Pt Constructions

P T CONSTRUCTIONS · Khammam · RERA P00800006516

PT CONSTRUCTIONS is a plotted development at Linga Gudem, Konijerla Mandal, Khammam District, Telangana. The registered promoter is P T CONSTRUCTIONS, recorded as a proprietorship. The RERA land record states an extent of 106482.57 sqmts, and the layout drawing shows 206 open residential plots, with sizes from 199.84 sqm (239.0 sq yd) to 1427.12 sqm (1706.8 sq yd); building floors are not applicable to the plotted layout. Its TG-RERA registration is P00800006516, issued 07/07/2023, and the RERA project-information record gives a proposed completion date of 30/11/2026.

More from P T Constructions · 2 projects →

01What we found

Period endedTG-RERA registration ran to 27 Mar 2026 - check its extension on TG-RERA
27documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Linga Gudem, Konijerla, Khammam · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project namePT CONSTRUCTIONS RERA record
Project type / statusPlotted development; RERA record labels status “New Project” RERA record RERA filing
Registered phase or portionNo phase name or phase-wise boundary is separately disclosed; registration identifies Survey Nos. 76/PART and 77/PART
TG-RERA registrationP00800006516, issued 07/07/2023; certificate states validity through 27/03/2026, subject to extension by the Authority
Registered promoterP T CONSTRUCTIONS, recorded as a proprietorship RERA filing
RERA statusThe supplied certificate records registration under section 5. No extension is recorded in the supplied certificate

Land and geographic identity

ItemProject record
LocalityLinga Gudem; RERA locality is recorded as “LINGA GUDEM, KONIJERLA” RERA record RERA filing
Revenue villageLinga Gudem is used in the RERA record; the approval and drawing also refer to Yathamkuntla Revenue Village. The supplied records therefore identify both village descriptions RERA record
Mandal / district / PINKonijerla Mandal, Khammam District, Telangana; PIN 507305 in the project record RERA record
Survey numbers76/PART and 77/PART
Registered site extentRERA land record: 106482.57 sqmts RERA filing
Drawing areaApproved layout drawing states 106481.70 SQ.MT.
Boundaries in RERA recordEast: OTHERS LAND; West: OTHERS LAND; North: WIDE ROAD -; South: OTHERS LAND RERA filing

Development identity

ItemProject record
Principal layout approvalTentative Layout Plan approval 262522/LP/GP/202463/0001/2023, approved 27-03-2023; approving authority shown as SUDA, delegated to Linga Gudem Grampanchayat
Drawing / permit identifiersLayout number 01/2020/W/SUDA-KMM and permit number TS/012975/2023 appear on the layout drawing
Approved development formResidential open-plot layout; 206 plots
Approved built-up area0.00 proposed built-up area, including and excluding parking, in the layout drawing; this is a plotted layout, not a building scheme
Buildings, floors and parking levelsNot applicable to the plotted layout or not disclosed as building-level details in the supplied records

Offering and status

ItemProject record
Unit typeOpen residential plots
Plot count and sizesThe drawing-derived schedule records 206 plots, from 199.84 sqm (239.0 sq yd) to 1427.12 sqm (1706.8 sq yd); software-read from the drawing and should be checked against it Layout record
Booked / availableNot disclosed in the supplied evidence RERA filing
Development progressNo reliable project-specific physical progress percentage is supplied; the RERA amenity checklist records 0% for listed items, which is not independent site verification RERA amenities
Completion datesForm B undertaking states completion by 27/03/2026. RERA project information separately records proposed completion as 30/11/2026 RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is supplied; the project is a plotted layout Document index

2. The project story

PT CONSTRUCTIONS is registered with TG-RERA as a plotted development at Linga Gudem, Konijerla Mandal, Khammam District. The registered land is identified as Survey Nos. 76/PART and 77/PART. The records describe a residential open-plot layout, not a multi-storey housing project: the layout drawing shows 206 plots and no proposed built-up area. RERA record

The approved layout drawing allocates land to plots, roads, parks/open space, social infrastructure and utilities. The tentative approval requires infrastructure and amenity works and a subsequent final layout plan; it also records that work-completion certification by a licensed technical person is to be submitted for final layout approval. These are approval conditions, not evidence that the works have been completed.

The supplied material does not establish current on-site construction or infrastructure completion independently. The RERA amenity checklist shows 0% progress against its listed items, but it does not provide a verified site inspection or dated progress narrative. RERA amenities

3. Master plan, architecture & building design

The project is planned as an open-plot residential layout. The layout drawing states a total and net layout area of 106481.70 SQ.MT. and records 206 plots. No residential building footprint, floor configuration, tower arrangement or building-level approved built-up area is shown; the drawing records 0.00 proposed built-up area, including and excluding parking.

The drawing’s land-use schedule records:

Layout useArea shownShare shown
Plotted area62636.1758.82%
Roads30506.9828.65%
Organized open space / park9607.229.02%
Social infrastructure2662.942.50%
Utility area1068.381.00%
Amenity area0.000.00%
Common parking area0.000.00%

These figures are from the authority-stamped layout drawing. Its road-width labels include 9.14mt, 12.19mt and 18.28 mt.

The separate tentative-layout approval describes the same broad land uses and identifies Ac 2.854 cents 13814.41 Sq.Yds as mortgage area, comprising listed plots held as security for layout development conditions. The approval requires infrastructure work and later final layout approval; it does not establish completion of those works.

4. Homes, configurations & floor plans

This project offers plots rather than apartments. The authority-stamped layout drawing shows 206 plots. Software extraction of the plot schedule identifies the following size bands; the extraction is not a substitute for checking the original drawing and plot schedule. Layout record

Plot size bandPlot count
200–250 sq yd1
250–300 sq yd9
300–400 sq yd170
400–500 sq yd20
500–1000 sq yd5
1000+ sq yd1

The software-read plot-size range is 199.84 sqm to 1427.12 sqm; the median is 285.18 sqm. These are drawing-derived measurements, not RERA-filed apartment saleable or carpet areas. Layout record

No booked or available plot inventory is supplied. The supplied floor-plan review does not provide measured home areas: one drawing is pending scan review, and the remaining drawing record is not a flat plan. Floor plans

5. Parking & vehicle circulation

The layout drawing records 0 proposed parkings and 0.00 common parking area. No resident, visitor, accessible or vehicle-specific parking allocation, parking allotment arrangement, or separate parking facility is established in the supplied evidence.

The layout provides road areas and road-width labels of 9.14mt, 12.19mt and 18.28 mt. The tentative approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site. These are recorded layout provisions and conditions; the evidence does not verify their on-site implementation.

6. Amenities, recreation & open spaces

The drawing and tentative approval identify the following layout-level provisions. The RERA checklist records 0% for listed progress items; no independent completion verification is supplied. RERA amenities

Park / organized open space
Description / size9607.22; 9.02% of layout area in the drawing
Declared progress / verified statusRERA checklist records 0% for aggregate recreational open space; completion not independently verified RERA amenities
Social infrastructure
Description / size2662.94; 2.50% of layout area; approval describes possible uses including pharmacy, clinic, school, play school, creche, dispensary and convenient shops
Declared progress / verified statusNot shown as delivered; checklist records 0% for community buildings RERA amenities
Utilities land
Description / size1068.38; 1.00% of layout area; tentative approval lists water reservoir, septic tank / STP, electric transformer and solid-waste management among utility purposes
Declared progress / verified statusChecklist records 0% for relevant service items; completion not independently verified RERA amenities
Tot-lot
Description / sizeNamed on the layout drawing; no size or capacity stated
Declared progress / verified statusCompletion not independently verified
Roads
Description / size30506.98; 28.65% of layout area
Declared progress / verified statusChecklist records 0% for internal roads and footpaths; completion not independently verified RERA amenities

7. Utilities, building services & safety

The tentative approval lists proposed layout works including roads, drains and nala channelization, greenery, rainwater-harvesting pits, street lighting, sewerage disposal and protected water supply. It also calls for an overhead tank or sump and a septic tank, as applicable, and harvesting pits. These are approval conditions and provisions, not evidence of completed services or operating capacities.

The RERA amenity checklist marks “YES” for water supply, sewerage (chamber, lines, septic tank, STP), storm-water drains, street lighting, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station, while recording 0% progress. It does not supply capacities, design details or evidence of commissioning. Fire protection, energy management and several other listed items have no “YES” value in the supplied checklist. RERA amenities

No verified information is supplied on water source or storage capacity, sewerage treatment capacity or reuse, power-backup capacity, EV charging, waste-segregation arrangements, security systems or accessibility features. The project is a plotted layout; building-level lifts and fire-escape arrangements are not documented. RERA amenities Document index

8. Location, access & connectivity

The registered project location is Linga Gudem, Konijerla Mandal, Khammam District, Telangana, PIN 507305; the project record gives the locality as LINGA GUDEM, KONIJERLA. The layout records Survey Nos. 76/PART and 77/PART and boundaries of other land to the east, west and south, with a wide road to the north. RERA record RERA filing RERA filing

The supplied location record contains one sampled connectivity point: the nearest sampled Outer Ring Road interchange is listed at approximately 172.3 km. No other approach-road distances, public-transport details or verified travel times are supplied. Location record

9. Developer & development status

The registered promoter is P T CONSTRUCTIONS, recorded as a Proprietorship. The RERA record names KURUVELLA PRAVEEN KUMAR as authorized signatory. The supplied evidence does not establish a separate company registration identifier or a project-specific official website/contact channel. RERA filing Parties record

The promoter’s Form B affidavit states that the project would be completed by 27/03/2026. The RERA project-information record lists a proposed completion date of 30/11/2026. The registration certificate states validity through 27/03/2026 and notes that extension would require Authority action in accordance with the Act and Rules; no extension is recorded in the supplied certificate. RERA filing

The RERA amenity checklist records 0% progress for its listed items. No independently verified construction or site-completion status is supplied. RERA amenities

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP00800006516; issued 07/07/2023; valid through 27/03/2026 as stated in the certificate
What the supplied record establishesRegistration for PT CONSTRUCTIONS, covering Survey Nos. 76/PART and 77/PART
Tentative Layout Plan approval
Identifier / date262522/LP/GP/202463/0001/2023; 27-03-2023; SUDA, delegated to Linga Gudem Grampanchayat
What the supplied record establishesApproval for a tentative layout of 206 plots, subject to the listed conditions and later final layout approval
Authority-stamped layout drawing
Identifier / dateLayout 01/2020/W/SUDA-KMM; permit TS/012975/2023; drawing stamp dated 17-02-2023
What the supplied record establishesOpen-plot layout drawing and land-use schedule
Form B promoter declaration
Identifier / dateProject completion undertaking: 27/03/2026
What the supplied record establishesPromoter declaration concerning title, encumbrances, project funds, approvals and completion
Other filed plan
Identifier / dateDocument 323533
What the supplied record establishesA proposed residential open-plot layout plan; the extracted text does not provide an approval or sanction

The supplied records include no occupancy or completion certificate and no final layout approval. The tentative approval states that the applicant must complete development works, submit a licensed technical person’s work-completion certificate and obtain the final layout plan.

Other registrations of Pt Constructions

Frequently asked questions

Is PT CONSTRUCTIONS registered with Telangana RERA?

Yes. PT CONSTRUCTIONS is registered with the Telangana Real Estate Regulatory Authority as P00800006516; the registration status is New Project.

Who is the developer of PT CONSTRUCTIONS?

The promoter named in the RERA registration is P T CONSTRUCTIONS.

Where is PT CONSTRUCTIONS located?

PT CONSTRUCTIONS is in LINGA GUDEM, KONIJERLA, Linga Gudem, Konijerla Mandal, Khammam, Telangana (507305).

When will PT CONSTRUCTIONS be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.