaration gives an undertaking transcribed as 16\\ October, 2026. These are completion-date fields, separate from registration validity. RERA record
Occupancy certificate (OC)No OC or completion certificate is supplied; the building permit says an OC is required before occupation. The available evidence does not establish OC status by a later project inspection.

2. The project story

  • SURYA ENCLAVE is registered as a residential apartment project on Plot No. 211 Western Part in Maithri Enclave, Kapra, Medchal-Malkajgiri district. The RERA and GHMC records identify the site by survey numbers 633 PART, 634 PART, 635 and 638 and describe a single building with one stilt level and five upper floors.
  • The RERA unit record lists ten 2BHK homes, all shown as available in a portal snapshot whose date is not provided. The building permit’s extracted plan records ten units as well. No construction-progress evidence establishes how much of the building has been completed, and no occupancy certificate is included in the supplied documents; therefore, the project cannot be described from this record as completed or ready for occupation. RERA unit table

3. Master plan, architecture & building design

  • The GHMC permit and filed plan describe a single residential apartment building on a 371.09 sq. mt. plot, with 996.10 sq. mt. proposed built-up area excluding parking and 1195.30 sq. mt. including parking. The permit records one stilt level and five upper floors. It also lists a building height of 14.75 and total height of 20.45mt. in the plan extraction; units for the first figure are not stated in that extraction.
  • The plan identifies a 103.92 sq. mt. built-up mortgage area and records a second-floor area as handed over in the permit extraction. It also calls for tree planting, a perimeter greenery strip, a tot-lot to be maintained as greenery, rainwater harvesting, transformer space and a garbage house. These are plan conditions or listed provisions; the supplied evidence does not verify that they have been completed.
  • The drawing-derived material supplied does not provide a verified account of building footprint, number of flats per floor, lifts, stairs, internal circulation, or residential/common-area distribution. The approved built-up figures above are not carpet area or saleable area. Floor plans

4. Homes, configurations & floor plans

  • The RERA filing lists ten 2BHK units with a saleable area of 105.12 sq. mt. each; it records zero booked and ten available, with no as-of date for those counts. RERA unit table RERA unit details
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010105.12 sq. mt.63.6–63.7 sq. mt. (software-measured from drawings)39% (software-derived record)
  • The measured carpet-area range and loading are software measurements from the approved floor-plan drawing, not RERA-filed disclosures; the measurement record says they need review. The supplied example drawing labels two bedrooms, living/dining, kitchen, two toilets and two balconies. The RERA saleable area is a different measure from carpet area; the supplied measurement note explains that saleable area also includes the home’s share of common areas. RERA unit details Floor plans

5. Parking & vehicle circulation

  • The GHMC permit records Total Parking Area 199.2 (unit not specified in the extracted field) and a stilt level; the plan record also reports 1195.30 sq. mt. total proposed built-up area including parking. The building-plan conditions state that the approved cellar and stilt parking areas are to be used exclusively for vehicle parking and not partitioned or repurposed. No parking-space count, resident or visitor allocation, accessible spaces, unit-wise allocation, or parking-level layout detail is established by the supplied record.
  • The permit requires one entry and one exit with minimum width 4.5mts. and height clearance 5mts. No evidence supplied confirms the completed circulation arrangement, or that any drawn or sanctioned parking bay is exclusively allocated to a particular home.

6. Amenities, recreation & open spaces

  • The RERA amenities record lists fourteen categories; the entries shown with a progress value are at 0%. These records are declarations in the project data, not independent verification of delivery. RERA amenities
Green strip / tot-lot / park
Description / sizeGHMC plan calls for a tot-lot fenced and maintained as greenery and a perimeter greenery strip; no size supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress entry: 0%; completion not independently verified.
Community buildings
Description / sizeListed in the RERA amenities record; no description or size supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress: 0%; completion not independently verified.
Internal roads and footpaths
Description / sizeListed in the RERA amenities record; no design or size supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress: 0%; completion not independently verified.
Street lighting
Description / sizeListed in the RERA amenities record; no details supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress: 0%; completion not independently verified.
  • No separate clubhouse or indoor facility, or sports facility, is established in the supplied evidence. Site utilities are addressed below. RERA amenities

7. Utilities, building services & safety

  • The RERA amenities record marks water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, rainwater harvesting, energy management, and an electrical meter room/sub-station/receiving station as available; each corresponding progress entry is 0%. The record does not specify water source, storage capacity, treatment capacity, reuse arrangements, electrical supply capacity or backup capacity. RERA amenities
  • The GHMC plan conditions require a rainwater-harvesting percolation pit, transformer space, a garbage house and a generator as an alternate electricity source. It also specifies an underground static water storage tank of 25,000 lits. and a separate terrace tank of 25,000lits for residential buildings. These are approval-document requirements, not evidence that the facilities have been installed.
  • The permit’s fire and life-safety conditions include emergency lighting in corridors/common passages and staircases, a manually operated alarm system, hose reel and down corner, specified fire extinguishers, and a sprinkler system if basement area exceeds 200 Sq.mts. It requires an occupancy fire NOC from the Director (EV&DM) before OC. The supplied record does not confirm the equipment’s installation, the applicable basement-area threshold, or issuance of an OC or fire NOC.
  • The documents do not establish lift count or capacity, service lifts, CCTV, security arrangements, waste-segregation facilities, or accessible circulation.

8. Location, access & connectivity

  • The RERA-recorded location is Kapra, Kapra mandal, Medchal-Malkajgiri district, Telangana, PIN 500062; the building-plan record describes the site as Plot No. 211 Western Part in Maithri Enclave. The site boundary information records a 60 feet wide road to the south. The permit also refers to existing and proposed 18.00 MT wide roads. RERA record RERA filing

Supplied location measurements list the following distances: Location record

Nearby place / referenceDistance
Asha Hospital0.3 km
St. Theresa High School0.5 km
Union bank0.7 km
(unnamed mall)0.7 km
Sai sudhir degree college1.5 km
TGSRTC Bus Station, ECIL1.7 km
Neredmet railway station2.7 km
Outer Ring Road (nearest sampled interchange, approx)6.2 km

9. Developer & development status

  • The registered promoter is KSHETRA REALTY, recorded as a partnership with GSTIN 36ABAFK6656P1ZO. The partnership deed filed for RERA names four partners; an authorization document identifies Chandradeep Kanakamedala as authorized signatory. The RERA certificate lists the promoter office as Village Kukatpally, Mandal Kukatpally, Medchal-Malkajgiri, PIN 500072. RERA filing Corporate record
  • The Form-B affidavit dated 13th November, 2023 is a promoter declaration that the project would be completed by 16\\ October, 2026 and that 70% of amounts realized from allottees would be deposited in a separate account. The RERA project record separately gives the proposed completion date as 16/02/2027. No project-progress evidence in the supplied documents independently verifies construction status. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200007554, issued 10/01/2024
What the supplied record establishesRegistration of SURYA ENCLAVE; certificate states validity from 10/01/2024 to 16/10/2026.
GHMC building permit order
Identifier / dateApproval 3841/GHMC/LBN/2023-BP, dated 16 October, 2023
What the supplied record establishesConditional permit for one residential building on the stated Kapra site; records one stilt plus five upper floors and requires an OC before occupation.
GHMC plan / drawing record
Identifier / dateFile No. TS/042837/2023
What the supplied record establishesFiled building plan describing the residential apartment building, unit count, areas, and listed plan conditions.
Form-B affidavit-cum-declaration
Identifier / dateDated 13th November, 2023
What the supplied record establishesPromoter declaration for title basis, encumbrances, separate-account obligations and completion undertaking.
Registration documents
Identifier / datePartnership deed and partner resolution
What the supplied record establishesPartnership and authorization records filed for KSHETRA REALTY.

The supplied records do not include an occupancy certificate or completion certificate. The building-permit extraction also references LP.NO: 43/MP2/H/2004; the available evidence index does not establish a separate layout approval document.

Frequently asked questions

Is SURYA ENCLAVE registered with Telangana RERA?

Yes. SURYA ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02200007554; the registration status is New Project.

Who is the developer of SURYA ENCLAVE?

The promoter named in the RERA registration is KSHETRA REALTY.

Where is SURYA ENCLAVE located?

SURYA ENCLAVE is in Kapra Municipality, Kapra, Medchal-Malkajgiri, Telangana (500062).

When will SURYA ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 16/02/2027. This is the promoter's declaration, not a guarantee.

More projects in Kapra